CN107093478A - A kind of pressurized water reactor core balanced recycle material-changing method of 24 months - Google Patents

A kind of pressurized water reactor core balanced recycle material-changing method of 24 months Download PDF

Info

Publication number
CN107093478A
CN107093478A CN201710201038.9A CN201710201038A CN107093478A CN 107093478 A CN107093478 A CN 107093478A CN 201710201038 A CN201710201038 A CN 201710201038A CN 107093478 A CN107093478 A CN 107093478A
Authority
CN
China
Prior art keywords
reactor core
fuel assembly
changing method
fuel
months
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710201038.9A
Other languages
Chinese (zh)
Inventor
刘国明
肖会文
李想
霍小东
杨海峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Power Engineering Co Ltd
Original Assignee
China Nuclear Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Power Engineering Co Ltd filed Critical China Nuclear Power Engineering Co Ltd
Priority to CN201710201038.9A priority Critical patent/CN107093478A/en
Publication of CN107093478A publication Critical patent/CN107093478A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C19/00Arrangements for treating, for handling, or for facilitating the handling of, fuel or other materials which are used within the reactor, e.g. within its pressure vessel
    • G21C19/20Arrangements for introducing objects into the pressure vessel; Arrangements for handling objects within the pressure vessel; Arrangements for removing objects from the pressure vessel
    • G21C19/205Interchanging of fuel elements in the core, i.e. fuel shuffling
    • GPHYSICS
    • G21NUCLEAR PHYSICS; NUCLEAR ENGINEERING
    • G21CNUCLEAR REACTORS
    • G21C19/00Arrangements for treating, for handling, or for facilitating the handling of, fuel or other materials which are used within the reactor, e.g. within its pressure vessel
    • G21C19/34Apparatus or processes for dismantling nuclear fuel, e.g. before reprocessing ; Apparatus or processes for dismantling strings of spent fuel elements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Plasma & Fusion (AREA)
  • General Engineering & Computer Science (AREA)
  • High Energy & Nuclear Physics (AREA)
  • Monitoring And Testing Of Nuclear Reactors (AREA)

Abstract

The invention belongs to reactor design field, it is related to a kind of pressurized water reactor core balanced recycle material-changing method of 24 months.Described material-changing method is that most long fuel assembly of each 90 95 groups of burning times changed in the group fuel assembly of reactor core 170 180 is novel fuel assembly, and described novel fuel assembly is placed in the secondary outer ring of reactor core and the center position close to reactor core in refuelling component, and spent fuel component is placed in the other positions of reactor core, described replacing is carried out once for every 24 months.Using the material-changing method of the present invention, the cycle of pressurized water reactor core balanced recycle can be increased to 24 months by 18 months.

Description

A kind of pressurized water reactor core balanced recycle material-changing method of 24 months
Technical field
The invention belongs to reactor design field, it is related to a kind of pressurized water reactor core balanced recycle side of reloading of 24 months Method.
Background technology
In reactor core fuel management, on the basis of the security of reactor core is ensured, the utilization rate of raising nuclear fuel, Extend the refulling cycle of reactor core, the phase in use longevity of nuclear power generating sets can be extended, shutdown number of times is reduced, so as to effectively drop Low overhaul cost, improves nuclear power generating sets capability facfor, lifts the economy of nuclear power plant.
At present, what the reactor core being made up of 177 group fuel assemblies was used is all the fuel management strategy reloaded for 18 months.It is flat 68 group 4.45% of fuel assembly is changed in weighing apparatus circulation every time, is loaded using low leakage.Although such management strategy can make heap Phase in the longevity length of core reaches 475EFPD, meets the requirement reloaded for 18 months, but there is the reality further extended in the reactor reloading pattern cycle Demand.
The content of the invention
The purpose of the present invention be for nuclear plant safety design requirement there is provided a kind of pressurized water reactor core balanced recycle 24 The material-changing method of the moon, to extend the cycle of pressurized water reactor core balanced recycle.
In order to achieve this, in the embodiment on basis, the present invention provides a kind of pressurized water reactor core balanced recycle 24 The material-changing method of the moon, described material-changing method is each 90-95 group burning times changed in reactor core 170-180 group fuel assemblies Most long fuel assembly is novel fuel assembly, and described novel fuel assembly is placed in into the secondary outer of reactor core in refuelling component Circle and the center position close to reactor core, and spent fuel component are placed in the other positions of reactor core, it is described more Change every 24 months and carry out once.
In a preferred embodiment, the present invention provides a kind of pressurized water reactor core balanced recycle side of reloading of 24 months Method, wherein described material-changing method carries out the replacing of described fuel assembly using low leakage loading pattern.
In a preferred embodiment, the present invention provides a kind of pressurized water reactor core balanced recycle side of reloading of 24 months Method, wherein described novel fuel assembly235U enrichments are 4.8-5.0%.
In a preferred embodiment, the present invention provides a kind of pressurized water reactor core balanced recycle side of reloading of 24 months Method, wherein replacing center gauge pipe with fuel rod in fuel assembly described in every group.
In a preferred embodiment, the present invention provides a kind of pressurized water reactor core balanced recycle side of reloading of 24 months Method, wherein the fuel assembly described in every group includes 250-280 roots fuel rod, 20-30 root guide pipes.
In a preferred embodiment, the present invention provides a kind of pressurized water reactor core balanced recycle side of reloading of 24 months Detection instrument is placed in the guide pipe nearest from described fuel assembly center in method, wherein presurized water reactor heap.
In order to lift the nuclear fuel useful load of reactor core, the core loading reloaded for 24 months is reached, each fuel assembly takes Disappeared fuel assembly center gauge pipe, is replaced using fuel rod, and the nuclear measurement instrument in heap is placed on from fuel stack In the nearest guide pipe in part center, the nuclear fuel useful load of reactor core is improved.After this method, reactor core adds additional quite In the nuclear fuel useful load of 0.67 former nuclear fuel assembly used.In the reactor core being made up of fuel assembly, control rod is arranged Position will not arrange detection instrument in heap, vice versa.Therefore the position that guide pipe had both been inserted as control rod, is used as and puts again The position of detection instrument is put, therefore cancelling gauge pipe will not cause fuel assembly unavailable.
In a preferred embodiment, the present invention provides a kind of pressurized water reactor core balanced recycle side of reloading of 24 months Method, wherein the novel fuel assembly described in every group includes fuel rod of the 4-24 roots containing gadolinium.
In a preferred embodiment, the present invention provides a kind of pressurized water reactor core balanced recycle side of reloading of 24 months Method, wherein the Gd containing percentage by weight 2-10% in the fuel rod containing gadolinium2O3
In a preferred embodiment, the present invention provides a kind of pressurized water reactor core balanced recycle side of reloading of 24 months Method, wherein in the fuel rod containing gadolinium235U enrichments are the 0.5-0.9 of fuel rod of the surrounding without gadolinium.
In a preferred embodiment, the present invention provides a kind of pressurized water reactor core balanced recycle side of reloading of 24 months Method, wherein in refuelling component, the novel fuel assembly for loading more gadolinium-containing fuel rods to be disposed adjacent to the centre bit of reactor core Place is put, the novel fuel assembly for loading less gadolinium-containing fuel rod is disposed adjacent to the position of reactor core outer ring, the secondary outer ring position of reactor core All arrange novel fuel assembly.
The balanced recycle reactor core reloaded for 24 months, the built-in reactivity at the beginning of core life is very big, and power peak factor is also higher. Gadolinium-containing fuel rod is arranged in the higher position in core power peak, on the one hand for controlling the built-in reactivity of beginning of life, reduces heap Core boron concentration, prevents that, because too high boron concentration causes positive temperature feedback, power peak factor on the other hand can be flattened.Every group new Fuel assembly is all novel fuel assembly containing gadolinium, and the number of gadolinium-containing fuel rod can be 4,8,12,16,20,24.Pellet containing gadolinia fuel Middle Gd2O3Percentage by weight be 2%-10%,235U enrichment is lower than the enrichment of surrounding not gadolinium-containing fuel rod, and it is enriched with Spend for the 0.5-0.9 of surrounding fuel enrichment.
In a preferred embodiment, the present invention provides a kind of pressurized water reactor core balanced recycle side of reloading of 24 months Method, wherein the sum of described fuel assembly is 177 groups, it is new that wherein 92 groups burning times most long fuel assembly is changed every time Fuel assembly.
The beneficial effects of the present invention are using the material-changing method of the present invention, by increasing novel fuel assembly number, lifting235U enrichments, addition reactor core nuclear fuel useful load, and component containing gadolinia fuel is used, can be by pressurized water reactor core balanced recycle Cycle was increased to 24 months by 18 months, so as to realize that phase in longevity length is that the balanced recycle of 24 months reloads loading.
Wherein, in novel fuel assembly, the gauge pipe in fuel assembly is replaced using fuel rod, the combustion of heap core is effectively increased The useful load of material;The reprinting pattern of low leakage is taken, the fuel assembly by irradiation is placed on reactor core outmost turns, gadolinium will be contained The less fuel assembly of fuel rod is arranged in reactor core time outer ring, and the more novel fuel assembly of other gadolinium-containing fuel rods is placed on reactor core Near center location;By using component containing gadolinia fuel, the control of reactor core reactivity is realized, boron concentration is reduced, it is therefore prevented that There is temperature positive feedback in reactor core, and power peak factor is reduced again, realizes the effect of power flattening.By the above method, obtain The balanced recycles of 177 group fuel assembly reactor cores load, phase in longevity length reaches 646EFPD.
Brief description of the drawings
Fig. 1 is fuel rod, the fuel containing gadolinium without gadolinium in new fuel assembly in exemplary material-changing method of the invention The distribution map of rod, guide pipe, wherein the internal square for indicating numeral 1 represents the fuel rod without gadolinium, inside indicates the side of numeral 2 Block represents the fuel rod (amounting to 8) containing gadolinium, and the square that inside indicates numeral 3 represents guide pipe.
Fig. 2 is exemplary material-changing method of the invention in the distribution map of after-combustion component that reloads, wherein black bars generation Table burnt (irradiation) cross fuel assembly, white square represent in new fuel assembly, square numeral represent contain gadolinia fuel The radical of rod.
Embodiment
The embodiment of the present invention is further illustrated below in conjunction with accompanying drawing.
In the exemplary pressurized water reactor core balanced recycle material-changing method of 24 months of the invention, pressurized water reactor core is constituted Fuel assembly includes 177 groups altogether.Wherein 92 groups burning times most long fuel assembly is changed using low leakage loading pattern every time For novel fuel assembly (wherein235U enrichments are 4.95%, more conventional to increase) so that reactor core balanced recycle Length of the cycle reaches length of reloading for 24 months.
The reactor fuel active section of 177 group fuel assemblies is highly 365.76cm, and equivalent diameter is 322.8cm, ratio of height to diameter For 1.13.The fuel rod of each fuel assembly is arranged by 17 × 17 square formations, (includes the combustion without gadolinium again comprising 265 fuel rods Charge bar and the fuel rod containing gadolinium), 24 guide pipes.Fuel rod, the fuel containing gadolinium of gadolinium are free of in exemplary new fuel assembly Rod, guide pipe distribution it is as shown in Figure 1.
Fuel assembly eliminates the position of center gauge pipe, instead rod, and detection instrument is placed on from combustion in heap Expect in the nearest guide pipe in component center.In 177 group fuel assemblies composition reactor core, heap will not be arranged by arranging the position of control rod Interior detection instrument, vice versa.Therefore the position that guide pipe had both been inserted as control rod, the position for detecting instrument as placing again Put, therefore cancelling gauge pipe will not cause fuel assembly unavailable.
Gd in the gadolinium-containing fuel rod of novel fuel assembly2O3The percentage by weight of (being burnable poison) is 8%,235U enrichments are 4.95%;Around not gadolinium-containing fuel rod35U enrichments are 3.0% (being the 61% of gadolinium-containing fuel rod).It can contain in novel fuel assembly Have 4,8,12,16,20 or 24 gadolinium-containing fuel rods, bring larger flexibility to design.Specifically, balanced recycle reactor core Novel fuel assembly is divided into five types according to the quantity of gadolinium-containing fuel rod:Containing 8, the new combustion of 12,16,20,24 gadolinium-containing fuel rods Expect component.
In refuelling component, the fuel assembly of (irradiation) excessively that will burn is placed on reactor core outmost turns, will contain gadolinium The less novel fuel assembly of fuel rod is arranged in reactor core time outer ring, and the more novel fuel assembly of other gadolinium-containing fuel rods is placed In reactor core near center location.
Exemplary material-changing method of the invention is as shown in Figure 2 in the distribution for the after-combustion component that reloads.In Fig. 2 abscissa from The right side is turned left to be arranged by A to R successively, and ordinate is from top to bottom successively by 1 to 15 arrangement, in balanced recycle reactor core, secondary outer ring position Put, i.e.,:B05、B06、B07、B08、B09、B10、B11、C04、C12、D03、D12、E02、E14、F02、F03、F13、F14、 G02、G14、H02、H14、J02、J14、K02、K14、L02、L14、M03、M13、N04、N12、P05、P06、P07、P08、P09、 P10, P11, which are disposed with, includes the novel fuel assembly of 8 or 16 gadolinium-containing fuel rods, close to reactor core center F07, F09, G06, G08, G10, H07, H09, J06, J08, J10, K07, K09 are disposed with the fresh fuel group including 24 gadolinium-containing fuel rods Part.
Core loading optimization design arrangement is on the premise of basic security criterion, to have considered fuel management performance ginseng What number and neutronics parameter were drawn.The fuel management result of calculation of balanced recycle is as shown in table 1 below, the neutronics ginseng of balanced recycle Number result of calculation is as shown in table 2 below.
The fuel management result of calculation of the balanced recycle of table 1
The neutronics parameter result of calculation of the balanced recycle of table 2
Core loading scheme in above balanced recycle meets basic design parameters:Fdh≤1.65;FQ≤ 2.45 and basic Safety criterion, wherein FdhFor enthalpy rise factor, FQFor hot spot factor.Balanced recycle heap can be drawn from the result of calculation of Tables 1 and 2 The design that core is loaded fully meets safety criterion.
Obviously, those skilled in the art can carry out the essence of various changes and modification without departing from the present invention to the present invention God and scope.So, if these modifications and variations to the present invention belong to the model of the claims in the present invention and its equivalent technology Within enclosing, then the present invention is also intended to comprising including these changes and modification.Above-described embodiment or embodiment are simply to the present invention For example, the present invention can also be implemented with other ad hoc fashions or other particular form, without departing from the present invention's Main idea or substantive characteristics.Therefore, it is regarded as from the point of view of the embodiment of description is in terms of any illustrative and non-limiting.This The scope of invention should be illustrated that any change equivalent with the intention and scope of claim should also be included by appended claims Within the scope of the invention.

Claims (10)

1. a kind of pressurized water reactor core balanced recycle material-changing method of 24 months, it is characterised in that:Described material-changing method is each The 90-95 group burning times most long fuel assembly changed in reactor core 170-180 group fuel assemblies is novel fuel assembly, and more Described novel fuel assembly is placed in the secondary outer ring of reactor core and the center position close to reactor core during fuel assembly reload, and by Spent fuel component is placed in the other positions of reactor core, and described replacing is carried out once for every 24 months.
2. material-changing method according to claim 1, it is characterised in that:Described material-changing method uses low leakage loading pattern Carry out the replacing of described fuel assembly.
3. material-changing method according to claim 1, it is characterised in that:Described novel fuel assembly235U enrichments are 4.8-5.0%.
4. material-changing method according to claim 1, it is characterised in that:Replaced in fuel assembly described in every group with fuel rod Center gauge pipe.
5. material-changing method according to claim 1, it is characterised in that:Fuel assembly described in every group includes 250-280 roots Fuel rod, 20-30 root guide pipes.
6. material-changing method according to claim 5, it is characterised in that:Detection instrument is placed on from described in presurized water reactor heap In the nearest guide pipe in fuel assembly center.
7. material-changing method according to claim 5, it is characterised in that:Novel fuel assembly described in every group includes 4-24 roots Fuel rod containing gadolinium.
8. material-changing method according to claim 7, it is characterised in that:Contain weight percent in the described fuel rod containing gadolinium Gd than 2-10%2O3
9. material-changing method according to claim 7, it is characterised in that:In the described fuel rod containing gadolinium235U enrichments are The 0.5-0.9 of fuel rod of the surrounding without gadolinium.
10. material-changing method according to claim 7, it is characterised in that:In refuelling component, it will load more containing gadolinium The novel fuel assembly of fuel rod is disposed adjacent to the center position of reactor core, and the novel fuel assembly for loading less gadolinium-containing fuel rod is put In the position close to reactor core outer ring, novel fuel assembly is all arranged in the secondary outer ring position of reactor core.
CN201710201038.9A 2017-03-30 2017-03-30 A kind of pressurized water reactor core balanced recycle material-changing method of 24 months Pending CN107093478A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710201038.9A CN107093478A (en) 2017-03-30 2017-03-30 A kind of pressurized water reactor core balanced recycle material-changing method of 24 months

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710201038.9A CN107093478A (en) 2017-03-30 2017-03-30 A kind of pressurized water reactor core balanced recycle material-changing method of 24 months

Publications (1)

Publication Number Publication Date
CN107093478A true CN107093478A (en) 2017-08-25

Family

ID=59648992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710201038.9A Pending CN107093478A (en) 2017-03-30 2017-03-30 A kind of pressurized water reactor core balanced recycle material-changing method of 24 months

Country Status (1)

Country Link
CN (1) CN107093478A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107910077A (en) * 2017-10-19 2018-04-13 中国核电工程有限公司 A kind of core loading method of the alternate balanced recycle of VVER heap-type length
CN114220560A (en) * 2021-12-13 2022-03-22 中国核动力研究设计院 Boron-controlled peak regulation method and system for pressurized water reactor nuclear power plant
CN114242283A (en) * 2021-12-22 2022-03-25 中国核动力研究设计院 Fuel loading method for 24-month refueling period of pressurized water reactor core
CN114267464A (en) * 2021-12-22 2022-04-01 中国核动力研究设计院 Pressurized water reactor core refueling long-period fuel management method and application
CN115376712A (en) * 2022-08-03 2022-11-22 上海核工程研究设计院有限公司 Fuel management method and reactor core of long-period balanced cycle of passive nuclear power plant

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103400619A (en) * 2013-07-03 2013-11-20 中国核电工程有限公司 Advanced loading method for year fuel cycle of 1/4 of reactor core
CN103578588A (en) * 2013-10-18 2014-02-12 中国核电工程有限公司 Reactor core loading method for exchanging fuels of pressurized water reactor nuclear power plant after 18 months of balanced circulation
CN103871528A (en) * 2012-12-14 2014-06-18 中国核动力研究设计院 Long period fuel management method of pressurized water reactor core
CN105139900A (en) * 2015-07-09 2015-12-09 中国核动力研究设计院 24-Month reload core loading method adopting erbium inflammable poison
CN105139901A (en) * 2015-07-09 2015-12-09 中国核动力研究设计院 Fuel management method of pressurized water reactor core formed by 177 fuel assemblies

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103871528A (en) * 2012-12-14 2014-06-18 中国核动力研究设计院 Long period fuel management method of pressurized water reactor core
CN103400619A (en) * 2013-07-03 2013-11-20 中国核电工程有限公司 Advanced loading method for year fuel cycle of 1/4 of reactor core
CN103578588A (en) * 2013-10-18 2014-02-12 中国核电工程有限公司 Reactor core loading method for exchanging fuels of pressurized water reactor nuclear power plant after 18 months of balanced circulation
CN105139900A (en) * 2015-07-09 2015-12-09 中国核动力研究设计院 24-Month reload core loading method adopting erbium inflammable poison
CN105139901A (en) * 2015-07-09 2015-12-09 中国核动力研究设计院 Fuel management method of pressurized water reactor core formed by 177 fuel assemblies

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
叶奇蓁等: "《中国电气工程大典第6卷核能发电卷》", 31 July 2009 *
王丹等: "24个月换料周期燃料管理初步研究", 《核动力工程》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107910077A (en) * 2017-10-19 2018-04-13 中国核电工程有限公司 A kind of core loading method of the alternate balanced recycle of VVER heap-type length
CN107910077B (en) * 2017-10-19 2021-08-24 中国核电工程有限公司 VVER reactor type length-alternating balance cycle reactor core loading method
CN114220560A (en) * 2021-12-13 2022-03-22 中国核动力研究设计院 Boron-controlled peak regulation method and system for pressurized water reactor nuclear power plant
CN114220560B (en) * 2021-12-13 2024-05-07 中国核动力研究设计院 Boron control peak regulation method and system for pressurized water reactor nuclear power plant
CN114242283A (en) * 2021-12-22 2022-03-25 中国核动力研究设计院 Fuel loading method for 24-month refueling period of pressurized water reactor core
CN114267464A (en) * 2021-12-22 2022-04-01 中国核动力研究设计院 Pressurized water reactor core refueling long-period fuel management method and application
CN115376712A (en) * 2022-08-03 2022-11-22 上海核工程研究设计院有限公司 Fuel management method and reactor core of long-period balanced cycle of passive nuclear power plant

Similar Documents

Publication Publication Date Title
CN107093478A (en) A kind of pressurized water reactor core balanced recycle material-changing method of 24 months
CN108320820B (en) A kind of 100,000 kilowatts of order reaction heap Nuclear design methods
CN105139899A (en) Core loading method of pressurized water reactor nuclear power plant first cycle
CN103871528B (en) A kind of long period fuel management method of pressurized water reactor core
CN108364696B (en) A kind of 100,000 kilowatts of order reaction heap reactor core reactivity control methods
CN105390167B (en) A kind of supercritical water reactor fuel assembly and reactor core
CN101241772B (en) 18-month feed replacement method for 1-million kW unit of China PWR nuclear power station
JPS61111488A (en) Fuel load for core of nuclear reactor and operating method thereof
CN103000232B (en) The head of a kind of advanced person circulates stowage of reloading for 18 months
CN103578588A (en) Reactor core loading method for exchanging fuels of pressurized water reactor nuclear power plant after 18 months of balanced circulation
CN105139901A (en) Fuel management method of pressurized water reactor core formed by 177 fuel assemblies
CN105139900B (en) A kind of 24 months reload core stowages of employing erbium burnable poison
CN109036603B (en) Long-circulation refueling and loading method for reactor core of ultra-large pressurized water reactor
CN108364695B (en) A kind of 100,000 kilowatts of order reaction heap in-core fuel management methods
CN107863165B (en) Method for loading 18-month refueling multi-cycle fuel of pressurized water reactor core
CN109994233B (en) Partial low-leakage loading and reloading method suitable for modular mini-stack
CN101847450B (en) Associated disposition method of fuel for nuclear power plant
CN112420223A (en) Long-circulation refueling loading method for pressurized water reactor core based on gadolinium enrichment
CN114242283A (en) Fuel loading method for 24-month refueling period of pressurized water reactor core
CN107093480A (en) A kind of alternate reactor fuel of phase in presurized water reactor longevity length reloads stowage
CN104952492B (en) Carry gadolinia fuel rod and with the fuel assembly and pressurized water reactor core for carrying gadolinia fuel rod
CN101226782A (en) Stowage method of million kilowatt units principal circle reactor core of Chinese press water stack nuclear power station
CN107093479A (en) A kind of first circulatory life-time length core loading method of 24 months of presurized water reactor
JPS6296889A (en) Light water type reactor core and fuel charging method thereof
CN108053904B (en) A kind of 18 months stowages of reloading of presurized water reactor head circulation reactor core containing gadolinium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170825