- CN107101661A CN107101661A CN201710426400.2A CN201710426400A CN107101661A CN 107101661 A CN107101661 A CN 107101661A CN 201710426400 A CN201710426400 A CN 201710426400A CN 107101661 A CN107101661 A CN 107101661A
- Authority
- CN
- China
- Prior art keywords
- plate
- crossbeam
- wall
- experimental rig
- installation frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009434 installation Methods 0.000 title claims abstract description 21
- 238000000429 assembly Methods 0.000 claims abstract description 14
- 230000000712 assembly Effects 0.000 claims abstract description 14
- 230000003014 reinforcing effect Effects 0.000 claims description 11
- 238000003032 molecular docking Methods 0.000 claims description 6
- 230000002787 reinforcement Effects 0.000 claims 1
- 230000015572 biosynthetic process Effects 0.000 abstract description 3
- 238000002474 experimental method Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000009970 fire resistant effect Effects 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01D—MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- G01D11/00—Component parts of measuring arrangements not specially adapted for a specific variable
- G01D11/30—Supports specially adapted for an instrument; Supports specially adapted for a set of instruments
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Abstract
The present invention discloses a kind of multifunctional combination experimental rig installation frame, including columns assemblies and the horizontally disposed transverse beam assembly for connecting the columns assemblies, the columns assemblies and transverse beam assembly have by the formation of bolt detachable connection is provided with wall board connector by bolt respectively on the rectangular-shaped frame body of five layers of wall-panels supports crossbeam, every layer of wall-panels supports crossbeam;Wherein, the mounting assembly connection top cover support crossbeam that the wall-panels supports crossbeam of top layer is also bolted.It is entirely bolt connection, convenient disassembly between the part and part of the present invention;Rationally, resistance to overturning is good for suspender uniform force;Single unit system dismounting, change, it is easy for installation;The framework is adjustable on length, width, three directions of height, can combine as needed, with very strong modularity and changeability.
Description
Technical field
The present invention relates to equipment mounting frame technical field, and in particular to a kind of multifunctional combination experimental rig installing frame
Frame.
Background technology
Fire-fighting Special testing device in hot-working industry includes 40 wallboards and furnace roof, for doing fire resistant doorsets or fire prevention
The experiment of the fire products such as post is used, and 5 layers of placement are divided when in use, and every layer of 8 blocks of wallboard are divided into above and below cornice sheathing and wainscot sheathing
Layer respectively puts 4 blocks of wallboards, totally 40 blocks of wallboards, and every layer of wallboard and top cover are independently to be placed on framework, according to different experiment need
The wallboard of the different numbers of plies is installed, done experiment if desired for first layer, 8 blocks of wallboards of first layer are just installed, if desired for first and second
Layer is done experiment, it is necessary to install first and second layer of 16 blocks of wallboards, by that analogy.Currently without a kind of installing frame of convenient use
Frame is to install the wallboard.
The content of the invention
In view of the technical drawbacks of the prior art, it is an object of the present invention to provide a kind of experiment of multifunctional combination
Device installation frame.
To realize that the technical scheme that the purpose of the present invention is used is:
A kind of multifunctional combination experimental rig installation frame, including columns assemblies and horizontally disposed by the column
The transverse beam assembly that component is connected, the columns assemblies and transverse beam assembly have by the formation of bolt detachable connection
Wall is provided with by bolt respectively on the rectangular-shaped frame body of five layers of wall-panels supports crossbeam, every layer of wall-panels supports crossbeam
Plate connector;Wherein, the mounting assembly connection top cover support crossbeam that the wall-panels supports crossbeam of top layer is also bolted.
The columns assemblies include eight root posts, are detachably connected and are formed by multiple pillar segments per root post;The column
Including H-shaped plate and two T-shaped plates, the T-shaped plate sets in cross structure with H-shaped plate and is welded to connect;Every layer of wallboard branch
Supportting crossbeam and top cover support crossbeam includes eight sections of crossbeams, and every section of crossbeam column corresponding with both sides is connected;The column
Bottom base is detachably installed.
The base includes upper bed-plate plate, bottom seat board and the cross between the upper bed-plate plate, bottom seat board
Connecting plate is erected in the centre of setting, and the bottom of the bottom seat board is bolted in support block.
The wall board connector includes cornice sheathing connector and wainscot sheathing connector.
The every column includes a top pillar segment, three middle part pillar segments and a bottom pillar segment, the top
Pillar segment is connected with the wall-panels supports crossbeam of the top cover support crossbeam, top layer, the middle part pillar segment respectively with middle part
Three layers of wall-panels supports crossbeam are connected, and the lower pole section is connected with the wall-panels supports crossbeam of bottom.
Connecting plate is docked in the butt end of the top pillar segment, middle part pillar segment and lower pole section respectively, it is described on
Used after portion's pillar segment, middle part pillar segment and lower pole section docking by the outside fixed plate set on the outside of docking location
Fixing bolt is connected;The bottom of the lower pole section is joined with bolts by bottom connecting plate with the base.
The two ends of every section of crossbeam have the correspondence column on the upright post connecting plate with bolt hole, the column to connect respectively
There is corresponding link bolt hole the position of fishplate bar;The crossbeam include upper beam slab and lower beam slab, the upper beam slab and lower beam slab it
Between be provided with multiple vertical supporting plates, be respectively equipped with the middle part of the upper surface of the two close end of the upper beam slab and lower beam slab and lower surface
Upper reinforcing plate and lower reinforcing plate, the outboard end of the upper reinforcing plate and lower reinforcing plate are connected with the column of respective side respectively
Plate is connected.
The mounting assembly includes multiple bearings, and each bearing includes upper plate, lower plate and is connected in described
The riser that cross between upper plate, lower plate is set.
The riser that the cornice sheathing connector includes crossbeam fixed plate, is connected with the crossbeam fixed plate;The riser
Both sides are provided with riser and transverse slat, and the riser per side is connected with transverse slat T-shaped structure, and the other end of the transverse slat and upper wall
Crab bolt fixed plate is connected.
The riser that the wainscot sheathing connector includes crossbeam fixed plate, is connected with the crossbeam fixed plate;The riser
Both sides are provided with riser and transverse slat, and the riser per side is connected with transverse slat T-shaped structure, and the other end of the transverse slat and lower wall
Crab bolt fixed plate is connected.
It is entirely bolt connection, convenient disassembly between the part and part of the present invention;Suspender uniform force is rationally, whole
Body stability is good;Single unit system dismounting, change, it is easy for installation;The framework is on length, width, three directions of height
Adjust, can combine as needed, with very strong modularity and changeability.
Brief description of the drawings
Fig. 1 show the schematic front view of the multifunctional combination experimental rig installation frame of the present invention;
Fig. 2 is Fig. 1 schematic side view;
Fig. 3 is to be provided with the schematic top plan view after experimental rig wallboard;
Fig. 4 is the enlarged diagram of I part in Fig. 2;
Fig. 5 is the enlarged diagram of II part in Fig. 2;
Fig. 6-8 is cornice sheathing connector, wainscot sheathing connector and cornice sheathing, the connection diagram of wainscot sheathing;
Fig. 9-10 is the main view and schematic top plan view of base respectively;
Figure 11-12 is the main view and schematic side view of column respectively;
Figure 13 is the schematic top plan view of the connecting plate in Figure 11;
Figure 14 is diagrammatic cross-sections of the Figure 11 along line A-A;
Figure 15 is the schematic diagram of crossbeam;
Figure 16-17 connects the main view and schematic top plan view of the bearing of back timber and crossbeam respectively;
Figure 18-20 distinguishes main view, side view and the schematic top plan view of cornice sheathing connector;
Figure 21-23 is main view, side view and the schematic top plan view of wainscot sheathing connector respectively.
Embodiment
The present invention is described in further detail below in conjunction with the drawings and specific embodiments.It should be appreciated that described herein
Specific embodiment only to explain the present invention, be not intended to limit the present invention.
As shown in Figure 1-22, a kind of multifunctional combination experimental rig installation frame, including:
Columns assemblies 2 and the horizontally disposed transverse beam assembly for connecting the columns assemblies, the columns assemblies
And transverse beam assembly has the rectangular-shaped frame body of five layers of wall-panels supports crossbeam 5 by the formation of bolt detachable connection, often
Wall board connector is provided with by bolt respectively on the layer wall-panels supports crossbeam;Wherein, the wall-panels supports crossbeam of top layer also leads to
Cross the bolted connection top cover support of mounting assembly 4 crossbeam 3.
Wherein, the columns assemblies 2 include eight root posts, are detachably connected and are formed by multiple pillar segments per root post;Ginseng
See Figure 11-14, the column 2 includes a H-shaped plate 201 and two T-shaped plates, and the T shapes plate is in cross structure with H-shaped plate
Setting is welded to connect;Every layer of the wall-panels supports crossbeam and top cover support crossbeam include eight sections of crossbeams, every section of crossbeam and two
The corresponding column in side is connected;The bottom of the column is detachably provided with base 1.
Wherein, the base include with the upper bed-plate plate 11 of bolt hole 17, the bottom seat board 14 with bolt hole 15 with
And connecting plate is erected in the centre that cross is set between the upper bed-plate plate, bottom seat board, the perpendicular connecting plate in centre is included laterally
Plate 13 and longitudinal plate 12, the bottom of the bottom seat board are bolted in support block 16, referring to shown in Fig. 9-10.
Wherein, the wall board connector is used for the connection of equipment wallboard 8, including cornice sheathing connector 6 and wainscot sheathing connect
Fitting 7, is connected for realizing between the cornice sheathing 80 of wall-panels supports crossbeam 5 and equipment, wainscot sheathing 81.Referring to shown in Fig. 2-3.
Wherein, every column includes a top pillar segment 20, three middle part bottom pillar segments of pillar segment 21 and one
22, the top pillar segment is connected with the wall-panels supports crossbeam 5 of the top cover support crossbeam 3, top layer, the middle part column
Section connection corresponding with three layers of middle part of wall-panels supports crossbeam 5 respectively, the lower pole section and the wall-panels supports of bottom are horizontal
Beam 5 is connected.
Connecting plate 203 is docked in the butt end of the top pillar segment, middle part pillar segment and lower pole section respectively, joins
As shown in Figure 11-13;By outside docking location after the top pillar segment, middle part pillar segment and lower pole section docking
The outside fixed plate 23 that side is set is connected with fixing bolt 24;The bottom of the lower pole section passes through bottom connecting plate and institute
Base 1 is stated to be joined with bolts.
Wherein, shown in Figure 15, there is the upright post connecting plate 51 with bolt hole at the two ends of every section of crossbeam respectively, described
There is corresponding link bolt hole the position of the correspondence upright post connecting plate on column, can be realized with bolt 56 by crossbeam and column
Connection;The crossbeam is included between two beam slabs 52 setting up and down, two beam slabs setting up and down provided with multiple vertical
Upper reinforcing plate is respectively equipped with the middle part of supporting plate 53, the upper surface of the two close end of two beam slabs setting up and down, lower surface
54 and lower reinforcing plate 55, the upright post connecting plate phase of the outboard end of the upper reinforcing plate and lower reinforcing plate respectively with respective side
Connection.
Wherein, shown in Figure 16, the mounting assembly includes multiple bearings, each bearing include upper plate 41, under
The riser that plate 42 and the cross being connected between the upper plate, lower plate are set, including transverse vertical plate 43 and longitudinal vertical plate
44。
Referring to shown in Figure 18-20, the cornice sheathing connector include the crossbeam fixed plate 62 with bolt hole, with it is described
The riser 63 of crossbeam fixed plate connection;The both sides of the riser are provided with riser 64 and transverse slat 61, the riser and transverse slat per side
T-shaped structure is connected, and the other end of the transverse slat is connected with cornice sheathing bolt fixed plate 65.
Referring to shown in Figure 21-23, the wainscot sheathing connector include the crossbeam fixed plate 71 with bolt hole, with it is described
The riser 73 of crossbeam fixed plate connection;The both sides of the riser are provided with riser 75 and horizontal 74 plate, the riser and transverse slat per side
T-shaped structure is connected, and the other end of the transverse slat is connected with wainscot sheathing bolt fixed plate 72.
The present invention is applied on dismountable equipment for combined multifunctional, and the supporting equipment of the framework is five layers, and equipment
The load of top cover also to put on the frame, so the framework is also by five layers of consideration, and increase top cover in the top
Crossbeam unit is with support equipment top cover.
During making, all parts are made completion of processing first, the bolt that base 1 is reserved with equipment bottom surface fixes peace
Install, can conveniently adjust flatness;Next to that installing the peace of the column of five-layer structure, wall-panels supports crossbeam and wall board connector
Load is connect, and a firm entirety is made after assembling, specific to install as follows:
The 1st, the lower pole section of first layer is installed, fixation is installed in the bottom of lower pole section by bolt and base 1
Good, the lower pole section of first layer connects each lower pole section by bolt with bottom wall-panels supports crossbeam 5 after installing
Come, then the cornice sheathing connector 6 and wall-panels supports crossbeam 5 between the wall-panels supports crossbeam 5 and cornice sheathing of bottom and lower wall
Wainscot sheathing connector 7 between plate is bolted on the wall-panels supports crossbeam 5 of bottom, keeps the upper wall for installing equipment
Plate 80 and wainscot sheathing 81;
The 2nd, the second layer, third layer, the 4th layer of pillar segment corresponding with layer 5, Mei Geli are installed in the same way
Bolt connection between shell of column, and wall-panels supports crossbeam 5 and cornice sheathing connector 6, wainscot sheathing connector 7;
3rd, it is finally the multiple bearings 4 and top cover support crossbeam 3 of erection support component, bearing is for connection to layer 5
Wall-panels supports crossbeam 5 and top cover support crossbeam 3, effect is to increase the intensity of top cover support crossbeam 3.Top cover support crossbeam 3 is used
Carry out support equipment top cover.Firm frame structure is constituted after whole part installations.
It is entirely bolt connection, convenient disassembly between the part and part of the present invention;Suspender uniform force is rationally, whole
Body stability is good;Single unit system dismounting, change, it is easy for installation;The framework is on length, width, three directions of height
Adjust, can combine as needed, with very strong modularity and changeability.The suspension of various suspender equipment is applicable to, especially
In terms of applying to multifunctional combined apparatus.
Described above is only the preferred embodiment of the present invention, it is noted that for the common skill of the art
For art personnel, under the premise without departing from the principles of the invention, some improvements and modifications can also be made, these improve and moistened
Decorations also should be regarded as protection scope of the present invention.
Claims (10)
1. a kind of multifunctional combination experimental rig installation frame, it is characterised in that including columns assemblies and horizontally disposed general
The transverse beam assembly that the columns assemblies are connected, the columns assemblies and transverse beam assembly pass through bolt detachable connection shape
Into the rectangular-shaped frame body with five layers of wall-panels supports crossbeam, wall is provided with by bolt respectively in every layer of crossbeam unit
Plate connector;Wherein, the mounting assembly connection top cover support crossbeam that the wall-panels supports crossbeam of top layer is also bolted.
2. multifunctional combination experimental rig installation frame as claimed in claim 1, it is characterised in that the columns assemblies include eight
Root post, is detachably connected by multiple pillar segments per root post and is formed;The column includes H-shaped plate and two T-shaped plates, described
T-shaped plate sets in cross structure with H-shaped plate and is welded to connect;Every layer of the wall-panels supports crossbeam and top cover support crossbeam include
Eight sections of crossbeams, every section of crossbeam column corresponding with both sides is connected;The bottom of the column is detachably provided with base.
3. multifunctional combination experimental rig installation frame as claimed in claim 2, it is characterised in that the base includes upper bed-plate
Connecting plate, the bottom are erected in plate, bottom seat board and the centre that cross is set between the upper bed-plate plate, bottom seat board
The bottom of seat board is bolted in support block.
4. multifunctional combination experimental rig installation frame as claimed in claim 3, it is characterised in that the wall board connector includes
Cornice sheathing connector and wainscot sheathing connector.
5. multifunctional combination experimental rig installation frame as claimed in claim 2, it is characterised in that the every column includes one
Top pillar segment, three middle part pillar segments and a bottom pillar segment, the top pillar segment and the top cover support crossbeam, top
The wall-panels supports crossbeam of layer is connected, and the middle part pillar segment is connected with three layers of wall-panels supports crossbeam at middle part respectively, described
Lower pole section is connected with the wall-panels supports crossbeam of bottom.
6. multifunctional combination experimental rig installation frame as claimed in claim 5, it is characterised in that the top pillar segment, in
Connecting plate is docked in the butt end of portion's pillar segment and lower pole section respectively, the top pillar segment, middle part pillar segment and under
Connected after portion's pillar segment docking by the outside fixed plate set on the outside of docking location with fixing bolt;The lower pole section
Bottom be joined with bolts by bottom connecting plate with the base.
7. multifunctional combination experimental rig installation frame as claimed in claim 2, it is characterised in that the two ends difference of every section of crossbeam
There is corresponding connecting bolt the position for having the correspondence upright post connecting plate on the upright post connecting plate with bolt hole, the column
Hole;The crossbeam includes upper beam slab and lower beam slab, and multiple vertical supporting plates, the upper beam are provided between the upper beam slab and lower beam slab
Upper reinforcing plate and lower reinforcing plate, the upper reinforcement are respectively equipped with the middle part of the upper surface of the two close end of plate and lower beam slab and lower surface
The outboard end of plate and lower reinforcing plate is connected with the upright post connecting plate of respective side respectively.
8. multifunctional combination experimental rig installation frame as claimed in claim 1, it is characterised in that the mounting assembly includes many
Individual bearing, each bearing is set including upper plate, lower plate and the cross being connected between the upper plate, lower plate
Riser.
9. multifunctional combination experimental rig installation frame as claimed in claim 4, it is characterised in that the cornice sheathing connector bag
Include crossbeam fixed plate, the riser being connected with the crossbeam fixed plate;The both sides of the riser are provided with riser and transverse slat, the institute per side
Riser is stated to be connected with transverse slat T-shaped structure, and the other end of the transverse slat is connected with cornice sheathing bolt fixed plate.
10. multifunctional combination experimental rig installation frame as claimed in claim 4, it is characterised in that the wainscot sheathing connector
The riser being connected including crossbeam fixed plate, with the crossbeam fixed plate;The both sides of the riser are provided with riser and transverse slat, per side
The riser is connected with transverse slat T-shaped structure, and the other end of the transverse slat is connected with wainscot sheathing bolt fixed plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710426400.2A CN107101661B (en) | 2017-06-08 | 2017-06-08 | Multifunctional combined test device mounting frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710426400.2A CN107101661B (en) | 2017-06-08 | 2017-06-08 | Multifunctional combined test device mounting frame |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107101661A true CN107101661A (en) | 2017-08-29 |
CN107101661B CN107101661B (en) | 2023-10-20 |
Family
ID=59660936
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710426400.2A Active CN107101661B (en) | 2017-06-08 | 2017-06-08 | Multifunctional combined test device mounting frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107101661B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0485317A1 (en) * | 1990-11-05 | 1992-05-13 | José Carlos Goyeneche Florez | Prefabricated modular construction |
CN102175475A (en) * | 2011-02-16 | 2011-09-07 | 山东大学 | Kiloton modular combined adjustable self-reaction table frame device |
CN205449525U (en) * | 2016-03-30 | 2016-08-10 | 张夏 | Experimental frame of layer door |
CN205826406U (en) * | 2016-07-25 | 2016-12-21 | 安徽理工大学 | A kind of Novel self-balanced reaction frame |
CN206891466U (en) * | 2017-06-08 | 2018-01-16 | 中国汽车工业工程有限公司 | A kind of multifunctional combination experimental rig installation frame |
-
2017
- 2017-06-08 CN CN201710426400.2A patent/CN107101661B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0485317A1 (en) * | 1990-11-05 | 1992-05-13 | José Carlos Goyeneche Florez | Prefabricated modular construction |
CN102175475A (en) * | 2011-02-16 | 2011-09-07 | 山东大学 | Kiloton modular combined adjustable self-reaction table frame device |
CN205449525U (en) * | 2016-03-30 | 2016-08-10 | 张夏 | Experimental frame of layer door |
CN205826406U (en) * | 2016-07-25 | 2016-12-21 | 安徽理工大学 | A kind of Novel self-balanced reaction frame |
CN206891466U (en) * | 2017-06-08 | 2018-01-16 | 中国汽车工业工程有限公司 | A kind of multifunctional combination experimental rig installation frame |
Also Published As
Publication number | Publication date |
---|---|
CN107101661B (en) | 2023-10-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104912004A (en) | Hold rail-type track transportation bridge evacuation maintenance platform | |
CN104831632B (en) | A kind of bridge cable tower entablature and sill construction method | |
KR101928614B1 (en) | Overhead conveying device having column gantries | |
CN105350760B (en) | A kind of construction method of suspending scaffold | |
CN108412187B (en) | Construction device and construction method for outer frame structure of ultra-high conjoined group tower | |
CN107651529A (en) | A kind of elevator hoistways framework | |
CN206891466U (en) | A kind of multifunctional combination experimental rig installation frame | |
CN113404281A (en) | Climbing type scaffold, climbing and mounting method thereof and construction method of fabricated building | |
CN206707237U (en) | Cable-stayed type top layer construction platform for elevator installation | |
CN107101661A (en) | A kind of multifunctional combination experimental rig installation frame | |
CN107858925A (en) | Platform structure for the operation of pier stud overhead connection | |
CN107806237A (en) | A kind of high building hydraulic climbing protecting screen and its construction method | |
CN209924407U (en) | Combined working platform for steel structure high-altitude installation | |
CN103899078A (en) | Mounting method of attached automatic lifting protection shield | |
JP2002129747A (en) | Lift-up method and lift-up system | |
CN218970586U (en) | Climbing frame supporting part and climbing frame | |
CN112049477A (en) | Platform support construction method and platform support structure | |
CN216663835U (en) | Beam section sliding track system | |
CN112478599B (en) | Method for replacing belt corridor platform plate | |
CN111677259B (en) | High-rise Bailey truss cantilever construction method | |
CN215107157U (en) | A stores pylon for apartment building vestibule construction | |
CN210013463U (en) | Core truss structure at top of creeping formwork | |
CN219114032U (en) | Go up people's wallboard storage rack | |
CN106382001A (en) | Parapet wall mold supporting frame capable of being moved and revolved | |
CN112983049B (en) | Prefabricated wallboard supporting system and using method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |