CN107092551A - A kind of server system performance optimization method and device - Google Patents
A kind of server system performance optimization method and device Download PDFInfo
- Publication number
- CN107092551A CN107092551A CN201710480734.8A CN201710480734A CN107092551A CN 107092551 A CN107092551 A CN 107092551A CN 201710480734 A CN201710480734 A CN 201710480734A CN 107092551 A CN107092551 A CN 107092551A
- Authority
- CN
- China
- Prior art keywords
- destination server
- busy percentage
- cpu busy
- upper limit
- alarm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000005457 optimization Methods 0.000 title claims abstract description 27
- 238000000034 method Methods 0.000 title claims abstract description 26
- 238000012544 monitoring process Methods 0.000 claims description 12
- 230000009897 systematic effect Effects 0.000 abstract description 5
- 230000000694 effects Effects 0.000 abstract 1
- 230000006870 function Effects 0.000 description 16
- 230000003111 delayed effect Effects 0.000 description 3
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000003862 health status Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 238000011002 quantification Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/3003—Monitoring arrangements specially adapted to the computing system or computing system component being monitored
- G06F11/3024—Monitoring arrangements specially adapted to the computing system or computing system component being monitored where the computing system component is a central processing unit [CPU]
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/06—Management of faults, events, alarms or notifications
- H04L41/0681—Configuration of triggering conditions
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/08—Configuration management of networks or network elements
- H04L41/0803—Configuration setting
- H04L41/0823—Configuration setting characterised by the purposes of a change of settings, e.g. optimising configuration for enhancing reliability
- H04L41/0836—Configuration setting characterised by the purposes of a change of settings, e.g. optimising configuration for enhancing reliability to enhance reliability, e.g. reduce downtime
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Computing Systems (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Mathematical Physics (AREA)
- Quality & Reliability (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Debugging And Monitoring (AREA)
Abstract
The invention discloses a kind of server system performance optimization method, this method comprises the following steps:When reaching the time interval of setting, the warning information of destination server is obtained;According to warning information, the warning value of destination server is calculated;According to warning value, the cpu busy percentage upper limit of destination server is determined, so that destination server is based on the cpu busy percentage upper limit and carries out system function optimization.The technical scheme provided using the embodiment of the present invention, the cpu busy percentage upper limit is determined by the warning information of destination server in time, destination server is optimized based on the cpu busy percentage upper limit to systematic function, in destination server operational envelope, maximally utilize its computing resource, the risk that server machine of delaying occurs, restarted can be reduced, optimizes server system performance.Optimize device the invention also discloses a kind of server system performance, with relevant art effect.
Description
Technical field
The present invention relates to computer control automation field, more particularly to a kind of server system performance optimization method and dress
Put.
Background technology
With the fast development of cloud computing technology, increasing enterprises and institutions tend to build data center, with logical
Cross the increasing calculating task of data center's mass disposal.Data center includes a fairly large number of server, every service
The working condition of device directly affects the operation of data center.
For every server that data center includes, the cpu busy percentage of the server is to influence its working condition
One of key factor.When each hardware effort is normal in server, if cpu busy percentage continues 100% in a short time,
Server can normally be run, and cpu busy percentage can return to normal condition.In this case, server is delayed
Machine, the probability restarted are little.But, when server has hardware alarm, and cpu busy percentage has reached 100%, or certain
Continue 100% in time, even continuing 100% in a short time, can also increase server delay machine, restart risk.
In summary, how to reduce server delay machine, restart risk, be current those skilled in the art asking of being badly in need of solving
Topic.
The content of the invention
It is an object of the invention to provide a kind of server system performance optimization method and device, delayed with reducing server
Machine, restart risk, optimize server system performance.
In order to solve the above technical problems, the present invention provides following technical scheme:
A kind of server system performance optimization method, including:
When reaching the time interval of setting, the warning information of destination server is obtained;
According to the warning information, the warning value of the destination server is calculated;
According to the warning value, the cpu busy percentage upper limit of the destination server is determined, so that the destination server base
System function optimization is carried out in the cpu busy percentage upper limit.
In a kind of embodiment of the present invention, the warning information includes multiple hardware in the destination server
Alarm level and alarm number, it is described according to the warning information, calculate the warning value of the destination server, including:
According to the alarm level of multiple hardware in the destination server and alarm number, it is determined that each alarm level correspondence
Alarm number;
According to the corresponding alarm number of each alarm level, the warning value of the destination server is calculated.
In a kind of embodiment of the present invention, the corresponding alarm number of each alarm level of basis is calculated
The warning value of the destination server, including:
For each alarm level, by the corresponding alarm number of the alarm level and the disturbance degree of the default alarm level
It is multiplied, obtains the influence value of the alarm level;
The influence value of each alarm level is added, the warning value of the destination server is obtained.
It is described according to the warning value in a kind of embodiment of the present invention, determine the destination server
The cpu busy percentage upper limit, including:
The cpu busy percentage upper limit of the destination server is determined by below equation:
The cpu busy percentage upper limit=(100- warning values) %.
In a kind of embodiment of the present invention, in addition to:
The cpu busy percentage of the destination server is monitored;
When monitoring that duration of the cpu busy percentage less than predetermined threshold value reaches setting duration, output prompting letter
Breath.
A kind of server system performance optimizes device, including:
Warning information obtains module, for when reaching the time interval of setting, obtaining the warning information of destination server;
Warning value computing module, for according to the warning information, calculating the warning value of the destination server;
Utilization rate upper limit determining module, for according to the warning value, on the cpu busy percentage for determining the destination server
Limit, so that the destination server is based on the cpu busy percentage upper limit and carries out system function optimization.
In a kind of embodiment of the present invention, the warning information includes multiple hardware in the destination server
Alarm level and alarm number, the warning value computing module, including:
Number determination sub-module is alerted, for according to the alarm level of multiple hardware in the destination server and alarm number
Mesh, it is determined that the corresponding alarm number of each alarm level;
Warning value calculating sub module, for according to the corresponding alarm number of each alarm level, calculating the destination service
The warning value of device.
In a kind of embodiment of the present invention, the warning value calculating sub module, specifically for:
For each alarm level, by the corresponding alarm number of the alarm level and the disturbance degree of the default alarm level
It is multiplied, obtains the influence value of the alarm level;
The influence value of each alarm level is added, the warning value of the destination server is obtained.
In a kind of embodiment of the present invention, the utilization rate upper limit determining module, specifically for:
The cpu busy percentage upper limit of the destination server is determined by below equation:
The cpu busy percentage upper limit=(100- warning values) %.
In a kind of embodiment of the present invention, in addition to:
Utilization rate monitoring modular, is monitored for the cpu busy percentage to the destination server;
Prompt message output module, for monitoring that the cpu busy percentage reaches less than the duration of predetermined threshold value
When setting duration, prompt message is exported.
The technical scheme provided using the embodiment of the present invention, when reaching the time interval of setting, obtains destination service
The warning information of device, according to the warning information, calculates the warning value of destination server, destination service is determined according to the warning value
The cpu busy percentage upper limit of device, so that destination server is based on the cpu busy percentage upper limit and carries out system function optimization.Pass through target
The warning information of server determines the cpu busy percentage upper limit in time, and destination server is based on the cpu busy percentage upper limit to systematic function
Optimize, in destination server operational envelope, maximally utilize its computing resource, it is possible to reduce server is delayed
Machine, the risk restarted, optimize server system performance.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this
Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with
Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is a kind of implementing procedure figure of server system performance optimization method in the embodiment of the present invention;
Fig. 2 is a kind of structural representation of server system performance optimization device in the embodiment of the present invention.
Embodiment
In order that those skilled in the art more fully understand the present invention program, with reference to the accompanying drawings and detailed description
The present invention is described in further detail.Obviously, described embodiment is only a part of embodiment of the invention, rather than
Whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not making creative work premise
Lower obtained every other embodiment, belongs to the scope of protection of the invention.
Referring to Fig. 1, a kind of implementing procedure figure of the server system performance optimization method provided by the embodiment of the present invention,
This method may comprise steps of:
S101:When reaching the time interval of setting, the warning information of destination server is obtained.
Destination server can be any one in any one server of pending system function optimization, such as data center
Platform server.
In destination server running, the hardware such as its hard disk, mainboard, fan, temperature, power supply occurs various unavoidably
Problem.When any one hardware goes wrong, can all there is corresponding alarm.In actual applications, can be to destination server
Hardware state is monitored, and the alarm situation of each hardware is obtained in time, and is recorded in alarm list.
In embodiments of the present invention, time interval can be preset, when reaching the time interval of setting, passes through alarm
List obtains the warning information of destination server.
It should be noted that time interval can be set and be adjusted according to actual conditions, the embodiment of the present invention is to this
It is not limited.Specifically, time interval can be adjusted according to the running status of destination server.Such as, when according to setting
Sometime interval perform the technical scheme that the multiple embodiment of the present invention is provided, but there is the machine of delaying, again in destination server
Open phenomenon still relatively more frequent, then can shorten the time interval, the cpu busy percentage upper limit to destination server is carried out really in time
It is fixed.So it is possible to prevente effectively from the time interval of acquiescence is not suitable for current environment, the time interval of user's manual configuration does not conform to
Reason, cause the cpu busy percentage upper limit setting it is unreasonable, cause the wasting of resources or equipment delay machine the problems such as appearance, be that user carries
For the monitoring management service for actual demand of more fitting.
S102:According to warning information, the warning value of destination server is calculated.
After the warning information for obtaining destination server, quantification treatment can be carried out to warning information, according to warning information, meter
Calculate the warning value of destination server.
In a kind of embodiment of the present invention, step S102 may comprise steps of:
Step one:According to the alarm level of multiple hardware in destination server and alarm number, it is determined that each alarm level
Corresponding alarm number;
Step 2:According to the corresponding alarm number of each alarm level, the warning value of destination server is calculated.
For convenience of describing, above-mentioned two step is combined and illustrated.
In embodiments of the present invention, warning information specifically can include destination server in multiple hardware alarm level and
Alert number.Warning content can have fan alarm, hard disk alarm, temperature warning, mainboard alarm, power alarm etc., alert level
Can there are not slight alarm, high severity alarm etc..Certainly, also more warning contents and alert level can be set according to actual conditions
Not, the embodiment of the present invention is without limitation.
According to the alarm level of multiple hardware in destination server and alarm number, it may be determined that each alarm level correspondence
Alarm number.Such as, in destination server, the slight alarm of hard disk has 3, and the slight alarm of mainboard has 3, power supply it is tight
Alarm has 1 again, can determine that the corresponding alarm number of slight alarm level is 6, the corresponding alarm of high severity alarm rank accordingly
Number is 1.
According to the corresponding alarm number of each alarm level, the warning value of destination server can be calculated.
In a kind of embodiment of the present invention, the warning value of destination server can be calculated by following steps:
First step:For each alarm level, by the corresponding alarm number of the alarm level and the default alarm
The disturbance degree of rank is multiplied, and obtains the influence value of the alarm level;
Second step:The influence value of each alarm level is added, the warning value of destination server is obtained.
In embodiments of the present invention, the disturbance degree of each alarm level can be preset, such as by slight alarm level
Disturbance degree be set to 1, the disturbance degree of high severity alarm rank is set to 2.Alarm level is higher, and its corresponding disturbance degree is bigger, table
The influence of the bright health status to destination server is bigger.The specific disturbance degree establishing method embodiment of the present invention is not limited,
It can be set and be adjusted according to actual conditions.
For each alarm level, by the corresponding alarm number of the alarm level and the disturbance degree of the default alarm level
It is multiplied, the influence value of the alarm level can be obtained.Such as, in destination server, the corresponding alarm number of slight alarm level
For 6, the corresponding alarm number of high severity alarm rank is 1, and the corresponding disturbance degree of slight alarm level is 1, high severity alarm rank pair
The disturbance degree answered is 2, then the influence value of slight alarm level is 6 × 1=6, and the influence value of high severity alarm rank is 1 × 2=2.
The influence value of each alarm level is added, the warning value of destination server can be obtained.For upper example, obtain
The warning value of the destination server arrived is 6+2=8.
Calculate after the warning value for obtaining destination server, step S103 operation can be continued executing with.
S103:According to warning value, the cpu busy percentage upper limit of destination server is determined, so that destination server is based on CPU profits
System function optimization is carried out with the rate upper limit.
Calculate after the warning value for obtaining destination server, according to the warning value, can determine that the CPU of destination server is utilized
The rate upper limit, such destination server can carry out system function optimization based on the cpu busy percentage upper limit, to avoid the occurrence of CPU profits
Exceed the situation of the cpu busy percentage upper limit with rate, so as to the risk for avoiding the occurrence of the machine of delaying, restarting.
In a kind of embodiment of the present invention, it can determine that the CPU of destination server is utilized by below equation
The rate upper limit:
The cpu busy percentage upper limit=(100- warning values) %.
Still exemplified by above example, the warning value for calculating obtained destination server is 8, then according to above-mentioned formula, can obtain
The cpu busy percentage upper limit is (100-8) %=92%.
After the cpu busy percentage upper limit for determining destination server, destination server can be based on the cpu busy percentage upper limit pair
Cpu busy percentage is controlled, when cpu busy percentage is not up to the cpu busy percentage upper limit, is received and is responded more calculating tasks
Processing request, when cpu busy percentage reaches the cpu busy percentage upper limit, can reject or respond the place of more calculating tasks
Reason request.So in the range of destination server safe operation, the computing resource of destination server can be maximally utilized, it is excellent
Change systematic function.
The method provided using the embodiment of the present invention, when reaching the time interval of setting, obtains destination server
Warning information, according to the warning information, calculates the warning value of destination server, destination server is determined according to the warning value
The cpu busy percentage upper limit, so that destination server is based on the cpu busy percentage upper limit and carries out system function optimization.Pass through destination service
The warning information of device determines the cpu busy percentage upper limit in time, and destination server is based on the cpu busy percentage upper limit and systematic function is carried out
Optimization, in destination server operational envelope, maximally utilize its computing resource, it is possible to reduce server occur the machine of delaying,
The risk restarted, optimizes server system performance.
In one embodiment of the invention, this method can also comprise the following steps:
Step one:The cpu busy percentage of destination server is monitored;
Step 2:When monitoring that duration of the cpu busy percentage less than predetermined threshold value reaches setting duration, output prompting
Information.
In embodiments of the present invention, the cpu busy percentage of destination server can be monitored.If monitoring CPU profits
Duration with rate less than predetermined threshold value reaches setting duration, then shows that destination server is constantly in the setting duration
Low level running status, the wasting of resources is more serious.In such a case, it is possible to export the cpu busy percentage for destination server
Low prompt message, to point out the current cpu busy percentage of ownership goal server relatively low, can increase calculating task, to avoid money
Source is wasted.
In actual applications, during being monitored to the cpu busy percentage of destination server, monitoring can be exported and obtained
Performance curve, facilitate user to recognize the cpu busy percentage situation of destination server by the performance curve.
Corresponding to above method embodiment, the embodiment of the present invention additionally provides a kind of server system performance optimization dress
Put, a kind of server system performance optimization device described below and a kind of above-described server system performance optimization method
Can be mutually to should refer to.
Shown in Figure 2, the device is included with lower module:
Warning information obtains module 201, the alarm letter for when reaching the time interval of setting, obtaining destination server
Breath;
Warning value computing module 202, for according to warning information, calculating the warning value of destination server;
Utilization rate upper limit determining module 203, for according to warning value, determining the cpu busy percentage upper limit of destination server, with
Destination server is based on the cpu busy percentage upper limit and carry out system function optimization.
The device provided using the embodiment of the present invention, when reaching the time interval of setting, obtains destination server
Warning information, according to the warning information, calculates the warning value of destination server, destination server is determined according to the warning value
The cpu busy percentage upper limit, so that destination server is based on the cpu busy percentage upper limit and carries out system function optimization.Pass through destination service
The warning information of device determines the cpu busy percentage upper limit in time, and destination server is based on the cpu busy percentage upper limit and systematic function is carried out
Optimization, in destination server operational envelope, maximally utilize its computing resource, it is possible to reduce server occur the machine of delaying,
The risk restarted, optimizes server system performance.
In a kind of embodiment of the present invention, warning information includes the alert level of multiple hardware in destination server
Not with alarm number, warning value computing module 202, including:
Alert number determination sub-module, for according to the alarm level of multiple hardware in destination server and alarm number,
It is determined that the corresponding alarm number of each alarm level;
Warning value calculating sub module, for according to the corresponding alarm number of each alarm level, calculating destination server
Warning value.
In a kind of embodiment of the present invention, warning value calculating sub module, specifically for:
For each alarm level, by the corresponding alarm number of the alarm level and the disturbance degree of the default alarm level
It is multiplied, obtains the influence value of the alarm level;
The influence value of each alarm level is added, the warning value of destination server is obtained.
In a kind of embodiment of the present invention, utilization rate upper limit determining module 203, specifically for:
The cpu busy percentage upper limit of destination server is determined by below equation:
The cpu busy percentage upper limit=(100- warning values) %.
In a kind of embodiment of the present invention, in addition to:
Utilization rate monitoring modular, is monitored for the cpu busy percentage to destination server;
Prompt message output module, for reaching setting monitoring cpu busy percentage less than the duration of predetermined threshold value
During duration, prompt message is exported.
The embodiment of each in this specification is described by the way of progressive, what each embodiment was stressed be with it is other
Between the difference of embodiment, each embodiment same or similar part mutually referring to.For being filled disclosed in embodiment
For putting, because it is corresponded to the method disclosed in Example, so description is fairly simple, related part is referring to method part
Explanation.
Professional further appreciates that, with reference to the unit of each example of the embodiments described herein description
And algorithm steps, can be realized with electronic hardware, computer software or the combination of the two, in order to clearly demonstrate hardware and
The interchangeability of software, generally describes the composition and step of each example according to function in the above description.These
Function is performed with hardware or software mode actually, depending on the application-specific and design constraint of technical scheme.Specialty
Technical staff can realize described function to each specific application using distinct methods, but this realization should not
Think beyond the scope of this invention.
Directly it can be held with reference to the step of the method or algorithm that the embodiments described herein is described with hardware, processor
Capable software module, or the two combination are implemented.Software module can be placed in random access memory (RAM), internal memory, read-only deposit
Reservoir (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technology
In any other form of storage medium well known in field.
Specific case used herein is set forth to the principle and embodiment of the present invention, and above example is said
It is bright to be only intended to help and understand technical scheme and its core concept.It should be pointed out that for the common of the art
For technical staff, under the premise without departing from the principles of the invention, some improvement and modification can also be carried out to the present invention, these
Improve and modification is also fallen into the protection domain of the claims in the present invention.
Claims (10)
1. a kind of server system performance optimization method, it is characterised in that including:
When reaching the time interval of setting, the warning information of destination server is obtained;
According to the warning information, the warning value of the destination server is calculated;
According to the warning value, the cpu busy percentage upper limit of the destination server is determined, so that the destination server is based on institute
State the cpu busy percentage upper limit and carry out system function optimization.
2. according to the method described in claim 1, it is characterised in that the warning information includes multiple in the destination server
The alarm level and alarm number of hardware, it is described according to the warning information, calculate the warning value of the destination server, bag
Include:
According to the alarm level of multiple hardware in the destination server and alarm number, accused it is determined that each alarm level is corresponding
Alert number;
According to the corresponding alarm number of each alarm level, the warning value of the destination server is calculated.
3. method according to claim 2, it is characterised in that the corresponding alarm number of each alarm level of basis,
The warning value of the destination server is calculated, including:
For each alarm level, by the corresponding alarm number of the alarm level and the disturbance degree phase of the default alarm level
Multiply, obtain the influence value of the alarm level;
The influence value of each alarm level is added, the warning value of the destination server is obtained.
4. the method according to any one of claims 1 to 3, it is characterised in that described according to the warning value, it is determined that described
The cpu busy percentage upper limit of destination server, including:
The cpu busy percentage upper limit of the destination server is determined by below equation:
The cpu busy percentage upper limit=(100- warning values) %.
5. the method according to any one of claims 1 to 3, it is characterised in that also include:
The cpu busy percentage of the destination server is monitored;
When monitoring that duration of the cpu busy percentage less than predetermined threshold value reaches setting duration, prompt message is exported.
6. a kind of server system performance optimizes device, it is characterised in that including:
Warning information obtains module, for when reaching the time interval of setting, obtaining the warning information of destination server;
Warning value computing module, for according to the warning information, calculating the warning value of the destination server;
Utilization rate upper limit determining module, for according to the warning value, determining the cpu busy percentage upper limit of the destination server,
So that the destination server is based on the cpu busy percentage upper limit and carries out system function optimization.
7. device according to claim 6, it is characterised in that the warning information includes multiple in the destination server
The alarm level and alarm number of hardware, the warning value computing module, including:
Alert number determination sub-module, for according to the alarm level of multiple hardware in the destination server and alarm number,
It is determined that the corresponding alarm number of each alarm level;
Warning value calculating sub module, for according to the corresponding alarm number of each alarm level, calculating the destination server
Warning value.
8. device according to claim 7, it is characterised in that the warning value calculating sub module, specifically for:
For each alarm level, by the corresponding alarm number of the alarm level and the disturbance degree phase of the default alarm level
Multiply, obtain the influence value of the alarm level;
The influence value of each alarm level is added, the warning value of the destination server is obtained.
9. the device according to any one of claim 6 to 8, it is characterised in that the utilization rate upper limit determining module, specifically
For:
The cpu busy percentage upper limit of the destination server is determined by below equation:
The cpu busy percentage upper limit=(100- warning values) %.
10. the device according to any one of claim 6 to 8, it is characterised in that also include:
Utilization rate monitoring modular, is monitored for the cpu busy percentage to the destination server;
Prompt message output module, for reaching setting monitoring the cpu busy percentage less than the duration of predetermined threshold value
During duration, prompt message is exported.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710480734.8A CN107092551B (en) | 2017-06-22 | 2017-06-22 | Server system performance optimization method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710480734.8A CN107092551B (en) | 2017-06-22 | 2017-06-22 | Server system performance optimization method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107092551A true CN107092551A (en) | 2017-08-25 |
CN107092551B CN107092551B (en) | 2020-09-18 |
Family
ID=59640746
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710480734.8A Active CN107092551B (en) | 2017-06-22 | 2017-06-22 | Server system performance optimization method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107092551B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110321266A (en) * | 2019-06-05 | 2019-10-11 | 上海易点时空网络有限公司 | CPU multi-core utilization rate optimization processing method and device for single server |
CN110727472A (en) * | 2019-09-10 | 2020-01-24 | 平安普惠企业管理有限公司 | Application server performance optimization method and device, storage medium and electronic equipment |
CN113098724A (en) * | 2021-06-09 | 2021-07-09 | 苏州浪潮智能科技有限公司 | Server tuning method, system and device |
CN114003380A (en) * | 2021-10-28 | 2022-02-01 | 浪潮电子信息产业股份有限公司 | Server software parameter adjusting method, device, equipment and readable storage medium |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101794251A (en) * | 2010-01-18 | 2010-08-04 | 浪潮(北京)电子信息产业有限公司 | Computer health monitoring and managing system and method |
CN103139007A (en) * | 2011-12-05 | 2013-06-05 | 阿里巴巴集团控股有限公司 | Method and system for detecting application server performance |
CN104348653A (en) * | 2013-08-06 | 2015-02-11 | 中国电信股份有限公司 | Method and system for realizing user task of cloud management platform as well as trigger |
CN105260253A (en) * | 2015-09-06 | 2016-01-20 | 浪潮集团有限公司 | Server failure measurement and calculation method and device |
KR101613513B1 (en) * | 2014-12-29 | 2016-04-19 | 서강대학교산학협력단 | Virtual machine placing method and system for guarantee of network bandwidth |
CN106789412A (en) * | 2016-12-08 | 2017-05-31 | 国网北京市电力公司 | Method, the apparatus and system of monitoring information collection main website performance |
-
2017
- 2017-06-22 CN CN201710480734.8A patent/CN107092551B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101794251A (en) * | 2010-01-18 | 2010-08-04 | 浪潮(北京)电子信息产业有限公司 | Computer health monitoring and managing system and method |
CN103139007A (en) * | 2011-12-05 | 2013-06-05 | 阿里巴巴集团控股有限公司 | Method and system for detecting application server performance |
CN104348653A (en) * | 2013-08-06 | 2015-02-11 | 中国电信股份有限公司 | Method and system for realizing user task of cloud management platform as well as trigger |
KR101613513B1 (en) * | 2014-12-29 | 2016-04-19 | 서강대학교산학협력단 | Virtual machine placing method and system for guarantee of network bandwidth |
CN105260253A (en) * | 2015-09-06 | 2016-01-20 | 浪潮集团有限公司 | Server failure measurement and calculation method and device |
CN106789412A (en) * | 2016-12-08 | 2017-05-31 | 国网北京市电力公司 | Method, the apparatus and system of monitoring information collection main website performance |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110321266A (en) * | 2019-06-05 | 2019-10-11 | 上海易点时空网络有限公司 | CPU multi-core utilization rate optimization processing method and device for single server |
CN110727472A (en) * | 2019-09-10 | 2020-01-24 | 平安普惠企业管理有限公司 | Application server performance optimization method and device, storage medium and electronic equipment |
CN113098724A (en) * | 2021-06-09 | 2021-07-09 | 苏州浪潮智能科技有限公司 | Server tuning method, system and device |
WO2022257304A1 (en) * | 2021-06-09 | 2022-12-15 | 苏州浪潮智能科技有限公司 | Server tuning method, system and apparatus |
CN114003380A (en) * | 2021-10-28 | 2022-02-01 | 浪潮电子信息产业股份有限公司 | Server software parameter adjusting method, device, equipment and readable storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN107092551B (en) | 2020-09-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20210006628A1 (en) | Managing operation of instances | |
CN107092551A (en) | A kind of server system performance optimization method and device | |
TW201816692A (en) | Risk identification method, client device, and risk identification system | |
WO2013158139A1 (en) | Virtual computing resource orchestration | |
CN115277566B (en) | Load balancing method and device for data access, computer equipment and medium | |
CN112579304A (en) | Resource scheduling method, device, equipment and medium based on distributed platform | |
US10469400B2 (en) | Method and apparatus for provisioning of resources to support applications and their varying demands | |
US20170187790A1 (en) | Ranking system | |
EP3423940A1 (en) | A method and device for scheduling resources | |
CN108733454B (en) | Virtual machine fault processing method and device | |
CN104991822A (en) | Memory management method and apparatus | |
CN110134490A (en) | Dynamic migration of virtual machine method, equipment and storage medium | |
CN112565391A (en) | Method, apparatus, device and medium for adjusting instances in an industrial internet platform | |
CN109960579B (en) | Method and device for adjusting service container | |
CN103399791A (en) | Method and device for migrating virtual machines on basis of cloud computing | |
CN110471769B (en) | Resource management method and device for virtual machine | |
CN103944940A (en) | Equipment and method for dynamically configuring proxy server | |
US11455293B2 (en) | Counting method, counter and storage medium | |
GB2507816A (en) | Calculating timeout for remote task execution from network delays and processing duration on local application/hardware replica | |
CN109039714A (en) | The management method and device of resource in cloud computing system | |
CN109960572B (en) | Equipment resource management method and device and intelligent terminal | |
CN108073449B (en) | Dynamic virtual machine placement method | |
WO2014209851A1 (en) | Automatic adjustment of application launch endpoints | |
CN108600403A (en) | A kind of DNS thread management methods, device and server | |
US9639137B2 (en) | Control method and electronic device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200821 Address after: 215100 No. 1 Guanpu Road, Guoxiang Street, Wuzhong Economic Development Zone, Suzhou City, Jiangsu Province Applicant after: SUZHOU LANGCHAO INTELLIGENT TECHNOLOGY Co.,Ltd. Address before: 450018 Henan province Zheng Dong New District of Zhengzhou City Xinyi Road No. 278 16 floor room 1601 Applicant before: ZHENGZHOU YUNHAI INFORMATION TECHNOLOGY Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |