CN107123279A - Intersection signal timing schemes evaluation method under saturation state - Google Patents

Intersection signal timing schemes evaluation method under saturation state Download PDF

Info

Publication number
CN107123279A
CN107123279A CN201611240684.8A CN201611240684A CN107123279A CN 107123279 A CN107123279 A CN 107123279A CN 201611240684 A CN201611240684 A CN 201611240684A CN 107123279 A CN107123279 A CN 107123279A
Authority
CN
China
Prior art keywords
optimization
phase
evaluation index
intersection
signal time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611240684.8A
Other languages
Chinese (zh)
Other versions
CN107123279B (en
Inventor
王琳
宋志洪
茹渑博
聂昌成
陈杰
吕红振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Keli Information Industry Co Ltd
Original Assignee
Anhui Keli Information Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Keli Information Industry Co Ltd filed Critical Anhui Keli Information Industry Co Ltd
Priority to CN201611240684.8A priority Critical patent/CN107123279B/en
Publication of CN107123279A publication Critical patent/CN107123279A/en
Application granted granted Critical
Publication of CN107123279B publication Critical patent/CN107123279B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08GTRAFFIC CONTROL SYSTEMS
    • G08G1/00Traffic control systems for road vehicles
    • G08G1/07Controlling traffic signals
    • G08G1/08Controlling traffic signals according to detected number or speed of vehicles

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Traffic Control Systems (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The present invention provides intersection signal timing schemes evaluation method under a kind of saturation state, belongs to technical field of traffic control, and this method includes obtaining the measured value of evaluation index before and after intersection signal timing scheme optimization under saturation state;According to the measured value of evaluation index before and after the timing scheme optimization, the difference before and after evaluation index optimization in each phase in intersection is calculated;According to the difference before and after evaluation index optimization in each phase in the intersection, the optimization direction of signal time distributing conception is evaluated.The present invention passes through the measured value according to the evaluation index before and after signal time distributing conception optimization, calculate the difference before and after the evaluation index optimization of each entrance driveway difference flow direction, and respectively flow to intersection corresponding with the progress of signal phase scheme, so as to obtain the difference of evaluation index under out of phase, the optimization direction of each phase can be explicitly pointed out, obtain optimizing step-length, signal time distributing conception is optimized according to the optimization direction of each phase.

Description

Intersection signal timing schemes evaluation method under saturation state
Technical field
The present invention relates to technical field of traffic control, intersection signal timing scheme is commented under more particularly to a kind of saturation state Valency method.
Background technology
In city, intersection is the throat of urban transportation, and signal timing dial control is used as the one of Intersection Controlling Fashion Kind, it is widely used in all kinds of intersections in city.But, signal time distributing conception often occurs that some are asked in practical application Topic, causes intersection traffic efficiency not high, it is therefore desirable to evaluate signal time distributing conception.
But, there is obvious shortcoming in existing signal time distributing conception evaluation method:One is, at present for intersection signal The evaluation of timing scheme works, which is focused primarily upon, provides the evaluation result after signal time distributing conception is implemented, and can not but provide signal and match somebody with somebody When scheme optimization direction.Two are, the index selected in existing signal time distributing conception evaluation method is excessive, there is evaluation index Excessively, evaluation index intersects and the problems such as important indicator can not be protruded.Three are, existing signal time distributing conception evaluation side Method does not account for the traffic behavior of intersection, and evaluation result is inaccurate.
The content of the invention
It is an object of the invention to provide intersection signal timing schemes evaluation method under a kind of saturation state, to intersecting Mouth signal time distributing conception provides the optimization direction of signal time distributing conception while evaluation.
To realize object above, the technical solution adopted by the present invention is:Intersection signal under a kind of saturation state is provided to match somebody with somebody When schemes evaluation method, this method includes:
Obtain the measured value of evaluation index before and after intersection signal timing scheme optimization under saturation state;
According to the measured value of evaluation index before and after the timing scheme optimization, evaluation index in each phase in intersection is calculated excellent Difference before and after changing;
According to the difference before and after evaluation index optimization in each phase in the intersection, the optimization side of signal time distributing conception is evaluated To.
Compared with prior art, there is following technique effect in the present invention:The present invention according to signal time distributing conception by optimizing The measured value of front and rear evaluation index, calculates the difference before and after the evaluation index optimization of each entrance driveway difference flow direction, and will intersect Each flow direction of mouth is corresponding with the progress of signal phase scheme, so as to obtain the difference of evaluation index under out of phase, can explicitly point out each The optimization direction of individual phase, obtains optimizing step-length, signal time distributing conception is optimized according to the optimization direction of each phase.
Brief description of the drawings
Fig. 1 is the schematic flow sheet of signal time distributing conception evaluation method under saturation state in one embodiment of the invention;
Fig. 2 is the schematic flow sheet of the fine division step of step S2 in one embodiment of the invention;
Fig. 3 is the schematic flow sheet for evaluating signal time distributing conception optimization direction in one embodiment of the invention;
Fig. 4 is another schematic flow sheet for evaluating signal time distributing conception optimization direction in one embodiment of the invention;
Fig. 5 is the flow signal of signal time distributing conception evaluation method under another saturation state in one embodiment of the invention Figure;
Fig. 6 is the flow signal of signal time distributing conception evaluation method under another saturation state in one embodiment of the invention Figure;
Fig. 7 is the flow signal of signal time distributing conception evaluation method under another saturation state in one embodiment of the invention Figure;
Fig. 8 is that the overall flow of signal time distributing conception evaluation method under another saturation state in one embodiment of the invention is shown It is intended to.
Embodiment
With reference to Fig. 1 to Fig. 8, the present invention is described in further detail.
As shown in figure 1, present embodiments providing intersection signal timing schemes evaluation method, the party under a kind of saturation state Method includes following step S1 to S3:
S1, the measured value for obtaining evaluation index before and after intersection signal timing scheme optimization under saturation state;
Evaluate and refer in S2, the measured value according to evaluation index before and after the timing scheme optimization, the calculating each phase in intersection Difference before and after mark optimization;
S3, according in each phase in the intersection evaluation index optimize before and after difference, evaluate signal time distributing conception it is excellent Change direction.
Signal time distributing conception evaluation method in the present embodiment passes through the measured value according to the evaluation index before and after optimization, knot The signal phase information of intersection is closed, the difference of evaluation index in out of phase is obtained, so as to be the optimization of signal time distributing conception There is provided optimization direction.
Specifically, as shown in Fig. 2 the step S2 in the present embodiment specifically includes following fine division step S21 to S22:
S21, the measured value according to evaluation index before and after signal time distributing conception optimization, calculate each entrance driveway in intersection not cocurrent flow Difference before and after upward evaluation index optimization;
S22, based on vehicle clearance scheme in signal time distributing conception, by each of the flow direction of each entrance driveway in intersection and intersection Phase is corresponded to, and obtains the difference before and after evaluation index optimization in each phase.
Wherein, signal time distributing conception evaluation index here is chosen from traffic parameter, the evaluation index in the present embodiment Preferably queue length or the magnitude of traffic flow or occupancy.
Specifically, the calculation of the difference in each phase in above-mentioned steps S22 before and after evaluation index optimization, specifically For:
Wherein, Δ (r)iPhase i evaluation index difference, Δ (r) before and after optimizing for signal time distributing conceptionijFor signal timing dial J evaluation index difference is flowed to before and after scheme optimization in phase i, n is the flow direction sum that phase i is included.
Such as, if exemplified by selecting queue length as the evaluation index of signal time distributing conception, signal time distributing conception is excellent The mathematic interpolation formula of each phase queue length in intersection is before and after changing:Δ(q)iFor signal timing dial Phase i queue length difference, Δ (q) before and after scheme optimizationijJ row is flowed to before and after optimizing for signal time distributing conception in phase i Team's length difference.Wherein, Δ (q) is the difference of queue length before and after signal time distributing conception optimizes, Δ (q)=qafter-qbefore, qafterQueue length after optimizing for signal time distributing conception, qbeforeQueue length before optimizing for signal time distributing conception.
Specifically, as shown in figure 3, evaluating the optimization direction of signal time distributing conception in step S3 in above-described embodiment, tool Body comprises the following steps S31 to S34:
S31, judge whether the number for the phase that the difference before and after the optimization of evaluation index in each phase is more than zero is more than 1;
If the number that difference is more than zero phase before and after time headway optimization in S32, each phase obtains institute more than 1 State the optimization number of times of signal time distributing conception currently;
S33, judge the optimization number of times of the signal time distributing conception currently whether be more than preset times u1;
By u1 values it is 3 preferably specific stream in the present embodiment it should be noted that u1 here is constant Journey refers to Fig. 3.
If S34, no more than preset times u1, the difference before and after being optimized according to evaluation index in each phase is evaluated The optimization direction of signal time distributing conception.
If it should be noted that the number for the phase that difference is more than zero is little before and after queue length optimization in each phase It is more than preset times u1 in 1 or the current optimization number of times of signal time distributing conception, then without feedback optimized, evaluation procedure knot Beam.
Here it is long to the queuing before and after how being optimized according to signal time distributing conception to select queue length as evaluation index Illustrated exemplified by degree difference, the optimization direction for providing signal time distributing conception:If the queue length of certain phase before and after optimization Difference is more than zero, then being fed back to signal timing optimization program increases the instruction of the phase green time, conversely, then without anti- Feedback.
As shown in figure 4, present embodiments providing intersection signal timing schemes evaluation method, the party under another saturation state Method is on the basis of above-described embodiment disclosure, using queue length and intersection delay as evaluation index, now, upper State on the basis of embodiment, step S3 also includes following fine division step S35 to S38:
When S35, the number for the phase for being more than zero in the front and rear difference of evaluation index optimization in judging each phase are equal to 1, sentence Break off a friendship prong mean delay Δ (d)AlwaysValue whether be more than zero;
If S36, intersection mean delay Δ (d)AlwaysValue be more than zero, then obtain current excellent of the signal time distributing conception Change number of times;
S37, judge signal time distributing conception optimization number of times whether be more than preset times u2;
If S38, no more than preset times u2, the difference before and after being optimized according to evaluation index in each phase is evaluated The optimization direction of signal time distributing conception.
It should be noted that preset times u2 here is constant, preferably value is 3 in the present embodiment.
If in addition, difference is less than zero before and after the optimization of intersection total delay in each phase or signal time distributing conception is current Optimization number of times be more than preset times u1, then without feedback optimized, evaluation procedure terminates.
Specifically, intersection mean delay difference DELTA (d) hereAlwaysCalculation be:Wherein, Δ (d)AlwaysThe mean delay of intersection is poor before and after optimizing for signal time distributing conception Value, Δ (d)ijThe spacing of intersection the i-th entrance driveway jth flow direction is delayed difference before and after optimizing for signal time distributing conception, and M is to intersect The number of mouth entrance driveway, N is the quantity that flows to of each entrance driveway in intersection, and n is the flow direction sum that phase i is included.Wherein, Δ (d)=dafter-dbefore, Δ (d) is the difference of intersection delay before and after signal time distributing conception optimizes, dafterFor signal timing dial Intersection delay after scheme optimization, dbeforeIntersection delay before optimizing for signal time distributing conception.
The changing value of intersection delay is anti-as evaluation result before and after the present embodiment optimizes by using signal time distributing conception The auxiliary judgment of feedback, until the queue length difference of all phases is respectively less than zero in signal time distributing conception, or reaches iteration time Number, then feedback termination.So avoid to optimize situation about judging by accident during feedback using single evaluation index, make pair Signal time distributing conception optimization feedback more science is accurate, improves the accuracy that signal time distributing conception optimization direction is evaluated, specifically Flow referring to Fig. 5.
As shown in fig. 6, also including step S39 after above-mentioned steps S34 and step S38:
S39, the optimization direction according to signal time distributing conception, perform step S1 after being optimized to signal time distributing conception.
The present embodiment is carried out by being optimized in real time to signal time distributing conception, and to the signal time distributing conception after optimization Optimize direction to evaluate, so circulation feedback is so as to finally give optimal signal time distributing conception.
As shown in Fig. 7 to 8, after above-mentioned steps S3, in addition to step S4:
S4, according to intersection mean delay, the whole structure of the signal time distributing conception after optimization is evaluated.
Here the calculation of intersection mean delay is:Wherein,For intersection Mean delay,The spacing delay flowed to for intersection the i-th entrance driveway jth.
Wherein, the whole structure of the signal time distributing conception after optimization is evaluated, specifically includes following steps:
According to mean delay of each entrance driveway in intersection in each flow direction, the mean delay of intersection is calculated;
Scope where searching the mean delay of the intersection in default effect assessment standard, it is determined that after optimization The whole structure of signal time distributing conception.
Default effect assessment standard at this is as shown in table 1:
Table 1
Specifically, in the present embodiment after being optimized to signal time distributing conception, using intersection mean delay to optimization The whole structure of signal time distributing conception afterwards is evaluated, because intersection delay can reflect be obstructed feelings of the vehicle in intersection Condition, concentrated expression goes out the service level of intersection.Evaluated by the whole structure to the signal time distributing conception after optimization, energy Intuitively judge the effect of optimization of signal time distributing conception.

Claims (9)

1. intersection signal timing schemes evaluation method under a kind of saturation state, it is characterised in that comprise the following steps:
S1, the measured value for obtaining evaluation index before and after intersection signal timing scheme optimization under saturation state;
S2, the measured value according to evaluation index before and after the timing scheme optimization, calculate evaluation index in each phase in intersection excellent Difference before and after changing;
S3, according in each phase in the intersection evaluation index optimize before and after difference, evaluate signal time distributing conception optimization side To.
2. the method as described in claim 1, it is characterised in that the step S2 is specifically included:
S21, the measured value according to evaluation index before and after signal time distributing conception optimization, are calculated in each entrance driveway difference flow direction in intersection Evaluation index optimization before and after difference;
S22, based on vehicle clearance scheme in signal time distributing conception, by the flow direction of each entrance driveway in intersection and each phase of intersection Corresponded to, obtain the difference before and after evaluation index optimization in each phase.
3. method as claimed in claim 1 or 2, it is characterised in that described evaluation index is queue length or the magnitude of traffic flow Or occupancy.
4. method as claimed in claim 3, it is characterised in that in each phase in the step S22 before evaluation index optimization The calculation of difference afterwards, be specially:
Wherein, △ (r)iPhase i evaluation index difference, △ (r) before and after optimizing for signal time distributing conceptionijFor signal time distributing conception J evaluation index difference is flowed to before and after optimization in phase i, n is the flow direction sum that phase i is included.
5. method as claimed in claim 3, it is characterised in that the optimization side of signal time distributing conception is evaluated in the step S3 To specifically including:
S31, judge whether the number for the phase that the difference before and after the optimization of evaluation index in each phase is more than zero is more than 1;
If the number that difference is more than zero phase before and after time headway optimization in S32, each phase obtains the letter more than 1 Number optimization number of times of timing scheme currently;
S33, judge the optimization number of times of the signal time distributing conception currently whether be more than preset times u1;
If S34, no more than preset times u1, the difference before and after being optimized according to evaluation index in each phase evaluates signal The optimization direction of timing scheme.
6. method as claimed in claim 5, it is characterised in that described evaluation index also includes intersection delay, the step Rapid S3 also includes:
When S35, the number for the phase for being more than zero in the front and rear difference of evaluation index optimization in judging each phase are equal to 1, judge to hand over Prong mean delay △ (d)AlwaysValue whether be more than zero;
If S36, intersection mean delay △ (d)AlwaysValue be more than zero, then obtain the optimization of the signal time distributing conception currently time Number;
S37, judge signal time distributing conception optimization number of times whether be more than preset times u2;
If S38, no more than preset times u2, the difference before and after being optimized according to evaluation index in each phase evaluates signal The optimization direction of timing scheme.
7. the method as described in claim 5 or 6, it is characterised in that also include after the step S34 and step S38:
S39, the optimization direction according to signal time distributing conception, perform step S1 after being optimized to signal time distributing conception.
8. method as claimed in claim 7, it is characterised in that after the step S3, in addition to:
S4, according to intersection mean delay, the whole structure of the signal time distributing conception after optimization is evaluated.
9. method as claimed in claim 8, it is characterised in that the whole structure of the signal time distributing conception after described pair of optimization enters Row is evaluated, and is specifically included:
S41, the mean delay according to each entrance driveway in intersection in each flow direction, calculate the mean delay of intersection;
S42, search the mean delay of the intersection in default effect assessment standard where scope, it is determined that optimization after The whole structure of signal time distributing conception.
CN201611240684.8A 2016-12-28 2016-12-28 Intersection signal timing scheme evaluation method in saturated state Active CN107123279B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611240684.8A CN107123279B (en) 2016-12-28 2016-12-28 Intersection signal timing scheme evaluation method in saturated state

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611240684.8A CN107123279B (en) 2016-12-28 2016-12-28 Intersection signal timing scheme evaluation method in saturated state

Publications (2)

Publication Number Publication Date
CN107123279A true CN107123279A (en) 2017-09-01
CN107123279B CN107123279B (en) 2020-04-10

Family

ID=59717162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611240684.8A Active CN107123279B (en) 2016-12-28 2016-12-28 Intersection signal timing scheme evaluation method in saturated state

Country Status (1)

Country Link
CN (1) CN107123279B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107862878A (en) * 2017-11-14 2018-03-30 浙江浙大中控信息技术有限公司 Single Intersection self-adaptation control method based on phasing scheme decision-making

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002150480A (en) * 2000-11-15 2002-05-24 Yazaki Corp Traffic light control system
JP2006119753A (en) * 2004-10-19 2006-05-11 Sumitomo Electric Ind Ltd Traffic signal control apparatus
CN102819958A (en) * 2012-08-27 2012-12-12 上海海事大学 Cellular simulation method for control of urban road motor vehicle traffic signals
CN104008659A (en) * 2014-06-12 2014-08-27 北京易华录信息技术股份有限公司 System and method capable of accurately monitoring control effects of intersection signal controller
CN105279982A (en) * 2015-11-13 2016-01-27 北京航空航天大学 Single intersection dynamic traffic signal control method based on data driving
CN105632177A (en) * 2016-01-21 2016-06-01 浙江大学 Dynamic traffic demand-oriented intersection operation efficiency change rate calculating method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002150480A (en) * 2000-11-15 2002-05-24 Yazaki Corp Traffic light control system
JP2006119753A (en) * 2004-10-19 2006-05-11 Sumitomo Electric Ind Ltd Traffic signal control apparatus
CN102819958A (en) * 2012-08-27 2012-12-12 上海海事大学 Cellular simulation method for control of urban road motor vehicle traffic signals
CN104008659A (en) * 2014-06-12 2014-08-27 北京易华录信息技术股份有限公司 System and method capable of accurately monitoring control effects of intersection signal controller
CN105279982A (en) * 2015-11-13 2016-01-27 北京航空航天大学 Single intersection dynamic traffic signal control method based on data driving
CN105632177A (en) * 2016-01-21 2016-06-01 浙江大学 Dynamic traffic demand-oriented intersection operation efficiency change rate calculating method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107862878A (en) * 2017-11-14 2018-03-30 浙江浙大中控信息技术有限公司 Single Intersection self-adaptation control method based on phasing scheme decision-making
CN107862878B (en) * 2017-11-14 2019-11-29 浙江浙大中控信息技术有限公司 Single Intersection self-adaptation control method based on phasing scheme decision

Also Published As

Publication number Publication date
CN107123279B (en) 2020-04-10

Similar Documents

Publication Publication Date Title
CN106530767B (en) Main signal coordination optimizing method based on follow the bus method
CN106683441A (en) Intersection signal timing plan evaluating method
CN103258436B (en) Method for determining length of variable guide lane for signal control intersection approach
CN105654741B (en) A kind of upstream region signal Optimization about control parameter method towards "bottleneck"
Christofa et al. Arterial queue spillback detection and signal control based on connected vehicle technology
CN106683440B (en) Single-point intersection signal timing schemes evaluation method under unsaturated state
CN105160894B (en) The optimization method of At-grade intersection signal control based on vehicle queue length
CN104615897B (en) Road section travel time estimation method based on low-frequency GPS data
CN103700273A (en) Signal timing optimization method based on variable guide lane
Praticò et al. Transport and traffic management by micro simulation models: operational use and performance of roundabouts
CN108831166B (en) Intersection can be changed guided vehicle road function change method under bus or train route cooperative surroundings
CN105047057B (en) A kind of high through street Macro-traffic Flow emulation mode of multi-user's multilane
CN110648536B (en) Variable lane signal control method based on multiple traffic indexes
CN108805959A (en) A kind of image labeling method and system
CN104166344B (en) Natural gas tube network operation regulation and control method based on adaptive Dynamic Programming
CN105390004B (en) A kind of paired intersection time-space distribution distribution method of the short track influence of left-hand rotation
CN109191847A (en) Adaptive Arterial Coordination Control method and system based on city bayonet data
CN105513366B (en) A kind of intersection traffic behavior decision method
CN107123279A (en) Intersection signal timing schemes evaluation method under saturation state
CN109285361A (en) The scheme transition method changed for urban trunk road coordination control direction
CN111127881B (en) Area anti-overflow traffic signal control game method and system
CN106652480A (en) Intersection maximum queuing length calculation method based on microwave and terrestrial magnetism data
Lan New optimal cycle length formulation for pretimed signals at isolated intersections
CN106408957A (en) Intersection phase time distribution method based on pass demand balance
CN107730927A (en) Signal Optimal Control System based on Internet traffic big data

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant