CN107092319A - A kind of computer cabinet of cooling, dust preventing - Google Patents

A kind of computer cabinet of cooling, dust preventing Download PDF

Info

Publication number
CN107092319A
CN107092319A CN201710314922.3A CN201710314922A CN107092319A CN 107092319 A CN107092319 A CN 107092319A CN 201710314922 A CN201710314922 A CN 201710314922A CN 107092319 A CN107092319 A CN 107092319A
Authority
CN
China
Prior art keywords
cabinet
air
conduit
fan
cooling chamber
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710314922.3A
Other languages
Chinese (zh)
Other versions
CN107092319B (en
Inventor
苗耀锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian International University
Original Assignee
Xian International University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian International University filed Critical Xian International University
Priority to CN201710314922.3A priority Critical patent/CN107092319B/en
Publication of CN107092319A publication Critical patent/CN107092319A/en
Application granted granted Critical
Publication of CN107092319B publication Critical patent/CN107092319B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/16Constructional details or arrangements
    • G06F1/18Packaging or power distribution
    • G06F1/181Enclosures
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/16Constructional details or arrangements
    • G06F1/20Cooling means
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2200/00Indexing scheme relating to G06F1/04 - G06F1/32
    • G06F2200/20Indexing scheme relating to G06F1/20
    • G06F2200/201Cooling arrangements using cooling fluid
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2200/00Indexing scheme relating to G06F1/04 - G06F1/32
    • G06F2200/20Indexing scheme relating to G06F1/20
    • G06F2200/202Air convective hinge

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Human Computer Interaction (AREA)
  • Physics & Mathematics (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Power Engineering (AREA)

Abstract

The invention discloses a kind of computer cabinet of cooling, dust preventing, including cabinet, the outside of cabinet is provided with aqua storage tank, aqua storage tank is connected to the inside of cabinet by flexible pipe, the flexible pipe is extended up at the top of cabinet inside in the inside of cabinet, connected between the flexible pipe and aqua storage tank by micro pump, condenser is installed in aqua storage tank, one air-intake device is installed on the tank wall of cabinet, air-intake device includes installation cavity, and it is connected to the blast pipe at installation cavity two ends, exhaust duct, cabinet is sealed cabinet, flexible pipe is pierced into, pass at the tank wall of cabinet, and the junction of blast pipe and cabinet tank wall is sealing state, when temperature in chassis is too high, frozen water is imported into air-intake device by cabinet inside conduit, air-intake device in air cooling chamber again by carrying out heat exchange, reach the effect of cooling, and whole cabinet is effectively prevented dust and entered in cabinet, so as to improve the service life of computer.

Description

A kind of computer cabinet of cooling, dust preventing
Technical field
The present invention relates to computer hardware field, more specifically to a kind of computer cabinet of cooling, dust preventing.
Background technology
With the gradually maturation of China's computer technology, the use field of computer is also increasingly wider, because computer exists Substantial amounts of heat is easily produced during long-time use, in order to ensure system for computer stability, is typically necessary to meter Calculation machine is radiated, and prior art radiates mainly by fan to computer, although it can be dropped to computer to a certain extent Temperature, but its cooling-down effect is limited, influences the radiating effect of computer.And traditional computer cabinet is after a long time use Easy dust stratification, is less useful for radiating.
The content of the invention
For computer heat dissipation problem present in prior art, it is an object of the invention to provide the calculating of cooling, dust preventing Machine cabinet, it can realize the cooling, dust preventing during computer use.
To solve the above problems, the present invention is adopted the following technical scheme that.
A kind of computer cabinet of cooling, dust preventing, including cabinet, the back side of the cabinet are provided with some USB interfaces, cabinet Inside is respectively equipped with host slot, power supply mounting groove and card slot, and the outside of the cabinet is provided with water storage at bottom Groove, the bottom of the aqua storage tank is connected to the inside of cabinet by a sealed flexible pipe, the flexible pipe the inside of cabinet to On extend at the top of cabinet inside, connected between the flexible pipe and aqua storage tank by micro pump, the micro pump The end of power line is USB joint, and the USB joint of micro pump and the USB interface of cabinet are connected, the aqua storage tank, flexible pipe position In on the same tank wall of cabinet, the inwall of the aqua storage tank is provided with condenser, and the power connection of the condenser is and machine The USB joint of the USB interface matching of case;One air-intake device is installed, air-intake device includes accommodating the on the tank wall of the cabinet The installation cavity of one fan, the second fan, and it is connected to the blast pipe at installation cavity two ends, exhaust duct, first fan, Second fan is separately mounted to the two ends of installation cavity, and the first fan is located at installation cavity close to one end of blast pipe, the second fan position In installation cavity close to one end of exhaust duct, blast pipe, exhaust duct are sealed with installation cavity respectively, and the air inlet of blast pipe is passed The tank wall of cabinet, the exhaust outlet of exhaust duct is towards mainboard direction, and the installation cavity passes through between the first fan and the second fan Dividing plate is divided into air cooling chamber and air storage cavern, and air cooling chamber is located at installation cavity close to the side of the first fan, empty Gas storage chamber is located at installation cavity close to the side of the second fan, and first fan, the second fan pass through connecing on mainboard respectively Confession electric drive;The flexible pipe is connected at the top of cabinet inwall with a standpipe, and the diameter of the standpipe is more than flexible pipe Diameter, the bottom of standpipe is connected with the conduit that diameter is more than flexible pipe, and one end of conduit is connected with standpipe, conduit it is another End is passed, the tank wall of ultimately out cabinet through the top of air-intake device, air inlet cooling chamber from air cooling chamber, with The top connection of aqua storage tank, part of the conduit in air cooling chamber is the body being made of Heat Conduction Material;The air is cold But chamber and the dividing plate at air storage cavern two ends are provided with the hole for air circulation;The cabinet is sealed cabinet, soft Pipe is pierced into, passed at the tank wall of cabinet, and the junction of blast pipe and cabinet tank wall is sealing state.
It is preferred that, aqua storage tank by demarcation strip be divided into above and below two layers, the condenser is installed on the upper strata of aqua storage tank, water storage Connected between upper and lower two layers of groove by the mozzle for the bottom for being located at aqua storage tank upper strata.
It is preferred that, the air inlet of blast pipe installs air cleaner.
It is preferred that, conduit is provided with 3, and 3 conduits are evenly distributed on standpipe.
It is preferred that, conduit pierce at air cooling chamber for air cooling chamber close to one end of the first fan, conduit passes sky At air cooling chamber for air cooling chamber close to one end of air storage cavern.
It is preferred that, the inclined spiral distribution in part of the conduit in air cooling chamber.
It is preferred that, the hole for air circulation on dividing plate between the first fan and air cooling chamber is the first hole Hole, the hole on dividing plate between air cooling chamber and air storage cavern is the second hole, air storage cavern and the second fan it Between dividing plate on hole be the 3rd hole, first hole be provided with airway tube, one end of airway tube and the first hole are close Envelope connection, the other end connect with conduit, and the junction of the airway tube and conduit is pierced at air cooling chamber positioned at conduit is close, And the junction is located at the side of half-turn on conduit, and the conduit is divided into the first conduit and the second conduit, wherein first leads One end of pipe is connected with standpipe, and the other end is located at air cooling chamber at the bottom of air storage cavern, second conduit One end connected with the bottom of air cooling chamber, the other end passes the tank wall of cabinet and connected with the top of aqua storage tank.
It is preferred that, air dried sponge is provided between the second fan and air storage cavern.
The present invention uses above-mentioned technical proposal, and aqua storage tank is installed on the outside of the tank wall of cabinet, when temperature in chassis is too high, Can be by micro pump to cabinet inside feeding frozen water, frozen water is imported into air-intake device by cabinet inside conduit, air intake Device by carrying out heat exchange in air cooling chamber, reaches the effect of cooling again, and is made by the effect of first and second fan close The cavity that closes produces negative pressure, air is produced flowing, and the air circulation by cooling blows to mainboard direction by the second fan, So as to reach the purpose of cooling, and whole cabinet uses closed space, and air filtration is also installed in air-intake device air inlet Device, is effectively prevented dust and enters in cabinet, so as to improve the service life of computer.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the structural representation of the aqua storage tank of the present invention;
Fig. 3 is the structural representation of the air-intake device of the present invention;
Fig. 4 is the distribution schematic diagram of the cabinet tank wall of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
As shown in Fig. 1 to 4, the computer cabinet of cooling, dust preventing of the present invention, including cabinet 1, the back side of the cabinet 1 is provided with Host slot, power supply mounting groove and card slot are respectively equipped with inside 4 USB interfaces, cabinet 1.
The outside of cabinet 1 is provided with aqua storage tank 2 at bottom, and the bottom of the aqua storage tank 2 passes through a sealed flexible pipe 3 The inside of cabinet 1 is connected to, the flexible pipe 3 is extended up at the top inside cabinet 1 in the inside of cabinet 1, flexible pipe 3 and storage Connected between tank 2 by micro pump 5, the end of the power line of the micro pump 5 is USB joint, micro pump 5 USB joint is connected with the USB interface of cabinet 1, aqua storage tank 2, flexible pipe 3 be located at cabinet 1 same tank wall on, aqua storage tank 2 it is interior Wall is provided with condenser 6, and the power connection of condenser 6 is the USB joint matched with the USB interface of cabinet 1, and aqua storage tank 2 passes through Demarcation strip be divided into above and below two layers, condenser 6 is installed on the upper strata of aqua storage tank 2, by being located between upper and lower two layers of aqua storage tank 2 The mozzle connection of the bottom on the upper strata of aqua storage tank 2.
The cabinet 1 installs an air-intake device 7 on the inside of the tank wall for installing aqua storage tank 2, and air-intake device 7 includes accommodating the The installation cavity 73 of one fan 71, the second fan 72, and it is connected to the blast pipe 74 at the two ends of installation cavity 73, exhaust duct 75, First fan 71, the second fan 72 are separately mounted to the two ends of installation cavity 73, and it is close that the first fan 71 is located at installation cavity 73 One end of blast pipe 74, the second fan 72 is located at installation cavity 73 close to one end of exhaust duct 75, and blast pipe 74, exhaust duct 75 are distinguished Sealed with installation cavity 73, and the air inlet of blast pipe 74 passes the tank wall of cabinet 1, the exhaust outlet of exhaust duct 75 is towards mainboard side To.The installation cavity 73 is divided into air cooling chamber 731 and sky between the first fan 71 and the second fan 72 by dividing plate Gas storage chamber 732, air cooling chamber 731 is located at installation cavity 73 close to the side of the first fan 71, and air storage cavern 732 is located at peace 73 are behave affectedly close to the side of the second fan 72, and first fan 71, the second fan 72 are powered by the interface on mainboard respectively Driving.
The flexible pipe 3 is connected at the top of the inwall of cabinet 1 with a standpipe 8, and the diameter of standpipe 8 is more than flexible pipe 3 Diameter, the bottom of standpipe 8 is connected with the conduit 4 that diameter is more than flexible pipe 3, and one end of conduit 4 is connected with standpipe 8, conduit 4 The other end pass through the top of air-intake device 7, air inlet cooling chamber 731, and being passed from air cooling chamber 731 is ultimately out The tank wall of cabinet 1, is connected with the top of aqua storage tank 2, and part of the conduit 4 in air cooling chamber 731 is to use Heat Conduction Material system Into body, conduit 4 be provided with 3,3 conduits 6 are evenly distributed on standpipe 8.The conduit 4 of the present invention pierces into air cooling At chamber 731 for air cooling chamber 731 close to one end of the first fan 71, conduit 4 pass at air cooling chamber 731 for air cool down Chamber 731 is easy to the arrangement of conduit 4 close to one end of air storage cavern 732.And part of the conduit 4 in air cooling chamber 731 is in The time of contact of frozen water and air in inclined spiral distribution, abundant elongate catheter 4, make its heat exchange fully, maximum limit The reduction air themperature of degree.
The dividing plate at air cooling chamber 731 and air storage cavern 732 two ends is provided with the hole for air circulation, The hole for air circulation on dividing plate wherein between the first fan 71 and air cooling chamber 731 is the first hole, air The hole on dividing plate between cooling chamber 731 and air storage cavern 732 is the second hole, the fan of air storage cavern 732 and second The hole on dividing plate between 72 is the 3rd hole.
First hole is provided with airway tube 9, and one end of airway tube 9 is tightly connected with the first hole, and the other end connects with conduit 4 Logical, the junction of airway tube 9 and conduit 4 is located at conduit 4 close to piercing at air cooling chamber 731, and the junction is located at and led The side of half-turn on pipe 4,4 points of conduit is the first conduit and the second conduit, wherein one end of the first conduit connects with standpipe 8 Connect, the other end is located at air cooling chamber 731 at the bottom of air storage cavern 732, one end and the air of the second conduit are cooled down The bottom connection of chamber 731, the tank wall that the other end passes cabinet 1 is connected with the top of aqua storage tank 2.Using this aqueous vapor at same The mode flowed in pipeline, not only makes the more abundant of aqueous vapor heat exchange, and water can be made to adsorb the impurity in air, reaches net Change the purpose of air.
The cabinet 1 of the present invention uses sealed cabinet, and flexible pipe 3 is pierced into, passed at the tank wall of cabinet 1, and blast pipe 74 Junction with the tank wall of cabinet 1 is sealing state, and can install air cleaner in the air inlet of blast pipe 74, Air dried sponge is provided between second fan 72 and air storage cavern 732, to purify the air into inside cabinet 1, is prevented Dust enters.
The present invention can be provided with temperature sensor, the temperature in order to automatically control cooling work inside cabinet 1 Sensor and the wireless connection of micro pump 5, when the temperature in cabinet 1 is higher than setting value, micro pump 5 receives temperature sensor Signal, and start work of drawing water;When the temperature in cabinet 1 is less than setting value, micro pump 5 receives the letter of temperature sensor Number, stop cooling work.
The present invention extracts the frozen water after the cooling of aqua storage tank 2, by soft by micro pump 5 first when in use Pipe 3 is transported in the standpipe 8 inside cabinet 1, and the air cooling chamber 731 of air-intake device 7 is then being entered by conduit 4 It is interior, meanwhile, outside air enters the first conduit by the first fan 71 and the synergy of the second fan 72 by airway tube 9 Interior, because the diameter of standpipe 8 and conduit 4 is all higher than the diameter of flexible pipe 3, thus conduit 4 can accommodate aqueous vapor and be compiled in first and lead In pipe, air flows in the first conduit together with frozen water, because conduit is using helical arrangement shape diagonally downward, therefore increases Time of aqueous vapor heat exchange, final aqueous vapor is flowed into air cooling chamber 731 by the end of the first conduit, then through supercooling But the air after is being entered in air storage cavern 732, eventually through the row of the second fan 72 into cabinet 1, is cooled.And water The upper strata of aqua storage tank 2 is then flowed to by the second conduit, then is cooled down by condenser 6, reciprocation cycle.
The present invention installs aqua storage tank 2 on the outside of the tank wall of cabinet 1, when temperature is too high in cabinet 1, can pass through Miniature water Pump 5 is to frozen water is sent into inside cabinet 1, and frozen water is imported into air-intake device 7 by the inner conduit 4 of cabinet 1, and air-intake device 7 leads to again Cross and heat exchange is carried out in air cooling chamber 731, reach the effect of cooling, and made by the effect of first and second fan 71,72 close The cavity that closes produces negative pressure, air is produced flowing, and the air circulation by cooling blows to mainboard side by the second fan 72 To, so that the purpose of cooling is reached, and whole cabinet 1 uses closed space, and air is also installed in the air inlet of air-intake device 7 Filter, is effectively prevented dust and enters in cabinet 1, so as to improve the service life of computer.
The present invention preferably embodiment is the foregoing is only, but protection scope of the present invention is not limited thereto, Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its Improve design and be subject to equivalent substitution or change, should all cover within the scope of the present invention.

Claims (8)

1. a kind of computer cabinet of cooling, dust preventing, including cabinet(1), the cabinet(1)The back side be provided with some USB interfaces, Cabinet(1)Inside is respectively equipped with host slot, power supply mounting groove and card slot, it is characterised in that:
The cabinet(1)Outside at bottom be provided with aqua storage tank(2), the aqua storage tank(2)Bottom pass through one sealing Flexible pipe(3)It is connected to cabinet(1)Inside, the flexible pipe(3)In cabinet(1)Inside extend up to cabinet(1)It is internal Top at, the flexible pipe(3)With aqua storage tank(2)Between pass through micro pump(5)Connection, the micro pump(5)Power supply The end of line is USB joint, micro pump(5)USB joint and cabinet(1)USB interface connection, the aqua storage tank(2), it is soft Pipe(3)Positioned at cabinet(1)Same tank wall on, the aqua storage tank(2)Inwall condenser is installed(6), the condenser (6)Power connection be and cabinet(1)USB interface matching USB joint;
The cabinet(1)Tank wall on install an air-intake device(7), air-intake device(7)Including accommodating the first fan(71), Two fans(72)Installation cavity(73), and it is connected to installation cavity(73)The blast pipe at two ends(74), exhaust duct(75), institute State the first fan(71), the second fan(72)It is separately mounted to installation cavity(73)Two ends, the first fan(71)Positioned at installation cavity (73)Close to blast pipe(74)One end, the second fan(72)Positioned at installation cavity(73)Close to exhaust duct(75)One end, air intake Pipe(74), exhaust duct(75)Respectively with installation cavity(73)Sealing, and blast pipe(74)Air inlet pass cabinet(1)Case Wall, exhaust duct(75)Exhaust outlet towards mainboard direction, the installation cavity(73)In the first fan(71)With the second fan(72) Between air cooling chamber is divided into by dividing plate(731)And air storage cavern(732), air cooling chamber(731)Positioned at installation Chamber(73)Close to the first fan(71)Side, air storage cavern(732)Positioned at installation cavity(73)Close to the second fan(72)'s Side, first fan(71), the second fan(72)Powered driving by the interface on mainboard respectively;
The flexible pipe(3)In cabinet(1)With a standpipe at the top of inwall(8)Connection, the standpipe(8)Diameter be more than Flexible pipe(3)Diameter, standpipe(8)Bottom be connected with diameter more than flexible pipe(3)Conduit(4), conduit(4)One end and storage Water pipe(8)Connection, conduit(4)The other end pass through air-intake device(7)Top, air inlet cooling chamber(731), and from air Cooling chamber(731)Pass, ultimately out cabinet(1)Tank wall, with aqua storage tank(2)Top connection, conduit(4)In air cooling Chamber(731)Interior part is the body being made of Heat Conduction Material;
The air cooling chamber(731)And air storage cavern(732)The dividing plate at two ends is provided with the hole for air circulation;
The cabinet(1)For sealed cabinet, flexible pipe(3)Pierce into, pass cabinet(1)Tank wall at, and blast pipe(74)With Cabinet(1)The junction of tank wall is sealing state.
2. the computer cabinet of cooling, dust preventing according to claim 1, it is characterised in that:The aqua storage tank(2)By dividing Dividing plate be divided into above and below two layers, the condenser(6)It is installed on aqua storage tank(2)Upper strata, aqua storage tank(2)It is upper and lower between two layers By being located at aqua storage tank(2)The mozzle connection of the bottom on upper strata.
3. the computer cabinet of cooling, dust preventing according to claim 2, it is characterised in that:The blast pipe(74)Air intake Air cleaner is installed at mouthful(741).
4. the computer cabinet of cooling, dust preventing according to claim 3, it is characterised in that:The conduit(4)Provided with 3,3 Root conduit(6)It is evenly distributed in standpipe(8)On.
5. the computer cabinet of cooling, dust preventing according to claim 4, it is characterised in that:The conduit(4)Pierce into air Cooling chamber(731)Locate as air cooling chamber(731)Close to the first fan(71)One end, conduit(4)Pass air cooling chamber (731)Locate as air cooling chamber(731)Close to air storage cavern(732)One end.
6. the computer cabinet of the cooling, dust preventing according to any one in claim 1 to 5, it is characterised in that:It is described to lead Pipe(4)In air cooling chamber(731)The inclined spiral distribution in interior part.
7. the computer cabinet of cooling, dust preventing according to claim 6, it is characterised in that:In the first fan(71)With air Cooling chamber(731)Between dividing plate on the hole for air circulation be the first hole, air cooling chamber(731)Stored up with air Deposit chamber(732)Between dividing plate on hole be the second hole, air storage cavern(732)With the second fan(72)Between dividing plate On hole be the 3rd hole, first hole be provided with airway tube(9), airway tube(9)One end and the first hole seal Connection, the other end and conduit(4)Connection, the airway tube(9)With conduit(4)Junction be located at conduit(4)It is close to pierce into sky Air cooling chamber(731)Place, and the junction is located at conduit(4)The side of upper half-turn, the conduit(4)Be divided into the first conduit with And second conduit, wherein one end and the standpipe of the first conduit(8)Connection, the other end is located at air cooling chamber(731)Close to empty Gas storage chamber(732)Bottom at, one end of second conduit and air cooling chamber(731)Bottom connection, the other end wears Go out cabinet(1)Tank wall and aqua storage tank(2)Top connection.
8. the computer cabinet of cooling, dust preventing according to claim 7, it is characterised in that:Second fan(72)With sky Gas storage chamber(732)Between be provided with air dried sponge.
CN201710314922.3A 2017-05-07 2017-05-07 A kind of computer cabinet of cooling, dust preventing Expired - Fee Related CN107092319B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710314922.3A CN107092319B (en) 2017-05-07 2017-05-07 A kind of computer cabinet of cooling, dust preventing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710314922.3A CN107092319B (en) 2017-05-07 2017-05-07 A kind of computer cabinet of cooling, dust preventing

Publications (2)

Publication Number Publication Date
CN107092319A true CN107092319A (en) 2017-08-25
CN107092319B CN107092319B (en) 2019-06-04

Family

ID=59638448

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710314922.3A Expired - Fee Related CN107092319B (en) 2017-05-07 2017-05-07 A kind of computer cabinet of cooling, dust preventing

Country Status (1)

Country Link
CN (1) CN107092319B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107704055A (en) * 2017-09-29 2018-02-16 南阳理工学院 A kind of English teaching main frame
CN107918464A (en) * 2017-11-15 2018-04-17 常州信息职业技术学院 A kind of cooling cabinet for computer
CN108170235A (en) * 2017-12-22 2018-06-15 河南农业大学 A kind of computer equipment equipped with air filtration mechanism
CN112099600A (en) * 2020-09-14 2020-12-18 浙江圣纳智能科技有限公司 Dustproof temperature control type computer host
CN112099611A (en) * 2020-08-31 2020-12-18 芜湖宏嘉科技有限公司 Computer power supply with dust collector
CN116719396A (en) * 2023-07-07 2023-09-08 重庆卓润科技有限公司 Outer frame system of computer case

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103793026A (en) * 2012-11-01 2014-05-14 哈尔滨维尔士科技发展有限公司 Water-cooled computer case
CN203733061U (en) * 2014-01-24 2014-07-23 陕西理工学院 Device for computer case internal cooling and purifying
CN203759629U (en) * 2014-04-04 2014-08-06 漯河医学高等专科学校 Multifunctional computer case
US20150147951A1 (en) * 2012-08-01 2015-05-28 Panasonic Intellectual Property Management Co., Lt d. Heating element housing device
CN105068618A (en) * 2015-08-26 2015-11-18 国网山东安丘市供电公司 Multifunctional dustproof computer case
CN205827330U (en) * 2016-06-15 2016-12-21 内蒙古电子信息职业技术学院 The main frame radiator structure of air convection heat radiation function
CN205844995U (en) * 2016-05-21 2016-12-28 天津青创科技有限公司 A kind of computer temperature reduction refrigeration device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20150147951A1 (en) * 2012-08-01 2015-05-28 Panasonic Intellectual Property Management Co., Lt d. Heating element housing device
CN103793026A (en) * 2012-11-01 2014-05-14 哈尔滨维尔士科技发展有限公司 Water-cooled computer case
CN203733061U (en) * 2014-01-24 2014-07-23 陕西理工学院 Device for computer case internal cooling and purifying
CN203759629U (en) * 2014-04-04 2014-08-06 漯河医学高等专科学校 Multifunctional computer case
CN105068618A (en) * 2015-08-26 2015-11-18 国网山东安丘市供电公司 Multifunctional dustproof computer case
CN205844995U (en) * 2016-05-21 2016-12-28 天津青创科技有限公司 A kind of computer temperature reduction refrigeration device
CN205827330U (en) * 2016-06-15 2016-12-21 内蒙古电子信息职业技术学院 The main frame radiator structure of air convection heat radiation function

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107704055A (en) * 2017-09-29 2018-02-16 南阳理工学院 A kind of English teaching main frame
CN107918464A (en) * 2017-11-15 2018-04-17 常州信息职业技术学院 A kind of cooling cabinet for computer
CN108170235A (en) * 2017-12-22 2018-06-15 河南农业大学 A kind of computer equipment equipped with air filtration mechanism
CN108170235B (en) * 2017-12-22 2020-11-20 河南农业大学 Computer equipment with air filtering mechanism
CN112099611A (en) * 2020-08-31 2020-12-18 芜湖宏嘉科技有限公司 Computer power supply with dust collector
CN112099600A (en) * 2020-09-14 2020-12-18 浙江圣纳智能科技有限公司 Dustproof temperature control type computer host
CN116719396A (en) * 2023-07-07 2023-09-08 重庆卓润科技有限公司 Outer frame system of computer case

Also Published As

Publication number Publication date
CN107092319B (en) 2019-06-04

Similar Documents

Publication Publication Date Title
CN107092319A (en) A kind of computer cabinet of cooling, dust preventing
CN207199799U (en) A kind of new energy car battery bag bottom bracket
CN103476231B (en) Air-conditioning
CN208282277U (en) New blower
CN205910663U (en) Efficient computer CPU radiator
CN203824040U (en) Sleeve-type heat exchange screw air-conditioning and ventilation device with disconnected fins
CN201724584U (en) Natural ventilation type temperature superconducting heat absorbing-radiating tube
CN206323733U (en) A kind of working fluid submerges cooled power amplifier in transmitter unit entirely
CN206789664U (en) A kind of battery constant temperature cabinet for communication base station of anti-dust energy-saving
CN206627892U (en) Radiating structure of computer
CN206332352U (en) Ring main unit intelligent positioning cooling system
CN208781163U (en) A kind of built-in power radiator for bi-nodal system server
CN106382672A (en) Integrated type energy-storage circulating device
CN202254010U (en) Air conditioner outdoor unit and heating system thereof
CN204790810U (en) Computer heat abstractor
CN206291376U (en) A kind of batteries of electric automobile group single cycle ambient temperature control device
CN201852274U (en) Outdoor machine for split type heat pump water heater
CN102478307B (en) Integral heat pump water heater
CN104864526B (en) A kind of moisture-proof air-cooler with underground water cooling system
CN105757814B (en) Cooling-heating integrated machine air-conditioning
CN206133432U (en) Special purpose computer subassembly of outwork
CN218844538U (en) Air compressor with heat dissipation machine case
CN203554871U (en) Naturally-cooled cool air gravity circulation cabinet
CN204790802U (en) Novel quick -witted case of refrigeration formula heat dissipation
CN211084438U (en) Waste energy recovery device of air source heat pump

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190604

Termination date: 20210507

CF01 Termination of patent right due to non-payment of annual fee