CN107093864A - Power supply for construction cable operculum colpi assembling and disassembling auxiliary device - Google Patents

Power supply for construction cable operculum colpi assembling and disassembling auxiliary device Download PDF

Info

Publication number
CN107093864A
CN107093864A CN201710376539.0A CN201710376539A CN107093864A CN 107093864 A CN107093864 A CN 107093864A CN 201710376539 A CN201710376539 A CN 201710376539A CN 107093864 A CN107093864 A CN 107093864A
Authority
CN
China
Prior art keywords
curved
load
trench cover
fixed plate
operculum colpi
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710376539.0A
Other languages
Chinese (zh)
Inventor
李博
马维强
刘忠昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Third Metallurgical Group Co Ltd
Original Assignee
China Third Metallurgical Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Third Metallurgical Group Co Ltd filed Critical China Third Metallurgical Group Co Ltd
Priority to CN201710376539.0A priority Critical patent/CN107093864A/en
Publication of CN107093864A publication Critical patent/CN107093864A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

A kind of power supply for construction cable operculum colpi assembling and disassembling auxiliary device disclosed by the invention, the present invention is moved to directly over trench cover first when using, its load-bearing fixed plate downside is set to touch trench cover, move upper ejector lever rotary pawl part, its lower claw is set to block four angles of trench cover, then curved is depressed, trench cover complete safety is lifted, by push-and-pull, curved promotes or pulls roller, trench cover is safely and conveniently moved to side, after after end-of-job in cable duct, trench cover is recovered by the present invention.Although also needing to artificial operation during sled fortune, but by manually carrying again after manually weight cover plate is levered up compared with conventional method, construction, operation and maintainer's operating efficiency can not only be effectively improved, the security risk of staff can also effectively be reduced, cable operculum colpi can be easily loaded and unloaded, with good application value.

Description

Power supply for construction cable operculum colpi assembling and disassembling auxiliary device
Technical field
The present invention relates to building cable construction technical field, and in particular to a kind of power supply for construction cable operculum colpi handling auxiliary dress Put.
Background technology
In building construction process, cable laying engineering is increasing.Electricity particularly at transforming plant primary equipment area Cable requirement arranges in cable duct, is provided with operculum colpi on cable duct, operculum colpi it is generally rectangular in shape.When needing to be transformed When, workmen starts cable operculum colpi, new power-up cable is arranged into cable duct, or old cable is withdrawn from.Due to not having There is a specific purpose tool, to unload or install the work of placement operculum colpi be to carry out handwork to staff typically to starting, due to operculum colpi Typically it is made up of the larger material of cement or color density, therefore, operculum colpi weight is big, is wasted time and energy in operation, inefficiency, and And the manual operation for starting operculum colpi is difficult to hold, and easily hurts sb.'s feelings, or operculum colpi is caused to damage so that operculum colpi fragmentation, led to not It is continuing with, serious inconvenience is brought to the various operations such as regular maintenance, maintenance.Accordingly, it would be desirable to which a kind of technical scheme is solved State problem.
The content of the invention
The purpose of the present invention:To solve the above problems, in view of the deficiencies of the prior art, the present invention provides a kind of construction is used Cable operculum colpi assembling and disassembling auxiliary device, can not only effectively improve construction, operation and maintainer's operating efficiency, moreover it is possible to effectively reduce work Make the security risk of personnel, it is convenient to load and unload cable operculum colpi, with good application value.
Technical scheme:
To reach above-mentioned purpose, the present invention adopts the following technical scheme that realization:
A kind of power supply for construction cable operculum colpi assembling and disassembling auxiliary device, including skeleton, load-bearing fixed plate, curved handle, A-frame, rolling Wheel, wheel shaft, jaw members, upper ejector lever, rotating shaft, lower claw, positioning sleeve;
The skeleton is in double perpendicular thick sticks, the setting of three cross bar reinforcing frame postures, its skeleton cross bar two ends using 32# stainless steel materials Be respectively welded in the curved on two scuncheons of closed-in construction, it is described it is curved on rear side of two frame lower ends in being symmetrically respectively welded The A-frame that tabular triangular in shape is set, its it is curved two frames present lower vertical direction away from the total length of upper end 1/3 using backward 30 ° of angles of oblique inclination are curved to set folding hand;
The skeleton and curved perpendicular orthogonal shape on front side of lower end is welded with use holding for the rectangular tabular of stainless steel material Weight fixed plate, the wheel shaft two ends in ladder shaft-like be each passed through roller and A-frame rear end mounting hole by attaching nut, Its roller is set rotatably to be detachably fixed between two A-frames;
The jaw members are that 360 ° of four angular positions for being rotatably mounted to load-bearing fixed plate are used for fixing cable operculum colpi, The rotating shaft upper end is welded with the upper ejector lever in lath-shaped, and load-bearing fixed plate is passed through after shaft set positioning sleeve, under its rotating shaft End is also welded with lower claw with the equidirectional setting of upper ejector lever, and lower claw to the distance of load-bearing fixed plate be 10~15 ㎝.
In use, the present invention is moved to directly over trench cover first, its load-bearing fixed plate downside is set to touch trench cover, Upper ejector lever rotary pawl part is moved, its lower claw is blocked four angles of trench cover, curved is then depressed, trench cover is complete Safety is lifted, curved promoting or pulling roller by push-and-pull, and trench cover is safely and conveniently moved to side, treated in cable duct After end-of-job, trench cover is recovered by the present invention.
Compared with prior art, the beneficial effects of the invention are as follows:
A kind of power supply for construction cable operculum colpi assembling and disassembling auxiliary device disclosed by the invention, ditch is moved to when using by the present invention first Directly over cover plate, its load-bearing fixed plate downside is touched trench cover, move upper ejector lever rotary pawl part, make its lower claw card Firmly four angles of trench cover, then depress curved, trench cover complete safety are lifted, and promotion or pulling are rolled by the way that push-and-pull is curved Wheel, trench cover is safely and conveniently moved to side, after after end-of-job in cable duct, by the present invention that trench cover is extensive It is multiple.Although also needing to artificial operation during sled fortune, by artificial after manually weight cover plate is levered up compared with conventional method Carry again, construction, operation and maintainer's operating efficiency can not only be effectively improved, moreover it is possible to effectively reduce the safety wind of staff Danger, it is convenient to cable operculum colpi is loaded and unloaded, with good application value.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the side structure schematic view of the present invention;
Fig. 3 is Fig. 2 A-A overlooking the structure diagrams;
Fig. 4 is the claw structure schematic diagram of the present invention.
In figure:1- skeletons, 2- load-bearing fixed plate, the curved handles of 3-, 4- A-frames, 5- rollers, 6- wheel shafts, 7- jaw members, 71- upper ejector levers, 72- rotating shafts, 73- lower claws, 74- positioning sleeves.
Embodiment
The embodiment to the present invention is described further below in conjunction with the accompanying drawings:
It should be noted that " on ", " under " here, "left", "right", "front", "rear" are only to facilitate describe this hair The bright and exemplary direction that defines, as shown in figure 1, on the upside of paper direction for " on ", on the downside of paper direction for " under ", on the left of paper Direction is " left side ", and paper right direction is " right side ", and paper rear direction is that direction is " preceding ", certain ability on front side of " rear ", paper Field technique personnel understand on the basis of the present invention, can also other manner define the directions such as "left", "right", equally fall into this hair Within bright protection domain.
As shown in Fig. 1-Fig. 4, a kind of power supply for construction cable operculum colpi assembling and disassembling auxiliary device, including it is skeleton 1, load-bearing fixed plate 2, curved 3, A-frame 4, roller 5, wheel shaft 6, jaw members 7, upper ejector lever 71, rotating shaft 72, lower claw 73, positioning sleeve 74;
The skeleton 1 is in double perpendicular thick sticks, the setting of three cross bar reinforcing frame postures, its cross bar two of skeleton 1 using 32# stainless steel materials End is respectively welded in the curved on 3 liang of scuncheons of closed-in construction, it is described it is curved on rear side of 3 liang of frame lower ends in symmetrically welding respectively The A-frame 4 that tabular triangular in shape is set is connected to, its is curved to present lower vertical direction away from being adopted at the total length of upper end 1/3 3 liang of frames Folding hand is set with 30 ° of angles of oblique inclination are curved backward;
The skeleton 1 and curved perpendicular orthogonal shape on front side of 3 lower ends is welded with use the rectangular tabular of stainless steel material Load-bearing fixed plate 2, the two ends of wheel shaft 6 are each passed through roller 5 and the rear end mounting hole of A-frame 4 in ladder shaft-like and pass through connection Nut, its roller 5 is set rotatably to be detachably fixed between two A-frames 4;
The jaw members 7 are that 360 ° of four angular positions for being rotatably mounted to load-bearing fixed plate 2 are used for fixing cable duct Lid, the upper end of rotating shaft 72 is fixed after being welded with the upper ejector lever 71 in lath-shaped, and the suit positioning sleeve 74 of rotating shaft 72 through load-bearing Plate 2, its lower end of rotating shaft 72 is also welded with the lower claw 73 with the equidirectional setting of upper ejector lever 71, and lower claw 73 is fixed to load-bearing The distance of plate 2 is 10~15 ㎝.
In use, the present invention is moved to directly over trench cover first, its downside of load-bearing fixed plate 2 is set to touch operculum colpi Plate, moves the rotary pawl part 7 of upper ejector lever 71, its lower claw 73 is blocked four angles of trench cover, then depresses curved 3, general Trench cover complete safety is lifted, and 3 is promoted or is pulled roller 5 by the way that push-and-pull is curved, trench cover is safely and conveniently moved into side Side, after after end-of-job in cable duct, recovers trench cover by the present invention.
Further, skeleton 1 of the invention is set to high 1300mm, the long 500mm of load-bearing supporting plate 2, width 450mm, vehicle bone Frame 1 makes its load-carrying stronger, more laborsaving using double perpendicular thick stick, three cross bar Design of Reinforcement, and the bottom of load-bearing fixed plate 2 increase angle steel is set, Make the whole supporting plate hardness of car firmer, substantially increase the ability of delivery weight, it is ensured that the present invention has enough load-carrying energy Power.
Further, it is of the invention it is curved can tilt 30 ° of angles using oblique backward 3 and set, more meet than traditional straight grip Body mechanics, more flexible laborsaving, suitable long-time is used.
Further, roller 5 of the invention uses high-strength solid rubber wheel, and rubber wheel adds solid ¢ 25mm wheel shaft 26, effectively increase durability and reliability;And band steel bar resistance to compression roller bearing in taking turns, steel bar resistance to compression roller bearing is more anti- Pressure, it is wear-resistant, make sled transport car be more suitable for various road surfaces and different landform.And each wheel is duplex bearing, more durable, entirely Portion uses carbon steel bearing, and intensity is higher.
Further, the present invention shows from onsite application, during with present invention handling trench cover, without workmen and operculum colpi Plate is contacted, and workmen holds curved fortune car is started trench cover and transports or recover, and the present invention fully meets safety requirements, Effectively reduce personal risk.

Claims (2)

1. a kind of power supply for construction cable operculum colpi assembling and disassembling auxiliary device, including skeleton, load-bearing fixed plate, curved handle, A-frame, roller, Wheel shaft, jaw members, upper ejector lever, rotating shaft, lower claw, positioning sleeve;It is characterized in that:The skeleton is in double perpendicular thick stick, three cross bar frames Posture is set, its skeleton cross bar two ends be respectively welded at it is curved on two scuncheons, it is described it is curved on rear side of two frame lower ends in pair Title is respectively welded A-frame, and its is curved, and two frames, away from use at the total length of upper end 1/3, oblique 30 ° of angles of inclination are set backward, The skeleton and curved load-bearing fixed plate is welded with front side of lower end, the wheel shaft two ends are each passed through roller and three in ladder shaft-like Angle support rear end mounting hole by attaching nut, its roller is rotatably detachably fixed between two A-frames, The jaw members are 360 ° of four angular positions for being rotatably mounted to load-bearing fixed plate.
2. a kind of power supply for construction cable operculum colpi assembling and disassembling auxiliary device according to claim 1, it is characterised in that:The rotating shaft upper end It is welded with after upper ejector lever, and shaft set positioning sleeve and passes through load-bearing fixed plate, its rotating shaft lower end is also welded with lower claw, and under Claw to load-bearing fixed plate distance be 10~15 ㎝.
CN201710376539.0A 2017-05-25 2017-05-25 Power supply for construction cable operculum colpi assembling and disassembling auxiliary device Pending CN107093864A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710376539.0A CN107093864A (en) 2017-05-25 2017-05-25 Power supply for construction cable operculum colpi assembling and disassembling auxiliary device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710376539.0A CN107093864A (en) 2017-05-25 2017-05-25 Power supply for construction cable operculum colpi assembling and disassembling auxiliary device

Publications (1)

Publication Number Publication Date
CN107093864A true CN107093864A (en) 2017-08-25

Family

ID=59638813

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710376539.0A Pending CN107093864A (en) 2017-05-25 2017-05-25 Power supply for construction cable operculum colpi assembling and disassembling auxiliary device

Country Status (1)

Country Link
CN (1) CN107093864A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108821161A (en) * 2018-05-31 2018-11-16 国网山东省电力公司郓城县供电公司 A kind of device for removal cable trench cover
CN112072559A (en) * 2020-09-15 2020-12-11 国网山东省电力公司济南市长清区供电公司 Cable trench cover plate paving device
CN113386257A (en) * 2021-06-17 2021-09-14 郭维君 Stirring barrel for civil engineering splitting grouting

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108821161A (en) * 2018-05-31 2018-11-16 国网山东省电力公司郓城县供电公司 A kind of device for removal cable trench cover
CN108821161B (en) * 2018-05-31 2023-09-26 国网山东省电力公司郓城县供电公司 Device for moving cable trench cover plate
CN112072559A (en) * 2020-09-15 2020-12-11 国网山东省电力公司济南市长清区供电公司 Cable trench cover plate paving device
CN112072559B (en) * 2020-09-15 2022-04-05 国网山东省电力公司济南市长清区供电公司 Cable trench cover plate paving device
CN113386257A (en) * 2021-06-17 2021-09-14 郭维君 Stirring barrel for civil engineering splitting grouting

Similar Documents

Publication Publication Date Title
CN107093864A (en) Power supply for construction cable operculum colpi assembling and disassembling auxiliary device
CN106993408A (en) A kind of material transport scraper bowl and its application method for shipping one
CN207010071U (en) Power supply for construction cable operculum colpi assembling and disassembling auxiliary device
CN204430348U (en) A kind of bar planting boring lever parallelogram mechanical arm
CN207420041U (en) A kind of building template surface device for fast cleaning
CN204916855U (en) Line pole secondary handling tool
CN207002180U (en) Power supply for construction cable trench cover sled fortune aid
CN206885077U (en) Trolley
CN209290430U (en) A kind of architectural engineering trolley
CN107839721A (en) Gas cylinder transfer car(buggy)
CN105857351B (en) A kind of cart
CN211732713U (en) Portable pole material transfer device
CN111532315A (en) Switch cabinet transferring method
CN107542027A (en) A kind of half mechanical roadbed rectangular slab of stone short distance transport spreading machine
CN207274759U (en) Construction wheelbarrow
CN206769413U (en) A kind of new fixing device that can integrally lift assembling reinforcement
CN207072355U (en) A kind of construction dump cart
CN206569989U (en) The simple device for carrying motor
CN206705585U (en) One kind is wheeled to have bad luck car
CN203819794U (en) Muck conveying barrel
CN212861474U (en) Manual portable transport vehicle
CN205706744U (en) A kind of easy handbarrow for building
CN217649462U (en) Self-control cement feeding carrier
CN218558867U (en) Convenient trolley for construction site
CN212267513U (en) Cart applied to oil drum carrying

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170825

WD01 Invention patent application deemed withdrawn after publication