CN107100585A - 高压胶囊固孔器 - Google Patents
高压胶囊固孔器 Download PDFInfo
- Publication number
- CN107100585A CN107100585A CN201710278589.5A CN201710278589A CN107100585A CN 107100585 A CN107100585 A CN 107100585A CN 201710278589 A CN201710278589 A CN 201710278589A CN 107100585 A CN107100585 A CN 107100585A
- Authority
- CN
- China
- Prior art keywords
- capsule
- tube
- inner tube
- tube sealing
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000002775 capsule Substances 0.000 title claims abstract description 33
- 238000007789 sealing Methods 0.000 claims abstract description 41
- 239000007787 solid Substances 0.000 claims description 18
- 239000004568 cement Substances 0.000 abstract description 8
- 239000003245 coal Substances 0.000 abstract description 3
- 229910000831 Steel Inorganic materials 0.000 description 7
- 239000010959 steel Substances 0.000 description 7
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 7
- 238000010276 construction Methods 0.000 description 6
- 239000010720 hydraulic oil Substances 0.000 description 4
- 230000002265 prevention Effects 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 239000011435 rock Substances 0.000 description 2
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/10—Sealing or packing boreholes or wells in the borehole
- E21B33/13—Methods or devices for cementing, for plugging holes, crevices or the like
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
Abstract
本发明公开了一种高压胶囊固孔器,包括内管、设置在内管两端的前封管与后封管,还包括胶囊,所述胶囊套装在内管外且两端分别与前封管及后封管连接,前封管、胶囊、后封管及内管间共同组成填充腔,所述前封管上设有与填充腔相连通的接口;该煤矿用高压胶囊固孔器整体长度不足1m,因此需要施工的孔很短,省时省力;该固孔器采用胶囊取代水泥作为固孔介质,具有固孔快速、方便、承受力大等优点,同时,还能实现重复使用,大大节约了成本投入。
Description
技术领域
本发明属于土层或岩石的钻进、采矿领域,具体涉及一种高压胶囊固孔器。
背景技术
煤矿井下施工瓦斯、水防突孔时,必须在孔口外安装防喷装置,以防止出现安全事故。煤矿用固孔装置一端固定在孔内,另一端连接孔外防喷装置,其作用是将防喷装置固定在孔口,防止瓦斯、水突出时将防喷装置冲开。
目前煤矿井下施工瓦斯、水防突孔时使用的固孔装置比较简单,如附图1所示,现有固孔装置由钢管3、水泥2等组成,使用时,首先施工一个孔径较大、长度在10-15m的岩石孔,然后将相同长度的钢管3放置在孔内,最后在钢管3和孔壁1之间注入水泥2,待水泥凝固后,钢管的法兰端才可连接防喷装置。
现有的防喷固孔装置的主要存在以下几点不足:
(1)施工周期长:为保证钢管和孔壁之间的强度,需要施工的孔较长,且使用水泥作为粘合剂,凝固时间长,一般成功埋放这样一个固孔装置的周期约为3天;
(2)成本高:由于施工的孔长,相应使用的钢管、水泥多,且需要的工时也多;
(3)不可重复利用:使用水泥将钢管凝固在孔内后,只能在该孔使用,不能重复利用。
发明内容
有鉴于此,本发明的目的在于提供一种高压胶囊固孔器,以解决现有防喷固孔装置所存在的钻孔过长、耗材过多及施工工时长等问题。
为达到上述目的,本发明提供如下技术方案:一种高压胶囊固孔器,包括内管、设置在内管两端的前封管与后封管,还包括胶囊,所述胶囊套装在内管外且两端分别与前封管及后封管连接,前封管、胶囊、后封管及内管间共同组成填充腔,所述前封管上设有与填充腔相连通的接口。
进一步,所述前封管与后封管上对应设有O型密封圈。
进一步,所述内管上设有限位螺母,所述限位螺母位于内管上后封管一端。
本发明的有益效果在于:该煤矿用高压胶囊固孔器整体长度不足1m,因此需要施工的孔很短,省时省力;该固孔器采用胶囊取代水泥作为固孔介质,具有固孔快速、方便、承受力大等优点,同时,还能实现重复使用,大大节约了成本投入。
附图说明
为了使本发明的目的、技术方案和有益效果更加清楚,本发明提供如下附图进行说明:
图1为现有防喷固孔装置结构示意图;
图2为本发明的结构示意图。
具体实施方式
下面将结合附图,对本发明的优选实施例进行详细的描述。
如图2所示,本发明中的高压胶囊固孔器,包括内管4、设置在内管4两端的前封管5与后封管6,还包括胶囊7,所述胶囊7套装在内管4外且两端分别与前封管5及后封管6连接,前封管5、胶囊7、后封管6及内管4间共同组成填充腔,所述前封管5上设有与填充腔相连通的接口,接口用于连通外部高压源。
本实施例中,所述前封管5与后封管6上对应设有O型密封圈8,用以保证密封性;所述内管4上设有限位螺母9,所述限位螺母9位于内管4上后封管6一端,用以保证后封管位置的可靠性,对应的,前封管5则依靠端头处的法兰盘限定位置。
该煤矿用高压胶囊固孔器采用高压油或高压水涨紧胶囊7,具体的,高压油或者高压水经锁止阀10、输送管11及接口进入前封管5与内管4之间的流道,再通过流道进入前封管5、胶囊7、内管4、后封管6之间形成的填充腔内。在高压油或高压水的作用下,胶囊7向外扩张,进而使得胶囊7的外壁与孔壁12紧贴,依靠胶囊7与孔壁12之间产生的力,使整个固孔器牢牢地固定在孔内。没有高压油或高压水作用时,该固孔器可从孔内取出。
该固孔器通过锁止阀10与外部高压源相连,锁止阀10与输送管11间设有压力表13,当压力表13显示达到设定的压力后,关闭锁止阀10,可使填充腔内的高压持续保持。打开锁止阀10,则使填充腔内的高压卸荷,还可再取出固孔器重复使用。
最后说明的是,以上优选实施例仅用以说明本发明的技术方案而非限制,尽管通过上述优选实施例已经对本发明进行了详细的描述,但本领域技术人员应当理解,可以在形式上和细节上对其作出各种各样的改变,而不偏离本发明权利要求书所限定的范围。
Claims (3)
1.一种高压胶囊固孔器,其特征在于:包括内管、设置在内管两端的前封管与后封管,还包括胶囊,所述胶囊套装在内管外且两端分别与前封管及后封管连接,前封管、胶囊、后封管及内管间共同组成填充腔,所述前封管上设有与填充腔相连通的接口。
2.根据权利要求1所述的高压胶囊固孔器,其特征在于:所述前封管与后封管上对应设有O型密封圈。
3.根据权利要求1所述的高压胶囊固孔器,其特征在于:所述内管上设有限位螺母,所述限位螺母位于内管上后封管一端。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710278589.5A CN107100585A (zh) | 2017-04-25 | 2017-04-25 | 高压胶囊固孔器 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710278589.5A CN107100585A (zh) | 2017-04-25 | 2017-04-25 | 高压胶囊固孔器 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107100585A true CN107100585A (zh) | 2017-08-29 |
Family
ID=59656962
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710278589.5A Pending CN107100585A (zh) | 2017-04-25 | 2017-04-25 | 高压胶囊固孔器 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107100585A (zh) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3968656A (en) * | 1974-04-01 | 1976-07-13 | Texaco Inc. | Marine structure with hydraulic tensioner |
CN102337920A (zh) * | 2011-09-14 | 2012-02-01 | 成都晟鑫机电设备有限公司 | 瓦斯粉尘敛集器 |
CN203145926U (zh) * | 2013-02-19 | 2013-08-21 | 中国矿业大学 | 下行超深钻孔快速测定煤层瓦斯压力的装置 |
CN203655213U (zh) * | 2013-09-10 | 2014-06-18 | 湖南省煤炭科学研究所 | 嵌入式防喷孔导流装置 |
CN204827340U (zh) * | 2015-06-15 | 2015-12-02 | 华北科技学院 | 一种新型胶囊封孔器 |
CN205047184U (zh) * | 2015-08-31 | 2016-02-24 | 河南能源化工集团研究院有限公司 | 煤矿井下打钻和冲孔过程中的防喷降尘装置 |
CN206681703U (zh) * | 2017-04-25 | 2017-11-28 | 中煤科工集团重庆研究院有限公司 | 高压胶囊固孔器 |
-
2017
- 2017-04-25 CN CN201710278589.5A patent/CN107100585A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3968656A (en) * | 1974-04-01 | 1976-07-13 | Texaco Inc. | Marine structure with hydraulic tensioner |
CN102337920A (zh) * | 2011-09-14 | 2012-02-01 | 成都晟鑫机电设备有限公司 | 瓦斯粉尘敛集器 |
CN203145926U (zh) * | 2013-02-19 | 2013-08-21 | 中国矿业大学 | 下行超深钻孔快速测定煤层瓦斯压力的装置 |
CN203655213U (zh) * | 2013-09-10 | 2014-06-18 | 湖南省煤炭科学研究所 | 嵌入式防喷孔导流装置 |
CN204827340U (zh) * | 2015-06-15 | 2015-12-02 | 华北科技学院 | 一种新型胶囊封孔器 |
CN205047184U (zh) * | 2015-08-31 | 2016-02-24 | 河南能源化工集团研究院有限公司 | 煤矿井下打钻和冲孔过程中的防喷降尘装置 |
CN206681703U (zh) * | 2017-04-25 | 2017-11-28 | 中煤科工集团重庆研究院有限公司 | 高压胶囊固孔器 |
Non-Patent Citations (1)
Title |
---|
张凤舞等: "胶囊封隔器封堵煤矿井下压裂孔技术研究", 《矿业安全与环保》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108119094B (zh) | 深部煤层瓦斯抽采钻孔两堵一注一排封孔装置及使用方法 | |
CN103742129B (zh) | 松软煤层钻孔测定煤层瓦斯压力的方法 | |
CN101824999B (zh) | 穿层孔测定煤层瓦斯压力方法 | |
CN103603683B (zh) | 袋式注浆锚固方法 | |
CN102628352B (zh) | 一种多段式定点水力压裂方法 | |
CN109681262B (zh) | 一种提高破碎煤体中瓦斯钻孔抽采浓度的方法 | |
CN105756599A (zh) | 煤矿用两头气堵及中间水封穿层钻孔封孔装置及封孔方法 | |
CN103758533B (zh) | 一种高低压一体化巷道注浆加固方法 | |
CN106194143B (zh) | 一种二氧化碳致裂器 | |
CN207073410U (zh) | 向煤层循环注入热水和液氮的增透系统 | |
CN209261534U (zh) | 一种组合式煤层注水及瓦斯抽采封孔装置 | |
CN106988719A (zh) | 向煤层循环注入热水和液氮的增透系统和增透方法 | |
CN104449609A (zh) | 一种瓦斯抽采钻孔的主动保压封孔材料及其封孔工艺 | |
CN105156067A (zh) | 煤矿井下水力压裂钻孔封孔装置及方法 | |
CN103939075B (zh) | 一种提高煤矿瓦斯抽采效果的压裂方法及装置 | |
AU2016231638B2 (en) | A type of high pressure resistant borehole sealing device and method | |
CN204960882U (zh) | 煤矿井下水力压裂钻孔封孔装置 | |
CN109578058B (zh) | 一种通过辅助钻孔提高抽采钻孔瓦斯抽采浓度的方法 | |
CN104612649A (zh) | 低压低渗透储层煤层气井化学增透压裂增透增产方法及其设备 | |
CN206681703U (zh) | 高压胶囊固孔器 | |
CN106837420B (zh) | 基于巷道围岩裂隙结构密闭煤矿采空区的装置和方法 | |
CN104612625A (zh) | 一种用于低渗煤层气相压裂钻孔的封孔装置 | |
CN205638532U (zh) | 煤矿井下可重复利用的瓦斯抽采注水一体封孔装置 | |
CN210685919U (zh) | 一种地下水防喷反压装置 | |
CN107100585A (zh) | 高压胶囊固孔器 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170829 |
|
RJ01 | Rejection of invention patent application after publication |