CN107096595A - A kind of road maintenance lime block disintegrating apparatus - Google Patents
A kind of road maintenance lime block disintegrating apparatus Download PDFInfo
- Publication number
- CN107096595A CN107096595A CN201710425631.1A CN201710425631A CN107096595A CN 107096595 A CN107096595 A CN 107096595A CN 201710425631 A CN201710425631 A CN 201710425631A CN 107096595 A CN107096595 A CN 107096595A
- Authority
- CN
- China
- Prior art keywords
- block
- mounting bracket
- fixed pulley
- lime
- rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B02—CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
- B02C—CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
- B02C1/00—Crushing or disintegrating by reciprocating members
- B02C1/14—Stamping mills
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Food Science & Technology (AREA)
- Emergency Lowering Means (AREA)
Abstract
The present invention relates to a kind of lime block disintegrating apparatus, more particularly to a kind of road maintenance lime block disintegrating apparatus.The technical problem to be solved in the present invention is to provide do not have the road maintenance lime block disintegrating apparatus that lime block is spilt in a kind of shattering process.In order to solve the above-mentioned technical problem, the invention provides such a road maintenance lime block disintegrating apparatus, include mounting bracket, collect frame, connecting rod, apparatus for placing, lowering or hoisting gear etc.;Collection frame is placed with the right side of mounting bracket inner bottom part, mounting bracket inner left wall top is connected with connecting rod, and connecting rod right-hand member is connected with apparatus for placing, mounting bracket is provided with lowering or hoisting gear, broken block is connected with lowering or hoisting gear, block bottom is crushed and is provided with crushing teeth, block is crushed in apparatus for placing.Shattering process of the present invention is carried out in placement block, can be prevented effectively from lime block and be spilt, by pushes pedals, reach the effect crushed to lime block, operate very simple and efficient.
Description
Technical field
The present invention relates to a kind of lime block disintegrating apparatus, more particularly to a kind of road maintenance lime block disintegrating apparatus.
Background technology
Road is exactly the infrastructure for supplying various trackless vehicles and walk from the meaning of a word;It is divided into by its handling characteristics
Highways and streets, backroad, factories and mines road, forestry road, examination road, contest road, automobile test road, workshop
Passage and school's road etc., ancient china also has post road.Also refer to the approach for reaching certain target, things development, change in addition
Approach.Lime can form block after making moist, and be unfavorable for using, it is necessary to carry out it break process, current disintegrating apparatus is broken
The thing that is easily broken during broken is easily spilt, and influences work.
To sum up, need to research and develop that not have the road maintenance that lime block spills in a kind of shattering process broken with lime block at present
Equipment, to overcome the shortcoming that lime block is easily spilt in the prior art.
The content of the invention
(1) technical problem to be solved
The present invention is in order to overcome the shortcoming that lime block is easily spilt in the prior art, and the technical problem to be solved in the present invention is
There is provided and do not have the road maintenance lime block disintegrating apparatus that lime block is spilt in a kind of shattering process.
(2) technical scheme
In order to solve the above-mentioned technical problem, the invention provides such a road maintenance lime block disintegrating apparatus, bag
Mounting bracket has been included, has collected and is put on the right side of frame, connecting rod, apparatus for placing, lowering or hoisting gear, broken block and crushing teeth, mounting bracket inner bottom part
Collection frame is equipped with, mounting bracket inner left wall top is connected with connecting rod, and connecting rod right-hand member is connected with apparatus for placing, and mounting bracket is provided with
Broken block is connected with lowering or hoisting gear, lowering or hoisting gear, block bottom is crushed and is provided with crushing teeth, block is crushed in apparatus for placing.
Preferably, apparatus for placing includes placement block, fixed block, the first spring and web plate, and connecting rod right-hand member, which is connected with, to be put
Block is put, places and cavity is provided with the middle part of block, places and drain hole is provided with the middle part of block right wall, two wall bottoms of the interior left and right of cavity are arranged with solid
Determine block, fixed block top center is connected with the first spring, and the first spring top is connected with web plate.
Preferably, lowering or hoisting gear includes slide rail, sliding block, pedal, the first fixed pulley, the second fixed pulley and the first rope,
Mounting bracket left wall bottom is provided with slide rail, and slide rail left slide formula is connected with the left of sliding block, sliding block and is connected with pedal, mounting bracket left wall
The mounting bracket left wall that top is provided with above the first fixed pulley, the first fixed pulley is provided with the right side of first through hole, mounting bracket inner top and set
There is the second fixed pulley, slider top center is connected with the first rope, and the first rope bypasses the first fixed pulley, through first through hole,
And bypass the second fixed pulley and be connected with broken block.
Preferably, also include second spring, place plate, the 3rd fixed pulley, the 4th fixed pulley, bracing wire and draw ring, install
Frame inner bottom part is symmetrical to be connected with second spring, and second spring top is connected with placement plate, places in plate and is placed with collection frame,
Place the mounting bracket inner left wall bottom on the left of plate and be provided with the 3rd fixed pulley, connecting rod bottom left is provided with the 4th fixed pulley, the 4th
The second through hole is provided with mounting bracket left wall on the left of fixed pulley, places and is connected with bracing wire on the left of plate, bracing wire bypasses the 3rd fixed pulley
With the 4th fixed pulley, and draw ring is connected with through the second through hole.
Preferably, also include and be connected with the second rope on the right side of the second rope, hook and link, mounting bracket inner top, the
Two ropes are on the right side of the second fixed pulley, and the second rope bottom is connected with hook, crush block top right side and are provided with link, link is with hanging
Hook coordinates.
Preferably, it is stainless steel to install frame material.
Operation principle:When needing to carry out broken to lime block, it would be desirable to which broken lime block is put into apparatus for placing, so
Drive broken block to move up and down by lowering or hoisting gear afterwards, and then drive crushing teeth to move up and down, to the lime block in apparatus for placing
Break process is carried out, the lime block that break process is finished drops to collection inframe and is collected.
Because apparatus for placing includes placement block, fixed block, the first spring and web plate, connecting rod right-hand member is connected with placement
Block, places and cavity is provided with the middle part of block, places and drain hole is provided with the middle part of block right wall, and two wall bottoms of the interior left and right of cavity are arranged with fixation
Block, fixed block top center is connected with the first spring, and the first spring top is connected with web plate, when needing to place lime block, leads to
Cross that lowering or hoisting gear drives broken block and device is moved up to above drain hole thereon, then by drain hole toward placing on web plate
Broken lime block is needed, spring plays recoil effect, and can improve crushing efficiency.Because shattering process is to place to enter in block
Capable, lime block can be prevented effectively from and spilt.
Because lowering or hoisting gear includes slide rail, sliding block, pedal, the first fixed pulley, the second fixed pulley and the first rope, install
Frame left wall bottom is provided with slide rail, and slide rail left slide formula is connected with the left of sliding block, sliding block and is connected with pedal, mounting bracket left wall top
Provided with the first fixed pulley, the mounting bracket left wall above the first fixed pulley is provided with first through hole, provided with the on the right side of mounting bracket inner top
Two fixed pulleys, slider top center is connected with the first rope, and the first rope bypasses the first fixed pulley, through first through hole, and around
Cross the second fixed pulley and be connected with broken block, down pedal, broken block is driven by the first rope and crushing teeth is transported upwards thereon
It is dynamic, pedal is unclamped, under gravity, block is crushed and crushing teeth is moved downward thereon, thus by pushes pedals, reach to stone
The effect that grey block is crushed, operates very simple and efficient.
Because also including second spring, placing in plate, the 3rd fixed pulley, the 4th fixed pulley, bracing wire and draw ring, mounting bracket
Bottom is symmetrical to be connected with second spring, and second spring top is connected with placement plate, places in plate and is placed with collection frame, places
Mounting bracket inner left wall bottom on the left of plate is provided with the 3rd fixed pulley, and connecting rod bottom left is provided with the 4th fixed pulley, and the 4th is fixed sliding
It is provided with the second through hole in mounting bracket left wall on the left of wheel, places and bracing wire is connected with the left of plate, bracing wire bypasses the 3rd fixed pulley and the
Four fixed pulleys, and draw ring is connected with through the second through hole, pulling draw ring of turning left drives placement plate by bracing wire and collects frame thereon
To left movement, second spring is deformed upon, and unclamps draw ring, and second spring resets, and is driven and is placed plate and thereon device reset, so
Draw ring is pulled by left and right, drives and collects frame double swerve so that collects the broken lime block finished of inframe and is distributed evenly,
Save space.
Because also including the second rope, hook and link, the second rope, the second rope are connected with the right side of mounting bracket inner top
Rope is on the right side of the second fixed pulley, and the second rope bottom is connected with hook, crushes block top right side and is provided with link, link is matched somebody with somebody with hook
Close, when needing charging, up pull draw ring, then hook is hung over and is fixed on link, so more facilitate charging.
(3) beneficial effect
Shattering process of the present invention is carried out in placement block, can be prevented effectively from lime block and be spilt.By pushes pedals, reach
To the effect crushed to lime block, operate very simple and efficient.Draw ring is pulled by left and right, drives and collects frame or so
Rock so that collect the broken lime block finished of inframe and be distributed evenly, save space.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the invention.
Fig. 2 is the main structure diagram of apparatus for placing of the present invention.
Fig. 3 is the main structure diagram of lowering or hoisting gear of the present invention.
Fig. 4 is second of main structure diagram of the invention.
Fig. 5 is the third main structure diagram of the invention.
Mark in accompanying drawing for:1- mounting brackets, 2- collects frame, and 3- connecting rods, 4- apparatus for placing, 41- places block, 42- chambers
Body, 43- drain holes, 44- fixed blocks, the springs of 45- first, 46- web plates, 5- crushes block, and 6- crushing teeths, 7- lowering or hoisting gears, 71- is slided
Rail, 72- sliding blocks, 73- pedals, the fixed pulleys of 74- first, 75- first through hole, the fixed pulleys of 76- second, the ropes of 77- first, 8- second
Spring, 9- places plate, the fixed pulleys of 10- the 3rd, the fixed pulleys of 11- the 4th, the through holes of 12- second, 13- bracing wires, 14- draw rings, 15- second
Rope, 16- hooks, 17- links.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of road maintenance lime block disintegrating apparatus, as Figure 1-5, includes mounting bracket 1, collects frame 2, connecting rod
3rd, collection frame 2, mounting bracket 1 are placed with the right side of apparatus for placing 4, lowering or hoisting gear 7, broken block 5 and crushing teeth 6, the inner bottom part of mounting bracket 1
Inner left wall top is connected with connecting rod 3, and the right-hand member of connecting rod 3 is connected with apparatus for placing 4, and mounting bracket 1 is provided with lowering or hoisting gear 7, rises
Broken block 5 is connected with falling unit 7, the bottom of block 5 is crushed and is provided with crushing teeth 6, block 5 is crushed in apparatus for placing 4.
Embodiment 2
A kind of road maintenance lime block disintegrating apparatus, as Figure 1-5, includes mounting bracket 1, collects frame 2, connecting rod
3rd, collection frame 2, mounting bracket 1 are placed with the right side of apparatus for placing 4, lowering or hoisting gear 7, broken block 5 and crushing teeth 6, the inner bottom part of mounting bracket 1
Inner left wall top is connected with connecting rod 3, and the right-hand member of connecting rod 3 is connected with apparatus for placing 4, and mounting bracket 1 is provided with lowering or hoisting gear 7, rises
Broken block 5 is connected with falling unit 7, the bottom of block 5 is crushed and is provided with crushing teeth 6, block 5 is crushed in apparatus for placing 4.
Apparatus for placing 4 includes placement block 41, fixed block 44, the first spring 45 and web plate 46, and the right-hand member of connecting rod 3 is connected with
Block 41 is placed, the middle part of block 41 is placed and is provided with cavity 42, place and two walls of left and right in drain hole 43, cavity 42 are provided with the middle part of the right wall of block 41
Bottom is arranged with fixed block 44, and the top center of fixed block 44 is connected with the first spring 45, and the top of the first spring 45 is connected with net
Plate 46.
Embodiment 3
A kind of road maintenance lime block disintegrating apparatus, as Figure 1-5, includes mounting bracket 1, collects frame 2, connecting rod
3rd, collection frame 2, mounting bracket 1 are placed with the right side of apparatus for placing 4, lowering or hoisting gear 7, broken block 5 and crushing teeth 6, the inner bottom part of mounting bracket 1
Inner left wall top is connected with connecting rod 3, and the right-hand member of connecting rod 3 is connected with apparatus for placing 4, and mounting bracket 1 is provided with lowering or hoisting gear 7, rises
Broken block 5 is connected with falling unit 7, the bottom of block 5 is crushed and is provided with crushing teeth 6, block 5 is crushed in apparatus for placing 4.
Apparatus for placing 4 includes placement block 41, fixed block 44, the first spring 45 and web plate 46, and the right-hand member of connecting rod 3 is connected with
Block 41 is placed, the middle part of block 41 is placed and is provided with cavity 42, place and two walls of left and right in drain hole 43, cavity 42 are provided with the middle part of the right wall of block 41
Bottom is arranged with fixed block 44, and the top center of fixed block 44 is connected with the first spring 45, and the top of the first spring 45 is connected with net
Plate 46.
Lowering or hoisting gear 7 includes slide rail 71, sliding block 72, pedal 73, the first fixed pulley 74, the second fixed pulley 76 and the first rope
Rope 77, the left wall bottom of mounting bracket 1 is provided with slide rail 71, and the left slide formula of slide rail 71 is connected with sliding block 72, and the left side of sliding block 72 is connected with
Pedal 73, the left wall top of mounting bracket 1 is provided with the first fixed pulley 74, and the left wall of mounting bracket 1 of the top of the first fixed pulley 74 is provided with first
The second fixed pulley 76 is provided with the right side of through hole 75, the inner top of mounting bracket 1, the top center of sliding block 72 is connected with the first rope 77, first
Rope 77 bypasses the first fixed pulley 74, through first through hole 75, and bypasses the second fixed pulley 76 and be connected with broken block 5.
Embodiment 4
A kind of road maintenance lime block disintegrating apparatus, as Figure 1-5, includes mounting bracket 1, collects frame 2, connecting rod
3rd, collection frame 2, mounting bracket 1 are placed with the right side of apparatus for placing 4, lowering or hoisting gear 7, broken block 5 and crushing teeth 6, the inner bottom part of mounting bracket 1
Inner left wall top is connected with connecting rod 3, and the right-hand member of connecting rod 3 is connected with apparatus for placing 4, and mounting bracket 1 is provided with lowering or hoisting gear 7, rises
Broken block 5 is connected with falling unit 7, the bottom of block 5 is crushed and is provided with crushing teeth 6, block 5 is crushed in apparatus for placing 4.
Apparatus for placing 4 includes placement block 41, fixed block 44, the first spring 45 and web plate 46, and the right-hand member of connecting rod 3 is connected with
Block 41 is placed, the middle part of block 41 is placed and is provided with cavity 42, place and two walls of left and right in drain hole 43, cavity 42 are provided with the middle part of the right wall of block 41
Bottom is arranged with fixed block 44, and the top center of fixed block 44 is connected with the first spring 45, and the top of the first spring 45 is connected with net
Plate 46.
Lowering or hoisting gear 7 includes slide rail 71, sliding block 72, pedal 73, the first fixed pulley 74, the second fixed pulley 76 and the first rope
Rope 77, the left wall bottom of mounting bracket 1 is provided with slide rail 71, and the left slide formula of slide rail 71 is connected with sliding block 72, and the left side of sliding block 72 is connected with
Pedal 73, the left wall top of mounting bracket 1 is provided with the first fixed pulley 74, and the left wall of mounting bracket 1 of the top of the first fixed pulley 74 is provided with first
The second fixed pulley 76 is provided with the right side of through hole 75, the inner top of mounting bracket 1, the top center of sliding block 72 is connected with the first rope 77, first
Rope 77 bypasses the first fixed pulley 74, through first through hole 75, and bypasses the second fixed pulley 76 and be connected with broken block 5.
Also include second spring 8, place plate 9, the 3rd fixed pulley 10, the 4th fixed pulley 11, bracing wire 13 and draw ring 14, peace
Shelve that 1 inner bottom part is symmetrical to be connected with second spring 8, the top of second spring 8 is connected with placement plate 9, places and is placed with plate 9
Frame 2 is collected, the inner left wall bottom of mounting bracket 1 for placing the left side of plate 9 is provided with the 3rd fixed pulley 10, the bottom left of connecting rod 3 is provided with the
The second through hole 12 is provided with four fixed pulleys 11, the left wall of mounting bracket 1 in the left side of the 4th fixed pulley 11, the left side of plate 9 is placed and is connected with drawing
Line 13, bracing wire 13 bypasses the 3rd fixed pulley 10 and the 4th fixed pulley 11, and is connected with draw ring 14 through the second through hole 12.
Also include and be connected with the second rope 15 on the right side of the second rope 15, hook 16 and link 17, the inner top of mounting bracket 1,
Second rope 15 is connected with hook 16 in the right side of the second fixed pulley 76, the bottom of the second rope 15, crushes the top right side of block 5 provided with extension
Ring 17, link 17 coordinates with hook 16.
The material of mounting bracket 1 is stainless steel.
Operation principle:When needing to carry out broken to lime block, it would be desirable to which broken lime block is put into apparatus for placing 4,
Then drive broken block 5 to move up and down by lowering or hoisting gear 7, and then drive crushing teeth 6 to move up and down, in apparatus for placing 4
Lime block carries out break process, and the lime block that break process is finished is dropped to be collected in collection frame 2.
Because apparatus for placing 4 includes placement block 41, fixed block 44, the first spring 45 and web plate 46, the right-hand member of connecting rod 3 connects
Placement block 41 is connected to, the middle part of block 41 is placed and is provided with cavity 42, place and left and right in drain hole 43, cavity 42 is provided with the middle part of the right wall of block 41
Two wall bottoms are arranged with fixed block 44, and the top center of fixed block 44 is connected with the first spring 45, and the top of the first spring 45 is connected
There is web plate 46, when needing to place lime block, broken block 5 is driven by lowering or hoisting gear 7 and device moves up to blowing thereon
The top of mouth 43, then needs broken lime block, spring plays recoil and acted on, and energy by drain hole 43 toward placement on web plate 46
Improve crushing efficiency.Because shattering process is to place progress in block 41, can be prevented effectively from lime block and spill.
Because lowering or hoisting gear 7 includes slide rail 71, sliding block 72, pedal 73, the first fixed pulley 74, the second fixed pulley 76 and
One rope 77, the left wall bottom of mounting bracket 1 is provided with slide rail 71, and the left slide formula of slide rail 71 is connected with sliding block 72, and the left side of sliding block 72 connects
Pedal 73 is connected to, the left wall top of mounting bracket 1 is provided with the first fixed pulley 74, and the left wall of mounting bracket 1 of the top of the first fixed pulley 74 is provided with
The second fixed pulley 76 is provided with the right side of first through hole 75, the inner top of mounting bracket 1, the top center of sliding block 72 is connected with the first rope 77,
First rope 77 bypasses the first fixed pulley 74, through first through hole 75, and bypasses the second fixed pulley 76 and be connected with broken block 5, past
Lower pedal 73, drives broken block 5 by the first rope 77 and crushing teeth 6 is moved upwards thereon, unclamp pedal 73, make in gravity
Under, crush block 5 and crushing teeth 6 is moved downward thereon, thus by pushes pedals 73, reach the effect crushed to lime block
Really, operate very simple and efficient.
Because also including second spring 8, placing plate 9, the 3rd fixed pulley 10, the 4th fixed pulley 11, bracing wire 13 and draw ring
14, the inner bottom part of mounting bracket 1 is symmetrical to be connected with second spring 8, and the top of second spring 8 is connected with placement plate 9, placed in plate 9
Collection frame 2 is placed with, the inner left wall bottom of mounting bracket 1 for placing the left side of plate 9 is provided with the 3rd fixed pulley 10, the bottom left of connecting rod 3
Provided with the 4th fixed pulley 11, the second through hole 12 is provided with the left wall of mounting bracket 1 in the left side of the 4th fixed pulley 11, the left side of plate 9 is placed and connects
Bracing wire 13 is connected to, bracing wire 13 bypasses the 3rd fixed pulley 10 and the 4th fixed pulley 11, and is connected with draw ring 14 through the second through hole 12,
Turn left and pull draw ring 14, driven by bracing wire 13 and place plate 9 and collect frame 2 thereon to left movement, second spring 8 is deformed upon,
Draw ring 14 is unclamped, second spring 8 resets, drive and place plate 9 and thereon device reset, draw ring 14, band are pulled thus by left and right
It is dynamic to collect the double swerve of frame 2 so as to collect the broken lime block finished in frame 2 and be distributed evenly, save space.
Because also including and being connected with the second rope on the right side of the second rope 15, hook 16 and link 17, the inner top of mounting bracket 1
15, the second rope 15 is connected with hook 16 in the right side of the second fixed pulley 76, the bottom of the second rope 15, and the broken top right side of block 5 is set
There is link 17, link 17 coordinates with hook 16, when needing charging, up pull draw ring 14, hook 16 is then hung over into link
It is fixed on 17, so more facilitates charging.
Embodiment described above only expresses the preferred embodiment of the present invention, and it describes more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art
For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (6)
1. a kind of road maintenance lime block disintegrating apparatus, it is characterised in that include mounting bracket (1), collect frame (2), connection
It is placed with the right side of bar (3), apparatus for placing (4), lowering or hoisting gear (7), broken block (5) and crushing teeth (6), mounting bracket (1) inner bottom part
Frame (2) is collected, mounting bracket (1) inner left wall top is connected with connecting rod (3), and connecting rod (3) right-hand member is connected with apparatus for placing (4),
Mounting bracket (1) is provided with lowering or hoisting gear (7), lowering or hoisting gear (7) and is connected with broken block (5), crushes block (5) bottom provided with broken
Tooth (6), crushes block (5) in apparatus for placing (4).
2. a kind of road maintenance lime block disintegrating apparatus according to claim 1, it is characterised in that apparatus for placing (4)
Include placement block (41), fixed block (44), the first spring (45) and web plate (46), connecting rod (3) right-hand member is connected with placement block
(41), place and cavity (42) is provided with the middle part of block (41), place and a left side in drain hole (43), cavity (42) is provided with the middle part of block (41) right wall
Right two wall bottoms are arranged with fixed block (44), and fixed block (44) top center is connected with the first spring (45), the first spring
(45) top is connected with web plate (46).
3. a kind of road maintenance lime block disintegrating apparatus according to claim 2, it is characterised in that lowering or hoisting gear (7)
Include slide rail (71), sliding block (72), pedal (73), the first fixed pulley (74), the second fixed pulley (76) and the first rope (77),
Mounting bracket (1) left wall bottom is provided with slide rail (71), and slide rail (71) left slide formula, which is connected with the left of sliding block (72), sliding block (72), to be connected
Pedal (73) is connected to, mounting bracket (1) left wall top is provided with the mounting bracket above the first fixed pulley (74), the first fixed pulley (74)
(1) left wall, which is provided with the right side of first through hole (75), mounting bracket (1) inner top, is provided with the second fixed pulley (76), in sliding block (72) top
The heart is connected with the first rope (77), and the first rope (77) bypasses the first fixed pulley (74), through first through hole (75), and bypasses
Two fixed pulleys (76) are connected with broken block (5).
4. a kind of road maintenance lime block disintegrating apparatus according to claim 3, it is characterised in that also include second
Spring (8), placement plate (9), the 3rd fixed pulley (10), the 4th fixed pulley (11), bracing wire (13) and draw ring (14), mounting bracket (1)
Inner bottom part is symmetrical to be connected with second spring (8), and second spring (8) top is connected with placement plate (9), places and is put in plate (9)
Collection frame (2) is equipped with, mounting bracket (1) inner left wall bottom on the left of plate (9) is placed and is provided with the 3rd fixed pulley (10), connecting rod (3)
Bottom left is provided with mounting bracket (1) left wall on the left of the 4th fixed pulley (11), the 4th fixed pulley (11) and is provided with the second through hole
(12), place on the left of plate (9) and be connected with bracing wire (13), bracing wire (13) bypasses the 3rd fixed pulley (10) and the 4th fixed pulley (11),
And it is connected with draw ring (14) through the second through hole (12).
5. a kind of road maintenance lime block disintegrating apparatus according to claim 4, it is characterised in that also include second
The second rope (15), the second rope are connected with the right side of rope (15), hook (16) and link (17), mounting bracket (1) inner top
(15) on the right side of the second fixed pulley (76), the second rope (15) bottom is connected with hook (16), and broken block (5) top right side is provided with
Link (17), link (17) coordinates with hook (16).
6. a kind of road maintenance lime block disintegrating apparatus according to claim 5, it is characterised in that mounting bracket (1) material
Expect for stainless steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710425631.1A CN107096595A (en) | 2017-06-08 | 2017-06-08 | A kind of road maintenance lime block disintegrating apparatus |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710425631.1A CN107096595A (en) | 2017-06-08 | 2017-06-08 | A kind of road maintenance lime block disintegrating apparatus |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107096595A true CN107096595A (en) | 2017-08-29 |
Family
ID=59659313
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710425631.1A Withdrawn CN107096595A (en) | 2017-06-08 | 2017-06-08 | A kind of road maintenance lime block disintegrating apparatus |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107096595A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107583714A (en) * | 2017-10-17 | 2018-01-16 | 戴新杰 | A kind of lithium battery makes and uses native graphite disintegrating apparatus |
CN108176456A (en) * | 2017-12-19 | 2018-06-19 | 管奇芳 | One boar food is prepared with corn multiple stage crushing equipment |
CN108686820A (en) * | 2018-03-21 | 2018-10-23 | 镇江倍斯特曼新材料研究有限公司 | A kind of environment-friendly type stone crusher |
-
2017
- 2017-06-08 CN CN201710425631.1A patent/CN107096595A/en not_active Withdrawn
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107583714A (en) * | 2017-10-17 | 2018-01-16 | 戴新杰 | A kind of lithium battery makes and uses native graphite disintegrating apparatus |
CN108176456A (en) * | 2017-12-19 | 2018-06-19 | 管奇芳 | One boar food is prepared with corn multiple stage crushing equipment |
CN108176456B (en) * | 2017-12-19 | 2019-08-13 | 玉林正邦饲料有限公司 | One boar food, which is prepared, uses corn multiple stage crushing equipment |
CN108686820A (en) * | 2018-03-21 | 2018-10-23 | 镇江倍斯特曼新材料研究有限公司 | A kind of environment-friendly type stone crusher |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107096595A (en) | A kind of road maintenance lime block disintegrating apparatus | |
CN206539849U (en) | A kind of fixed mount for being conveniently replaceable LED display | |
CN107243167A (en) | A kind of Bioexperiment vegetation water extraction element | |
CN203227685U (en) | Coil collection station for cold-rolled wire rods | |
CN108166456A (en) | A kind of farmland water conservancy works water channel impurity filtering device | |
CN107138402A (en) | A kind of road maintenance stone screening installation | |
CN107233985A (en) | A kind of geological exploration ore crushing equipment | |
CN109098053A (en) | A kind of track automatic disassembling vehicle | |
CN206924996U (en) | A kind of road maintenance stone screening installation | |
CN115059018B (en) | Construction material distribution estimation method for bank collapse treatment process | |
CN205996669U (en) | A kind of horizontal process equipment with waste recovery | |
CN107185731A (en) | A kind of gravel mine gravity concentration apparatus | |
CN205562446U (en) | Make things convenient for device of categorised collection explosion test fragment | |
CN208633587U (en) | A kind of housing construction temporary traffic jump frame | |
CN213976144U (en) | Movable dual-purpose receiving hopper for placing bucket and hanging bag | |
CN106552685A (en) | A kind of lithium battery processing technology graphite ore quick crashing equipment | |
CN207123417U (en) | A kind of sewage detection sample extraction equipment | |
CN209911006U (en) | Soil sampling device for environmental monitoring with degree of depth sign function | |
CN207099703U (en) | A kind of integrated harvester header being easy for installation and removal | |
CN206660520U (en) | A kind of new basketry mesh paving device | |
CN210665665U (en) | Ore composition detection device | |
CN205154230U (en) | Mining safety protection system | |
CN106337327B (en) | A kind of motor-car track automatic processing equipment | |
CN205850968U (en) | A kind of lifting device of rare earth processing | |
CN216038375U (en) | Special device for lifting and placing trench filter screen of desulfurization system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 330052 Jiangxi city of Nanchang province Nanchang County Huiren Road No. 301 Huaxin road facilities Engineering Company Limited Applicant after: Liu Yichen Address before: 330095 Jiangxi Province, Nanchang Qingshan Lake Ziyang Road No. 318, Jiangxi Manufacturing Polytechnic College Applicant before: Liu Yichen |
|
CB02 | Change of applicant information | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20170829 |
|
WW01 | Invention patent application withdrawn after publication |