CN107098095B - High density tiered warehouse facility goes out storage method - Google Patents

High density tiered warehouse facility goes out storage method Download PDF

Info

Publication number
CN107098095B
CN107098095B CN201710291471.6A CN201710291471A CN107098095B CN 107098095 B CN107098095 B CN 107098095B CN 201710291471 A CN201710291471 A CN 201710291471A CN 107098095 B CN107098095 B CN 107098095B
Authority
CN
China
Prior art keywords
goods
tunnel
cargo
goods yard
yard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710291471.6A
Other languages
Chinese (zh)
Other versions
CN107098095A (en
Inventor
耿鹏丽
唐自强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yongshanqiao Archives Management Service Co ltd
Original Assignee
Wing Kong (nanjing) Storage Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wing Kong (nanjing) Storage Service Co Ltd filed Critical Wing Kong (nanjing) Storage Service Co Ltd
Priority to CN201710291471.6A priority Critical patent/CN107098095B/en
Publication of CN107098095A publication Critical patent/CN107098095A/en
Application granted granted Critical
Publication of CN107098095B publication Critical patent/CN107098095B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G1/00Storing articles, individually or in orderly arrangement, in warehouses or magazines
    • B65G1/02Storage devices
    • B65G1/04Storage devices mechanical
    • B65G1/0492Storage devices mechanical with cars adapted to travel in storage aisles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G1/00Storing articles, individually or in orderly arrangement, in warehouses or magazines
    • B65G1/02Storage devices
    • B65G1/04Storage devices mechanical
    • B65G1/137Storage devices mechanical with arrangements or automatic control means for selecting which articles are to be removed
    • B65G1/1373Storage devices mechanical with arrangements or automatic control means for selecting which articles are to be removed for fulfilling orders in warehouses

Abstract

Go out storage method the invention discloses high density tiered warehouse facility, includes the following steps:Step 1, goods yard is generated:The goods yard of goods areas all in tiered warehouse facility is named, and excludes not available goods yard;Step 2, a temporary working is defined in each goods area, i.e. sky tunnel, and the shuttle in a special service sky tunnel is reserved on each empty tunnel;Step 3, when the goods warehousing of client, according to the similarity of the label substance of cargo, the highest tunnel of similarity is obtained as most suitable tunnel, and by the available empty goods yard on the cargo storage to the tunnel;Step 4, when picking, on the goods movement to temporary working outside cargo that will be taken out, then the cargo is taken out, further according to the similarity of the label substance of cargo on temporary working, show that the cargo of temporary working as most suitable tunnel, and is moved on to the available empty goods yard on the tunnel by the highest tunnel of similarity.

Description

High density tiered warehouse facility goes out storage method
Technical field
Go out storage method the present invention relates to high density tiered warehouse facility.
Background technique
Since storage rack industry reform is open, China's warehousing industry is fast-developing, and storage facilities are obviously improved, industry size Continuous enlargement, the level of socializations are gradually accelerated, and service level increases with operating efficiency, the storage of real estate class, finance occur The new operation industry situations such as class storage, self-service storage, e-tailing storage, a collection of perfect in shape and function incorporate Supply Chain Coordination Management clothes The modern storage enterprise of business shows one's talent.But in general, there are no essence for traditional management style of China's warehousing industry Change, automated warehouse, standardization and information system management cause circulation enterprise of China commodity stocks time still in reduced levels It is too long, to account for pressure fund excessive.
Logistic industry develops constantly at present, also pushes the development of shelf.With the significantly increasing of logistics capacity Add, warehouse also will gradually carry out modern management, and in order to improve the performance in warehouse, the quantity of shelf does not require nothing more than more, also require There is more more functions, can help to realize mechanization, the operation of automation.
Summary of the invention
The present invention in view of the deficiencies of the prior art and the urgent need of storage sector, provides high density tiered warehouse facility Storage method out, method, storage method and warehouse-out method including generating goods yard, storage method has followed stack " after advanced out Out, last in, first out " principle, subregion stored, and the reliability of warehousing management is effectively increased.Generate goods yard method include Goods yard naming method, storage method include searching that empty goods yard can be used, and warehouse-out method is including searching temporary working, searching cargo outer end Non-empty goods yard.Wherein, lookup can be in empty goods yard, and preferential distribution client has occupied the available empty goods yard in tunnel, and guarantees It is all that the cargo in one tunnel is all pertaining only to a client, while the highest cargo of label substance similarity is placed in one It rises, effectively increases the efficiency of batch outbound.The present invention specifically comprises the following steps:
Step 1, goods yard is generated:The goods yard of goods areas all in tiered warehouse facility is named, and excludes not available goods yard;
Step 2, a temporary working is defined in each goods area, i.e., empty tunnel, and one is reserved on each empty tunnel The shuttle in a special service sky tunnel;
Step 3, when the goods warehousing of client, according to the similarity of the label substance of cargo, the highest lane of similarity is obtained Road is as most suitable tunnel, and by the available empty goods yard on the cargo storage to the tunnel;
Step 4, when picking, on the goods movement to temporary working outside cargo that will take out, then the cargo is taken Out, further according to the similarity of the label substance of cargo on temporary working, obtain the highest tunnel of similarity as most suitable lane Road, and the cargo of temporary working is moved on to the available empty goods yard on the tunnel.
Goods warehousing and when outbound in step 3 and step 4, it then follows the principle of stack " first-in last-out, last in, first out ".
Step 1 includes the following steps:
Step 1-1, it is assumed that have n goods area in tiered warehouse facility, each goods area has a row, b layers, c column, then a shared d goods Position, d=n*a*b*c, goods yard naming method are i-x-y-z, indicate that the goods yard is located at i-th of goods area, xth row, y layers, z Column, wherein i value range is 1~n, and n value is natural number, and x value range is 1~a, and a value is natural number, y value range For 1~b, b value is natural number, and z value range is 1~c, and c value is natural number, defines the goods nearest apart from warehouse entrance Frame is site location, and site location is as the starting point of storage and the terminal of outbound, in going out storage process, site location play to Important role is closed, site location is about set to 1-1-1-1 in this example, i.e. the 1st goods area the 1st arranges the 1st layer of the 1st column goods yard position Set, and define from entrance to reservoir area inside, goods area, shelf number of rows are incremented by successively, and the number of plies is incremented by successively from top to bottom, columns from Arrive outside interior incremented by successively, i.e., the 1st is classified as outermost end, and c is classified as inner terminal, and the shelf that x arranges y layers are defined as tunnel x-y;
Step 1-2, excludes not available goods yard, including excludes website, i.e. the 1st goods area, the 1st row goods yard.
In step 2, highest one layer of the shelf temporary working H as the goods area that each goods area is relatively intermediate is used The jth of i-th goods area arranges b layers as temporary working, wherein j=[a/2], i.e. number of rows are rounded divided by 2, it is such as obtaining the result is that Tunnel where the goods yard excluded, should carry out number of rows j plus 1 obtains temporary working H, and the shuttle reserved on empty tunnel defaults position It is set to i-j-b-1, i.e. temporary working outermost goods yard.
Step 3 includes the following steps:
Before the goods warehousing of client, label is arranged to each cargo, the content that label is used to record cargo (enters in step 3-1 When library, preferential distribution client has occupied the available empty goods yard in tunnel, and guarantees that the cargo in a tunnel is all pertaining only to one Client is all, and the efficiency of picking is improved convenient for the later period);
Step 3-2 inquires the client with the presence or absence of the cargo for occupying goods yard and searches occupied goods yard if there is record All tunnels at place execute step 3-3, no to then follow the steps 3-4;
Whether step 3-3, all tunnels where inquiring goods yard occupied by the client fill, that is, judge tunnel outermost goods Whether position has cargo, if only one tunnel for being not filled up with, takes the innermost empty goods yard in the tunnel as goods warehousing Target goods yard cargo transport to target goods yard is completed into storage;If there is the tunnel that two or more is not filled up with, according to lane The label intersection of all cargos obtains the common tag set in tunnel on road, and the tag set of cargo to be put in storage can be used with each The common tag intersection of sets collection in tunnel obtains the same label set of cargo Yu corresponding tunnel, such as tunnel a1Upper m1 public Tag set is P1, tunnel a2Upper m2 common tag collection is combined into P2, and n tag set of cargo to be put in storage is P, wherein n =card (P), element number in card () function representation set of computations, cargo and tunnel a1Label intersection Q1=P1 ∩ P, goods Object and tunnel a2Label intersection Q2=P2 ∩ P, the number n1=card (Q1), n2=card of element in set of computations Q1, Q2 (Q2), to obtain the similarity s1=n1/n=for storing the label substance of cargo on the label substance and each tunnel of cargo Where card (P1 ∩ P)/card (P), s2=n2/n=card (P2 ∩ P)/card (P), similarity maximum value max (s1, s2) Tunnel as the highest tunnel of label substance similarity because denominator is identical, the maximum value max of element number in Q1, Q2 (card (P1 ∩ P), card (P2 ∩ P)), max () function representation is maximized, that is, collection that can be most by identical element Tunnel where closing takes target goods of the innermost empty goods yard in the tunnel as goods warehousing as most suitable tunnel is put in storage Position cargo transport to target goods yard is completed into storage;
Step 3-4, inquiry can use empty tunnel:If inner terminal goods yard is sky on tunnel, determine that the tunnel is available sky Tunnel, definition set P are the goods yard set of all inner terminals in warehouse, and set Q is the goods yard set of occupied inner terminal, According to goods yard row, layer positive sequence query set P and Q, set P is looped through, when the goods yard m in set P is not in set Q, i.e.,It indicates that tunnel where the m of goods yard is available empty tunnel, circulation is terminated, using the corresponding goods yard information of goods yard m as goods warehousing Target goods yard, due to be according to goods yard row, the inquiry of layer positive sequence, tunnel where the m of goods yard be apart from warehouse entrance most Close tunnel, by cargo transport to target goods yard, if inquiry is less than any available empty tunnel, then it represents that institute is available in stock in the storehouse Area has been filled with, and needs replacing new storehouse and is put in storage;
Step 3-5, the picking coding after the completion of storage, using the goods yard of cargo storage name as the cargo.
Step 4 includes the following steps:
Step 4-1, read picking coding, (in goods warehousing, which goods yard cargo is placed on, i.e., using the goods yard name as The picking of the cargo encodes, and goods yard name is to be named described in step 1 to goods yard), goods will be taken out by being obtained according to goods yard name The goods yard information of object, it is assumed that the goods yard information for the cargo to be taken is i-x-y-z, i.e., the cargo position is i-th of goods area xth Y layers of z column of row, inquire the position, if inquiring the goods yard as sky, prompt not find the cargo, otherwise execute step Rapid 4-2;
Step 4-2, where inquiring the cargo to be taken out i-th of goods is inquired with the presence or absence of cargo in the goods yard of tunnel outer end Area's xth, which is arranged y floor z-1 and arranged, arranges y floor the 1st to i-th of goods area xth and arranges, and total z-1 goods yard will be searched with the presence or absence of cargo To cargo be put into set O, if there are cargos in the goods yard of tunnel outer end where the cargo to be taken out, then it represents that set O is not For sky, the cargo in set O is successively moved on temporary working H from outside to inside, executes step 4-3;If not searching arrival Object, then it represents that set O is sky, directly execution step 4-3;
Cargo transport to site location is completed picking by step 4-3;
Step 4-4, according to first-in last-out, the principle that last in, first out, cargo in the set O goods in the shifting library of step 4-2 The relative position of object has occurred that inversion, i.e. the goods movement in script outer end goods yard has arrived the inner end of temporary working, Jiang Yuanji It closes O and be inverted and obtains set O ', and the cargo in set O ' is gone to match goods occupied by the client successively according to label substance Label content similarity (it is similar to enter the method in library lookup goods yard in calculation method and step 3-3) in all tunnels where position, Show that the highest tunnel of similarity successively moves on to can be used on the tunnel as most suitable tunnel, and by the cargo of temporary working Empty goods yard.
Beneficial effect:
First, storehouse utilization rate is high, save the cost.High density storing goods shelf, than the sky that common pallet goods shelf improves 50% Between utilization rate, greatly reduce warehouse cost.
Second, efficient conveyer mechanism.In transportation system pass through track shuttle, it can be achieved that one or more pipeline with The connection of a plurality of pipeline completes cargo and shunts work.
Third, scalability is strong, and flexibility is high.From software application angle, the goods yard attribute of storehouse is carried out by database Management and distribution, same set of system can be applied to multiple and different storehouses.
4th, batch outbound is high-efficient.When storage, preferential distribution client has occupied the available empty goods yard in tunnel, and protects The cargo for demonstrate,proving a tunnel, which is all pertaining only to a client, to be owned, while the highest cargo of label substance similarity is placed in one It rises, substantially increases the speed of batch outbound.
Detailed description of the invention
The present invention is done with reference to the accompanying drawings and detailed description and is further illustrated, it is of the invention above-mentioned or Otherwise advantage will become apparent.
Fig. 1 is warehouse floor map.
Fig. 2 is shelf stereoscopic schematic diagram.
Fig. 3 is storage flow chart.
Fig. 4 is outbound flow chart.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings and embodiments.
The present invention specifically comprises the following steps:
Step 1, goods yard is generated:The goods yard of goods areas all in tiered warehouse facility is named, and excludes not available goods yard;
Step 2, a temporary working is defined in each goods area, i.e., empty tunnel, and one is reserved on each empty tunnel The shuttle in a special service sky tunnel;
Step 3, when the goods warehousing of client, according to the similarity of the label substance of cargo, the highest lane of similarity is obtained Road is as most suitable tunnel, and by the available empty goods yard on the cargo storage to the tunnel;
Step 4, when picking, on the goods movement to temporary working outside cargo that will take out, then the cargo is taken Out, further according to the similarity of the label substance of cargo on temporary working, obtain the highest tunnel of similarity as most suitable lane Road, and the cargo of temporary working is moved on to the available empty goods yard on the tunnel.
Step 1 includes the following steps:
Step 1-1, it is assumed that have n goods area in tiered warehouse facility, each goods area has a row, b layers, c column, then a shared d goods Position, d=n*a*b*c, goods yard naming method are i-x-y-z, indicate that the goods yard is located at i-th of goods area, xth row, y layers, z Column, wherein i value range is 1~n, and n value is natural number, and x value range is 1~a, and a value is natural number, y value range For 1~b, b value is natural number, and z value range is 1~c, and c value is natural number, defines the goods nearest apart from warehouse entrance Frame is site location, and site location is as the starting point of storage and the terminal of outbound, in going out storage process, site location play to Important role is closed, site location is about set to 1-1-1-1 in this example, i.e. the 1st goods area the 1st arranges the 1st layer of the 1st column goods yard position Set, and define from entrance to reservoir area inside, goods area, shelf number of rows are incremented by successively, and the number of plies is incremented by successively from top to bottom, columns from Arrive outside interior incremented by successively, i.e., the 1st is classified as outermost end, and c is classified as inner terminal, and the shelf that x arranges y layers are defined as tunnel x-y;
Step 1-2, by the interference of storehouse external condition and client's particular/special requirement, meanwhile, in order to keep the unification of goods yard number of rows Symmetry, goods area need to exclude some unavailable goods yards, have generally just determined naturally after the installation is completed in shelf, the present invention Need to exclude all goods yards of the 1st the 20th row of goods area in embodiment, the inner terminal three in the 2nd the 20th row of goods area arranges goods yard, together When be also required to be excluded according to the tunnel where the site location arranged in step 1-1, i.e. the 1st goods area, the 1st row institute it is available in stock Position.
In step 2, highest one layer of the shelf temporary working H as the goods area that each goods area is relatively intermediate is used The jth of i-th goods area arranges b layers as temporary working, wherein j=[a/2], i.e. number of rows are rounded divided by 2, it is such as obtaining the result is that Tunnel where the goods yard excluded, should carry out number of rows j plus 1 obtains temporary working H, and the shuttle reserved on empty tunnel defaults position It is set to i-j-b-1, i.e. temporary working outermost goods yard.
As shown in figure 3, step 3 includes the following steps:
Step 3-1 before the goods warehousing of client, is arranged label, such as 5 labels of setting to each cargo, is respectively used to Record department name, branch's site information, time, classification, number of packages, such as accounting department, Nanjing branch, voucher, 20 in 2012 Part, (when storage, preferential distribution client has occupied the available empty goods yard in tunnel to content of the label for recording cargo, and guarantees The cargo in one tunnel, which is all pertaining only to a client, to be owned, and the efficiency of picking is improved convenient for the later period);
Step 3-2 inquires the client with the presence or absence of the cargo for occupying goods yard and searches occupied goods yard if there is record All tunnels at place execute step 3-3, no to then follow the steps 3-4;
Whether step 3-3, all tunnels where inquiring goods yard occupied by the client fill, that is, judge tunnel outermost goods Whether position has cargo, if only one tunnel for being not filled up with, takes the innermost empty goods yard in the tunnel as goods warehousing Target goods yard cargo transport to target goods yard is completed into storage;If there is the tunnel that two or more is not filled up with, goods is calculated The similarity that the label substance of cargo is stored on the label substance of object and each tunnel, inquires being total to for all cargos on tunnel With tag set, it is assumed that the common tag set P1 in tunnel 1 be accounting department, and Nanjing branch, 2012 }, tunnel 2 it is public Tag set P2 is { accounting department, Nanjing branch, 2010 }, and the tag set P of cargo to be put in storage is { accounting department, Nanjing point Row, 2010, voucher, 20 }, obtained according to formula, cargo to be put in storage label number identical with tunnel 1 is card (P1 ∩ P)=2, cargo to be put in storage label number identical with tunnel 2 is card (P2 ∩ P)=3, to obtain being put in storage most suitable Tunnel be tunnel 2, take target goods yard of the innermost empty goods yard in the tunnel as goods warehousing, execution step 3-5;
Step 3-4, inquiry can use empty tunnel:If inner terminal goods yard is sky on tunnel, determine that the tunnel is available sky Tunnel, definition set P are the goods yard set of all inner terminals in warehouse, and set Q is the goods yard set of occupied inner terminal, According to goods yard row, layer positive sequence query set P and Q, it is assumed that element is the goods yard that 1 area 1-20 arranges all inner terminals, set in set P Q is the goods yard that 1 area 1-5 arranges all inner terminals, loops through set P and show that the goods yard does not exist when the 6th arranges the 1st layer of 12 column In set Q, that is to say, that the goods yard does not have occupied, and the tunnel where indicating goods yard 1-6-1-12 is available empty tunnel, by goods Target goods yard of the position 1-6-1-12 as goods warehousing, executes step 3-5, if inquiry is less than any available empty tunnel, table Show that all goods areas have been filled in the storehouse, needs replacing new storehouse and be put in storage.
Cargo is tied to target goods yard by step 3-5, and is issued inbound task and instructed and give storage control system WCS, WCS It after receiving instruction, decomposes, be assigned to specific execution equipment, target goods yard is transported into goods yard.
As shown in figure 4, step 4 includes the following steps:
Step 4-1, it is assumed that the goods yard information for the cargo to be taken is i-x-y-z, i.e., the cargo position is i-th of goods area Xth arranges y layers of z column, inquires the position, if inquiring the goods yard as sky, prompts not find the cargo, otherwise execute Step 4-2;
Step 4-2, where inquiring the cargo to be taken out i-th of goods is inquired with the presence or absence of cargo in the goods yard of tunnel outer end Area's xth, which is arranged y floor z-1 and arranged, arranges y floor the 1st to i-th of goods area xth and arranges, and total z-1 goods yard will be searched with the presence or absence of cargo To cargo be put into set O, if there are cargos in the goods yard of tunnel outer end where the cargo to be taken out, then it represents that set O is not For sky, the goods yard information of cargo in set O is updated, and issues shifting library assignment instructions and gives storage control system WCS, it will be in set O The cargo in z-1 goods yard is moved on temporary working H from the 1st column to z-1 Leie, is moved after the completion of library, is continued to execute step 4-3;
Step 4-3, unbinds the goods yard information for the cargo to be taken out, and issues outbound task and instruct to storage control system It after WCS, WCS receive instruction, decomposes, be assigned to specific execution equipment, site location is transported into goods yard, picking is completed Afterwards, if set O is not sky, step 4-4 is continued to execute;
Step 4-4, according to first-in last-out, the principle that last in, first out, cargo in the set O goods in the shifting library of step 4-2 The relative position of object has occurred that inversion, i.e. the goods movement in script outer end goods yard has arrived the inner end of temporary working, Jiang Yuanxiang The cargo that cargo set O be inverted obtain in cargo set O ', set O ' on temporary working on road is successively according in label Hold, removes to match label content similarity in all tunnels where goods yard occupied by the client and (enter in calculation method and step 3-3 The method in library lookup goods yard is similar), the highest tunnel of similarity is obtained as most suitable tunnel, if it fails to match, is incited somebody to action Former tunnel updates the goods yard information of cargo as most suitable tunnel, sends and moves library assignment instructions to storage control system WCS, The cargo of temporary working is successively moved on to the available empty goods yard on most suitable tunnel.
Embodiment
Go out storage method the present invention provides high density tiered warehouse facility, as shown in Figure 1, Figure 2, Figure 3 and Figure 4.
It as depicted in figs. 1 and 2,6 is day rail in Fig. 2,7 be piler, and it includes 2 areas in the present embodiment that 8, which be loading platform, Domain, each region have 20 rows, 12 column, 3 layers, exclude the 1st the 1st row's (interference region 1) of goods area, all goods yards of 20 rows (interference region 2), Inner terminal three in 2nd the 20th row of goods area arranges goods yard (interference region 3), and 10 row of the 1st goods area, 3 floor is the temporary working (mark in 1st area 4), 10 row of the 2nd goods area, 3 floor is the temporary working (mark 5) in 2nd area, and piler is used to mobile cargo and shuttle, loading in Fig. 2 Platform places goods on the shelf of different height by moving up and down, places goods onto tunnel tool finally by shuttle On the goods yard of body.
As shown in figure 3, website cargo is transported on the area I X row Y floor Z column goods yard for storage process.
The definition of inbound task order parameter:
Cargo coding:trayCode
Originate goods yard:from(1-1-1-1)
Purpose goods yard:to(I-X-Y-Z)
Task type:TaskType=1
Process description:
(1) it places goods on website pallet, scanning cargo coding (trayCode=Q1000) obtains the phase of cargo Information is closed, to show that cargo belongs to client A, the label substance of cargo is:Accounting department, Yangzhou subbranch, subpoena, 20 in 2012 Part;
(2) search client A occupied tunnel, obtain the 1st area tunnel 1-1,1-2,1-3,2-1,2-2,2-3,3-1,3-2, It is all that 3-3 belongs to A client;
(3) the above tunnel is searched with the presence or absence of available empty goods yard, show that the 1st area tunnel 2-1,3-2 has empty goods yard, simultaneously The common tag for obtaining tunnel 2-1 is accounting department, Yangzhou subbranch, 2011, the common tag of the 1st area tunnel 3-2 be accounting department, Yangzhou subbranch, 2012 take the 1st area lane to obtain the label of the cargo and the label similarity highest of the 1st area tunnel 3-2 Road 3-2 is as most suitable tunnel, while the tunnel inner terminal can be 1-3-2-5 with empty goods yard, i.e., the 2nd floor the 5th is arranged in the 1st area the 3rd Column;
(4) by the above-mentioned available empty goods yard found, as the purpose goods yard (to=1-3-2-5) of storage, and by cargo Be tied to purpose goods yard, while issuing inbound task and instruct and giving storage control system WCS, after WCS receives instruction, decompose, under Equipment is executed up to specific, cargo transport to the 1st area the 3rd is arranged into the 2nd floor the 5th column goods yard.
As shown in figure 4, being outbound process, i.e., the area I X is arranged into the cargo on Y floor Z column goods yard and be fetched into website.
The definition of outbound task order parameter:
Cargo coding:trayCode
Originate goods yard:from(I-X-Y-Z)
Purpose goods yard:to(1-1-1-1)
Task type:TaskType=2
Move library assignment instructions parameter definition:
Cargo coding:trayCode
Originate goods yard:from(I-X-Y-Z)
Purpose goods yard:to(I-X'-Y'-Z')
Task type:TaskType=3
Process description:
(1) scanning wants the cargo of outbound to encode (trayCode=Q1001), the relevant information of cargo is obtained, to obtain Goods yard information where cargo is that the 1st floor the 2nd column goods yard is arranged in the 1st area the 5th, and the temporary working of cargo is that the 1st area the 10th arranges the 3rd Layer, the starting goods yard (from=1-5-1-2) of cargo outbound;
(2) it obtains the non-empty goods yard that the 1st floor the 3rd column goods yard outer end is arranged in the 1st area the 5th, obtains outer end cargo set O, i.e., the 1st The 1st column cargo Q1002 of the 1st floor is arranged in area the 5th, and cargo in set O is successively moved to the 1st area the 10th on temporary working and arranges the 3rd floor 12nd column goods yard, updates the goods yard information of cargo, issues shifting library assignment instructions and gives storage control system WCS, moves library and complete;
(3) the goods yard information of cargo Q1001 is unbinded, and outbound task instruction is handed down to storage control system WCS, WCS It after receiving instruction, decomposes, be assigned to specific execution equipment, by cargo transport to site location, picking is completed;
(4) customer information and label information of cargo on temporary working are obtained, i.e. the 12nd column goods of the 3rd floor is arranged in the 1st area the 10th Object Q1002 show that cargo belongs to client B, and the label substance of cargo Q1002 is:Accounting department, Yangzhou subbranch, 2012, subpoena, 15, the common tag that the label substance of cargo and client B have occupied tunnel is matched, show that the highest tunnel of similarity is the 1 area tunnel 5-2, while the tunnel inner terminal can be 1-5-2-3 with empty goods yard, i.e. the 2nd floor the 3rd column are arranged in the 1st area the 5th, update goods The goods yard information of object issues and moves library assignment instructions and give storage control system WCS, by cargo Q1002 from the 1st area the 10th of temporary working Arrange the 3rd floor the 12nd column be moved to the 1st area the 5th arrange the 2nd floor the 3rd column, move library complete.
Go out storage method the present invention provides high density tiered warehouse facility, implements the method and approach of the technical solution Very much, the above is only a preferred embodiment of the present invention, it is noted that those skilled in the art are come It says, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications also should be regarded as Protection scope of the present invention.All undefined components in this embodiment can be implemented in the prior art.

Claims (5)

1. high density tiered warehouse facility goes out storage method, which is characterized in that include the following steps:
Step 1, goods yard is generated:The goods yard of goods areas all in tiered warehouse facility is named, and excludes not available goods yard;
Step 2, a temporary working is defined in each goods area, i.e., empty tunnel, and one is reserved specially on each empty tunnel Door services the shuttle in empty tunnel;
Step 3, when the goods warehousing of client, according to the similarity of the label substance of cargo, show that the highest tunnel of similarity is made For most suitable tunnel, and by the available empty goods yard on the cargo storage to the tunnel;
Step 4, when picking, on the goods movement to temporary working outside cargo that will take out, then the cargo is taken out, then According to the similarity of the label substance of cargo on temporary working, obtain the highest tunnel of similarity as most suitable tunnel, and The cargo of temporary working is moved on to the available empty goods yard on the tunnel.
2. high density tiered warehouse facility according to claim 1 goes out storage method, which is characterized in that step 1 includes as follows Step:
Step 1-1, setting has n goods area in tiered warehouse facility, and each goods area has a row, b layers, c column, then a shared d goods yard, d= N*a*b*c, goods yard naming method are i-x-y-z, indicate that the goods yard is located at i-th of goods area, xth row, y layers, z column, wherein I value range is 1~n, and x value range is 1~a, and y value range is 1~b, and z value range is 1~c, is defined apart from warehouse The nearest shelf of entrance are site location, and are defined inside from entrance to reservoir area, and goods area, shelf number of rows are incremented by successively, layer Number is incremented by successively from top to bottom, and columns is incremented by successively from outside to inside, i.e., the 1st is classified as outermost end, and c is classified as inner terminal, and x arranges y layers Shelf be defined as tunnel x-y;
Step 1-2, excludes not available goods yard, including excludes website, i.e. the 1st goods area, the 1st row goods yard.
3. high density tiered warehouse facility according to claim 2 goes out storage method, which is characterized in that, will be each in step 2 Highest one layer of the shelf relatively intermediate temporary working H as the goods area of goods area, that is, use the jth of the i-th goods area arrange b layers as Temporary working, wherein j=a/2, i.e. number of rows are rounded divided by 2, such as obtaining the result is that tunnel, Ying Jiang where the goods yard excluded Number of rows j is carried out plus 1 obtains temporary working H, the shuttle default location reserved on empty tunnel be i-j-b-1, i.e. temporary working most Outside goods yard.
4. high density tiered warehouse facility according to claim 3 goes out storage method, which is characterized in that step 3 includes as follows Step:
Before the goods warehousing of client, label is arranged to each cargo, label is used to record the content of cargo in step 3-1;
Step 3-2 inquires the client with the presence or absence of the cargo for occupying goods yard and searches occupied goods yard place if there is record All tunnels, execute step 3-3, it is no to then follow the steps 3-4;
Whether step 3-3, all tunnels where inquiring goods yard occupied by the client fill, that is, judge that tunnel outermost goods yard is It is no to have cargo, if only one tunnel for being not filled up with, take target of the innermost empty goods yard in the tunnel as goods warehousing Goods yard cargo transport to target goods yard is completed into storage;If there is the tunnel that two or more is not filled up with, cargo is calculated The similarity of the label substance of label substance and each tunnel memory goods putting object, obtains the highest tunnel of label substance similarity, Take target goods yard of the innermost empty goods yard in the tunnel as goods warehousing that cargo transport to target goods yard is completed storage;
Step 3-4, inquiry can use empty tunnel:If inner terminal goods yard is sky on tunnel, determine that the tunnel is available empty tunnel, Definition set P is the goods yard set of all inner terminals in warehouse, and set Q is the goods yard set of occupied inner terminal, according to Goods yard row, layer positive sequence query set P and Q, loop through set P, when the goods yard m in set P is not in set Q, indicate goods Tunnel where the m of position is available empty tunnel, terminates circulation, using the corresponding goods yard information of goods yard m as the target goods yard of goods warehousing, By cargo transport to target goods yard, if inquiry is less than any available empty tunnel, then it represents that all goods areas have been filled in the storehouse, New storehouse is needed replacing to be put in storage;
Step 3-5, the picking coding after the completion of storage, using the goods yard of cargo storage name as the cargo.
5. high density tiered warehouse facility according to claim 4 goes out storage method, which is characterized in that step 4 includes as follows Step:
Step 4-1 reads picking coding, and the goods yard information that take out cargo is obtained according to goods yard name, the setting cargo to be taken Goods yard information is i-x-y-z, i.e., the cargo position is that i-th of goods area xth arranges y layers of z column, is inquired the position, such as Fruit inquires the goods yard as sky, then prompts not finding the cargo, no to then follow the steps 4-2;
Step 4-2, where inquiring the cargo to be taken out i-th of goods area xth is inquired with the presence or absence of cargo in the goods yard of tunnel outer end It arranges y layer z-1 and arranges and arrange y layer the 1st to i-th of goods area xth and arrange, total z-1 goods yard is with the presence or absence of cargo, the goods that will be found Object is put into set O, if there are cargos in the goods yard of tunnel outer end where the cargo to be taken out, then it represents that set O is not sky, will Cargo in set O is successively moved on temporary working from outside to inside, executes step 4-3;If not finding cargo, then it represents that Set O is sky, directly execution step 4-3;
Cargo transport to site location is completed picking by step 4-3;
Step 4-4, according to first-in last-out, the principle that last in, first out, the cargo in set O moves cargo in library in step 4-2 Relative position has occurred that inversion, i.e. the goods movement in script outer end goods yard has arrived the inner end of temporary working, by original set O into Row is inverted and obtains set O ', and the cargo in set O ' is gone to match the institute of goods yard occupied by the client successively according to label substance All tunnels in label content similarity, obtain the highest tunnel of similarity as most suitable tunnel, and by interim lane The cargo in road successively moves on to the available empty goods yard on the tunnel.
CN201710291471.6A 2017-04-28 2017-04-28 High density tiered warehouse facility goes out storage method Active CN107098095B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710291471.6A CN107098095B (en) 2017-04-28 2017-04-28 High density tiered warehouse facility goes out storage method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710291471.6A CN107098095B (en) 2017-04-28 2017-04-28 High density tiered warehouse facility goes out storage method

Publications (2)

Publication Number Publication Date
CN107098095A CN107098095A (en) 2017-08-29
CN107098095B true CN107098095B (en) 2018-11-30

Family

ID=59658008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710291471.6A Active CN107098095B (en) 2017-04-28 2017-04-28 High density tiered warehouse facility goes out storage method

Country Status (1)

Country Link
CN (1) CN107098095B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107628404B (en) * 2017-11-07 2024-04-12 北京翰宁智能科技有限责任公司 Order-to-person-based sorting system and method for logistics storage center
CN110796400A (en) * 2018-08-01 2020-02-14 北京京东振世信息技术有限公司 Method and device for caching goods
CN109447536A (en) * 2018-08-28 2019-03-08 浙江工业大学 A kind of warehouse Real-time Monitor Management method based on GIS
CN110046864B (en) * 2019-04-25 2023-05-09 四川中电昆辰科技有限公司 Positioning system for intelligent warehousing system and intelligent warehousing method
CN110877798B (en) * 2019-10-29 2021-05-11 海宁小二慧储智能科技有限公司 Design method of cloth storage rack in warehouse
CN113525978B (en) * 2020-04-14 2023-05-05 北京旷视机器人技术有限公司 Goods warehouse-in method, device and system for dense warehouse
CN111966112A (en) * 2020-07-26 2020-11-20 中国建设银行股份有限公司 Automatic file storage, method and device for loading and unloading files and electronic equipment
CN112093359B (en) * 2020-10-16 2021-11-26 永山窍档案管理有限公司 Method for improving full-automatic retrieval efficiency of high-density three-dimensional library
CN113003080A (en) * 2021-03-11 2021-06-22 中工美(北京)供应链物流管理有限责任公司 Device and method for allocating storage positions and scheduling operation in article warehousing management
CN114212426B (en) * 2021-11-24 2023-10-27 昆船智能技术股份有限公司 Warehouse-in and warehouse-out goods position distribution method of track through type dense goods shelf and storage medium
CN114429314B (en) * 2022-04-02 2022-09-09 机科发展科技股份有限公司 Scheduling system and scheduling method based on horizontal and vertical logistics equipment
CN116777354B (en) * 2023-08-25 2023-11-03 深圳市明心数智科技有限公司 Textile-based warehouse management method, system and medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012071928A (en) * 2010-09-28 2012-04-12 Tsubakimoto Chain Co Article management system
CN102602643A (en) * 2012-03-02 2012-07-25 无锡普智联科高新技术有限公司 Automatic high-density three-dimensional storage system
CN103193054A (en) * 2013-04-27 2013-07-10 龙岩烟草工业有限责任公司 Warehouse management method and warehouse management system
JP2015075935A (en) * 2013-10-09 2015-04-20 株式会社デンソーウェーブ Article search system and portable terminal
CN105346913A (en) * 2015-11-13 2016-02-24 上海诺力智能科技有限公司 Automatic guide sorting system and method
CN105775550A (en) * 2016-04-14 2016-07-20 福州大学 Order zone picking system based on electronic tags and implementation method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012071928A (en) * 2010-09-28 2012-04-12 Tsubakimoto Chain Co Article management system
CN102602643A (en) * 2012-03-02 2012-07-25 无锡普智联科高新技术有限公司 Automatic high-density three-dimensional storage system
CN103193054A (en) * 2013-04-27 2013-07-10 龙岩烟草工业有限责任公司 Warehouse management method and warehouse management system
JP2015075935A (en) * 2013-10-09 2015-04-20 株式会社デンソーウェーブ Article search system and portable terminal
CN105346913A (en) * 2015-11-13 2016-02-24 上海诺力智能科技有限公司 Automatic guide sorting system and method
CN105775550A (en) * 2016-04-14 2016-07-20 福州大学 Order zone picking system based on electronic tags and implementation method thereof

Also Published As

Publication number Publication date
CN107098095A (en) 2017-08-29

Similar Documents

Publication Publication Date Title
CN107098095B (en) High density tiered warehouse facility goes out storage method
CN109064090B (en) Goods picking prompting method and device
CN111033539B (en) Robot inventory update for order-prescribed routes
CN109205163B (en) Across tunnel Multilayer shuttle car warehousing system design method, system and storage medium
US10803420B2 (en) Hybrid modular storage fetching system
Gu et al. Research on warehouse operation: A comprehensive review
Hu et al. Travel time analysis of a new automated storage and retrieval system
WO2022095835A1 (en) Warehousing management system and method
KR20210008170A (en) Optimization of warehouse layout based on customizable goals
CN113443316B (en) Storage system, goods collecting method and device, material box moving device and control terminal
CN102117445A (en) Method for monitoring goods in real time in logistics management
CN109492724A (en) Warehouse, warehouse compartment state identification method, logistics execute system and electronic equipment
CN103577946A (en) Steel coil storeroom position dynamic distribution method under position-data-reference-free condition
WO2018218620A1 (en) System for picking out cargo and method for picking out cargo
CN109533759A (en) A kind of automatic shifting library method and automatic shifting library system
CN115744014A (en) Roadway storage management method, system and equipment
CN113269494A (en) Inventory scheduling method, equipment and system
CN110189071A (en) A kind of method and device for realizing kinds of goods combination
US9633329B2 (en) Dynamic item-space allocation and retrieval
CN111605945A (en) Article warehousing system and article warehousing method
CN112093359B (en) Method for improving full-automatic retrieval efficiency of high-density three-dimensional library
CN113830478A (en) Method, system and device for automatic warehousing and sorting
CN116757608A (en) Warehouse processing method, system, electronic equipment and medium
Jawahar et al. Optimal random storage allocation for an AS/RS in an FMS
CN116629734A (en) Method, device, equipment and medium for planning article picking path of warehouse system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: Room 1201, Longtai International, 198 Shandong Road, Qinhuai District, Nanjing City, Jiangsu Province

Patentee after: Jiangsu Yongshan Qiaoqiao Archives Management Co.,Ltd.

Address before: Room 2119, Building B, 6 Yongzhi Road, Qinhuai District, Nanjing City, Jiangsu Province, 210000

Patentee before: YONGSHANQIAO (NANJING) STORAGE SERVICE CO.,LTD.

CP03 Change of name, title or address
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Warehouse in-out method for high-density stereoscopic warehouse

Effective date of registration: 20190612

Granted publication date: 20181130

Pledgee: Hongwu Branch of Nanjing Bank Co.,Ltd.

Pledgor: Jiangsu Yongshan Qiaoqiao Archives Management Co.,Ltd.

Registration number: 2019320000269

PE01 Entry into force of the registration of the contract for pledge of patent right
CP03 Change of name, title or address

Address after: 1033, building C5, Greenland window, No. 5, Jinxiu street, Yuhua District, Nanjing, Jiangsu Province

Patentee after: Yongshanqiao Archives Management Co.,Ltd.

Address before: Room 1201, Longtai International, 198 Shandong Road, Qinhuai District, Nanjing City, Jiangsu Province

Patentee before: Jiangsu Yongshan Qiaoqiao Archives Management Co.,Ltd.

CP03 Change of name, title or address
CP02 Change in the address of a patent holder

Address after: Room 512, Zhongxin ecological building, No.2 keying Road, Suzhou Industrial Park, Jiangsu Province

Patentee after: Yongshanqiao Archives Management Co.,Ltd.

Address before: 1033, building C5, Greenland window, No.5, Jinxiu street, Yuhua District, Nanjing City, Jiangsu Province, 210012

Patentee before: Yongshanqiao Archives Management Co.,Ltd.

CP02 Change in the address of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Room 512, Zhongxin ecological building, No.2 keying Road, Suzhou Industrial Park, Jiangsu Province

Patentee after: Jiangsu Yongshanqiao Archives Management Service Co.,Ltd.

Address before: Room 512, Zhongxin ecological building, No.2 keying Road, Suzhou Industrial Park, Jiangsu Province

Patentee before: Yongshanqiao Archives Management Co.,Ltd.

CP01 Change in the name or title of a patent holder