CN107062350B - A kind of thermal power plant unit renewable energy Depth peak regulating method - Google Patents

A kind of thermal power plant unit renewable energy Depth peak regulating method Download PDF

Info

Publication number
CN107062350B
CN107062350B CN201710305147.5A CN201710305147A CN107062350B CN 107062350 B CN107062350 B CN 107062350B CN 201710305147 A CN201710305147 A CN 201710305147A CN 107062350 B CN107062350 B CN 107062350B
Authority
CN
China
Prior art keywords
power plant
thermal power
plant unit
depth peak
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710305147.5A
Other languages
Chinese (zh)
Other versions
CN107062350A (en
Inventor
吕海祯
赵岩
游大宁
丁俊齐
辛刚
刘锐
刘玉智
郭俊山
张虎
郑威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Shandong Zhongshi Yitong Group Co Ltd
Shandong Electric Power Industrial Boiler Pressure Vessel Inspection Center Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Shandong Zhongshi Yitong Group Co Ltd
Shandong Electric Power Industrial Boiler Pressure Vessel Inspection Center Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd, Shandong Zhongshi Yitong Group Co Ltd, Shandong Electric Power Industrial Boiler Pressure Vessel Inspection Center Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710305147.5A priority Critical patent/CN107062350B/en
Publication of CN107062350A publication Critical patent/CN107062350A/en
Application granted granted Critical
Publication of CN107062350B publication Critical patent/CN107062350B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D3/00Hot-water central heating systems
    • F24D3/02Hot-water central heating systems with forced circulation, e.g. by pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • F24D19/1009Arrangement or mounting of control or safety devices for water heating systems for central heating

Abstract

The invention discloses a kind of thermal power plant unit renewable energy Depth peak regulating methods, determine the type of thermal power plant unit, and confirm each thermal power plant unit operating status, depth peak regulation is carried out to thermal power plant unit, and during peak regulation, unit pressure of steam supply, or supplement Heating Load are supplemented;The present invention can satisfy depth peak regulation requirement, realize cleaning substitution and electric energy substitution, be made that contribution for Ecological Civilization Construction.

Description

A kind of thermal power plant unit renewable energy Depth peak regulating method
Technical field
The present invention relates to a kind of thermal power plant unit renewable energy Depth peak regulating methods.
Background technique
Ecological Civilization Construction requires energy field to realize two substitutions, and one is cleaning substitution, and one is electric energy substitution.
The energy is mainly divided into clean energy resource and non-clean energy by cleaning substitution, for electric energy, clean energy resource It is primarily referred to as the energy that wind energy, water energy, solar energy, geothermal energy etc. do not need fossil fuel;Non-clean energy is primarily referred to as passing through The energy of combustion of fossil fuels.Electric energy substitution mainly using the fuel factor and magnetic effect of electricity, generates thermal energy and mechanical energy with full The needs of sufficient production and living.
Bureau of Energy of the Committee of Development and Reform puts into effect policy, and guidance fired power generating unit depth peak regulation dissolves clean energy resource, realizes cleaning substitution.It is real Middle discovery is trampled, certain thermal power plant units are not able to satisfy depth peak regulation requirement.These units can be divided into highback according to heat-supplying mode difference Press thermal power plant unit and condensing bleeder turbine unit.High back pressure thermal power plant unit is mainly affected by hot loading limitation, condensing bleeder turbine unit master If being limited by low pressure (LP) cylinder into steam flow amount in heat supply running.
During ENERGY PLANNING requires 13, all active service units meet depth peak regulation requirement, therefore thermal power plant unit is not if It is able to satisfy requirement, faces the danger shut down.
And for high back pressure thermal power plant unit, mainly in depth peak regulation, electric load is lower, and throttle flow is small, Bu Nengman Sufficient thermic load requirement;To condensing bleeder turbine unit, mainly in depth peak regulation, it is not able to satisfy Heating Load or industry heat is negative The requirement of lotus, being limited by low pressure (LP) cylinder minimum throttle flow also, is not easy to realize.
Summary of the invention
The present invention to solve the above-mentioned problems, proposes a kind of thermal power plant unit renewable energy Depth peak regulating method, this hair The bright requirement for making thermal power plant unit can satisfy depth peak regulation.
To achieve the goals above, the present invention adopts the following technical scheme:
A kind of thermal power plant unit renewable energy Depth peak regulating method, determines the type of thermal power plant unit, and confirm each heat supply machine Group operating status carries out depth peak regulation to thermal power plant unit, and during peak regulation, supplements unit pressure of steam supply, or supplement heating Thermic load.
Further, if thermal power plant unit is high back pressure thermal power plant unit, and Heating Period high back pressure is run, non-heating period pure condensate fortune When row, emphasis monitoring boiler emission sulfur dioxide or/and nitrogen oxides be not exceeded when depth peak regulation.
Further, thermal power plant unit can satisfy the requirement of depth peak regulation under pure condensate operating condition.
Further, if thermal power plant unit is high back pressure thermal power plant unit, and pure high back pressure is run, and meets depth tune in electric load When peak requires, the insufficient part of thermic load has electrically heated boiler substitution.
Further, if thermal power plant unit is condensing bleeder turbine unit, and thermic load is extraction steam for factories, checks unit pure condensate work Whether condition meets depth peak regulation requirement, under the premise of meeting the requirements, checks whether industrial pressure of steam supply meets heat user requirement, It is such as unsatisfactory for thermic load pressure of steam supply requirement, is calmed the anger from steam turbine higher pressure steam extraction section steam extraction and being installed additional on heat supply pipeline Machine.
The depth peak regulation electric load and thermic load that thermal power plant unit is indicated if meeting heat user requirement all meet.
Further, compressor is by being driven by electricity.
Further, if thermal power plant unit is condensing bleeder turbine unit, and thermic load is heating steam supply, when depth peak regulation, is adopted Warm heat load is unsatisfactory for part and is substituted by electric heater.
Further, if thermal power plant unit is condensing bleeder turbine unit, and thermic load provides industry and heating steam supply simultaneously, then Its heating load part installs electric heater additional, and industrial steam supply loaded portion installs compressor additional on heat supply pipeline and is arranged than supplying The standby steam source of vapour load pressure higher pressure.
Compared with prior art, the invention has the benefit that
The present invention can satisfy depth peak regulation requirement, realizes cleaning substitution and electric energy substitution, does for Ecological Civilization Construction Contribution is gone out.
Detailed description of the invention
The accompanying drawings constituting a part of this application is used to provide further understanding of the present application, and the application's shows Meaning property embodiment and its explanation are not constituted an undue limitation on the present application for explaining the application.
Fig. 1 is work flow diagram of the present invention.
Specific embodiment:
The invention will be further described with embodiment with reference to the accompanying drawing.
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.Unless another It indicates, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singular Also it is intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, operation, device, component and/or their combination.
The application provides a kind of for thermal power plant unit renewable energy Depth peak regulation method.
High back pressure thermal power plant unit includes two kinds, and one is the operation of Heating Period high back pressure, non-heating period pure condensate operation is another It is pure high back pressure operation.When high back pressure is run, when electric load meets depth peak regulation requirement, the insufficient part of thermic load has electricity Heating boiler substitution.
It for condensing bleeder turbine unit, and can be divided into three classes, the first kind is that thermic load is extraction steam for factories, and the second class is heat Load is heating steam supply, and third class is to provide industry and heating steam supply simultaneously.
For first kind unit, requires to be tested first, checks whether unit pure condensate operating condition meets depth peak regulation requirement, It under the premise of meeting the requirements, checks whether industrial pressure of steam supply meets heat user requirement, is such as unsatisfactory for, from steam turbine more high pressure Power steam extraction section steam extraction simultaneously installs the compressor being driven by electricity additional on heat supply pipeline.
For the second class unit, when depth peak regulation, Heating Load is unsatisfactory for part and is substituted by electric heater.
For third class unit, then the method for requiring comprehensive the second class of first kind unit, heating part installs electric heater additional, Industrial steam supply part installs compressor additional on heat supply pipeline and the standby steam source of higher pressure is arranged.
Certain factory is domestic 200,000 unit, and unit pattern is three cylinder three-exhausters (high pressure divides cylinder), and three low pressure (LP) cylinders, one low Cylinder pressure is connected with intermediate pressure cylinder, and another two low pressure (LP) cylinder is arranged symmetrically.Each low pressure (LP) cylinder corresponds to individual condenser.Extraction steam for factories is three Pumping, standby steam source are two pumpings, and heating steam extraction is six pumpings.It is limited by area of heat-supply service, one and intermediate pressure cylinder is only transformed in high back pressure transformation Connected low pressure (LP) cylinder, to meet heat demand and the minimum throttle flow limitation of another two low pressure (LP) cylinder, unit generation load operation is 19 Ten thousand or so.In order to meet depth peak regulation requirement, unit electric load is set to drop to 80,000, power plant has carried out technological transformation.Mainly Electric boiler heater has been installed additional in heat supply network service water outlet, in this way when electric load drops to 80,000, when recirculated water leaving water temperature reduces, It is heated by electric boiler heater, meets heat supply network recirculated water supply water temperature requirement.
By transformation, meet unit depth peak regulation requirement, electric load can drop to 80,000, and meet extraction steam for factories and The requirement of heating steam extraction.
The foregoing is merely preferred embodiment of the present application, are not intended to limit this application, for the skill of this field For art personnel, various changes and changes are possible in this application.Within the spirit and principles of this application, made any to repair Change, equivalent replacement, improvement etc., should be included within the scope of protection of this application.
Above-mentioned, although the foregoing specific embodiments of the present invention is described with reference to the accompanying drawings, not protects model to the present invention The limitation enclosed, those skilled in the art should understand that, based on the technical solutions of the present invention, those skilled in the art are not Need to make the creative labor the various modifications or changes that can be made still within protection scope of the present invention.

Claims (5)

1. a kind of thermal power plant unit renewable energy Depth peak regulating method it is characterized in that: determining the type of thermal power plant unit, and confirms each Thermal power plant unit operating status carries out depth peak regulation to thermal power plant unit, and during peak regulation, supplements unit pressure of steam supply, or mend Fill Heating Load;
If thermal power plant unit is high back pressure thermal power plant unit, and Heating Period high back pressure is run, when non-heating period pure condensate is run, depth peak regulation Shi Chongdian monitors that boiler emission sulfur dioxide or/and nitrogen oxides be not exceeded;
If thermal power plant unit is high back pressure thermal power plant unit, and pure high back pressure is run, when electric load meets depth peak regulation requirement, heat Underload part is substituted by electrically heated boiler;
If thermal power plant unit is condensing bleeder turbine unit, and thermic load is extraction steam for factories, checks whether unit pure condensate operating condition meets depth Spend peak regulation requirement;
It under the premise of meeting the requirements, checks whether industrial pressure of steam supply meets heat user requirement, is such as unsatisfactory for thermic load steam supply Pressure requirements install compressor additional from the steam extraction section steam extraction of steam turbine higher pressure and on heat supply pipeline;
The depth peak regulation electric load and thermic load that thermal power plant unit is indicated if meeting heat user requirement all meet.
2. a kind of thermal power plant unit renewable energy Depth peak regulating method as described in claim 1, it is characterized in that: thermal power plant unit exists Under pure condensate operating condition, the requirement of depth peak regulation can satisfy.
3. a kind of thermal power plant unit renewable energy Depth peak regulating method as described in claim 1, it is characterized in that: compressor is by electricity Power drive.
4. a kind of thermal power plant unit renewable energy Depth peak regulating method as described in claim 1, it is characterized in that: if thermal power plant unit For condensing bleeder turbine unit, and thermic load is heating steam supply, and when depth peak regulation, Heating Load is unsatisfactory for part by electric heater Substitution.
5. a kind of thermal power plant unit renewable energy Depth peak regulating method as described in claim 1, it is characterized in that: if thermal power plant unit For condensing bleeder turbine unit, and thermic load provides industry and heating steam supply simultaneously, then its heating load part installs electric heater additional, Industrial steam supply loaded portion installs compressor additional on heat supply pipeline and the spare vapour than steam supply load pressure higher pressure is arranged Source.
CN201710305147.5A 2017-05-03 2017-05-03 A kind of thermal power plant unit renewable energy Depth peak regulating method Active CN107062350B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710305147.5A CN107062350B (en) 2017-05-03 2017-05-03 A kind of thermal power plant unit renewable energy Depth peak regulating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710305147.5A CN107062350B (en) 2017-05-03 2017-05-03 A kind of thermal power plant unit renewable energy Depth peak regulating method

Publications (2)

Publication Number Publication Date
CN107062350A CN107062350A (en) 2017-08-18
CN107062350B true CN107062350B (en) 2019-01-15

Family

ID=59596938

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710305147.5A Active CN107062350B (en) 2017-05-03 2017-05-03 A kind of thermal power plant unit renewable energy Depth peak regulating method

Country Status (1)

Country Link
CN (1) CN107062350B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111475951B (en) * 2020-04-09 2023-06-02 国网山东省电力公司电力科学研究院 Working condition analysis method of thermoelectric unit

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103107560A (en) * 2011-11-15 2013-05-15 华北电力科学研究院有限责任公司 Wind power access method and system based on heat supply unit participating power grid peak shaving
CN103883364A (en) * 2013-12-15 2014-06-25 河南省电力勘测设计院 Method for solving combined heat and power generation, split-shaft heat supply turbine generating set, and operating method of split-shaft heat supply turbine generating set
EP2787197A1 (en) * 2013-04-05 2014-10-08 Siemens Aktiengesellschaft Gas turbine power plant with heat accumulator for treating water for a STIG method
CN105202519A (en) * 2015-10-27 2015-12-30 国家电网公司 Frequency and peak load modulation all condition coordination control method of heat supply unit
CN105202623A (en) * 2015-09-21 2015-12-30 国家电网公司 Method for predicting heating peak modulation capacity of heat supply unit

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103107560A (en) * 2011-11-15 2013-05-15 华北电力科学研究院有限责任公司 Wind power access method and system based on heat supply unit participating power grid peak shaving
EP2787197A1 (en) * 2013-04-05 2014-10-08 Siemens Aktiengesellschaft Gas turbine power plant with heat accumulator for treating water for a STIG method
CN103883364A (en) * 2013-12-15 2014-06-25 河南省电力勘测设计院 Method for solving combined heat and power generation, split-shaft heat supply turbine generating set, and operating method of split-shaft heat supply turbine generating set
CN105202623A (en) * 2015-09-21 2015-12-30 国家电网公司 Method for predicting heating peak modulation capacity of heat supply unit
CN105202519A (en) * 2015-10-27 2015-12-30 国家电网公司 Frequency and peak load modulation all condition coordination control method of heat supply unit

Also Published As

Publication number Publication date
CN107062350A (en) 2017-08-18

Similar Documents

Publication Publication Date Title
Wang et al. Peak shaving operational optimization of supercritical coal-fired power plants by revising control strategy for water-fuel ratio
Liu et al. Heat–power decoupling technologies for coal-fired CHP plants: Operation flexibility and thermodynamic performance
KR101567712B1 (en) Hybrid power generation system and method using a supercritical CO2 cycle
CN105351018A (en) Thermal power generation system and method with fused salt energy storage, power supply and heat supply functions
CN107940538A (en) A kind of classification hold over system and its peak regulating method for cogeneration units
CN109768583B (en) Method for determining transformation capacity of thermoelectric generator set in new energy power system
CN106089338A (en) A kind of back pressure machine association system regulating heat supply and generating and method
CN111723475B (en) Wind power, photovoltaic and heat storage combined thermoelectric system and capacity optimization modeling method
CN205135735U (en) Thermal power system with heat supply of fused salt energy storage power
CN107062350B (en) A kind of thermal power plant unit renewable energy Depth peak regulating method
CN103397918B (en) The back pressure type small turbine drive blower fan system of frequency conversion generator speed governing and method
US9222360B2 (en) Combined power and heating station
CN208606249U (en) A kind of heat load adjustment system of gas turbine cogeneration of heat and power
CN103485892B (en) There is the power device of solar energy system
CN203052970U (en) Dual-heat-source hot-water boiler
CN208419709U (en) A kind of steam turbine of thermal power plant afterheat utilizing system
Ivanova et al. Cost—Benefit analysis of electric boiler at combined heat and power plants
CN207033500U (en) A kind of combustion gas cogeneration technology optimizes system
CN205243569U (en) Double reheat steam turbine of heating boiler overgrate air draws gas super -heated rate and utilizes system
CN105927965B (en) A kind of wide load heat regenerative system and method for work
KR100769118B1 (en) District heating system for using micro turbine
JP7246357B2 (en) Fuel cell system and power generation system using the same
CN108644859A (en) A kind of the heat load adjustment system and its control method of gas turbine cogeneration of heat and power
CN203394698U (en) Feed pump system driven by back pressure-type small steam turbine for speed regulation of power frequency generator
CN113280507B (en) Optimal heat source determining system and method for multi-heat-source air heater under variable working condition

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Lv Haizhen

Inventor after: Zheng Wei

Inventor after: Zhao Yan

Inventor after: You Daning

Inventor after: Ding Junqi

Inventor after: Xin Gang

Inventor after: Liu Rui

Inventor after: Liu Yuzhi

Inventor after: Guo Junshan

Inventor after: Zhang Hu

Inventor before: Lv Haizhen

Inventor before: Liu Rui

Inventor before: Liu Yuzhi

Inventor before: Guo Junshan

Inventor before: Zhang Hu

CB03 Change of inventor or designer information
GR01 Patent grant