CN107059971A - Water-bed soil pick-up special operation ship - Google Patents
Water-bed soil pick-up special operation ship Download PDFInfo
- Publication number
- CN107059971A CN107059971A CN201710255746.0A CN201710255746A CN107059971A CN 107059971 A CN107059971 A CN 107059971A CN 201710255746 A CN201710255746 A CN 201710255746A CN 107059971 A CN107059971 A CN 107059971A
- Authority
- CN
- China
- Prior art keywords
- sludge
- cabin
- water
- operation ship
- absorption plant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000002689 soil Substances 0.000 title claims abstract description 27
- 239000010802 sludge Substances 0.000 claims abstract description 91
- 238000010521 absorption reaction Methods 0.000 claims abstract description 35
- 230000000694 effects Effects 0.000 claims abstract description 11
- 150000004767 nitrides Chemical group 0.000 claims abstract description 8
- 238000003860 storage Methods 0.000 claims description 48
- 239000010801 sewage sludge Substances 0.000 claims description 21
- 239000012535 impurity Substances 0.000 claims description 3
- 238000000151 deposition Methods 0.000 claims description 2
- 230000000391 smoking effect Effects 0.000 claims description 2
- 230000006399 behavior Effects 0.000 claims 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 36
- 238000004062 sedimentation Methods 0.000 abstract description 8
- 238000003911 water pollution Methods 0.000 abstract description 4
- 241000196324 Embryophyta Species 0.000 description 24
- 239000003643 water by type Substances 0.000 description 15
- 241000192700 Cyanobacteria Species 0.000 description 14
- 239000000463 material Substances 0.000 description 9
- 108010066114 cabin-2 Proteins 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 230000007774 longterm Effects 0.000 description 3
- 235000015097 nutrients Nutrition 0.000 description 3
- 235000016709 nutrition Nutrition 0.000 description 3
- 230000035764 nutrition Effects 0.000 description 3
- 241000251468 Actinopterygii Species 0.000 description 2
- 241000195493 Cryptophyta Species 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 238000000354 decomposition reaction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000003344 environmental pollutant Substances 0.000 description 2
- 238000012851 eutrophication Methods 0.000 description 2
- 238000007667 floating Methods 0.000 description 2
- 231100000719 pollutant Toxicity 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 235000014676 Phragmites communis Nutrition 0.000 description 1
- 241000124033 Salix Species 0.000 description 1
- 230000001154 acute effect Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000010790 dilution Methods 0.000 description 1
- 239000012895 dilution Substances 0.000 description 1
- 201000010099 disease Diseases 0.000 description 1
- 208000037265 diseases, disorders, signs and symptoms Diseases 0.000 description 1
- 238000001035 drying Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 239000003337 fertilizer Substances 0.000 description 1
- 239000013505 freshwater Substances 0.000 description 1
- JEGUKCSWCFPDGT-UHFFFAOYSA-N h2o hydrate Chemical compound O.O JEGUKCSWCFPDGT-UHFFFAOYSA-N 0.000 description 1
- 238000003306 harvesting Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 239000005416 organic matter Substances 0.000 description 1
- 230000001376 precipitating effect Effects 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 208000024891 symptom Diseases 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/88—Dredgers; Soil-shifting machines mechanically-driven with arrangements acting by a sucking or forcing effect, e.g. suction dredgers
- E02F3/8833—Floating installations
- E02F3/885—Floating installations self propelled, e.g. ship
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/88—Dredgers; Soil-shifting machines mechanically-driven with arrangements acting by a sucking or forcing effect, e.g. suction dredgers
- E02F3/90—Component parts, e.g. arrangement or adaptation of pumps
- E02F3/905—Manipulating or supporting suction pipes or ladders; Mechanical supports or floaters therefor; pipe joints for suction pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/88—Dredgers; Soil-shifting machines mechanically-driven with arrangements acting by a sucking or forcing effect, e.g. suction dredgers
- E02F3/90—Component parts, e.g. arrangement or adaptation of pumps
- E02F3/92—Digging elements, e.g. suction heads
- E02F3/9243—Passive suction heads with no mechanical cutting means
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/88—Dredgers; Soil-shifting machines mechanically-driven with arrangements acting by a sucking or forcing effect, e.g. suction dredgers
- E02F3/90—Component parts, e.g. arrangement or adaptation of pumps
- E02F3/92—Digging elements, e.g. suction heads
- E02F3/9293—Component parts of suction heads, e.g. edges, strainers for preventing the entry of stones or the like
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Treatment Of Sludge (AREA)
Abstract
The invention provides a kind of water-bed soil pick-up special operation ship, it is related to technical field of water environment treatment, the technical problem for eliminating water pollution could be realized by solving water environment treatment in the prior art and needing thoroughly to remove sludge underwater.The water-bed soil pick-up special operation ship, including operation ship body and sludge absorption plant, the sludge absorption plant includes depth location adjusting means and absorption plant body, and the absorption plant body includes sludge suction inlet, and passes through the sludge suction inlet sucking sludge;The absorption plant body is connected by the depth location adjusting means with the operation ship body, the depth location adjusting means can drive the absorption plant body to rise, and the deposit position of nitride layer of half sedimentation for allowing the aspirator body at least extend to sludge suction inlet above underwater mud top layer under weight effect is in half sedimentation and deposited the sludge of nitride layer to aspirate.The present invention is used to remove water pollution.
Description
Technical field
The present invention relates to technical field of water environment treatment, more particularly, to a kind of water-bed soil pick-up special operation ship.
Background technology
Every summer many waters can often break out blue-green algae, water source be caused in the big fresh water lake of serious pollution, especially five
Taihu Lake, the Dian Chi in Chaohu and Kunming, be particularly acute, the outburst of blue-green algae has had a strong impact on the production in place, life.Blue-green algae
Outburst be caused by the eutrophication of water body, as described above the blue-green algae in three lakes be it is typical represent, because of long-term inflow river course
Many, discharge outlet is few, flood bring into after the biological death in substantial amounts of floating object and polluter, and waters rot, all because
Water surface area is vast, and delivery port is few, and these pollutants can not be discharged, and be accumulated in for a long time in waters, is gradually deposited to the bottom, for a long time
Accumulation, causes body eutrophication.More long material of the general bottom drift age, can be deposited on bottom, remain static,
And decompose completely, it will not produce influence to water quality.Produce influence to water quality is that bottom surface is in half settling phase
Drift, half precipitum on these water-bed top layers is all posterior settlement, is not decomposed, when meeting wind and waves, these
The drift of bottom surface can be stirred by stormy waves, and water surface muddiness is exactly this reason when typically having high sea.To summer water temperature
Rise, the drift of these half settling phases takes water body upper strata to by stormy waves, because upper strata water temperature is higher than the bottom, these half drifts
The material of floating state causes water nutrition to strengthen, produces wawter bloom because being excited rear accelerated decomposition by water temperature is elevated, it is continuous properly
Temperature in the case of, gather generation blue-green algae, this be blue-green algae generation mechanism.
Nowadays people have following several ways in the improvement of blue-green algae:One is the method using chemistry, because of the side of chemistry
Formula can produce side effect to water quality in itself, leave future trouble, and institute can not use in this way.Two are used to blue algae collecting, processing
Method, this method cures the symptoms, not the disease, because blue-green algae is when meeting suitable meteorological condition, concentrate in a short time large area break out, phase
For vast waters, the blue-green algae being collected is very little, spends substantial amounts of manpower and materials, problem can not be solved at all;
Three be that plantation water loving plant absorbs nutrient method, because as large-size lake stormy waves such as Taihu Lake, Chaohu, greatly, pure water plant is difficult to grow,
Littoral some wetlands of construction are taken now, some water loving plants such as reed, willow are planted, because these plants are not grown directly upon
In water body, simply in bank wetland, only a small amount of root system is washed in a pan because of stormy waves has gone the soil on bank root system is exposed in water, right
The nutrient for absorbing water body can be ignored;Plus the unmanned harvesting of these plants, on the contrary to winter it is withered lose after ruin landscape, and because
More heavy polluted water after rotting;Four be to clear up mud using dredger, and existing dredger is cleared up by hinge, suction, is needed
To be cleared up in the lump together with water-bed a large amount of soil, so for large-scale waters, gigantic project, cleaning effect is slow, and the cycle is too
It is long, and because the ship belongs to large scale equipment, operating cost is too high, the human and material resources spent are unbecoming with the effect received, more
Because use cost is too high, it is impossible to long-term operation, to large-size lake, effect in short-term can only be obtained, for small-sized waters, because setting
It is standby huge, at all can not operation;Five be, using after draining water, to be rushed mud using giant in some city inland rivers, and
Taken away after dilution with high-pressure pump, its drawback is to have to drain in the water in waters, could operation, increase workload and fund into
This, is also to implement in large-size lake.
Below two methods by sludge underwater it is fully erased after, it is possible to achieve the effect of thorough pollution control of water, but
It is because workload and cost are excessive, it is impossible to for any waters concrete operations.
The content of the invention
It is an object of the invention to provide water-bed soil pick-up special purpose device, with solve water environment treatment in the prior art need by
Sludge underwater, which is thoroughly removed, could realize the technical problem for eliminating water pollution.
The technical scheme is that:A kind of water-bed soil pick-up special operation ship, including operation ship body and sludge absorb dress
Put, the sludge absorption plant includes depth location adjusting means and absorption plant body, the absorption plant body includes dirt
Mud suction inlet, and sludge is absorbed by the sludge suction inlet;The absorption plant body is adjusted by the depth location and filled
Put and be connected with the operation ship body, the depth location adjusting means can drive the absorption plant body to rise, and allow
Half sedimentation that the absorption plant body at least extends to sludge suction inlet above underwater mud top layer under weight effect is become silted up
The position of product nitride layer is in the sludge of the half sedimentation alluvial nitride layer to absorb.
Described water-bed soil pick-up special operation ship, operation is not limited by waters, and any waters can be used, and cost
It is low, the model of suitable operation ship body according to waters size, can be chosen during operation, operating cost is low, and large-scale waters can be grown
Phase operation;Described water-bed soil pick-up special operation shipowner will aspirate the half sedimentation drift on underwater mud top layer, and these materials
The Major Nutrient donor that exactly blue-green algae generates, by taking these materials away, so that nutrition supplying necessary to cut-out blue-green algae generation
Should, for administering blue algae bloom, it can fundamentally break off the necessary condition of blue-green algae generation;And because the operation ship is not required to clear up bottom
Layer mud, than the workload that dredger reduces several times, administering the cost of blue-green algae can decline to a great extent, and more preferable, more efficient can change
Kind water quality, fund input, which is produced effects, understands into several times benefit.
Optionally, the operation ship body includes sewage sludge storage cabin, the sludge outlet of the sludge absorption plant and institute
State sewage sludge storage cabin.
Optionally, one end in the sewage sludge storage cabin separates provided with draining, and the draining separates the sewage sludge storage
Cabin is divided into the main cabin of storage and the secondary cabin of storage, and the draining cut-off is detachably connected with the sewage sludge storage cabin, and the sludge leads to
The sludge absorption plant is crossed into the sludge stored in main cabin, the main cabin of storage by the draining to separate sludge
In moisture drip into the secondary cabin of storage, and then from the secondary cabin discharge of the storage.
Optionally, provided with discharge groove in the secondary cabin of the storage, plane is less than the storage where the bottom surface of the discharge groove
Plane where main bilge face.
Optionally, it is provided with the discharge groove on excavationg pump, the excavationg pump and connects discharge pipe.
Optionally, sludge pushing meanss are provided with the sewage sludge storage cabin, the sludge pushing meanss are by sludge from described
Store main cabin and be pushed into the discharge groove, and then discharged by the excavationg pump and discharge pipe.
Optionally, the operation ship body is additionally provided with operating room and piggyback pod.
Optionally, described to take out dirty device and include taking out dirty pump and cutter device, the cutter device, which is arranged on, described takes out dirty pump
Sludge inlet end at, can wind or block the impurity for taking out dirty pump in sludge for shredding.
Optionally, the absorption plant body includes taking out dirty device and takes out dirty pipeline, described to take out dirty pipeline including taking out dirty pipe
And take out dirty device cabin, the sludge inlet be arranged on it is described take out on dirty device cabin, it is described to take out dirty pipe and include taking out dirty inlet pipe and take out dirt
Outlet pipe, the sludge inlet end for taking out dirty inlet pipe is connected with the sludge outlet for taking out dirty device cabin, the dirt for taking out dirty inlet pipe
The mud port of export is connected with taking out the sludge inlet end of dirty device, the sludge outlet for taking out dirty device and the sludge for taking out dirty outlet pipe
Arrival end is connected, and the sludge outlet end for taking out dirty outlet pipe is connected with the sewage sludge storage cabin of the operation ship body.
Optionally, the depth location adjusting means includes the first hawser and the second hawser, described to take out dirty device cabin and pass through
First hawser and the second hawser are connected with the operation ship body.
Beneficial effects of the present invention:
1st, water-bed soil pick-up special operation ship of the present invention can be any in large-size lake, city inland river, cultivation fish pond etc.
Waters operation, can select model according to waters size, reduce operating cost, depth of water water is shallow, need to only adjust dragging cable length,
Can equally operation, can remove from for those river courses, cultivation fish pond and drain the trouble of operation after water, and the system is than existing
Dredger is manufactured and the low decades of times of operating cost, and the efficiency-cost ratio of pollution control of water can increase at double, and input can be high
The pollution control of water of utilization rate.Such as large-scale waters in Chaohu, Taihu Lake, can set special as being cleaned urban road
Operation fleet, organize many ship long-term operations, the effect of thorough pollution control of water can be obtained, it is to avoid chemical pollution treatment mode
Secondary hazards, efficiency-cost ratio is high.
2nd, using water-bed soil pick-up special operation ship of the present invention, the pollutant for falling to underwater mud top layer is removed, is cut
The supplying of disconnected water nutrition, so that reaching improves the purpose of water quality.The pump orifice for taking out dirty device cabin is located at mud top layer, passes through
The dragging movement of operation ship body, the sucking sludge for taking out dirty pump in dirty device cabin is taken out by being connected by pipeline.
3rd, it is described to take out dirty device including taking out dirty pump and cutter device, it can prevent the easily tamper such as the polybag at the bottom from blocking
Water pump, by the suction of strength, extracts the half sedimentation drift on water-bed top layer out water-bed, is discharged into cabin.
4th, sludge enters sewage sludge storage cabin, and the filter separated by draining, controls out part moisture, reduces volume,
After operation ship collects boatload cabin, then transport and be discharged at specified special accumulation mud.
5th, water-bed soil pick-up special operation ship is in addition;It is mainly the thing for being partly deposited in underwater mud top layer based on water pollution
Matter, these materials rise because not decomposing completely to summer water temperature, can accelerated decomposition, release decomposed substance, enhancing water body
Eutrophy, produces wawter bloom, forms blue-green algae;The mainly underwater mud top layer that bottom soil pick-up special operation ship of the invention is extracted out
Material, these materials are rich in large amount of organic matter, are exactly to have well without processing in specified storeroom after precipitating, drying
Machine fertilizer, can be used, and form the benign cycle of twice laid.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this
Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with
Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is water-bed soil pick-up special operation ship structural representation of the present invention;
Fig. 2 is the structural representation of the present invention for taking out dirty device cabin.
11- first sides in figure;12- second sides;The sides of 13- the 3rd;131- takes out dirty pipe joint;14- takes out dirty device cabin
Sludge inlet;15- takes out the first extension board;151- first is linked up with;152- second is linked up with;The extension boards of 16- second;2- storage masters
Cabin;The secondary cabin of 21- storages;22- discharges groove;23- excavationg pumps;24- discharge pipes;311- cross bars;312- montants;313- securing plates;32-
Folding and unfolding pulley;33- folding and unfolding capstan winches;The hawsers of 34- first;4- takes out dirty device;41- takes out dirty inlet pipe;42- takes out dirty outlet pipe;The cables of 5- second
Rope;6- drainings separate;7- operating rooms;8- piggyback pods.
Embodiment
To make the object, technical solutions and advantages of the present invention clearer, technical scheme will be carried out below
Detailed description.Obviously, described embodiment is only a part of embodiment of the invention, rather than whole embodiments.Base
Embodiment in the present invention, those of ordinary skill in the art are resulting on the premise of creative work is not made to be owned
Other embodiment, belongs to the scope that the present invention is protected.
The invention provides one kind:A kind of water-bed soil pick-up special operation ship, including operation ship body and sludge absorption plant,
The sludge absorption plant includes depth location adjusting means and absorption plant body, and the absorption plant body is inhaled including sludge
Entrance 14, and sludge is absorbed by the sludge suction inlet 14;The absorption plant body is adjusted by the depth location and filled
Put and be connected with the operation ship body, the depth location adjusting means can drive the absorption plant body to rise, and allow
Half sedimentation that the absorption plant body at least extends to sludge suction inlet 14 above underwater mud top layer under weight effect
The position for nitride layer of depositing is in the sludge of the half sedimentation alluvial nitride layer to absorb.
Optionally embodiment, the operation ship body includes sewage sludge storage cabin, the dirt of the sludge absorption plant
Mud outlet and the sewage sludge storage cabin.
One end in optionally embodiment, the sewage sludge storage cabin is provided with draining cut-off 6, the draining cut-off 6
The sewage sludge storage cabin is divided into the main cabin 2 of storage and the secondary cabin 21 of storage, the draining cut-off 6 is removable with the sewage sludge storage cabin
Connection is unloaded, the sludge that the sludge is entered in the main cabin 2 of storage, the main cabin 2 of storage by the sludge absorption plant leads to
Cross the draining cut-off 6 to drip the moisture in sludge into the secondary cabin 21 of storage, and then discharged from the secondary cabin 21 of the storage.
Provided with discharge groove 22 in optionally embodiment, the secondary cabin 21 of the storage, the bottom surface institute of the discharge groove 22
In plane less than the plane where the main bottom surface of cabin 2 of storage.
It is provided with optionally embodiment, the discharge groove 22 on excavationg pump 23, the excavationg pump 23 and connects discharge
Pipe 24.
Sludge pushing meanss, the sludge pushing meanss are provided with optionally embodiment, the sewage sludge storage cabin
Sludge is pushed into the discharge groove 22 from the main cabin 2 of storage, and then discharged by the excavationg pump 23 and discharge pipe 24.
Optionally embodiment, the operation ship body is additionally provided with operating room 7 and piggyback pod 8.
Optionally embodiment, described to take out dirty device 4 including taking out dirty pump and cutter device, the cutter device setting
At the sludge inlet end for taking out dirty pump, the impurity for taking out dirty pump can be wound or blocked in sludge for shredding.
Optionally embodiment, it is described to take out dirty device 4 and be fixed on the operation ship body.
Optionally embodiment, the absorption plant body includes taking out dirty device 4 and takes out dirty pipeline, described to take out dirty pipe
Road includes taking out dirty pipe and takes out dirty device cabin, the sludge inlet 14 be arranged on it is described take out on dirty device cabin, it is described to take out dirty pipe and include
Take out dirty inlet pipe 41 and take out dirty outlet pipe 42, the sludge inlet end for taking out dirty inlet pipe 41 connects with the sludge outlet for taking out dirty device cabin
Logical, the sludge outlet end for taking out dirty inlet pipe 41 is connected with taking out the sludge inlet end of dirty device 4, the sludge for taking out dirty device 4
Outlet is connected with the sludge inlet end for taking out dirty outlet pipe 42, the sludge outlet end for taking out dirty outlet pipe 42 and the operation ship sheet
The sewage sludge storage cabin connection of body.
Optionally embodiment, the depth location adjusting means includes the first hawser 34 and the second hawser 5, described
Dirty device cabin is taken out to be connected with the operation ship body by the hawser 5 of the first hawser 34 and second.
Optionally embodiment, it is described take out dirty device cabin be shaped as it is triangular prism shaped, it is described it is triangular prism shaped including according to
Three rectangular sides of secondary adjacent connection, respectively first side 11, the side of second side 12 and the 3rd 13, it is described to take out dirt
The sludge outlet in device cabin is arranged on the 3rd side 13, and smokes dirty inlet pipe 41 by smoking dirty pipe joint 131 with described
Sludge inlet end is connected, and the sludge inlet 14 for taking out dirty device cabin is thin-and-long entrance, and the thin-and-long entrance is close to described
The seamed edge that first side 11 and second side 12 connect is arranged in the first side 11, and length direction is put down with the seamed edge
OK.
Optionally embodiment, described to take out dirty device cabin also including the first extension board 15 and the second extension board 16, institute
State the first extension board 15 for the first side 11 at the first side 11 and the seamed edges that connect of the 3rd side 13 to
The part of outer extension;Second extension board 16 is the second side 12 in the second side 12 and the 3rd side 13
The part stretched out at the seamed edge connected;The both sides of edges of first extension board 15 is respectively equipped with the first hook 151 and
Two hooks 152, first hawser 34 is connected on the second hook 152, and second hawser 5 is connected to first hook
On 151.
The foregoing is only a specific embodiment of the invention, but protection scope of the present invention is not limited thereto, any
Those familiar with the art the invention discloses technical scope in, change or replacement can be readily occurred in, should all be contained
Cover within protection scope of the present invention.Therefore, protection scope of the present invention should be based on the protection scope of the described claims.
Claims (10)
1. a kind of water-bed soil pick-up special operation ship, it is characterised in that including operation ship body and sludge absorption plant, the sludge
Absorption plant includes depth location adjusting means and absorption plant body, and the absorption plant body includes sludge suction inlet
(14), and by the sludge suction inlet (14) sludge is absorbed;The absorption plant body is adjusted by the depth location and filled
Put and be connected with the operation ship body, the depth location adjusting means can drive the absorption plant body to rise, and allow
It is partly heavy above underwater mud top layer that the absorption plant body at least extends to sludge suction inlet (14) under weight effect
The position of drop alluvial nitride layer is in described half sludge for settling nitride layer of depositing to absorb.
2. water-bed soil pick-up special operation ship according to claim 1, it is characterised in that the operation ship body includes sludge
Holding bay, the sludge outlet of the sludge absorption plant and the sewage sludge storage cabin.
3. water-bed soil pick-up special operation ship according to claim 2, it is characterised in that one end in the sewage sludge storage cabin
Separate (6) provided with draining, the sewage sludge storage cabin is divided into the main cabin (2) of storage and the secondary cabin of storage by the draining cut-off (6)
(21), the draining cut-off (6) is detachably connected with the sewage sludge storage cabin, and the sludge is entered by the sludge absorption plant
The sludge entered in the main cabin (2) of storage, the main cabin (2) of storage separates (6) by the moisture drip in sludge by the draining
Enter the secondary cabin (21) of storage, and then discharged from the secondary cabin (21) of the storage.
4. water-bed soil pick-up special operation ship according to claim 3, it is characterised in that be provided with the secondary cabin (21) of the storage
Groove (22) is discharged, plane where the bottom surface of the discharge groove (22) is less than the plane where main cabin (2) bottom surface of storage.
5. according to the water-bed soil pick-up special operation ship described in claim 4, it is characterised in that provided with discharge in the discharge groove (22)
Discharge pipe (24) is connected on pump (23), the excavationg pump (23).
6. water-bed soil pick-up special operation ship according to claim 5, it is characterised in that provided with dirt in the sewage sludge storage cabin
Sludge is discharged groove (22) by mud pushing meanss, the sludge pushing meanss from main cabin (2) push-in of the storage is described, and then is passed through
The excavationg pump (23) and discharge pipe (24) discharge.
7. water-bed soil pick-up special operation ship according to claim 6, it is characterised in that the operation ship body is additionally provided with behaviour
Make room (7) and piggyback pod (8).
8. water-bed soil pick-up special operation ship according to claim 2, it is characterised in that the dirty device (4) of taking out includes taking out
Dirty pump and cutter device, the cutter device be arranged on it is described take out at the sludge inlet end of dirty pump, can be twined for shredding in sludge
Around or block and take out the impurity of dirty pump.
9. water-bed soil pick-up special operation ship according to claim 2, it is characterised in that the absorption plant body includes taking out
Dirty device (4) and dirty pipeline is taken out, described to take out dirty pipeline and include taking out dirty pipe and take out dirty device cabin, the sludge inlet (14) is arranged on
It is described to take out on dirty device cabin, described take out dirty pipe and include taking out dirty inlet pipe (41) and take out dirty outlet pipe (42), the dirty inlet pipe (41) of smoking
Sludge inlet end is connected with the sludge outlet for taking out dirty device cabin, and the sludge outlet end for taking out dirty inlet pipe (41) is with taking out dirty dress
Put the sludge inlet end connection of (4), the sludge outlet for taking out dirty device (4) and the sludge inlet end for taking out dirty outlet pipe (42)
Connection, the sludge outlet end for taking out dirty outlet pipe (42) is connected with the sewage sludge storage cabin of the operation ship body.
10. water-bed soil pick-up special operation ship according to claim 9, it is characterised in that the depth location adjusting means
It is described to take out dirty device cabin and pass through first hawser (34) and the second hawser (5) including the first hawser (34) and the second hawser (5)
It is connected with the operation ship body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710255746.0A CN107059971A (en) | 2017-04-19 | 2017-04-19 | Water-bed soil pick-up special operation ship |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710255746.0A CN107059971A (en) | 2017-04-19 | 2017-04-19 | Water-bed soil pick-up special operation ship |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107059971A true CN107059971A (en) | 2017-08-18 |
Family
ID=59600835
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710255746.0A Pending CN107059971A (en) | 2017-04-19 | 2017-04-19 | Water-bed soil pick-up special operation ship |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107059971A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108454803A (en) * | 2018-02-08 | 2018-08-28 | 中交机电工程局有限公司 | Fishing device peculiar to vessel for leaving chemical weapons recycling |
CN111335381A (en) * | 2020-04-20 | 2020-06-26 | 安徽捷思新材料科技有限公司 | Full-water-area dragging type water bottom sewage pumping operation ship |
CN111335382A (en) * | 2020-04-20 | 2020-06-26 | 安徽捷思新材料科技有限公司 | Full water area pulls formula water bottom and takes out dirty device |
Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1989000630A1 (en) * | 1987-07-22 | 1989-01-26 | O&K Orenstein & Koppel Ag | Process and device for dredging silt in ports, waterways and the like |
EP0821109A1 (en) * | 1996-07-25 | 1998-01-28 | Société de Prestations Industrielles et de Montage (S.P.I.M.) | Excavator for use in a hazardous environment, buoy for maritime work and control post therefor |
DE102005045407A1 (en) * | 2005-09-23 | 2007-03-29 | Wurpts, Rewert, Dipl.-Ing. | In situ conditioning by remedial dredging method for maintenance of navigable depths in air-locks, outer ports, sea lanes and rivers, comprises ventilation of silt/mud present at bed of the water bodies by contacting with atmospheric oxygen |
CN201559798U (en) * | 2009-08-19 | 2010-08-25 | 林宗仁 | Silt and garbage separation boat |
CN202689069U (en) * | 2012-08-06 | 2013-01-23 | 周飞 | Pool decontamination device |
CN103502538A (en) * | 2011-01-21 | 2014-01-08 | 迪科玛股份公司 | Apparatus and method for the dredging of sediments from the seabed |
CN103526795A (en) * | 2013-11-01 | 2014-01-22 | 郭丙庄 | Self-propelled canal dredging ship |
CN203531033U (en) * | 2013-11-01 | 2014-04-09 | 郭丙庄 | Self-propelled canal dredging boat |
JP2015007310A (en) * | 2013-06-24 | 2015-01-15 | 株式会社シンフォニーエム | Dredge device |
CN204112387U (en) * | 2014-07-30 | 2015-01-21 | 孙红霞 | A kind of engineering water conservancy Accrete clearing device |
JP3196857U (en) * | 2015-01-16 | 2015-04-09 | 株式会社リソースクリエイト | Sauce intake structure |
CN204368400U (en) * | 2014-11-17 | 2015-06-03 | 浙江机电职业技术学院 | Novel water course descaling machine |
JP2016118088A (en) * | 2014-12-19 | 2016-06-30 | アクアント株式会社 | Dredging inlet structure |
CN105735389A (en) * | 2014-12-11 | 2016-07-06 | 重庆市合川区海常关船舶修造有限公司 | Dredger |
CN105771381A (en) * | 2016-03-05 | 2016-07-20 | 杭州骄航环保科技有限公司 | River sludge filter device |
CN205604319U (en) * | 2016-05-07 | 2016-09-28 | 何县香 | Dredger |
CN206844187U (en) * | 2017-04-19 | 2018-01-05 | 安徽捷思新型材料有限公司 | Water-bed soil pick-up special operation ship |
-
2017
- 2017-04-19 CN CN201710255746.0A patent/CN107059971A/en active Pending
Patent Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1989000630A1 (en) * | 1987-07-22 | 1989-01-26 | O&K Orenstein & Koppel Ag | Process and device for dredging silt in ports, waterways and the like |
EP0821109A1 (en) * | 1996-07-25 | 1998-01-28 | Société de Prestations Industrielles et de Montage (S.P.I.M.) | Excavator for use in a hazardous environment, buoy for maritime work and control post therefor |
DE102005045407A1 (en) * | 2005-09-23 | 2007-03-29 | Wurpts, Rewert, Dipl.-Ing. | In situ conditioning by remedial dredging method for maintenance of navigable depths in air-locks, outer ports, sea lanes and rivers, comprises ventilation of silt/mud present at bed of the water bodies by contacting with atmospheric oxygen |
CN201559798U (en) * | 2009-08-19 | 2010-08-25 | 林宗仁 | Silt and garbage separation boat |
CN103502538A (en) * | 2011-01-21 | 2014-01-08 | 迪科玛股份公司 | Apparatus and method for the dredging of sediments from the seabed |
US20140015302A1 (en) * | 2011-01-21 | 2014-01-16 | Decomar S.P.A. | Apparatus and method for the dredging of sediments from the seabed |
CN202689069U (en) * | 2012-08-06 | 2013-01-23 | 周飞 | Pool decontamination device |
JP2015007310A (en) * | 2013-06-24 | 2015-01-15 | 株式会社シンフォニーエム | Dredge device |
CN203531033U (en) * | 2013-11-01 | 2014-04-09 | 郭丙庄 | Self-propelled canal dredging boat |
CN103526795A (en) * | 2013-11-01 | 2014-01-22 | 郭丙庄 | Self-propelled canal dredging ship |
CN204112387U (en) * | 2014-07-30 | 2015-01-21 | 孙红霞 | A kind of engineering water conservancy Accrete clearing device |
CN204368400U (en) * | 2014-11-17 | 2015-06-03 | 浙江机电职业技术学院 | Novel water course descaling machine |
CN105735389A (en) * | 2014-12-11 | 2016-07-06 | 重庆市合川区海常关船舶修造有限公司 | Dredger |
JP2016118088A (en) * | 2014-12-19 | 2016-06-30 | アクアント株式会社 | Dredging inlet structure |
JP3196857U (en) * | 2015-01-16 | 2015-04-09 | 株式会社リソースクリエイト | Sauce intake structure |
CN105771381A (en) * | 2016-03-05 | 2016-07-20 | 杭州骄航环保科技有限公司 | River sludge filter device |
CN205604319U (en) * | 2016-05-07 | 2016-09-28 | 何县香 | Dredger |
CN206844187U (en) * | 2017-04-19 | 2018-01-05 | 安徽捷思新型材料有限公司 | Water-bed soil pick-up special operation ship |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108454803A (en) * | 2018-02-08 | 2018-08-28 | 中交机电工程局有限公司 | Fishing device peculiar to vessel for leaving chemical weapons recycling |
CN111335381A (en) * | 2020-04-20 | 2020-06-26 | 安徽捷思新材料科技有限公司 | Full-water-area dragging type water bottom sewage pumping operation ship |
CN111335382A (en) * | 2020-04-20 | 2020-06-26 | 安徽捷思新材料科技有限公司 | Full water area pulls formula water bottom and takes out dirty device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105155491B (en) | A kind of blue-green algae intercepts collection device | |
CN207305490U (en) | A kind of environmental and ecological bank protection in gardens | |
CN107059971A (en) | Water-bed soil pick-up special operation ship | |
CN103803762A (en) | Organic composite soil high-efficiency ecological water purification system | |
CN108990452B (en) | Coupling diving layer salt and fresh water replacing and leaching desalting device | |
CN108781576B (en) | Beach desalting method coupling water circulation | |
CN106884452A (en) | Water-bed soil pick-up special purpose device | |
CN204728392U (en) | The ecologic rainwater being applicable to side slope filters and gathering-device | |
CN1817115A (en) | Energy and water-saving fry hatching system | |
CN206844187U (en) | Water-bed soil pick-up special operation ship | |
KR101404215B1 (en) | Rainwater Storage Assembly | |
CN206844195U (en) | Water-bed soil pick-up special purpose device | |
JP2007146425A (en) | Method and system for dredging lake water | |
CN207451740U (en) | A kind of agricultural drain system to purify water | |
CN114809227A (en) | Rain and sewage flow distribution ecological treatment system based on artificial intelligence vision | |
CN205776127U (en) | Algae platform is taken out in floating type enrichment | |
CN108557988A (en) | A kind of the dryland soil filtration system and method for agricultural non-point source pollution control | |
CN212742743U (en) | Rainwater recovery processing system is used in sponge city | |
CN203904141U (en) | System for efficient ecological water purification through organic composite soil | |
CN113060861A (en) | Gardens sewage purification circulation system | |
CN206423376U (en) | Cultivation fish educates fishpond drainage system | |
CN206735919U (en) | A kind of landscape pond to water pollution ecological environment reparation | |
KR20150068885A (en) | Rainwater Storage Assembly | |
JP4724081B2 (en) | How to drain sediment at the bottom of a farm pond | |
CN110981095A (en) | Gardens collection water, water supply circulation clean system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170818 |
|
RJ01 | Rejection of invention patent application after publication |