Put pre-signal control method in a kind of intersection bus left-hand rotation right side
Technical field
Pre-signal control method is put the present invention relates to the intersection bus left-hand rotation right side.
Background technology
With the continuous rising of China's vehicle guaranteeding organic quantity, the traffic jam issue in city is all the more serious, as restriction city
One of major issue of city's sustainable development.Among urban transporting system, intersection is wherein vital composition
Part, even more restricts the key point of road passage capability.In order to improve the traffic capacity of intersection, field of traffic scholar and from
Dealer is under limited road conditions, it is proposed that many optimization methods and corrective measure, obtains good effect.
Wherein, for the intersection of some Four-phase controls, it, which has entrance driveway, has two or more to turn left or straight
Left Shared Lane (not setting left-hand rotation dedicated bus lanes) is respectively positioned on the road leftmost side, but bus bus stop is in the entrance driveway road
On the right side of road, and station is not far far from intersection, and more and when needing to turn left in intersection in the bus circuit that the station is stopped,
Left turn lane will be laterally merged into by force, if now Through Lane queue length is more than bus position,
The delay of bus and through vehicles can be increased;Now, bus gets lodged in rightmost side track because to the left and road is difficult, no
It can only hinder follow-up bus to enter the bus bus stop, and can seriously hinder right-turning vehicles on the track of the rightmost side
It is current, left-hand rotation bus, through vehicles and right-turning vehicles unnecessary stand-by period are caused, this will also result in driver not
Peace, irritated mood.For how effectively to solve this problem, there is presently no more effective research.
Pre-signal is the auxiliary equipment of intersection main signal, is gone with vehicle traveling in specification and guided crossover mouthful entrance driveway
For.The application both at home and abroad for pre-signal concentrates on control two aspects of intersection left turning vehicle and public traffic in priority at present.Generally
Way be the setting pre-signal stop line at the previous segment distance of stop line, be Dai Hang areas between two stop lines.Work as left-hand rotation
When demand is larger, pre-signal control through vehicles are parked in pre-signal left-hand rotation bus waiting area, and left turning vehicle can drive into and wait to go
All tracks in area include Through Lane, realize.When public traffic in priority strategy is carried out in intersection, pre-signal is used to control society
Can meeting vehicle drive into Dai Hang areas, it is ensured that the bus reached during red light can be come before public vehicles, real
Existing public traffic in priority.But, often there are through vehicles and the current phenomenon of left-hand rotation car is hindered because of parking waiting.
The content of the invention
The invention aims to solve intersection pull in bus turn left when with through vehicles occur traffic conflict,
Cause the problem of intersection vehicles traffic efficiency is low, and propose a kind of intersection bus left-hand rotation right side and put pre-signal control side
Method.
Put pre-signal control method and comprise the following steps in a kind of intersection bus left-hand rotation right side:
Step one:Provide on pre-signal control vehicle traveling direction rightmost side track and rightmost side track adjacent columns track
The operation rule of vehicle;
Step 2:Coordinate the timing of pre-signal according to the timing of intersection main signal;
Step 3:According to road speed limit and means of transportation, physical condition is set, it is determined that set pre-signal, traffic marking and
The position of traffic sign;
Step 4:According to the set location of pre-signal lamp and traffic marking, when determining that pre-signal left-hand rotation public transport red light opens bright
Between relative to the main signal left-hand rotation direction green light end time duration, and pre-signal straight trip green light open the bright time relative to main letter
The duration of number left-hand rotation direction green light end time;
Step 5:According to the set location of pre-signal lamp and traffic marking, when determining that pre-signal left-hand rotation public transport green light opens bright
Between relative to main signal keep straight on the direction green light end time duration, and pre-signal keep straight on red light on time relative to main letter
Number straight trip the direction green light end time duration.
Beneficial effects of the present invention are:
The inventive method, in bus erect-position on the right side of road, and station is not far far from intersection, and stopped at the station
Public bus network is more and when needing to turn left in intersection, the left turn lane right side is put, and only allows left-hand rotation bus, through vehicles to lead to
Cross;Now, pre-signal lamp is installed on this rightmost side track, for controlling through vehicles to enter the track, and it is left
Turn whether bus needs to wait in left-hand rotation bus waiting area.On the one hand it may insure in the main signal left-hand rotation direction green light phase
Between the track can be used by left-hand rotation bus, on the other hand also ensure that main signal straight trip green light during the track can
To be used by through vehicles, to improve the traffic capacity of intersection.The inventive method by intersection parking line the last period away from
One pre-signal lamp mutually coordinated with main signal is set from place, coordinates the left-hand rotation public transport vapour on the track of the rightmost side under pre-signal control
Car and its operation rule close to the through vehicles on Through Lane and driving behavior, reach improvement bus turn left it is difficult,
Improve the overall traffic capacity in intersection, reduce the effect that the intersection is delayed per capita.
Compared with prior art, control method of the present invention, can make the intersection main signal left-hand rotation direction green light phase
Between the track can be used to greatest extent by left-hand rotation bus, and main signal straight trip green light during the track can always by
Through vehicles are used, and by controlling what pre-signal left-hand rotation public transport green light and pre-signal kept straight on green light to open bright in advance, can improve intersection
Mouth straight trip, the traffic capacity in left-hand rotation direction.The present invention can be such that through vehicles are per capita delayed to have reduced compared with prior art,
The delay per capita of left turning vehicle is greatly decreased.Average delay per capita reduces 3.61s (15.0%), and effect is notable.
Brief description of the drawings
Fig. 1 is the hardware facility figure of intersection rightmost side track pre-signal control;
Fig. 2 is Harbin City's signalized intersections entrance driveway schematic diagram;
Fig. 3 is Harbin City's signalized intersections entrance driveway signal timing dial schematic diagram,;
Fig. 4 is pre-signal timing schematic diagram;
Fig. 5 is pre-signal related facility facilities schematic diagram.
Embodiment
Embodiment one:As shown in figure 1, a kind of intersection bus left-hand rotation right side is put pre-signal control method and included
Following steps:
After the bus left turn lane right side is put, rightmost side track only allows right-turning vehicles, left-hand rotation bus and straight trip
Vehicle pass-through, wherein right-turning vehicles are under master, pre-signal control, and passing rules are consistent with straight trip, therefore herein below is not right
Right-turning vehicles do independent elaboration, and both are referred to as into through vehicles.
Consider that road speed limit, actual traffic facility set restrictive condition to ask for apart from L, rightmost side track and its close to
Away from a prompting lane change graticule is set at stop line L in Through Lane, one piece of traffic sign and pre-signal system are set in its trackside
System;Then according to vehicle dimension, road speed limit and related specifications etc. in the track of the rightmost side away from prompting lane change graticule A at set
The left-hand rotation bus waiting area that a block length is G is put, one piece of traffic sign is set in its trackside, and provide in left-hand rotation bus waiting area
Other vehicles are not allowed to take, wherein prompting, which becomes the distance between diatom and left-hand rotation bus waiting area A, should meet through vehicles peace
Full lane-change distance;Finally (5m) sets one piece of traffic guide sign at suitable distance before bus stop, points out left-hand rotation bus
Put on the junction ahead left-hand rotation bus zone right side.Pre-signal need to work as pre-signal with intersection main signal straight trip direction with phase coordination
When straight trip green light opens bright, it can be queued up close to the through vehicles in the Through Lane in rightmost side track before its stop line,
Rightmost side track can be changed lane to before prompting lane change graticule, between rightmost side track stop line and left-hand rotation bus waiting area
Queue up in region;The bus of left-hand rotation, which needs to be parked in left-hand rotation bus waiting area, to be waited.When pre-signal public transport left-hand rotation green light shifts to an earlier date
When opening bright, the left-hand rotation bus in rightmost side track left-hand rotation bus waiting area is pointed out to start, and then it is logical to accelerate to appropriate speed
Cross intersection;Close to Through Lane in through vehicles can not change lane to rightmost side track again.The present invention can avoid
The bus traffic disturbance that continuous lane change is brought by force, it is ensured that left-hand rotation bus has right-of-way in intersection, and
Intersection left-hand rotation bus and the situation of through vehicles traffic conflict is avoided to occur, and then it is green to improve the straight trip of main signal pre-signal
Left turning vehicle is finally carried by efficiency when through vehicles open bright by efficiency, and main signal left-hand rotation direction green light when lamp opens bright
The overall traffic efficiency of high intersection.
Step one:Provide on pre-signal control vehicle traveling direction rightmost side track and rightmost side track adjacent columns track
The operation rule of vehicle (using vehicle traveling direction as front in the present invention);
Step 2:Coordinate the timing of pre-signal according to the timing of intersection main signal;
Step 3:Physical condition etc. is set according to road speed limit and means of transportation, it is determined that setting pre-signal, traffic marking
With the position of traffic sign;
Step 4:According to the set location of pre-signal lamp and traffic marking etc., determine that pre-signal left-hand rotation public transport red light opens bright
Time relative to the main signal left-hand rotation direction green light end time duration, and pre-signal straight trip green light open the bright time relative to master
The duration of signal left-hand rotation direction green light end time;
Step 5:According to the set location of pre-signal lamp and traffic marking etc., determine that pre-signal left-hand rotation public transport green light opens bright
Time relative to main signal keep straight on the direction green light end time duration, and pre-signal keep straight on red light on time relative to master
The duration of signal straight trip direction green light end time.
Embodiment two:Present embodiment from unlike embodiment one:Provided in the step one pre-
The operation rule of vehicle is specific on signal control vehicle traveling direction rightmost side track and rightmost side track adjacent columns track
Process is:
When pre-signal straight trip green light opens bright, the through vehicles in the Through Lane adjacent with rightmost side track are in stop line
Queue up before, or rightmost side track is changed lane to before prompting lane change graticule, in rightmost side track stop line and left-hand rotation public transport etc.
Treat that the region between area is queued up;The bus of left-hand rotation is parked in left-hand rotation bus waiting area and waited;When pre-signal public transport left-hand rotation is green
When lamp opens bright, point out the left-hand rotation bus in rightmost side track left-hand rotation bus waiting area to start, pass through intersection;With the rightmost side
Through vehicles in the adjacent Through Lane in track can not change lane to rightmost side track.
Other steps and parameter are identical with embodiment one.
Embodiment three:Present embodiment from unlike embodiment one or two:Root in the step 2
The detailed process of timing for coordinating pre-signal according to the timing of intersection main signal is:
Pre-signal is divided into through vehicles pre-signal lamp and left-hand rotation public transport pre-signal lamp, through vehicles pre-signal lamp and public affairs of turning left
Hand over pre-signal lamp to include red and green two kinds of colors, be divided into two phase place control:1. pre-signal left-hand rotation public transport green light+pre-signal
Keep straight on red light 2. pre-signal straight trip green light+pre-signal left-hand rotation public transport red light, main signal and pre-signal cycle duration are equal;
Before main signal left-hand rotation direction green light terminates, pre-signal left-hand rotation public transport green light terminates, while the green (control of pre-signal straight trip
All through vehicles) lamp is bright opens, and also exist at the end of avoiding main signal left-hand rotation direction green light, on the track of the rightmost side and do not complete
The left-hand rotation bus of left-hand rotation, when causing the next phase main signal straight trip direction green light to light, left-hand rotation bus hinders straight
The situation of row vehicle pass-through occurs;Meanwhile, it can make, close to the through vehicles pre-cooling on the Through Lane in rightmost side track, to change
On road to rightmost side track, ranked before its stop line, when next main signal straight trip direction green light is lighted, the rightmost side
Through vehicles on track can accelerate by intersection at once;
Before main signal (intersection traffic lights) straight trip direction green light terminates, pre-signal (present invention sets traffic lights) straight trip is green
Lamp terminates, while pre-signal left-hand rotation public transport green light opens bright, during for avoiding main signal left-hand rotation direction green light from opening bright, rightmost side track
Hinder the current situation of left-hand rotation bus to occur because of through vehicles parking waiting, and can make to queue up in left-hand rotation bus waiting area
The left-hand rotation bus pre-cooling of wait, allows all left-hand rotation bus waited in left-hand rotation bus waiting area in main signal
Safety intersection during left-hand rotation direction green light rises.
Other steps and parameter are identical with embodiment one or two.
Embodiment four:Unlike one of present embodiment and embodiment one to three:The step 3
It is middle to determine to set the pre-signal, the detailed process of the position of traffic marking and traffic sign are:
Left-hand rotation bus waiting area is with pointing out the distance between lane change graticule A to meet the safe lane-change distance of through vehicles, i.e.,;
A represents left-hand rotation bus waiting area with pointing out the distance between lane change graticule in formula, and unit is m;D represents through vehicles
Starting loop, unit is m/s2;TCThe through vehicles safe lane-change time is represented, unit is s;The safe lane-change of through vehicles
Time is 3s~10s;
Traffic guide sign is away from bus bus stop 5m~20m;
The length G in left-hand rotation bus waiting area was met within the peak hour, if left-hand rotation bus is in undersaturated condition,
The left-hand rotation bus reached in one signal period can in left-hand rotation bus waiting area parking waiting;
G≥NPLbus
N in formulaPRepresent one signal period of peak hour in bus reach a number peak value, unit for;Lbus
The safe stopping distance of bus is represented, unit is m;
If left-hand rotation bus is in hypersaturated state, the left-hand rotation public transport vapour of parking waiting in left-hand rotation bus waiting area
Che Junneng is vented in a phase;I.e.
G≤NmaxLbus
G represents the length in left-hand rotation bus waiting area in formula, and unit is m;NmaxRepresent to lead to during the entrance driveway left-hand rotation green light
Cross the maximum of left-hand rotation bus, unit for;
Pre-signal, prompting lane change graticule and traffic sign to stop line distance it is equal (pre-signal, prompting lane change graticule and
Traffic sign is in same position) it is L, meet claimed below:
(1) it is the traffic efficiency of raising intersection as far as possible, according to the maximum percent of pass of through vehicles in a signal period,
The through vehicles maximum being queued in during main signal keeps straight on direction red light between stop line and left-hand rotation bus waiting area is calculated,
When entrance driveway pre-signal straight trip green light opens bright, through vehicles can keep straight on green time by handing over using main signal to greatest extent
Prong;
L≤nmaxLS
L represents the distance between prompting lane change graticule and stop line in formula, and unit is m;nmaxRepresent one letter of peak hour
Bicycle road through vehicles reach the peak value of a number in number cycle, unit for;LSThe safe stopping distance of through vehicles is represented,
Unit is m;
(2) distance of pre-signal, prompting lane change graticule and traffic sign to stop line is met in Bus stand 30m
The means of transportation design specification that Parking permitted, i.e.,
L+A+G≤W-30 is L≤W-30-A-G
Wherein W represents distance of the bus bus stop away from intersection.
Other steps and parameter are identical with one of embodiment one to three.
Embodiment five:Unlike one of present embodiment and embodiment one to four:The step 4
It is middle to determine duration of the pre-signal left-hand rotation public transport red light on time relative to the main signal left-hand rotation direction green light end time, and in advance
Signal straight trip green light opens the bright time and is relative to the detailed process of the duration of main signal left-hand rotation direction green light end time:
Ensure pre-signal left-hand rotation public transport green light terminate with pre-signal straight trip green light Qi Liangshi in advance, in left-hand rotation bus waiting area
Last bus also can safety intersection, pre-signal left-hand rotation public transport red light on time is left relative to main signal
Turn the duration t of direction green light end timeELThe bright time is opened relative to main signal left-hand rotation direction green light knot with pre-signal straight trip green light
The duration t of beam timeSSIt should meet:
V in formulaLThe left-hand rotation bus speed of service is represented, turning speed limit is taken, unit is km/h;α represents left-hand rotation public transport
Automobile starting acceleration, unit is m/s2。
Other steps and parameter are identical with one of embodiment one to four.
Embodiment six:Unlike one of present embodiment and embodiment one to five:The step 5
It is middle to determine that pre-signal left-hand rotation public transport green light opens duration of the bright time relative to the main signal straight trip direction green light end time, and in advance
Signal keep straight on red light on time relative to main signal keep straight on the direction green light end time duration be specially:
Ensure pre-signal straight trip green light terminate in advance with pre-signal left-hand rotation public transport green light Qi Liangshi in advance, have passed past prompting and become
The through vehicles of road graticule can open in main signal straight trip red light and bright advance into intersection;Meanwhile, because the entrance driveway does not set public affairs
Left-hand rotation dedicated Lanes are handed over, the bus turned left in theory can not be fully utilized main signal left-hand rotation direction green time, now, be
Make pass through green time of the through vehicles in intersection most long, do not require that left-hand rotation bus is green in main signal left-hand rotation direction
Intersection is reached exactly to when lamp is lighted, need to only ensure last left-hand rotation bus in left-hand rotation bus waiting area in main letter
What number left-hand rotation direction green light terminated advances into intersection, and it is straight relative to main signal that pre-signal left-hand rotation public transport green light opens the bright time
The duration t of line direction green light end timeESWith pre-signal straight trip red light on time relative to main signal straight trip direction green light knot
The duration t of beam timeSLMeet:
V in formulaSThe through vehicles speed of service is represented, speed limit is taken, unit is km/h;D represents through vehicles Acceleration of starting
Degree, unit is m/s2。
Beneficial effects of the present invention are verified using following examples:
Embodiment one:
By taking the signalized intersections of Harbin as an example, its entrance driveway with two left-hand rotation dedicated Lanes, and the import are studied
There is a bus bus stop at 180m on the right side of road, as shown in Figure 2.
The basic condition of the entrance driveway is as follows:The track of entrance driveway 4, wherein 2 left-hand rotation dedicated Lanes, 1 Through Lane and 1
The straight right Shared Lane of bar;A length of 174s during the signal period, the entrance driveway signal timing dial has two phases, timing situation such as Fig. 3 institutes
Show;Peak hour traffic situation, as shown in table 1.Delay estimation emulates the side for coordinating video surveys to be combined using VISSIM
Method, take peak hour car load factor for 1.5 people/, bus load factor be 30 people/, the obtained entrance driveway is each
Delay per capita on direction, as shown in table 2,
The signalized intersections target inlet road peak hour traffic of table 1
The intersection target inlet road all directions of table 2 are delayed per capita
Direction |
Turn left |
Straight trip |
Turn right |
It is average to be delayed per capita |
Delay/s |
24.12 |
35.65 |
16.79 |
27.71 |
Meanwhile, the method that we use video surveys, having observed 60 cycles amounts to the left-hand rotation bus of 3 hours in public affairs
Hand over station to the left and road running situation.In this 60 cycles, there is left-hand rotation bus to be parked in rightmost side track and its tight
Waited on adjacent Through Lane properly can crossing gap to the left and road is so as to hindering the current situation of through vehicles to occur.
With reference to field observation situation, entrance driveway straight trip flow is very big, but left-hand rotation flow is comparatively small, stream of turning right
Amount is considerably less, and needs the bus bus stop at from intersection 180m to stop and must turn left in this intersection public
Hand over car it is more, therefore using the left turn lane right side is put be changed into through vehicles, the car that left-hand rotation bus and right-turning vehicles are shared
Road.
Here introduce a stand-by period T, represent left-hand rotation bus to the left and road during because through vehicles stop and
The total time waited in line.
T=T1+T2+T3+…+Tn
In formula, T1、T2、T3、TnRepresent respectively each left-hand rotation bus because through vehicles stop wait in line when
Between.
Meanwhile, introduce a stand-by period t, represent through vehicles because left-hand rotation bus stop wait in line it is total when
Between.
T=t1+t2+t3+…+tn
In formula, t1、t2、t3、tnRepresent respectively each through vehicles because left-hand rotation bus stop wait in line when
Between.
The left-hand rotation bus of table 3 and through vehicles wait total duration
This two results show have two or more left turn lane to be respectively positioned on road for some entrance driveway most left
Side, but bus bus stop is on the right side of road, and station is not far far from intersection, and the public bus network that the station is stopped it is more and
When needing to turn left in intersection, the delay of left-hand rotation bus is obvious, and the delay is due to not conforming to for left turn lane position
What reason was caused.Not only reduce the traffic efficiency of left-hand rotation bus, and can allow left-hand rotation bus, straight trip and right-turning vehicles
Driver produces tired psychology because of mutually stopping, is unfavorable for easily driving, safety driving tips.
Now made improvements using method proposed by the invention:
According to physical condition, it is 5m to take distance of the traffic guide sign away from bus bus stop
According to formula, it is determined that the length of left-hand rotation Accreditation Waiting Area, left-hand rotation bus is in undersaturated condition, N heremaxTake 3
, LbusTake 15m;
G≥NmaxLbus=3 × 15=45m
According to formula, it is determined that left-hand rotation bus waiting area is with pointing out the distance between lane change graticule A, d takes 3m/s here2, TCTake
3s;
According to formula, pre-signal is determined away from 'STOP' line ahead L, here nmaxTake 25, LSTake 6m;Left-hand rotation bus speed
Degree V takes turning speed limit 30km/h, vehicle acceleration α to take 1.5m/s2, W takes 180m
Pre-signal straight trip long green light time TgTake 51s,
L≤nmaxLS=25 × 6=150m
L≤- the 13.5-45=91.5m of W-30-A-G=180-30
It is 91.5m to take L
T is asked according to formulaELAnd tSS, left-hand rotation bus speed V hereLTurning speed limit 30km/h is taken, its acceleration alpha takes
1.5m/s2
Take tELAnd tSSFor 21s;
T is sought further according to formulaESAnd tSLHere through vehicles speed VSSpeed limit 60km/h is taken, its acceleration d takes 3m/s2
Take tESAnd tSLFor 10s
Wherein need to ensure that last bus in left-hand rotation bus waiting area also can be green in main signal left-hand rotation direction
Lamp reaches intersection before terminating:tES+Tg≥tELI.e. 10+31 >=21, meet and require.
So far, each item data needed for this method is tried to achieve.Pre-signal timing is as shown in figure 4, intersection related facility is set
As shown in Figure 5.By the L of determination, G, tEL、tSS、tESAnd tSLIt is reflected in the intersection model using VISSIM, this method is entered
Row emulation, the crossing inlet road delay finally obtained is as shown in table 4, is delayed at bus lane-change as shown in table 5.
Crossing inlet road all directions are delayed per capita after table 4 is improved
Direction |
Turn left |
Straight trip |
Turn right |
It is average to be delayed per capita |
Delay/s |
16.73 |
33.45 |
19.34 |
24.10 |
Left-hand rotation bus and straight trip and right-turning vehicles wait total duration after table 5 is improved
T/s |
<20 |
(20,40) |
(40,60) |
>60 |
Periodicity |
60 |
0 |
0 |
0 |
t/s |
<30 |
(30,60) |
(60,90) |
>90 |
Periodicity |
2 |
14 |
28 |
16 |
As can be seen that the delay per capita of right-turning vehicles increased from delay table 4, through vehicles are delayed per capita have been subtracted
Few, the delay per capita of left turning vehicle is greatly decreased.The average delay per capita of the final entrance driveway reduces 3.61s (15.0%),
Effect highly significant, this traffic organization method also optimizes the arrangement operational efficiency of the intersection, has particularly given straight traffic
And the more running spaces of left-hand rotation bus, actual entrance driveway all directions path resource occupation rate more matches with its volume of traffic.
Meanwhile, as can be seen from Table 5, the time that left-hand rotation bus is waited because lane-change is obstructed on the track of the rightmost side is significantly
Decline, greatly improve the operation conditions of left-hand rotation bus, improve the left-hand rotation efficiency of left-hand rotation bus, this also will be very big
Improve left-hand rotation bus driver's mood, the national public traffic in priority policy of response.
The present invention can also have other various embodiments, in the case of without departing substantially from spirit of the invention and its essence, this area
Technical staff works as can make various corresponding changes and deformation according to the present invention, but these corresponding changes and deformation should all belong to
The protection domain of appended claims of the invention.