CN107100585A - 高压胶囊固孔器 - Google Patents

高压胶囊固孔器 Download PDF

Info

Publication number
CN107100585A
CN107100585A CN201710278589.5A CN201710278589A CN107100585A CN 107100585 A CN107100585 A CN 107100585A CN 201710278589 A CN201710278589 A CN 201710278589A CN 107100585 A CN107100585 A CN 107100585A
Authority
CN
China
Prior art keywords
capsule
tube
inner tube
tube sealing
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710278589.5A
Other languages
English (en)
Inventor
辛德忠
万军
陈航
吕晋军
罗华
张始斋
刘小华
陶勇
蒲剑
宋玉壁
李和祥
唐敏
梁佐兴
石磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCTEG Chongqing Research Institute Co Ltd
Original Assignee
CCTEG Chongqing Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCTEG Chongqing Research Institute Co Ltd filed Critical CCTEG Chongqing Research Institute Co Ltd
Priority to CN201710278589.5A priority Critical patent/CN107100585A/zh
Publication of CN107100585A publication Critical patent/CN107100585A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

本发明公开了一种高压胶囊固孔器,包括内管、设置在内管两端的前封管与后封管,还包括胶囊,所述胶囊套装在内管外且两端分别与前封管及后封管连接,前封管、胶囊、后封管及内管间共同组成填充腔,所述前封管上设有与填充腔相连通的接口;该煤矿用高压胶囊固孔器整体长度不足1m,因此需要施工的孔很短,省时省力;该固孔器采用胶囊取代水泥作为固孔介质,具有固孔快速、方便、承受力大等优点,同时,还能实现重复使用,大大节约了成本投入。

Description

高压胶囊固孔器
技术领域
本发明属于土层或岩石的钻进、采矿领域,具体涉及一种高压胶囊固孔器。
背景技术
煤矿井下施工瓦斯、水防突孔时,必须在孔口外安装防喷装置,以防止出现安全事故。煤矿用固孔装置一端固定在孔内,另一端连接孔外防喷装置,其作用是将防喷装置固定在孔口,防止瓦斯、水突出时将防喷装置冲开。
目前煤矿井下施工瓦斯、水防突孔时使用的固孔装置比较简单,如附图1所示,现有固孔装置由钢管3、水泥2等组成,使用时,首先施工一个孔径较大、长度在10-15m的岩石孔,然后将相同长度的钢管3放置在孔内,最后在钢管3和孔壁1之间注入水泥2,待水泥凝固后,钢管的法兰端才可连接防喷装置。
现有的防喷固孔装置的主要存在以下几点不足:
(1)施工周期长:为保证钢管和孔壁之间的强度,需要施工的孔较长,且使用水泥作为粘合剂,凝固时间长,一般成功埋放这样一个固孔装置的周期约为3天;
(2)成本高:由于施工的孔长,相应使用的钢管、水泥多,且需要的工时也多;
(3)不可重复利用:使用水泥将钢管凝固在孔内后,只能在该孔使用,不能重复利用。
发明内容
有鉴于此,本发明的目的在于提供一种高压胶囊固孔器,以解决现有防喷固孔装置所存在的钻孔过长、耗材过多及施工工时长等问题。
为达到上述目的,本发明提供如下技术方案:一种高压胶囊固孔器,包括内管、设置在内管两端的前封管与后封管,还包括胶囊,所述胶囊套装在内管外且两端分别与前封管及后封管连接,前封管、胶囊、后封管及内管间共同组成填充腔,所述前封管上设有与填充腔相连通的接口。
进一步,所述前封管与后封管上对应设有O型密封圈。
进一步,所述内管上设有限位螺母,所述限位螺母位于内管上后封管一端。
本发明的有益效果在于:该煤矿用高压胶囊固孔器整体长度不足1m,因此需要施工的孔很短,省时省力;该固孔器采用胶囊取代水泥作为固孔介质,具有固孔快速、方便、承受力大等优点,同时,还能实现重复使用,大大节约了成本投入。
附图说明
为了使本发明的目的、技术方案和有益效果更加清楚,本发明提供如下附图进行说明:
图1为现有防喷固孔装置结构示意图;
图2为本发明的结构示意图。
具体实施方式
下面将结合附图,对本发明的优选实施例进行详细的描述。
如图2所示,本发明中的高压胶囊固孔器,包括内管4、设置在内管4两端的前封管5与后封管6,还包括胶囊7,所述胶囊7套装在内管4外且两端分别与前封管5及后封管6连接,前封管5、胶囊7、后封管6及内管4间共同组成填充腔,所述前封管5上设有与填充腔相连通的接口,接口用于连通外部高压源。
本实施例中,所述前封管5与后封管6上对应设有O型密封圈8,用以保证密封性;所述内管4上设有限位螺母9,所述限位螺母9位于内管4上后封管6一端,用以保证后封管位置的可靠性,对应的,前封管5则依靠端头处的法兰盘限定位置。
该煤矿用高压胶囊固孔器采用高压油或高压水涨紧胶囊7,具体的,高压油或者高压水经锁止阀10、输送管11及接口进入前封管5与内管4之间的流道,再通过流道进入前封管5、胶囊7、内管4、后封管6之间形成的填充腔内。在高压油或高压水的作用下,胶囊7向外扩张,进而使得胶囊7的外壁与孔壁12紧贴,依靠胶囊7与孔壁12之间产生的力,使整个固孔器牢牢地固定在孔内。没有高压油或高压水作用时,该固孔器可从孔内取出。
该固孔器通过锁止阀10与外部高压源相连,锁止阀10与输送管11间设有压力表13,当压力表13显示达到设定的压力后,关闭锁止阀10,可使填充腔内的高压持续保持。打开锁止阀10,则使填充腔内的高压卸荷,还可再取出固孔器重复使用。
最后说明的是,以上优选实施例仅用以说明本发明的技术方案而非限制,尽管通过上述优选实施例已经对本发明进行了详细的描述,但本领域技术人员应当理解,可以在形式上和细节上对其作出各种各样的改变,而不偏离本发明权利要求书所限定的范围。

Claims (3)

1.一种高压胶囊固孔器,其特征在于:包括内管、设置在内管两端的前封管与后封管,还包括胶囊,所述胶囊套装在内管外且两端分别与前封管及后封管连接,前封管、胶囊、后封管及内管间共同组成填充腔,所述前封管上设有与填充腔相连通的接口。
2.根据权利要求1所述的高压胶囊固孔器,其特征在于:所述前封管与后封管上对应设有O型密封圈。
3.根据权利要求1所述的高压胶囊固孔器,其特征在于:所述内管上设有限位螺母,所述限位螺母位于内管上后封管一端。
CN201710278589.5A 2017-04-25 2017-04-25 高压胶囊固孔器 Pending CN107100585A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710278589.5A CN107100585A (zh) 2017-04-25 2017-04-25 高压胶囊固孔器

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710278589.5A CN107100585A (zh) 2017-04-25 2017-04-25 高压胶囊固孔器

Publications (1)

Publication Number Publication Date
CN107100585A true CN107100585A (zh) 2017-08-29

Family

ID=59656962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710278589.5A Pending CN107100585A (zh) 2017-04-25 2017-04-25 高压胶囊固孔器

Country Status (1)

Country Link
CN (1) CN107100585A (zh)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3968656A (en) * 1974-04-01 1976-07-13 Texaco Inc. Marine structure with hydraulic tensioner
CN102337920A (zh) * 2011-09-14 2012-02-01 成都晟鑫机电设备有限公司 瓦斯粉尘敛集器
CN203145926U (zh) * 2013-02-19 2013-08-21 中国矿业大学 下行超深钻孔快速测定煤层瓦斯压力的装置
CN203655213U (zh) * 2013-09-10 2014-06-18 湖南省煤炭科学研究所 嵌入式防喷孔导流装置
CN204827340U (zh) * 2015-06-15 2015-12-02 华北科技学院 一种新型胶囊封孔器
CN205047184U (zh) * 2015-08-31 2016-02-24 河南能源化工集团研究院有限公司 煤矿井下打钻和冲孔过程中的防喷降尘装置
CN206681703U (zh) * 2017-04-25 2017-11-28 中煤科工集团重庆研究院有限公司 高压胶囊固孔器

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3968656A (en) * 1974-04-01 1976-07-13 Texaco Inc. Marine structure with hydraulic tensioner
CN102337920A (zh) * 2011-09-14 2012-02-01 成都晟鑫机电设备有限公司 瓦斯粉尘敛集器
CN203145926U (zh) * 2013-02-19 2013-08-21 中国矿业大学 下行超深钻孔快速测定煤层瓦斯压力的装置
CN203655213U (zh) * 2013-09-10 2014-06-18 湖南省煤炭科学研究所 嵌入式防喷孔导流装置
CN204827340U (zh) * 2015-06-15 2015-12-02 华北科技学院 一种新型胶囊封孔器
CN205047184U (zh) * 2015-08-31 2016-02-24 河南能源化工集团研究院有限公司 煤矿井下打钻和冲孔过程中的防喷降尘装置
CN206681703U (zh) * 2017-04-25 2017-11-28 中煤科工集团重庆研究院有限公司 高压胶囊固孔器

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张凤舞等: "胶囊封隔器封堵煤矿井下压裂孔技术研究", 《矿业安全与环保》 *

Similar Documents

Publication Publication Date Title
CN108119094B (zh) 深部煤层瓦斯抽采钻孔两堵一注一排封孔装置及使用方法
CN103742129B (zh) 松软煤层钻孔测定煤层瓦斯压力的方法
CN101824999B (zh) 穿层孔测定煤层瓦斯压力方法
CN103603683B (zh) 袋式注浆锚固方法
CN102628352B (zh) 一种多段式定点水力压裂方法
CN109681262B (zh) 一种提高破碎煤体中瓦斯钻孔抽采浓度的方法
CN105756599A (zh) 煤矿用两头气堵及中间水封穿层钻孔封孔装置及封孔方法
CN103758533B (zh) 一种高低压一体化巷道注浆加固方法
CN106194143B (zh) 一种二氧化碳致裂器
CN207073410U (zh) 向煤层循环注入热水和液氮的增透系统
CN209261534U (zh) 一种组合式煤层注水及瓦斯抽采封孔装置
CN106988719A (zh) 向煤层循环注入热水和液氮的增透系统和增透方法
CN104449609A (zh) 一种瓦斯抽采钻孔的主动保压封孔材料及其封孔工艺
CN105156067A (zh) 煤矿井下水力压裂钻孔封孔装置及方法
CN103939075B (zh) 一种提高煤矿瓦斯抽采效果的压裂方法及装置
AU2016231638B2 (en) A type of high pressure resistant borehole sealing device and method
CN204960882U (zh) 煤矿井下水力压裂钻孔封孔装置
CN109578058B (zh) 一种通过辅助钻孔提高抽采钻孔瓦斯抽采浓度的方法
CN104612649A (zh) 低压低渗透储层煤层气井化学增透压裂增透增产方法及其设备
CN206681703U (zh) 高压胶囊固孔器
CN106837420B (zh) 基于巷道围岩裂隙结构密闭煤矿采空区的装置和方法
CN104612625A (zh) 一种用于低渗煤层气相压裂钻孔的封孔装置
CN205638532U (zh) 煤矿井下可重复利用的瓦斯抽采注水一体封孔装置
CN210685919U (zh) 一种地下水防喷反压装置
CN107100585A (zh) 高压胶囊固孔器

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170829