CN107100284A - Prevent iron tower of power transmission line bottom column material corrosion device - Google Patents
Prevent iron tower of power transmission line bottom column material corrosion device Download PDFInfo
- Publication number
- CN107100284A CN107100284A CN201710437096.1A CN201710437096A CN107100284A CN 107100284 A CN107100284 A CN 107100284A CN 201710437096 A CN201710437096 A CN 201710437096A CN 107100284 A CN107100284 A CN 107100284A
- Authority
- CN
- China
- Prior art keywords
- plate
- arc
- silica gel
- die
- mould
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/64—Insulation or other protection; Elements or use of specified material therefor for making damp-proof; Protection against corrosion
- E04B1/642—Protecting metallic construction elements against corrosion
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/22—Sockets or holders for poles or posts
- E04H12/2292—Holders used for protection, repair or reinforcement of the post or pole
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Water Treatment By Electricity Or Magnetism (AREA)
Abstract
Prevent iron tower of power transmission line bottom column material corrosion device, including L shaped plate and Die and mould plate, Die and mould plate is arc plate structure, the middle part of L shaped plate sets arcwall face, the radian of L shaped plate is more than the radian of Die and mould plate, and the both sides of L shaped plate are respectively mounted second arc, and the both sides of Die and mould plate are respectively mounted first arc, the present invention uses hyperbola design to facilitate inside stuffing to play guiding rainwater to trickling on the outside of tower material, the occurrence of mitigating ponding to greatest extent;The present invention is fixed on tower leg; a kind of gluey composite is poured into a mould inside to it; play the fine gap filled up between cement protective cap and tower material and guiding current outwards drain effect, to reach the occurrence of preventing infiltration and ponding, to reach the optimum efficiency of anti-tower material bottom corrosion.
Description
Technical field
The present invention relates to a kind of Rustproofing apparatus, iron tower of power transmission line bottom column material corrosion device is specifically prevented.
Background technology
The current power transmission line steel tower overwhelming majority is angle steel tower, is exposed to for a long time in large natural environment.Current Shandong District
Run time most long 500kV transmission lines of electricity nearly 30 years, the earliest 500kV transmission lines of electricity in Linyi Prefecture such as you transported according to I line
Row was more than 15 years.Due to some following reason, steel tower bottom column material with cement protective cap contact position nearby seriously become rusty by generally existing
Erosion situation:Water at cement protective cap:Due to the old all planar designs of circuit protective cap, hold around the main material of steel tower bottom
Easy ponding, such as acidic rain water, long term causes and the tower material corrosion of protective cap contact position;Coefficient of expansion difference causes protective cap
Occurs infiltration gap between tower material:Simultaneously gap is not present in script cement protective cap and angle steel, but due to material different heat expansion system
Number is different, adds and is exposed to for many years under large natural environment, causes occur trickle gap, acid rain between cement protective cap and tower material
Water, humid air etc. cause further corrosion to bottom column material after penetrating into;Tower material corrosion is accelerated in the accumulation such as stalk, debris:According to
Transmission line of electricity operating standard, does not allow have the accumulation situations such as stalk, native stone debris at tower leg.But every transmission line of electricity is at least several
The base steel tower of ten milimeter number hundred, typically has four tower legs per base steel tower, therefore packing phenomenon is difficult to avoid completely.Due to stalk corrosion
And local humid air effect, further speed up the speed of steel tower bottom column material corrosion.
The content of the invention
It is an object of the invention to provide iron tower of power transmission line bottom column material corrosion device is prevented, above mentioned problem can solve the problem that.
The present invention to achieve the above object, is achieved through the following technical solutions:Prevent iron tower of power transmission line bottom column material from becoming rusty
Device, including L shaped plate and Die and mould plate are lost, Die and mould plate is arc plate structure, and the middle part of L shaped plate sets arcwall face, the radian of L shaped plate
More than the radian of Die and mould plate, the both sides of L shaped plate are respectively mounted second arc, and the both sides of Die and mould plate are respectively mounted first arc
Shape plate, the side of the side of the second arc and the first arc coordinates, energy after the coordinating with the first arc of the second arc
Formed on the plane of an arc, one of them second arc and the second connecting plate is installed, installed on another second arc
The first connecting plate is installed on second snapping plate, one of them first arc, the first snapping is installed on another first arc
Plate, the side of the second connecting plate and the side of the first connecting plate are hinged, and the second strong magnet, first are installed in the side of the second snapping plate
The first strong magnet is installed in the side of snapping plate, and the first strong magnet can attract each other cooperations with the second strong magnet, the first arc with
Second arc is installed in the fixed cylinder for setting one end open on the outside of elastic sealing device, L shaped plate two ends respectively, L shaped plate two ends
Side sets guide sleeve is equipped with guide rod, guide rod respectively, sets reinforcing plate on the inside of Die and mould plate, guide sleeve and reinforcing plate it
Between bracing piece is set, bracing piece two ends are hinged with guide sleeve and reinforcing plate respectively, and fixed cylinder openend is hinged one end of baffle plate, gear
The other end of plate is locked with L shaped plate, and the two ends of drawstring are set on baffle plate, and drawstring is connected through the two ends of L shaped plate and guide sleeve.
In order to further realize the purpose of the present invention, following technical scheme can also be used:The elastic sealing device bag
The 3rd silica gel plate is included, the 3rd silica gel plate is located between the first arc and the second arc, the side and first of the 3rd silica gel plate
Arc is connected.The end both sides of 3rd silica gel plate are respectively mounted the first silica gel plate and the second silica gel plate, the first silica gel plate
Curved with the second silica gel plate, the first silica gel plate is fitted with the inwall of the first arc, the second silica gel plate and the second arc
Inwall laminating.
The advantage of the invention is that:The present invention uses hyperbola design to facilitate inside stuffing to play guiding rainwater to tower
Trickled on the outside of material, the occurrence of mitigating ponding to greatest extent;The present invention is fixed on tower leg, to it inside cast it is a kind of gluey
Composite, plays the fine gap filled up between cement protective cap and tower material and guiding current outwards drain effect, anti-to reach
Only infiltration and the occurrence of ponding, to reach the optimum efficiency of anti-tower material bottom corrosion.The Die and mould plate and L shaped plate of the present invention makes
Particular manufacturing craft is made with PVC material.The radian that the radian of the L shaped plate of the present invention is more than Die and mould plate makes the filler poured to be formed
Middle part is abundant, improves the degree that the filler poured is penetrated between tower material and concrete, makes the filler poured in tower material
Right angle goes out can be more closely knit, it is to avoid space occurs between the filler and tower material that pour, so as to improve the filler pair poured
The barrier propterty of tower material.The plane that an arc can be formed after the coordinating with the first arc of the second arc of the present invention can be with
The filler poured is formed round and smooth face in tower material edge, be more uniformly stressed the filler poured, reduce what is poured
The probability that filler is damaged under external force.The side of the second connecting plate of the present invention is hinged both with the side of the first connecting plate
Die and mould plate and L shaped plate can be facilitated to fasten and Die and mould plate can be facilitated and L shaped plate dismounting.The first strong magnet and second of the present invention
Strong magnet can mutually be held after Die and mould plate and L shaped plate are fastened, and make Die and mould plate and L shaped plate maintain to fasten posture, while first
Strong magnet and the second strong magnet, which coordinate, can save the use of bolt, and substantially increase the filler that pours pours efficiency.This
The elastic sealing device of invention can make the contact surface of the first arc and the second arc close after Die and mould plate and L shaped plate coordinate
Envelope, it is to avoid the filler leakage poured.Bracing piece and drawstring can be placed on fixed cylinder by the present invention in transport and placement
It is interior, and baffle plate is locked with L shaped plate, make bracing piece and the convenient transport of drawstring, it is to avoid put mixed and disorderly space-consuming big.Before pouring,
Take out bracing piece and by two ends be hinged with guide sleeve and reinforcing plate, and connect baffle plate and guide sleeve with drawstring, pass through fixed draw
The link position of rope and baffle plate, the position of regulation guide sleeve on the guide bar, so as to adjust between Die and mould plate and L shaped plate
Distance, it is to avoid when pulling avoids pouring, Die and mould plate and L shaped plate are filled thing and strut deformation, and connect between Die and mould plate and L shaped plate
Connecing too closely causes later stage filler to strut both.Reinforcing plate can play protection Die and mould plate, and conveniently connect with bracing piece
The effect connect.The present invention also has the advantages that compact, manufacturing cost simple for structure is cheap and easy to use.
Brief description of the drawings
Fig. 1 is structural representation of the invention;Fig. 2 is Fig. 1 I mplifying structure schematic diagram.
Mark explanation:The arc 6L shapes of 1 Die and mould plate, 2 first connecting plate, 3 second connecting plate, 4 first arc 5 second
The strong magnet 14 of 7 arcwall face of plate, 9 first 12 first snapping plate of silica gel plate the 3rd silica gel plate of 10 second silica gel plate 11 13 first
The baffle plate of second 20 bracing piece of strong magnet 15 second snapping plate, 16 fixed cylinder, 17 guide rod, 18 guide sleeve, 19 reinforcing plate 21
22 drawstrings.
Embodiment
Iron tower of power transmission line bottom column material corrosion device is prevented, as depicted in figs. 1 and 2, including L shaped plate 6 and Die and mould plate 1,
Die and mould plate 1 is arc plate structure, and the middle part of L shaped plate 6 sets arcwall face 7, and the radian of L shaped plate 6 is more than the radian of Die and mould plate 1, L-shaped
The both sides of plate 6 are respectively mounted second arc 5, and the both sides of Die and mould plate 1 are respectively mounted first arc 4, the second arc 5
The side of side and the first arc 4 coordinate, can form an arc after the coordinating with the first arc 4 of the second arc 5
Plane, the second connecting plate 3 is installed on one of them second arc 5, the second snapping plate is installed on another second arc 5
15, the first connecting plate 2 is installed on one of them first arc 4, the first snapping plate 12 is installed on another first arc 4,
The side of second connecting plate 3 and the side of the first connecting plate 2 are hinged, and the second strong magnet 14 is installed in the side of the second snapping plate 15,
The first strong magnet 13 is installed in the side of first snapping plate 12, and the first strong magnet 13 can attract each other cooperation with the second strong magnet 14,
First arc 4 and the second arc 5 install the fixation for setting one end open on the outside of elastic sealing device, the two ends of L shaped plate 6 respectively
Set respectively on the inside of cylinder 16, the two ends of L shaped plate 6 and guide sleeve 18 is equipped with guide rod 17, guide rod 17, the inner side of Die and mould plate 1 is set
Put reinforcing plate 19, between guide sleeve 18 and reinforcing plate 19 set bracing piece 20, the two ends of bracing piece 20 respectively with guide sleeve 18 and plus
Strong plate 19 is hinged, and the openend of fixed cylinder 16 is hinged one end of baffle plate 21, and the other end and the L shaped plate 6 of baffle plate 21 are locked, on baffle plate 21
The two ends of drawstring 22 are set, and drawstring 22 is connected through L shaped plate 6 with the two ends of guide sleeve 18.
The present invention uses hyperbola design to facilitate inside stuffing to play guiding rainwater to trickling, maximum limit on the outside of tower material
The occurrence of degree mitigates ponding;The present invention is fixed on tower leg, to it inside pour into a mould a kind of gluey composite, play and fill up
Fine gap and guiding current between cement protective cap and tower material outwards drain effect, and infiltration and ponding situation are prevented to reach
Occur, to reach the optimum efficiency of anti-tower material bottom corrosion.The Die and mould plate 1 and L shaped plate 6 of the present invention makes special using PVC material
Use mould.The radian of the L shaped plate 6 of the present invention, which is more than the radian of Die and mould plate 1, makes abundant in the middle part of the filler poured to be formed, raising
The degree that the filler poured is penetrated between tower material and concrete, the filler poured is gone out at tower material right angle can be more
It is closely knit, it is to avoid space occur between the filler and tower material that pour, so as to improve the barrier propterty of the filler that pours to tower material.
The plane with that can form an arc after the cooperation of the first arc 4 of the second arc 5 of the present invention can make the filling poured
Thing forms round and smooth face in tower material edge, is more uniformly stressed the filler poured, reduces the filler poured in external force
The lower probability damaged of effect.The side of the second connecting plate 3 of the present invention is hinged with the side of the first connecting plate 2 can both facilitate mould
Tool plate 1 and L shaped plate 6 are fastened can facilitate Die and mould plate 1 and L shaped plate 6 to dismantle again.The first strong magnet 13 and the last the second magnetic of the present invention
Iron 14 can mutually be held after Die and mould plate 1 and L shaped plate 6 are fastened, and make Die and mould plate 1 and L shaped plate 6 maintain to fasten posture, while the
One strong magnet 13 and the second strong magnet 14, which coordinate, can save the use of bolt, and substantially increase the filler that pours pours effect
Rate.The elastic sealing device of the present invention can make the first arc 4 and the second arc 5 after Die and mould plate 1 and L shaped plate 6 coordinate
Contact surface sealing, it is to avoid pour filler leakage.The fixed cylinder 16, L of one end open is set respectively on the outside of the two ends of L shaped plate 6
Set respectively on the inside of the two ends of shape plate 6 and guide sleeve 18 is equipped with guide rod 17, guide rod 17, the inner side of Die and mould plate 1, which is set, to be strengthened
Plate 19, between guide sleeve 18 and reinforcing plate 19 set bracing piece 20, the two ends of bracing piece 20 respectively with guide sleeve 18 and reinforcing plate 19
It is hinged, the openend of fixed cylinder 16 is hinged one end of baffle plate 21, the other end and the L shaped plate 6 of baffle plate 21 are locked, sets and draw on baffle plate 21
The two ends of rope 22, drawstring 22 is connected through L shaped plate 6 with the two ends of guide sleeve 18.Perforate or setting hook etc. are fixed on baffle plate 21
Device, facilitates drawstring 22 to be connected with baffle plate 21.This structure can place bracing piece 20 and drawstring 22 in transport and placement
In fixed cylinder 16, and baffle plate 21 is locked with L shaped plate 6, make bracing piece 20 and the convenient transport of drawstring 22, it is to avoid put and account in a jumble
It is big with space.Before pouring, take out bracing piece 20 and by two ends be hinged with guide sleeve 18 and reinforcing plate 19, and connected with drawstring 22
Baffle plate 21 and guide sleeve 18, by fixed pulling rope 22 and the link position of baffle plate 21, regulation guide sleeve 18 is on guide rod 17
Position, so as to adjust the distance between Die and mould plate 1 and L shaped plate 6, it is to avoid when pulling avoids pouring, Die and mould plate 1 and L shaped plate 6
Being filled thing and strutting to connect between deformation, and Die and mould plate 1 and L shaped plate 6 too closely causes later stage filler to strut both.
Reinforcing plate 19 can play protection Die and mould plate 1, and the effect being conveniently connected with bracing piece 20.
The elastic sealing device includes the 3rd silica gel plate 11, and the 3rd silica gel plate 11 is located at the first arc 4 and the second arc
Between shape plate 5, the side of the 3rd silica gel plate 11 is connected with the first arc 4.The 3rd silica gel plate 11 of the present invention, can be in mould
Plate 1 and L shaped plate 6 seal the contact surface of the first arc 4 and the second arc 5 after coordinating, it is to avoid the filler leakage poured.
The end both sides of 3rd silica gel plate 11 are respectively mounted the first silica gel plate 9 and the second silica gel plate 10, the first silica gel
The silica gel plate 10 of plate 9 and second is curved, and the first silica gel plate 9 is fitted with the inwall of the first arc 4, the second silica gel plate 10 and
The inwall laminating of two arcs 5.The first silica gel plate 9 of the present invention is fitted with the inwall of the first arc 4, the second silica gel plate 10 and
The inwall laminating of second arc 5 can increase the sealing area of the 3rd silica gel plate 11, further avoid the filler poured from letting out
Dew.
Technical scheme is not restricted in the range of embodiment of the present invention.The not detailed description of the present invention
Technology contents be known technology.
Claims (3)
1. prevent iron tower of power transmission line bottom column material corrosion device, it is characterised in that:Including L shaped plate (6) and Die and mould plate (1), mould
It is arc plate structure to have plate (1), and the middle part of L shaped plate (6) sets arcwall face (7), and the radian of L shaped plate (6) is more than Die and mould plate (1)
Radian, the both sides of L shaped plate (6) are respectively mounted second arc (5), and the both sides of Die and mould plate (1) are respectively mounted first arc
Plate (4), the side of the second arc (5) and the side of the first arc (4) coordinate, the second arc (5) with the first arc
Plate (4) can form the plane of an arc after coordinating, and the second connecting plate (3) is installed on one of them second arc (5), another
Second snapping plate (15) is installed on individual second arc (5), the first connecting plate (2) is installed on one of them first arc (4),
First snapping plate (12), side and the first connecting plate (2) of the second connecting plate (3) are installed on another first arc (4)
Side is hinged, and the second strong magnet (14) is installed in the side of the second snapping plate (15), and the side of the first snapping plate (12) installs first
Strong magnet (13), the first strong magnet (13) can attract each other cooperation, the first arc (4) and the second arc with the second strong magnet (14)
Shape plate (5) installs elastic sealing device, L shaped plate(6)The fixed cylinder of one end open is set respectively on the outside of two ends(16), L shaped plate(6)
Guide rod is set respectively on the inside of two ends(17), guide rod(17)On be equipped with guide sleeve(18), Die and mould plate (1) inner side, which is set, to be added
Strong plate(19), guide sleeve(18)With reinforcing plate(19)Between bracing piece is set(20), bracing piece(20)Two ends respectively with guide sleeve
(18)And reinforcing plate(19)It is hinged, fixed cylinder(16)Openend is hinged baffle plate(21)One end, baffle plate(21)The other end and L-shaped
Plate(6)Locking, baffle plate(21)Upper setting drawstring(22)Two ends, drawstring(22)Through L shaped plate(6)With guide sleeve(18)Two ends
Connection.
2. according to claim 1 prevent iron tower of power transmission line bottom column material corrosion device, it is characterised in that:The elasticity
Sealing device includes the 3rd silica gel plate (11), the 3rd silica gel plate (11) be located at the first arc (4) and the second arc (5) it
Between, the side of the 3rd silica gel plate (11) is connected with the first arc (4).
3. according to claim 2 prevent iron tower of power transmission line bottom column material corrosion device, it is characterised in that:Described 3rd
The end both sides of silica gel plate (11) are respectively mounted the first silica gel plate (9) and the second silica gel plate (10), the first silica gel plate (9) and second
Silica gel plate (10) is curved, and the first silica gel plate (9) is fitted with the inwall of the first arc (4), the second silica gel plate (10) and the
The inwall laminating of two arcs (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710437096.1A CN107100284B (en) | 2017-06-12 | 2017-06-12 | Prevent iron tower of power transmission line bottom column material from corroding device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710437096.1A CN107100284B (en) | 2017-06-12 | 2017-06-12 | Prevent iron tower of power transmission line bottom column material from corroding device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107100284A true CN107100284A (en) | 2017-08-29 |
CN107100284B CN107100284B (en) | 2019-02-19 |
Family
ID=59660121
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710437096.1A Active CN107100284B (en) | 2017-06-12 | 2017-06-12 | Prevent iron tower of power transmission line bottom column material from corroding device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107100284B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109458031A (en) * | 2018-10-10 | 2019-03-12 | 安溪达亚齐机械设计有限公司 | Prevent regulation high-tension line steel tower by magnetostriction to expand with heat and contract with cold with fixed device |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1631227A (en) * | 1926-12-06 | 1927-06-07 | Edward E See | Staff base |
JP2001164761A (en) * | 1999-12-06 | 2001-06-19 | Suehiro Resin Kogyosho:Kk | Repair construction by raising heavy corrosion-proof root-wound laminate for existing steel plate column, and method therefor |
CN201221160Y (en) * | 2008-06-02 | 2009-04-15 | 华升建设集团有限公司 | Waterproof structure of roof deformation joint |
JP2010236295A (en) * | 2009-03-31 | 2010-10-21 | Chugoku Electric Power Co Inc:The | Cover for portion of contact of electric pole with ground surface |
JP2010236296A (en) * | 2009-03-31 | 2010-10-21 | Chugoku Electric Power Co Inc:The | Cover for portion of contact of electric pole with ground surface |
CN102518216A (en) * | 2011-12-27 | 2012-06-27 | 江西中联建设集团有限公司 | Cantilever type cover plate deformation joint structure of accessible roof and construction method for structure |
CN103498514A (en) * | 2013-09-02 | 2014-01-08 | 东莞市彩丽建筑维护技术有限公司 | Method for preventing and treating leakage in joint portion between outer wall eave grid and roof and water blocking and draining component |
CN104912208A (en) * | 2015-06-17 | 2015-09-16 | 中冶南方工程技术有限公司 | Anticorrosion structure and treatment method of outer bottom edge board of gas chamber |
-
2017
- 2017-06-12 CN CN201710437096.1A patent/CN107100284B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1631227A (en) * | 1926-12-06 | 1927-06-07 | Edward E See | Staff base |
JP2001164761A (en) * | 1999-12-06 | 2001-06-19 | Suehiro Resin Kogyosho:Kk | Repair construction by raising heavy corrosion-proof root-wound laminate for existing steel plate column, and method therefor |
CN201221160Y (en) * | 2008-06-02 | 2009-04-15 | 华升建设集团有限公司 | Waterproof structure of roof deformation joint |
JP2010236295A (en) * | 2009-03-31 | 2010-10-21 | Chugoku Electric Power Co Inc:The | Cover for portion of contact of electric pole with ground surface |
JP2010236296A (en) * | 2009-03-31 | 2010-10-21 | Chugoku Electric Power Co Inc:The | Cover for portion of contact of electric pole with ground surface |
CN102518216A (en) * | 2011-12-27 | 2012-06-27 | 江西中联建设集团有限公司 | Cantilever type cover plate deformation joint structure of accessible roof and construction method for structure |
CN103498514A (en) * | 2013-09-02 | 2014-01-08 | 东莞市彩丽建筑维护技术有限公司 | Method for preventing and treating leakage in joint portion between outer wall eave grid and roof and water blocking and draining component |
CN104912208A (en) * | 2015-06-17 | 2015-09-16 | 中冶南方工程技术有限公司 | Anticorrosion structure and treatment method of outer bottom edge board of gas chamber |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109458031A (en) * | 2018-10-10 | 2019-03-12 | 安溪达亚齐机械设计有限公司 | Prevent regulation high-tension line steel tower by magnetostriction to expand with heat and contract with cold with fixed device |
CN109458031B (en) * | 2018-10-10 | 2020-10-13 | 泉州台商投资区长矽工业设计有限公司 | Fixing device for preventing and controlling expansion with heat and contraction with cold of high-voltage line iron tower through magnetostriction |
Also Published As
Publication number | Publication date |
---|---|
CN107100284B (en) | 2019-02-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204060720U (en) | A kind of inverted arch structure being applicable to soft rock tunnel | |
CN204000838U (en) | The anti-Flow Structure Around of diaphragm wall capsule-type | |
CN209642270U (en) | A kind of novel power cable protection pipe | |
CN107100284A (en) | Prevent iron tower of power transmission line bottom column material corrosion device | |
CN208267867U (en) | A kind of tunnel upper large size is without filled-type solution cavity supporting construction | |
CN206016818U (en) | A kind of suitable for steel bushing balance originating with reach portal seal construction | |
CN206309099U (en) | Prevent iron tower of power transmission line bottom column material corrosion device | |
CN206829752U (en) | A kind of single-pipe tower | |
CN201663240U (en) | Movable grounding electrode and auxiliary grounding wire | |
CN209472354U (en) | It is a kind of for communicating the cable self-detaching device in overhead transmission line | |
CN205421736U (en) | Structure of lockstitching a border of contour plate | |
CN204825820U (en) | Utilize traffic hole to make pressure regulating well structure that goes up room | |
CN109505256B (en) | Anti-sliding device of movable formwork in strong wind environment | |
CN209779813U (en) | Anti-settling mounting structure for building pipeline | |
CN205776344U (en) | A kind of beam slab overhead type cable termination field | |
CN209179597U (en) | A kind of frost crack-proof hollow concrete electric pole | |
CN206874253U (en) | Uphole hole sealing device in grouting | |
CN201738570U (en) | Large wall template | |
CN206722870U (en) | A kind of Air Throttle in Mine Pit wall | |
CN206752485U (en) | Vacuum-dewatering well plugging structure | |
CN216238626U (en) | Bilateral ultrahigh tower crane foundation enclosure system and tower crane system | |
CN213693117U (en) | Roof lightning rod mounting structure | |
CN205296176U (en) | Support tip in concrete and adopt shaped steel structural system | |
CN203742166U (en) | Combined mold for reserving cast-in-situ concrete floor holes | |
CN204676580U (en) | A kind of rock foundation overhead power line steel tower prestressed anchor basis |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |