CN107117469B - It is a kind of can fast lifting with unload ore mining electric locomotive transport wagon box - Google Patents

It is a kind of can fast lifting with unload ore mining electric locomotive transport wagon box Download PDF

Info

Publication number
CN107117469B
CN107117469B CN201710460591.4A CN201710460591A CN107117469B CN 107117469 B CN107117469 B CN 107117469B CN 201710460591 A CN201710460591 A CN 201710460591A CN 107117469 B CN107117469 B CN 107117469B
Authority
CN
China
Prior art keywords
welding
plate
block
wagon box
baffle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710460591.4A
Other languages
Chinese (zh)
Other versions
CN107117469A (en
Inventor
林阳辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Ma Keng Mining Industry Ltd Co
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710460591.4A priority Critical patent/CN107117469B/en
Publication of CN107117469A publication Critical patent/CN107117469A/en
Application granted granted Critical
Publication of CN107117469B publication Critical patent/CN107117469B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G67/00Loading or unloading vehicles
    • B65G67/02Loading or unloading land vehicles

Landscapes

  • Engineering & Computer Science (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Auxiliary Devices For And Details Of Packaging Control (AREA)

Abstract

The present invention relates to a kind of mining electric locomotive, more particularly to it is a kind of being capable of fast lifting and the mining electric locomotive transport wagon box that unloads ore.The technical problem to be solved in the present invention is to provide promoted the rate of loading and discharge rate are fast, work efficiency is high, discharge process can discharging it is clean it is a kind of can fast lifting with the mining electric locomotive for unloading ore transport wagon box.In order to solve the above-mentioned technical problem, the present invention provides it is such a can fast lifting with unload ore mining electric locomotive transport wagon box, include packaging wagon box, wheel, first baffle, lever, the first support base, first rotating shaft, the first spill spin block, second baffle, the first screw rod, pressing plate, first nut etc.;The left and right sides and front and rear sides are equipped with wheel on the downside of packaging wagon box.Invention achieves promoted the rate of loading and discharge rate are fast, work efficiency is high, discharge process being capable of the clean effect of discharging.

Description

It is a kind of can fast lifting with unload ore mining electric locomotive transport wagon box
Technical field
The present invention relates to a kind of mining electric locomotive, more particularly to it is a kind of being capable of fast lifting and the mine motor that unloads ore Vehicle transports wagon box.
Background technique
Mining electric locomotive is mainly used for the long-distance transportation on underground transportation main entry and ground.It is equivalent in railway transportation Electric locomotive head draws and is walked in orbit by the train that mine car or people's vehicle form, and completes to coal, spoil, material, sets The electric locomotive of standby, personnel transports is known as mining electric locomotive.
At present when the mineral aggregate to mining electric locomotive wagon box promotes loading and discharging, most of is all using manually by mineral aggregate Serve in wagon box, then after transport using manually being unloaded, but have the drawback that in this way promoted the rate of loading with Discharge rate is all very slow, and efficiency is very low, and during discharging, can not accomplish that discharging is clean.
Therefore need to research and develop a kind of the promotions rate of loading and discharge rate fastly, work efficiency is high, discharge process being capable of discharging It is clean can fast lifting overcome with the mining electric locomotive transport wagon box that unloads ore at present to mining electric locomotive wagon box into Row material promoted load and exist when discharging promoted the rate of loading and discharge rate are relatively slow, working efficiency is very low, discharge process can not The clean disadvantage of discharging.
Summary of the invention
(1)Technical problems to be solved
The present invention carries out existing to be promoted when material promotes loading and discharging loading to mining electric locomotive wagon box at present in order to overcome Speed and discharge rate are relatively slow, working efficiency is very low, discharge process can not the clean disadvantage of discharging, the invention solves technology Problem be to provide promoted the rate of loading and discharge rate are fast, work efficiency is high, discharge process can the clean one kind of discharging can Fast lifting and the mining electric locomotive transport wagon box for unloading ore.
(2)Technical solution
In order to solve the above-mentioned technical problems, the present invention provides it is such a can fast lifting with unload the mining of ore Electric haulage wagon box includes packaging wagon box, wheel, first baffle, lever, the first support base, first rotating shaft, the first rotation Block, second baffle, the first screw rod, pressing plate, the first nut, bottom plate, support rod, the first mounting rod, the second shaft, driving wheel, Two mounting rods, third shaft, runner, the second support base, the 4th shaft, directive wheel and conveyer belt, packaging wagon box downside left and right two Side and front and rear sides are equipped with wheel, and packaging wagon box upper left side sum aggregate entrucking bucket front and rear sides are equipped with first by welding Baffle, the front and rear sides on right side are equipped with lever by welding on packaging wagon box, and packaging wagon box right side central passes through weldering The mode connect is equipped with the first support base, is rotatably connected with first rotating shaft on front side of the first support base, is connected in first rotating shaft First spill spin block, the first spill spin block upper end are equipped with second baffle by welding, and second baffle blocks between lever Vacancy, front side is equipped with the first screw rod by welding above the lever of front side, is connected with pressing plate on the first screw rod, on pressing plate It is provided with through-hole, pressing plate is connected on the first screw rod by through-hole, the first nut is screwed on the first screw rod, with first in the first nut Screw rod cooperation, the first nut are located at pressing plate right, and pressing plate blocks second baffle, and packaging wagon box left is equipped with bottom plate, and bottom plate is upper right Side is equipped with support rod by welding, and post upper is equipped with the first mounting rod, the first peace by welding Dress bar lower left is rotatably connected with the second shaft, driving wheel is connected in the second shaft, the first mounting rod lower-left end passes through weldering The mode connect is equipped with the second mounting rod, is rotatably connected with third with the first mounting rod upper right side on the left of the second mounting rod and turns Axis is connected with runner in third shaft, is equipped with the second support base by welding on front side of right on the upside of the second mounting plate, It rotatably is connected with the 4th shaft on rear side of second support base, directive wheel is connected in the 4th shaft, transport is connected between runner Band, conveyer belt is by the way that on the downside of driving wheel, conveyer belt passes through on the downside of directive wheel.
It preferably, further include having cylinder and push rod, right side is equipped with cylinder, cylinder by bolted connection on bottom plate The Telescopic-cylinder bar of upper end is equipped with push rod by welding, and push rod left end is mounted on the support rod right side by welding Upper side, support rod are not welded to connect with bottom plate.
It preferably, further include having material-pulling device, material-pulling device includes the first sliding rail, the first sliding block, first motor, tooth Wheel, rack gear, the first link block and push plate, packaging wagon box are equipped with material-pulling device, and front side is bolted in packaging wagon box Mode is equipped with the first sliding rail, and the first sliding rail inner sliding type is connected with the first sliding block, is bolted on front side of the first sliding block Mode is equipped with first motor, and the first motor output shaft on front side of first motor is connected with gear, the first sliding rail by shaft coupling Rack gear, wheel and rack engagement are installed by bolted connection, the first sliding block upside passes through welding on front side of inner underside wall Mode the first link block is installed, push plate is installed by welding on rear side of the first link block.
It preferably, further include having the second link block and the first brush block, push plate lower right-hand side is equipped with by welding Second link block, the second link block downside are connected with the first brush block.
It preferably, further include having extension discharging device, extending discharging device includes lifter plate, third link block, third Baffle, fourth gear plate, the second screw rod and the second nut, push plate, which is equipped with, extends discharging device, is connected with lifter plate in push plate, rises It is provided with empty slot on drop plate, lifter plate is connected in push plate by empty slot, the side that top front and rear sides pass through welding on the right side of lifter plate Formula is equipped with third link block, is equipped with third baffle, the right side on rear side of third baffle between third link block by welding Fourth gear plate is installed by welding between side, a word hole is provided on the left of lifter plate, left passes through welding on the upside of push plate Mode the second screw rod is installed, the second screw rod reaches lifter plate left by a word hole, and the second screw rod upper left side is screwed with second Nut, the second nut and the second screw rod cooperate.
It preferably, further include having the 4th link block and the second brush block, lifter plate lower right-hand side is installed by welding There is the 4th link block, left side lower section is connected with the second brush block under the 4th link block.
It preferably, further include having vibration blanking device, vibration blanking device includes inclined plate, the 5th link block, block, the Two sliding rails, the second sliding block, the first spring, the 5th shaft, the second spill spin block, jolting plate, the second motor and cam, packaging wagon box are right Side is equipped with vibration blanking device, is equipped with inclined plate on the first support base by welding, passes through weldering on the downside of the first support plate The mode connect is equipped with the 5th link block, and the 5th link block lower right-hand side is equipped with block by welding, and block blocks The second baffle put down, the interior left side top of second baffle are equipped with the second sliding rail, the second sliding rail by bolted connection Inner sliding type is connected with the second sliding block, is equipped with the first spring by welding on the right side of the second sliding block, the first spring is another End is mounted on by welding on the first sliding rail right side wall, and the second sliding block front side top is rotatably connected with the 5th shaft, The second spill spin block is connected in 5th shaft, the second spill spin block upper end is equipped with jolting plate, second baffle by welding The second motor is installed by bolted connection above interior middle part, the second motor output shaft on front side of the second motor passes through connection Axis device is connected with cam, cam contact to jolting plate.
It preferably, further include having second spring, right is equipped with second spring by welding on the downside of jolting plate, the Two lower spring ends are mounted on by welding on the upside of second baffle.
Working principle:When user needs to carry out the Lifting Convey of mineral aggregate to mining electric locomotive and when discharging, user can be When being moved to mining electric locomotive wagon box below conveyer belt in mine, user can open driving wheel and control actively clockwise Rotation, driving wheel drive conveyer belt to rotate clockwise by the runner and directive wheel of two sides, and then mineral aggregate is placed on transport by user With upside left, Lifting Convey is carried out to mineral aggregate on conveyer belt, when transporting conveyer belt the top, mineral aggregate will fall on packaging wagon box On, after putting mineral aggregate well, it can be carried out transport at this time, when on the position for transporting required discharging, user can revolve Turn the first nut, the first nut is screwed out to the right by the cooperation with the first screw rod, pressing plate is then taken out from the first screw rod, then Second baffle is rotated, rotates clockwise second baffle around first rotating shaft, user can be from collection entrucking after opening second baffle Mineral aggregate is taken out in bucket.
Because further including having cylinder and push rod, right side is equipped with cylinder by bolted connection on bottom plate, on cylinder The Telescopic-cylinder bar at end is equipped with push rod by welding, and push rod left end is mounted on by welding on the right side of support rod Top, support rod are not welded to connect with bottom plate, when user needs to carry out the promotion of mineral aggregate to the packaging wagon box of different height, are used Family can control cylinder and elongate or shorten, and cylinder drives push rod to move up and down, and push rod drives support rod to move up and down, to drive First mounting rod moves up and down, so that conveyer belt be driven to move up and down.
Because further including having material-pulling device, material-pulling device includes the first sliding rail, the first sliding block, first motor, gear, tooth Item, the first link block and push plate, packaging wagon box are equipped with material-pulling device, and front side is pacified by bolted connection in packaging wagon box Equipped with the first sliding rail, the first sliding rail inner sliding type is connected with the first sliding block, pacifies by bolted connection on front side of the first sliding block Equipped with first motor, the first motor output shaft on front side of first motor is connected with gear, the first sliding rail inner underside by shaft coupling Rack gear is installed by bolted connection, wheel and rack engagement, the first sliding block upside is by welding on front side of wall First link block is installed, push plate is installed by welding on rear side of the first link block, when user needs quickly collect When mineral aggregate on entrucking bucket unloads, user can open first motor, and first motor band moving gear rotates clockwise, gear rotation On rack gear, so that the first sliding block be driven to move right in the first sliding rail, the first sliding block drives the first link block to move right, First link block drives push plate to move right, so that the mineral aggregate on packaging wagon box be pushed to the right, then releases packaging wagon box.
Because further including having the second link block and the first brush block, push plate lower right-hand side is equipped with second by welding Link block, the second link block downside are connected with the first brush block, and when push plate is during moving right, the first brush block can be by mine The drawbacks of material residue brushes out packaging wagon box, avoids the occurrence of blocking.
Because further including having extension discharging device, extending discharging device includes lifter plate, third link block, third gear Plate, fourth gear plate, the second screw rod and the second nut, push plate, which is equipped with, extends discharging device, is connected with lifter plate in push plate, goes up and down Empty slot is provided on plate, lifter plate is connected in push plate by empty slot, and lifter plate right side top front and rear sides are by welding Third link block is installed, third baffle, right on rear side of third baffle are installed by welding between third link block Between fourth gear plate is installed by welding, a word hole is provided on the left of lifter plate, left passes through welding on the upside of push plate Mode is equipped with the second screw rod, and the second screw rod reaches lifter plate left by a word hole, and the second screw rod upper left side is screwed with the second spiral shell Mother, the second nut and the second screw rod cooperate, and when user needs to increase the cargo dead-weight of packaging wagon box, user can move up liter Plate drops, and lifter plate moves up in push plate, and lifter plate, which moves up, drives third link block to move up, to drive third Baffle and fourth gear plate move up, and when being moved to required cargo dead-weight position, user can rotate the first nut, the first spiral shell Mother touches lifter plate by the precession to the right of the cooperation with the first screw rod, the first nut, to lifter plate is fixed on this being On no longer move, then mineral aggregate is placed in packaging wagon box by user, and lifter plate, third baffle and fourth gear plate will block mineral aggregate It does not fall out.
Because further including having the 4th link block and the second brush block, lifter plate lower right-hand side is equipped with by welding Four link blocks, left side lower section is connected with the second brush block under the 4th link block, and when lifter plate moves down, the second brush block can To avoid mineral aggregate slag from entering in empty slot for the mineral aggregate slag outwash in push plate.
Because further including having vibration blanking device, vibration blanking device includes inclined plate, the 5th link block, block, second Sliding rail, the second sliding block, the first spring, the 5th shaft, the second spill spin block, jolting plate, the second motor and cam, packaging wagon box right Equipped with vibration blanking device, inclined plate is installed by welding on the first support base, passes through welding on the downside of the first support plate Mode the 5th link block is installed, the 5th link block lower right-hand side is equipped with block by welding, and block, which blocks, to be put The second baffle to get off, left side top is equipped with the second sliding rail by bolted connection in second baffle, in the second sliding rail Slidingtype is connected with the second sliding block, is equipped with the first spring, the first spring other end by welding on the right side of the second sliding block It being mounted on the first sliding rail right side wall by welding, the second sliding block front side top is rotatably connected with the 5th shaft, the It is connected with the second spill spin block in five shafts, the second spill spin block upper end is equipped with jolting plate by welding, in second baffle The second motor is installed by bolted connection above middle part, the second motor output shaft on front side of the second motor passes through shaft coupling Device is connected with cam, and cam contact to jolting plate, when user's needs are more efficient and faster unload mineral aggregate, user can be beaten Second baffle is opened, holds jolting plate when opening second baffle, jolting plate is made to move right in the second sliding rail by the second sliding block To the first spring of compression, second baffle is touched on block when then rotating to, and then unclamps jolting plate, and the first spring will be from Compressive state is restored, and the second sliding block is pushed to be moved to the left, so that jolting plate be pushed to be moved to the left, is moved to jolting plate and is located at tiltedly Position below plate, user can open first motor promotion push plate and directly shift mineral aggregate on inclined plate at this time, then from inclined plate On slide, and slided by jolting plate, user can open the second motor at this time, and the second motor drives rotation counterclockwise, cam Jolting plate is touched, rotates jolting plate counterclockwise around the 5th shaft, when cam, which is rotated to, not to be contacted with jolting plate, jolting plate It will be rotated clockwise around the 5th shaft, and so shake repeatedly and quickly fall the mineral aggregate made on jolting plate, and do not had very More mineral aggregate residuals.
Because further including having second spring, right is equipped with second spring by welding on the downside of jolting plate, second Lower spring end is mounted on by welding on the upside of second baffle, when cam rotation rotates jolting plate counterclockwise, Second spring will be in tensional state, and when cam is not contacted with jolting plate, second spring will be restored from tensional state, draw Dynamic jolting plate rotates clockwise, so that jolting plate be enable to rotate clockwise faster.
Control mode of the invention is automatically controlled by controller, the skill that the control circuit of controller passes through this field Art personnel's simple programming can be realized, and belong to the common knowledge of this field, and the present invention is mainly used to protect mechanical device, institute Control mode and circuit connection are not explained with the present invention.
(3)Beneficial effect
Invention achieves promoted the rate of loading and discharge rate are fast, work efficiency is high, discharge process can discharging it is clean Effect, push mineral aggregate to remove packaging wagon box and by promoting lifter plate, third baffle and fourth gear plate by using push plate Mode is not only able to quickly carry out discharging to mineral aggregate, additionally it is possible to increase the useful load of mineral aggregate.
Detailed description of the invention
Fig. 1 is schematic view of the front view of the invention.
Fig. 2 is the schematic view of the front view of cylinder of the present invention.
Fig. 3 is the schematic view of the front view of material-pulling device of the present invention.
Fig. 4 is the schematic view of the front view of the first brush block of the invention.
Fig. 5 is the schematic view of the front view that the present invention extends discharging device.
Fig. 6 is the schematic view of the front view of the second brush block of the invention.
Fig. 7 is the schematic view of the front view of present invention vibration blanking device.
Fig. 8 is the schematic view of the front view of second spring of the present invention.
Label in attached drawing be:1- packaging wagon box, 2- wheel, 3- first baffle, 4- lever, the first support base of 5-, 6- One shaft, the first spill spin block of 7-, 8- second baffle, the first screw rod of 9-, 10- pressing plate, 11- through-hole, the first nut of 12-, the bottom 13- Plate, 14- support rod, the first mounting rod of 15-, the second shaft of 16-, 17- driving wheel, the second mounting rod of 18-, 19- third shaft, 20- runner, the second support base of 21-, the 4th shaft of 22-, 23- directive wheel, 24- conveyer belt, 141- cylinder, 142- push rod, 25- are pushed away Expect device, the first sliding rail of 251-, the first sliding block of 252-, 253- first motor, 254- gear, 255- rack gear, the connection of 256- first Block, 257- push plate, the second link block of 2571-, 2572- the first brush block, 26- extend discharging device, 261- lifter plate, 262- sky Slot, 263- third link block, 264- third baffle, 265- fourth gear plate, the mono- word hole 266-, the second screw rod of 267-, 268- second Nut, the 4th link block of 2611-, 2612- the second brush block, 27- vibration blanking device, 271- inclined plate, the 5th link block of 272-, 273- block, the second sliding rail of 274-, the second sliding block of 275-, the first spring of 276-, the 5th shaft of 277-, the second spill spin block of 278-, 279- jolting plate, the second motor of 2710-, 2711- cam, 2791- second spring.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
It is a kind of can fast lifting with unload ore mining electric locomotive transport wagon box include as shown in figures 1-8 packaging Wagon box 1, wheel 2, first baffle 3, lever 4, the first support base 5, first rotating shaft 6, the first spill spin block 7, second baffle 8, first Screw rod 9, pressing plate 10, the first nut 12, bottom plate 13, support rod 14, the first mounting rod 15, the second shaft 16, driving wheel 17, second Mounting rod 18, third shaft 19, runner 20, the second support base 21, the 4th shaft 22, directive wheel 23 and conveyer belt 24 collect entrucking The 1 downside left and right sides of bucket and front and rear sides are equipped with wheel 2, and 1 upper left side sum aggregate entrucking bucket of packaging wagon box, 1 front and rear sides pass through welding Mode first baffle 3 is installed, the front and rear sides on right side are equipped with lever 4, packaging by welding on packaging wagon box 1 1 right side central of wagon box is equipped with the first support base 5 by welding, and 5 front side of the first support base is rotatably connected with first Shaft 6 is connected with the first spill spin block 7 in first rotating shaft 6, and 7 upper end of the first spill spin block is equipped with second gear by welding Plate 8, second baffle 8 block the vacancy between lever 4, and lever 4 top front side in front side is equipped with the first spiral shell by welding Bar 9 is connected with pressing plate 10 on first screw rod 9, and through-hole 11 is provided on pressing plate 10, and pressing plate 10 is connected to the first screw rod by through-hole 11 On 9, it is screwed with the first nut 12 on the first screw rod 9, cooperates in the first nut 12 with the first screw rod 9, the first nut 12 is located at pressing plate 10 rights, pressing plate 10 block second baffle 8, and 1 left of packaging wagon box is equipped with bottom plate 13, and right side is by welding on bottom plate 13 Support rod 14 is installed, 14 upper end of support rod is equipped with the first mounting rod 15,15 lower-left of the first mounting rod by welding Side is rotatably connected with the second shaft 16, driving wheel 17 is connected in the second shaft 16,15 lower-left end of the first mounting rod passes through weldering The mode connect is equipped with the second mounting rod 18, and 18 left side of the second mounting rod and 15 upper right side of the first mounting rod are rotatably connected with the Three shafts 19 are connected with runner 20 in third shaft 19, are equipped with by welding on front side of right on the upside of the second mounting plate Second support base 21,21 rear side of the second support base are rotatably connected with the 4th shaft 22, are connected with directive wheel in the 4th shaft 22 23, conveyer belt 24 is connected between runner 20, conveyer belt 24 is passed through under directive wheel 23 by 17 downside of driving wheel, conveyer belt 24 Side.
Embodiment 2
It is a kind of can fast lifting with unload ore mining electric locomotive transport wagon box include as shown in figures 1-8 packaging Wagon box 1, wheel 2, first baffle 3, lever 4, the first support base 5, first rotating shaft 6, the first spill spin block 7, second baffle 8, first Screw rod 9, pressing plate 10, the first nut 12, bottom plate 13, support rod 14, the first mounting rod 15, the second shaft 16, driving wheel 17, second Mounting rod 18, third shaft 19, runner 20, the second support base 21, the 4th shaft 22, directive wheel 23 and conveyer belt 24 collect entrucking The 1 downside left and right sides of bucket and front and rear sides are equipped with wheel 2, and 1 upper left side sum aggregate entrucking bucket of packaging wagon box, 1 front and rear sides pass through welding Mode first baffle 3 is installed, the front and rear sides on right side are equipped with lever 4, packaging by welding on packaging wagon box 1 1 right side central of wagon box is equipped with the first support base 5 by welding, and 5 front side of the first support base is rotatably connected with first Shaft 6 is connected with the first spill spin block 7 in first rotating shaft 6, and 7 upper end of the first spill spin block is equipped with second gear by welding Plate 8, second baffle 8 block the vacancy between lever 4, and lever 4 top front side in front side is equipped with the first spiral shell by welding Bar 9 is connected with pressing plate 10 on first screw rod 9, and through-hole 11 is provided on pressing plate 10, and pressing plate 10 is connected to the first screw rod by through-hole 11 On 9, it is screwed with the first nut 12 on the first screw rod 9, cooperates in the first nut 12 with the first screw rod 9, the first nut 12 is located at pressing plate 10 rights, pressing plate 10 block second baffle 8, and 1 left of packaging wagon box is equipped with bottom plate 13, and right side is by welding on bottom plate 13 Support rod 14 is installed, 14 upper end of support rod is equipped with the first mounting rod 15,15 lower-left of the first mounting rod by welding Side is rotatably connected with the second shaft 16, driving wheel 17 is connected in the second shaft 16,15 lower-left end of the first mounting rod passes through weldering The mode connect is equipped with the second mounting rod 18, and 18 left side of the second mounting rod and 15 upper right side of the first mounting rod are rotatably connected with the Three shafts 19 are connected with runner 20 in third shaft 19, are equipped with by welding on front side of right on the upside of the second mounting plate Second support base 21,21 rear side of the second support base are rotatably connected with the 4th shaft 22, are connected with directive wheel in the 4th shaft 22 23, conveyer belt 24 is connected between runner 20, conveyer belt 24 is passed through under directive wheel 23 by 17 downside of driving wheel, conveyer belt 24 Side.
It further include having cylinder 141 and push rod 142, right side is equipped with cylinder 141 by bolted connection on bottom plate 13, 141 telescopic rod of cylinder of 141 upper end of cylinder is equipped with push rod 142, the side that 142 left end of push rod passes through welding by welding Formula is mounted on 14 right side top of support rod, and support rod 14 is not welded to connect with bottom plate 13.
Embodiment 3
It is a kind of can fast lifting with unload ore mining electric locomotive transport wagon box include as shown in figures 1-8 packaging Wagon box 1, wheel 2, first baffle 3, lever 4, the first support base 5, first rotating shaft 6, the first spill spin block 7, second baffle 8, first Screw rod 9, pressing plate 10, the first nut 12, bottom plate 13, support rod 14, the first mounting rod 15, the second shaft 16, driving wheel 17, second Mounting rod 18, third shaft 19, runner 20, the second support base 21, the 4th shaft 22, directive wheel 23 and conveyer belt 24 collect entrucking The 1 downside left and right sides of bucket and front and rear sides are equipped with wheel 2, and 1 upper left side sum aggregate entrucking bucket of packaging wagon box, 1 front and rear sides pass through welding Mode first baffle 3 is installed, the front and rear sides on right side are equipped with lever 4, packaging by welding on packaging wagon box 1 1 right side central of wagon box is equipped with the first support base 5 by welding, and 5 front side of the first support base is rotatably connected with first Shaft 6 is connected with the first spill spin block 7 in first rotating shaft 6, and 7 upper end of the first spill spin block is equipped with second gear by welding Plate 8, second baffle 8 block the vacancy between lever 4, and lever 4 top front side in front side is equipped with the first spiral shell by welding Bar 9 is connected with pressing plate 10 on first screw rod 9, and through-hole 11 is provided on pressing plate 10, and pressing plate 10 is connected to the first screw rod by through-hole 11 On 9, it is screwed with the first nut 12 on the first screw rod 9, cooperates in the first nut 12 with the first screw rod 9, the first nut 12 is located at pressing plate 10 rights, pressing plate 10 block second baffle 8, and 1 left of packaging wagon box is equipped with bottom plate 13, and right side is by welding on bottom plate 13 Support rod 14 is installed, 14 upper end of support rod is equipped with the first mounting rod 15,15 lower-left of the first mounting rod by welding Side is rotatably connected with the second shaft 16, driving wheel 17 is connected in the second shaft 16,15 lower-left end of the first mounting rod passes through weldering The mode connect is equipped with the second mounting rod 18, and 18 left side of the second mounting rod and 15 upper right side of the first mounting rod are rotatably connected with the Three shafts 19 are connected with runner 20 in third shaft 19, are equipped with by welding on front side of right on the upside of the second mounting plate Second support base 21,21 rear side of the second support base are rotatably connected with the 4th shaft 22, are connected with directive wheel in the 4th shaft 22 23, conveyer belt 24 is connected between runner 20, conveyer belt 24 is passed through under directive wheel 23 by 17 downside of driving wheel, conveyer belt 24 Side.
It further include having cylinder 141 and push rod 142, right side is equipped with cylinder 141 by bolted connection on bottom plate 13, 141 telescopic rod of cylinder of 141 upper end of cylinder is equipped with push rod 142, the side that 142 left end of push rod passes through welding by welding Formula is mounted on 14 right side top of support rod, and support rod 14 is not welded to connect with bottom plate 13.
It further include having material-pulling device 25, material-pulling device 25 includes the first sliding rail 251, the first sliding block 252, first motor 253, gear 254, rack gear 255, the first link block 256 and push plate 257, packaging wagon box 1 are equipped with material-pulling device 25, packaging wagon box Front side is equipped with the first sliding rail 251 by bolted connection in 1, and 251 inner sliding type of the first sliding rail is connected with the first sliding block 252, the front side of the first sliding block 252 is equipped with first motor 253 by bolted connection, and the first of 253 front side of first motor 253 output shaft of motor is connected with gear 254, the side being bolted on front side of 251 inner underside wall of the first sliding rail by shaft coupling Formula is equipped with rack gear 255, and gear 254 is engaged with rack gear 255, and 252 upside of the first sliding block is equipped with first by welding Link block 256,256 rear side of the first link block are equipped with push plate 257 by welding.
Embodiment 4
It is a kind of can fast lifting with unload ore mining electric locomotive transport wagon box include as shown in figures 1-8 packaging Wagon box 1, wheel 2, first baffle 3, lever 4, the first support base 5, first rotating shaft 6, the first spill spin block 7, second baffle 8, first Screw rod 9, pressing plate 10, the first nut 12, bottom plate 13, support rod 14, the first mounting rod 15, the second shaft 16, driving wheel 17, second Mounting rod 18, third shaft 19, runner 20, the second support base 21, the 4th shaft 22, directive wheel 23 and conveyer belt 24 collect entrucking The 1 downside left and right sides of bucket and front and rear sides are equipped with wheel 2, and 1 upper left side sum aggregate entrucking bucket of packaging wagon box, 1 front and rear sides pass through welding Mode first baffle 3 is installed, the front and rear sides on right side are equipped with lever 4, packaging by welding on packaging wagon box 1 1 right side central of wagon box is equipped with the first support base 5 by welding, and 5 front side of the first support base is rotatably connected with first Shaft 6 is connected with the first spill spin block 7 in first rotating shaft 6, and 7 upper end of the first spill spin block is equipped with second gear by welding Plate 8, second baffle 8 block the vacancy between lever 4, and lever 4 top front side in front side is equipped with the first spiral shell by welding Bar 9 is connected with pressing plate 10 on first screw rod 9, and through-hole 11 is provided on pressing plate 10, and pressing plate 10 is connected to the first screw rod by through-hole 11 On 9, it is screwed with the first nut 12 on the first screw rod 9, cooperates in the first nut 12 with the first screw rod 9, the first nut 12 is located at pressing plate 10 rights, pressing plate 10 block second baffle 8, and 1 left of packaging wagon box is equipped with bottom plate 13, and right side is by welding on bottom plate 13 Support rod 14 is installed, 14 upper end of support rod is equipped with the first mounting rod 15,15 lower-left of the first mounting rod by welding Side is rotatably connected with the second shaft 16, driving wheel 17 is connected in the second shaft 16,15 lower-left end of the first mounting rod passes through weldering The mode connect is equipped with the second mounting rod 18, and 18 left side of the second mounting rod and 15 upper right side of the first mounting rod are rotatably connected with the Three shafts 19 are connected with runner 20 in third shaft 19, are equipped with by welding on front side of right on the upside of the second mounting plate Second support base 21,21 rear side of the second support base are rotatably connected with the 4th shaft 22, are connected with directive wheel in the 4th shaft 22 23, conveyer belt 24 is connected between runner 20, conveyer belt 24 is passed through under directive wheel 23 by 17 downside of driving wheel, conveyer belt 24 Side.
It further include having cylinder 141 and push rod 142, right side is equipped with cylinder 141 by bolted connection on bottom plate 13, 141 telescopic rod of cylinder of 141 upper end of cylinder is equipped with push rod 142, the side that 142 left end of push rod passes through welding by welding Formula is mounted on 14 right side top of support rod, and support rod 14 is not welded to connect with bottom plate 13.
It further include having material-pulling device 25, material-pulling device 25 includes the first sliding rail 251, the first sliding block 252, first motor 253, gear 254, rack gear 255, the first link block 256 and push plate 257, packaging wagon box 1 are equipped with material-pulling device 25, packaging wagon box Front side is equipped with the first sliding rail 251 by bolted connection in 1, and 251 inner sliding type of the first sliding rail is connected with the first sliding block 252, the front side of the first sliding block 252 is equipped with first motor 253 by bolted connection, and the first of 253 front side of first motor 253 output shaft of motor is connected with gear 254, the side being bolted on front side of 251 inner underside wall of the first sliding rail by shaft coupling Formula is equipped with rack gear 255, and gear 254 is engaged with rack gear 255, and 252 upside of the first sliding block is equipped with first by welding Link block 256,256 rear side of the first link block are equipped with push plate 257 by welding.
It further include having the second link block 2571 and the first brush block 2572,257 lower right-hand side of push plate is pacified by welding Equipped with the second link block 2571, the first brush block 2572 is connected on the downside of the second link block 2571.
It further include having to extend discharging device 26, extending discharging device 26 includes lifter plate 261, third link block 263, the Three baffles 264, fourth gear plate 265, the second screw rod 267 and the second nut 268, push plate 257, which is equipped with, extends discharging device 26, pushes away It is connected with lifter plate 261 on plate 257, empty slot 262 is provided on lifter plate 261, lifter plate 261 is connected to push plate by empty slot 262 On 257,261 right side top front and rear sides of lifter plate are equipped with third link block 263, third link block by welding Third baffle 264 is installed by welding, between 264 rear side right of third baffle by welding between 263 Fourth gear plate 265 is installed, a word hole 266 is provided on the left of lifter plate 261,257 upside left of push plate is pacified by welding Equipped with the second screw rod 267, the second screw rod 267 reaches 261 left of lifter plate, the rotation of 267 upper left side of the second screw rod by a word hole 266 There is the second nut 268, the second nut 268 and the second screw rod 267 cooperate.
It further include having the 4th link block 2611 and the second brush block 2612,261 lower right-hand side of lifter plate is by welding 4th link block 2611 is installed, the lower left side lower section of the 4th link block 2611 is connected with the second brush block 2612.
It further include having vibration blanking device 27, vibration blanking device 27 includes inclined plate 271, the 5th link block 272, block 273, the second sliding rail 274, the second sliding block 275, the first spring 276, the 5th shaft 277, the second spill spin block 278, jolting plate 279, Second motor 2710 and cam 2711,1 right of packaging wagon box are equipped with vibration blanking device 27, pass through welding on the first support base 5 Mode inclined plate 271 is installed, the 5th link block 272, the 5th connection are installed by welding on the downside of the first support plate 272 lower right-hand side of block is equipped with block 273 by welding, and block 273 blocks the second baffle 8 put down, second gear Left side top is equipped with the second sliding rail 274 by bolted connection in plate 8, and 274 inner sliding type of the second sliding rail is connected with the Two sliding blocks 275,275 right side of the second sliding block are equipped with the first spring 276 by welding, and 276 other end of the first spring is logical The mode for crossing welding is mounted on 251 right side wall of the first sliding rail, and 275 front side top of the second sliding block is rotatably connected with the 5th shaft 277, the second spill spin block 278 is connected in the 5th shaft 277, and 278 upper end of the second spill spin block is equipped with shake by welding Movable plate 279, the interior middle part top of second baffle 8 are equipped with the second motor 2710, the second motor 2710 by bolted connection 2710 output shaft of the second motor of front side is connected with cam 2711 by shaft coupling, and cam 2711 touches jolting plate 279.
It further include having second spring 2791,279 downside right of jolting plate is equipped with second spring by welding 2791,2791 lower end of second spring is mounted on 8 upside of second baffle by welding.
Working principle:When user needs to carry out the Lifting Convey of mineral aggregate to mining electric locomotive and when discharging, user can be When being moved to mining electric locomotive wagon box positioned at 24 lower section of conveyer belt in mine, user can open driving wheel 17 and control actively suitable Hour hands rotation, driving wheel 17 drive conveyer belt 24 to rotate clockwise by the runner 20 and directive wheel 23 of two sides, and then user will Mineral aggregate is placed on 24 upside left of conveyer belt, carries out Lifting Convey to mineral aggregate on conveyer belt 24, when transporting 24 the top of conveyer belt, Mineral aggregate will be fallen on packaging wagon box 1, after putting mineral aggregate well, can be carried out transport at this time, when transporting required discharging When on position, user can rotate the first nut 12, and the first nut 12 is screwed out to the right by the cooperation with the first screw rod 9, then Pressing plate 10 is taken out from the first screw rod 9, is then rotated second baffle 8, is rotated clockwise second baffle 8 around first rotating shaft 6, beat User can take out mineral aggregate from packaging wagon box 1 after opening second baffle 8.
Because further including having cylinder 141 and push rod 142, right side is equipped with cylinder by bolted connection on bottom plate 13 141,141 telescopic rod of cylinder of 141 upper end of cylinder is equipped with push rod 142 by welding, and 142 left end of push rod passes through welding Mode be mounted on the right side of support rod 14 top, support rod 14 is not welded to connect with bottom plate 13, when user needs to different height Packaging wagon box 1 carry out mineral aggregate promotion when, user can control cylinder 141 and elongate or shorten, cylinder 141 drive push rod 142 It moves up and down, push rod 142 drives support rod 14 to move up and down, to drive the first mounting rod 15 to move up and down, to drive fortune Defeated band 24 moves up and down.
Because further including having material-pulling device 25, material-pulling device 25 includes the first sliding rail 251, first the 252, first electricity of sliding block Machine 253, gear 254, rack gear 255, the first link block 256 and push plate 257, packaging wagon box 1 are equipped with material-pulling device 25, collect entrucking Front side is equipped with the first sliding rail 251 by bolted connection in bucket 1, and it is sliding that 251 inner sliding type of the first sliding rail is connected with first Block 252, the front side of the first sliding block 252 are equipped with first motor 253 by bolted connection, and the of 253 front side of first motor One motor, 253 output shaft is connected with gear 254 by shaft coupling, is bolted on front side of 251 inner underside wall of the first sliding rail Mode is equipped with rack gear 255, and gear 254 is engaged with rack gear 255, and the upside of the first sliding block 252 is equipped with the by welding One link block 256,256 rear side of the first link block are equipped with push plate 257 by welding, when user needs quickly collect When mineral aggregate on entrucking bucket 1 unloads, user can open first motor 253, and first motor 253 is revolved clockwise with moving gear 254 Turning, gear 254 is rotated on rack gear 255, so that the first sliding block 252 is driven to move right in the first sliding rail 251, the first sliding block 252 the first link blocks 256 of drive move right, and the first link block 256 drives push plate 257 to move right, thus by packaging wagon box 1 On mineral aggregate push to the right, then release packaging wagon box 1.
Because further including having the second link block 2571 and the first brush block 2572,257 lower right-hand side of push plate passes through the side of welding Formula is equipped with the second link block 2571, and the first brush block 2572 is connected on the downside of the second link block 2571, when push plate 257 is moving right The drawbacks of in dynamic process, mineral aggregate slag can be brushed out packaging wagon box 1 by the first brush block 2572, avoid the occurrence of blocking.
Because further including having to extend discharging device 26, extending discharging device 26 includes lifter plate 261, third link block 263, third baffle 264, fourth gear plate 265, the second screw rod 267 and the second nut 268, push plate 257, which is equipped with, extends blowing dress 26 are set, lifter plate 261 is connected in push plate 257, empty slot 262 is provided on lifter plate 261, lifter plate 261 is connected by empty slot 262 In push plate 257,261 right side top front and rear sides of lifter plate are equipped with third link block 263 by welding, and third connects It connects and third baffle 264 is installed by welding between block 263, pass through welding between 264 rear side right of third baffle Mode is equipped with fourth gear plate 265, and a word hole 266, the side that 257 upside left of push plate passes through welding are provided on the left of lifter plate 261 Formula is equipped with the second screw rod 267, and the second screw rod 267 reaches 261 left of lifter plate, a left side on the second screw rod 267 by a word hole 266 Sidespin has the second nut 268, and the second nut 268 and the second screw rod 267 cooperate, when user needs to increase the loading of packaging wagon box 1 When amount, user can move up lifter plate 261, and lifter plate 261 moves up in push plate 257, and lifter plate 261 moves up Third link block 263 is driven to move up, to drive third baffle 264 and fourth gear plate 265 to move up, when being moved to When the cargo dead-weight position needed, user can rotate the first nut 12, and the first nut 12 is by the cooperation with the first screw rod 9 to dextrorotation Into the first nut 12 touches lifter plate 261, no longer moves so that lifter plate 261 is fixed on this to be upper, and then user will Mineral aggregate is placed in packaging wagon box 1, and lifter plate 261, third baffle 264 and fourth gear plate 265 will block mineral aggregate and not fall out.
Because further including having the 4th link block 2611 and the second brush block 2612,261 lower right-hand side of lifter plate passes through welding Mode is equipped with the 4th link block 2611, and the lower left side lower section of the 4th link block 2611 is connected with the second brush block 2612, works as lifter plate 261 when move down, and the mineral aggregate slag outwash in push plate 257 can be avoided mineral aggregate slag from entering empty slot by the second brush block 2612 In 262.
Because further include have vibration blanking device 27, vibration blanking device 27 include inclined plate 271, the 5th link block 272, Block 273, the second sliding rail 274, the second sliding block 275, the first spring 276, the 5th shaft 277, the second spill spin block 278, jolting plate 279, the second motor 2710 and cam 2711,1 right of packaging wagon box are equipped with vibration blanking device 27, pass through on the first support base 5 The mode of welding is equipped with inclined plate 271, is equipped with the 5th link block 272 on the downside of the first support plate by welding, and the 5th 272 lower right-hand side of link block is equipped with block 273 by welding, and block 273 blocks the second baffle 8 put down, the Left side top is equipped with the second sliding rail 274, the connection of 274 inner sliding type of the second sliding rail by bolted connection in two baffles 8 There is the second sliding block 275,275 right side of the second sliding block is equipped with the first spring 276 by welding, and the first spring 276 is another End is mounted on by welding on 251 right side wall of the first sliding rail, and 275 front side top of the second sliding block is rotatably connected with the 5th Shaft 277 is connected with the second spill spin block 278 in the 5th shaft 277, and 278 upper end of the second spill spin block is installed by welding There is jolting plate 279, middle part top is equipped with the second motor 2710, the second motor by bolted connection in second baffle 8 2710 output shaft of the second motor of 2710 front sides is connected with cam 2711 by shaft coupling, and cam 2711 touches jolting plate 279, When user's needs are more efficient and faster unload mineral aggregate, user can open second baffle 8, draw when opening second baffle 8 Firmly jolting plate 279 make jolting plate 279 move right to compress the first spring in the second sliding rail 274 by the second sliding block 275 276, second baffle 8 touches on block 273 when then rotating to, and then unclamps jolting plate 279, the first spring 276 will be from pressure Contracting state is restored, and the second sliding block 275 is pushed to be moved to the left, so that jolting plate 279 be pushed to be moved to the left, keeps jolting plate 279 mobile To the position for being located at 271 lower section of inclined plate, user can open the promotion push plate 257 of first motor 253 and directly shift mineral aggregate at this time It on inclined plate 271, then slides from inclined plate 271, and is slided by jolting plate 279, user can open the second motor at this time 2710, the second motor 2710 drives rotation counterclockwise, and cam 2711 touches jolting plate 279, makes jolting plate 279 around the 5th shaft 277 rotations counterclockwise, when cam 2711, which is rotated to, not to be contacted with jolting plate 279, jolting plate 279 will be suitable around the 5th shaft 277 Hour hands rotation, so shaking repeatedly falls the mineral aggregate on jolting plate 279 quickly, and it is residual not have many mineral aggregates It stays.
Because further including having second spring 2791,279 downside right of jolting plate is equipped with the second bullet by welding Spring 2791,2791 lower end of second spring are mounted on 8 upside of second baffle by welding, when the rotation of cam 2711 makes to shake When plate 279 rotates counterclockwise, second spring 2791 will be in tensional state, when cam 2711 is not contacted with jolting plate 279 When, second spring 2791 will be restored from tensional state, pull jolting plate 279 to rotate clockwise, to enable jolting plate 279 It is enough to rotate clockwise faster.
Control mode of the invention is automatically controlled by controller, the skill that the control circuit of controller passes through this field Art personnel's simple programming can be realized, and belong to the common knowledge of this field, and the present invention is mainly used to protect mechanical device, institute Control mode and circuit connection are not explained with the present invention.
The preferred embodiment of the present invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously Limitations on the scope of the patent of the present invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, several deformations can also be made, improves and substitutes, these belong to this hair Bright protection scope.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (8)

1. one kind can fast lifting with unload ore mining electric locomotive transport wagon box, include packaging wagon box (1), wheel (2), first baffle (3), packaging wagon box (1) the downside left and right sides and front and rear sides are equipped with wheel (2), left on packaging wagon box (1) Side sum aggregate entrucking bucket (1) front and rear sides are equipped with first baffle (3) by welding, which is characterized in that further include having shelves Bar (4), the first support base (5), first rotating shaft (6), the first spill spin block (7), second baffle (8), the first screw rod (9), pressing plate (10), the first nut (12), bottom plate (13), support rod (14), the first mounting rod (15), the second shaft (16), driving wheel (17), Second mounting rod (18), third shaft (19), runner (20), the second support base (21), the 4th shaft (22), directive wheel (23) and Conveyer belt (24), the front and rear sides on right side are equipped with lever (4) by welding on packaging wagon box (1), packaging wagon box (1) Right side central is equipped with the first support base (5) by welding, and first turn is rotatably connected on front side of the first support base (5) Axis (6) is connected with the first spill spin block (7) in first rotating shaft (6), and the first spill spin block (7) upper end is equipped with by welding Second baffle (8), second baffle (8) block the vacancy between lever (4), the side that front side passes through welding above front side lever (4) Formula is equipped with the first screw rod (9), is connected on the first screw rod (9) pressing plate (10), and through-hole (11), pressing plate are provided on pressing plate (10) (10) it is connected on the first screw rod (9) by through-hole (11), the first nut (12), the first nut is screwed on the first screw rod (9) (12) cooperating in the first screw rod (9), the first nut (12) is located at pressing plate (10) right, and pressing plate (10) blocks second baffle (8), Packaging wagon box (1) left is equipped with bottom plate (13), and right side is equipped with support rod (14) by welding on bottom plate (13), supports Bar (14) upper end is equipped with the first mounting rod (15) by welding, and the first mounting rod (15) lower left is rotatably connected with Second shaft (16) is connected with driving wheel (17) in the second shaft (16), the side that the first mounting rod (15) lower-left end passes through welding Formula is equipped with the second mounting rod (18), and on the left of the second mounting rod (18) and the first mounting rod (15) upper right side is rotatably connected with the Three shafts (19) are connected with runner (20) in third shaft (19), on the upside of the second mounting plate on front side of right by welding It is equipped with the second support base (21), the 4th shaft (22), the 4th shaft (22) is rotatably connected on rear side of the second support base (21) On be connected with directive wheel (23), be connected between runner (20) conveyer belt (24), conveyer belt (24) by the downside of driving wheel (17), Conveyer belt (24) passes through on the downside of directive wheel (23).
2. one kind according to claim 1 can fast lifting and the mining electric locomotive transport wagon box that unloads ore, it is special Sign is, further includes having cylinder (141) and push rod (142), and right side is equipped with gas by bolted connection on bottom plate (13) Cylinder (141) telescopic rod of cylinder (141), cylinder (141) upper end is equipped with push rod (142) by welding, push rod (142) Left end is mounted on top on the right side of support rod (14) by welding, and support rod (14) is not welded to connect with bottom plate (13).
3. one kind according to claim 2 can fast lifting and the mining electric locomotive transport wagon box that unloads ore, it is special Sign is, further includes having material-pulling device (25), and material-pulling device (25) includes the first sliding rail (251), the first sliding block (252), One motor (253), gear (254), rack gear (255), the first link block (256) and push plate (257), packaging wagon box (1) are equipped with Material-pulling device (25), the interior front side of packaging wagon box (1) are equipped with the first sliding rail (251), the first sliding rail by bolted connection (251) inner sliding type is connected with the first sliding block (252), is equipped with the on front side of the first sliding block (252) by bolted connection One motor (253), first motor (253) output shaft on front side of first motor (253) are connected with gear (254) by shaft coupling, It is equipped with by bolted connection rack gear (255) on front side of first sliding rail (251) inner underside wall, gear (254) and rack gear (255) it engages, the first link block (256), the first link block is installed by welding on the upside of the first sliding block (252) (256) rear side is equipped with push plate (257) by welding.
4. one kind according to claim 3 can fast lifting and the mining electric locomotive transport wagon box that unloads ore, it is special Sign is, further includes having the second link block (2571) and the first brush block (2572), the side that push plate (257) lower right-hand side passes through welding Formula is equipped with the second link block (2571), is connected with the first brush block (2572) on the downside of the second link block (2571).
5. one kind according to claim 4 can fast lifting and the mining electric locomotive transport wagon box that unloads ore, it is special Sign is, further includes having extension discharging device (26), and extending discharging device (26) includes lifter plate (261), third link block (263), third baffle (264), fourth gear plate (265), the second screw rod (267) and the second nut (268), push plate are set on (257) Have extension discharging device (26), be connected in push plate (257) lifter plate (261), is provided on lifter plate (261) empty slot (262), is risen Drop plate (261) is connected on push plate (257) by empty slot (262), and top front and rear sides pass through welding on the right side of lifter plate (261) Mode is equipped with third link block (263), and third link block is equipped with third baffle between (263) by welding (264), it is equipped with by welding fourth gear plate (265) between right on rear side of third baffle (264), lifter plate (261) Left side is provided with a word hole (266), and left is equipped with the second screw rod (267), the second spiral shell by welding on the upside of push plate (257) Bar (267) reaches lifter plate (261) left by a word hole (266), and the second screw rod (267) upper left side is screwed with the second nut (268), the second nut (268) and the second screw rod (267) cooperate.
6. one kind according to claim 5 can fast lifting and the mining electric locomotive transport wagon box that unloads ore, it is special Sign is, further includes having the 4th link block (2611) and the second brush block (2612), and lifter plate (261) lower right-hand side passes through welding Mode is equipped with the 4th link block (2611), and left side lower section is connected with the second brush block (2612) under the 4th link block (2611).
7. one kind according to claim 6 can fast lifting and the mining electric locomotive transport wagon box that unloads ore, it is special Sign is, further includes having vibration blanking device (27), and vibration blanking device (27) includes inclined plate (271), the 5th link block (272), block (273), the second sliding rail (274), the second sliding block (275), the first spring (276), the 5th shaft (277), second Spill spin block (278), jolting plate (279), the second motor (2710) and cam (2711), packaging wagon box (1) right are equipped under vibration Expect device (27), be equipped with by welding inclined plate (271) on the first support base (5), passes through weldering on the downside of the first support plate The mode connect is equipped with the 5th link block (272), and the 5th link block (272) lower right-hand side is equipped with block by welding (273), block (273) blocks the second baffle (8) put down, the side that left side top is bolted in second baffle (8) Formula is equipped with the second sliding rail (274), and the second sliding rail (274) inner sliding type is connected with the second sliding block (275), the second sliding block (275) Right side is equipped with the first spring (276) by welding, and the first spring (276) other end is mounted on by welding On first sliding rail (251) right side wall, the second sliding block (275) front side top is rotatably connected with the 5th shaft (277), the 5th shaft (277) it is connected on the second spill spin block (278), the second spill spin block (278) upper end is equipped with jolting plate by welding (279), middle part top is equipped with the second motor (2710), the second motor by bolted connection in second baffle (8) (2710) the second motor (2710) output shaft on front side of is connected with cam (2711) by shaft coupling, and cam (2711) touches shake Movable plate (279).
8. one kind according to claim 7 can fast lifting and the mining electric locomotive transport wagon box that unloads ore, it is special Sign is, further includes having second spring (2791), and right is equipped with second spring by welding on the downside of jolting plate (279) (2791), second spring (2791) lower end is mounted on by welding on the upside of second baffle (8).
CN201710460591.4A 2017-06-18 2017-06-18 It is a kind of can fast lifting with unload ore mining electric locomotive transport wagon box Active CN107117469B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710460591.4A CN107117469B (en) 2017-06-18 2017-06-18 It is a kind of can fast lifting with unload ore mining electric locomotive transport wagon box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710460591.4A CN107117469B (en) 2017-06-18 2017-06-18 It is a kind of can fast lifting with unload ore mining electric locomotive transport wagon box

Publications (2)

Publication Number Publication Date
CN107117469A CN107117469A (en) 2017-09-01
CN107117469B true CN107117469B (en) 2018-11-30

Family

ID=59718409

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710460591.4A Active CN107117469B (en) 2017-06-18 2017-06-18 It is a kind of can fast lifting with unload ore mining electric locomotive transport wagon box

Country Status (1)

Country Link
CN (1) CN107117469B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114516551B (en) * 2022-03-14 2023-07-18 三亚城投众辉新型建材有限公司 Transportation device for mining

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202294442U (en) * 2011-08-22 2012-07-04 铜陵狮达矿山机械有限公司 Mining trolley
US9139385B2 (en) * 2012-01-18 2015-09-22 Robert Walker Apparatus and system for the unloading of open top rail cars
KR101311256B1 (en) * 2012-03-13 2013-09-26 노현구 Salt loading system for salt pond
CN203580955U (en) * 2013-11-21 2014-05-07 龚轩 Turnover car used for coal mine
CN205769315U (en) * 2016-06-15 2016-12-07 山东华联矿业股份有限公司 Wing plate connects adjustable mine car
CN205905982U (en) * 2016-08-24 2017-01-25 天津同鑫煤矿机械制造有限公司 Mining carrier vehicle

Also Published As

Publication number Publication date
CN107117469A (en) 2017-09-01

Similar Documents

Publication Publication Date Title
CN107055136B (en) Novel container coke unloading system and process
CN107139957B (en) It is a kind of can quickly discharging material and thorough discharging the automobile-used packaging wagon box of mine motor
CN107187898B (en) A kind of efficient discharging collecting device of mining electric locomotive wagon box
CN110080145A (en) The garbage conveyor structure of garbage truck
CN107117469B (en) It is a kind of can fast lifting with unload ore mining electric locomotive transport wagon box
CN107264550B (en) A kind of automobile-used wagon box of mine motor being able to carry out thorough discharging
CN107745675B (en) A kind of dumper unloading safety alarm device
CN108360447A (en) A kind of self-propelled track device husky clearly
CN107031675A (en) A kind of automobile-used quickly discharging material wagon box of mine motor
CN205440357U (en) Novel mine car
CN206857772U (en) A kind of bulk goods is unloaded equipment
CN212221398U (en) Novel directional feeding of metallurgical raw materials device
CN109552899A (en) A kind of track type container tipper
CN110180637A (en) A kind of sand making machine of recyclable operation
CN206142254U (en) Rubbish compression case hopper
CN108773283A (en) A kind of safe and efficient new-energy automobile that charges
CN108529029A (en) A kind of tank container for petroleum asphalt device for discharging
CN207174936U (en) A kind of shockproof transporting equipment of tubing
CN116215695B (en) Metal raw material conveying vehicle with auxiliary discharging structure
CN201276368Y (en) Dual-supporting point double-wagon tipper
CN220298372U (en) Hopper of mining transport vehicle
CN220549620U (en) Automatic conveyer in colliery
CN219883865U (en) Ore body conveying vehicle
CN221623724U (en) Self-unloading transport vehicle
CN218907225U (en) Anti-collision electric locomotive capable of discharging rapidly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191206

Address after: Cao Xi Zhen Qi Lai Cun 364000 Longyan city Fujian District of Xinluo Province

Patentee after: Fujian Ma Keng mining industry limited company

Address before: Cao Xi Road Longyan city Fujian province 364000 Sheng long garden Xinluo District Three

Patentee before: Lin Yanghui

TR01 Transfer of patent right