CN107059922A - A kind of construction method of pipe gallery movement joint - Google Patents

A kind of construction method of pipe gallery movement joint Download PDF

Info

Publication number
CN107059922A
CN107059922A CN201710267373.9A CN201710267373A CN107059922A CN 107059922 A CN107059922 A CN 107059922A CN 201710267373 A CN201710267373 A CN 201710267373A CN 107059922 A CN107059922 A CN 107059922A
Authority
CN
China
Prior art keywords
substrate
waterstop
side template
movement joint
pipe gallery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710267373.9A
Other languages
Chinese (zh)
Other versions
CN107059922B (en
Inventor
钟晟
韩学池
叶洪兵
李红伟
赵彪
蒋欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201710267373.9A priority Critical patent/CN107059922B/en
Publication of CN107059922A publication Critical patent/CN107059922A/en
Application granted granted Critical
Publication of CN107059922B publication Critical patent/CN107059922B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

Side template propped the invention discloses a kind of construction method of pipe gallery movement joint, including first, waterstop is then fixed, then props Side Template, the step of finally carrying out concreting, when propping Side Template, using following steps:A, the Side Template for first obtaining following structure, including substrate and be wrapped on substrate polyurethane rubber layer;There is groove on the polyurethane rubber layer of substrate width direction side;The middle part of zig direction side has the through hole that insertion is set;When B, concrete operations, the first coating lubricating oil in groove, in the both sides brushing separating powder of Side Template, groove is connected in the center protrusion portion of waterstop again, after all Side Templates are all connected on waterstop, passed through using long bolt from the through hole of base ends, all Side Templates are fixed into an entirety by blending bolt fastening.The present invention has operating method simple, and Side Template is retracted conveniently, the advantages of forming quality of prearrangement of deformation amount seam is preferable.

Description

A kind of construction method of pipe gallery movement joint
Technical field
The present invention relates to technical field of building construction, in particular to a kind of construction method of pipe gallery movement joint.
Background technology
Urban Underground pipe gallery refers to the public tunnel of pipeline built in Urban Underground, by electric power, communication, combustion gas, gives The two or more municipal pipelines such as water, heating power, draining, which are concentrated, to be laid in the tunnel, by the Gas Pipe separately laid originally, rainwater Pipe, sewage pipe and high-tension bus-bar etc. are concentrated laying, are not mutually exclusive, and all include pipe gallery engineering.Underground pipe gallery is solved The problem of maintenance, the dilatation of all kinds of pipelines are caused during urban development " slide fastener road " and aerial " cobweb ", to lifting City pan-image, creates the harmonious ecological environment in city and serves the effect actively promoted.With the expansion and construction of urban area Development, the advantage for building underground pipe gallery progressively obtains the affirmative of departments of government.
In the work progress of pipe gallery, movement joint is the emphasis and difficult point of construction.Pipe gallery movement joint width For three centimeters, filled using detachable polystyrol plastic foam plate, but at the scene during practice of construction, due to polyphenyl Vinylic foam plate is softer and easily fractures, and can be deformed in concreting process, or even broken directly cast-in-place In to concrete and can not prearrangement of deformation amount seam, do not reach expected effect, therefore, part building site violate use requirement use wooden model Plate is poured into concrete instead of polystyrene foam plate, is taken out, is run counter in causing the movement joint that plank sheathing can not be after pouring The original intention of design.
The content of the invention
For above-mentioned the deficiencies in the prior art, the technical problems to be solved by the invention are:How a kind of operation side is provided Method is simple, and preferably, template retracts the construction method of convenient pipe gallery movement joint to the forming quality of prearrangement of deformation amount seam.
In order to solve the above-mentioned technical problem, present invention employs following technical scheme:
A kind of construction method of pipe gallery movement joint, including fixed waterstop is first installed, then Side Template is propped, finally mixed The step of solidifying soil is poured, it is characterised in that when propping Side Template, using following steps:
A, the Side Template for first obtaining following structure, including overall rectangular substrate and parcel polyurethane on the substrate Rubber layer, the thickness of wall where the width of the substrate is more than movement joint to be onstructed;The substrate and the polyurethane rubber The gross thickness of layer is consistent with the width of pipe gallery movement joint;Have on the polyurethane rubber layer of substrate width direction side There is the groove being engaged with the center protrusion portion of waterstop, length direction insertion of the groove along the substrate is set, and makes institute State groove and can be slided from the end of waterstop to middle part and is connected on waterstop;The middle part tool of zig direction side There is the through hole that through substrate and polyurethane rubber layer are set;
When B, concrete operations, first in the groove coating lubricating oil, in the both sides brushing separating powder of Side Template, then by groove by One end of waterstop is directed at the center protrusion portion of waterstop, and the center protrusion for being connected to waterstop is slided along waterstop length direction In portion, after all Side Templates are all connected on waterstop, are passed through, be used in combination from the through hole of base ends using long bolt Bolt is fastened, and all Side Templates are fixed into an entirety.
Using in above-mentioned steps, have reeded Side Template using end, the groove of Side Template be connected on waterstop, Side Template is fixed using the waterstop fixed, is conducive to the installation of Side Template.Because polyurethane rubber has firmly Degree is high, and the good characteristic of intensity, in concreting, will not be damaged under the extruding of concrete, and substrate and polyurethane rubber The gross thickness of layer is consistent with the width of pipe gallery movement joint, is wanted this way it is secured that the width of movement joint meets design Ask, so as to improve the forming quality of movement joint.The thickness of wall where being more than movement joint to be onstructed due to the width of substrate so that Substrate all the time some be located at outside wall, be easy to after construction terminates, template pulled from movement joint.Meanwhile, polyurethane rubber Glue also has the advantages that high resiliency, high-wearing feature and tear-resistant, so, during pulling, and polyurethane rubber layer can occur Deformation, so as to easily depart from concrete layer, it is easy to pull.Polylith Side Template is fixed into an entirety using long bolt, both The use needs of Side Template are disclosure satisfy that, and because monolithic Side Template size is smaller, are easy to carry, operation is more convenient, flexible, Meanwhile, the contact area between the less Side Template of size and concrete is smaller, and active force therebetween is also smaller so that Side Template is more prone to pull from movement joint.
Further, the length of substrate described in the step A is 500mm~1000mm.
Further, the lightening hole of insertion setting is densely covered with described in the step A on the side of substrate thickness direction.
It by the lightening hole of setting, can both mitigate the weight of Side Template, be easily installed operation.Simultaneously as on substrate It is densely covered with lightening hole so that the polyurethane rubber layer being wrapped on substrate, which can permeate, to be filled into lightening hole, so as to strengthen poly- Bond strength between urethane rubber layer and substrate, is prevented during Side Template is pulled, by polyurethane rubber layer from substrate On tear and be detained in movement joint, be conducive to improve construction quality.
Further, a diameter of 5~10mm of lightening hole described in the step A, the spacing of two neighboring lightening hole is 3 ~5mm.
Further, substrate described in the step A is made using aluminum alloy materials.
Aluminium alloy density is low, but intensity is higher, and near or above high-quality steel, plasticity is good.Substrate is made using aluminium alloy, The bulk strength of Side Template can either be ensured, have the weight that can mitigate Side Template, be easy to constructing operation.
In summary, the present invention has operating method simple, and Side Template is retracted conveniently, the forming quality of prearrangement of deformation amount seam Preferably the advantages of.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the Side Template of use the inventive method.
Embodiment
With reference to a kind of embodiment of the Side Template of use the inventive method, the present invention is described in further detail.
During specific implementation:As shown in figure 1, a kind of pipe gallery deformation joint construction Side Template, including it is overall rectangular Substrate 1 and the polyurethane rubber layer 2 being wrapped on the substrate 1, the width of the substrate 1 are more than where movement joint to be onstructed The thickness of wall;The substrate 1 is consistent with the width of pipe gallery movement joint with the gross thickness of polyurethane rubber layer 2.
Using said structure, polyurethane rubber layer is wrapped up on substrate, because polyurethane rubber has hardness high, intensity is good Characteristic, in concreting, will not be damaged under the extruding of concrete, and the gross thickness of substrate and polyurethane rubber layer with The width of pipe gallery movement joint is consistent, this way it is secured that the width of movement joint meets design requirement, so as to improve change The forming quality of shape seam.The thickness of wall where being more than movement joint to be onstructed due to the width of substrate so that substrate has one all the time Part is located at outside wall, is easy to after construction terminates, template is extracted out from movement joint.Meanwhile, polyurethane rubber also has high-elastic Property, high-wearing feature and it is tear-resistant the advantages of, so, in extraction, polyurethane rubber layer can deform so that easily Depart from concrete layer, it is easy to extract out.Simple in construction, the constructing operation convenience of above-mentioned Side Template, retracts easily, is conducive to improving The construction quality of movement joint.
During implementation, there is the center protrusion portion with waterstop on the polyurethane rubber layer 2 of the width side of substrate 1 The groove 3 being engaged, length direction insertion of the groove 3 along the substrate 1 is set, and enables the groove 3 from waterstop End to middle part slide be connected on waterstop.
Due to, it is necessary to first fix waterstop, using said structure, utilizing polyurethane rubber during deformation joint construction Polyurethane rubber layer, quickly can be connected on waterstop, so as to utilize the fixing device of waterstop by the groove on glue-line It is fixed, so as to simplify the positioning of Side Template.Groove can be slided along waterstop length direction so that the construction of Side Template Operate enhanced convenience.
During implementation, the length of the substrate 1 is 500mm~1000mm, and the middle part of length direction side has insertion base The through hole that plate and polyurethane rubber layer are set.
Because pipe gallery is buried in underground, during slope excavation construction, reserved construction width is generally 50- 60cm is wide, and pipe gallery movement joint is generally longer, according to the Side Template of an entirety, model sheetinstallat can be caused not open up Open, lose feasibility.In addition, after concrete setting, the contact area between template and concrete is larger, it is not easy to template Extracted out from movement joint.Using said structure, set logical using the less Side Template of single-block area, and in the end of Side Template Hole, so, it is possible to use the Side Template of fritter is connected into an entirety by stay bolt, can either meet the need of deformation joint construction Ask, bolt can be removed after concrete setting again, the Side Template of fritter is extracted out from movement joint, due to the end mould of fritter Contact area between plate and concrete is smaller so that remove enhanced convenience.
During implementation, the lightening hole of insertion setting is densely covered with the thickness direction side of substrate 1.
Using said structure, it by the lightening hole of setting, can both mitigate the weight of Side Template, be easily installed operation.Together When, due to being densely covered with lightening hole on substrate so that the polyurethane rubber layer being wrapped on substrate, which can permeate, is filled into lightening hole In, so as to strengthen the bond strength between polyurethane rubber layer and substrate, be conducive to improving the reuse life-span of Side Template.
During implementation, a diameter of 5~10mm of the lightening hole, the spacing of two neighboring lightening hole is 3~5mm.
Using said structure, more lightening holes can be arranged in unit area so that polyurethane rubber layer and substrate Between contact area it is bigger, further increase the bond strength of the two.
During implementation, the substrate 1 is made using aluminum alloy materials.
Aluminium alloy density is low, but intensity is higher, and near or above high-quality steel, plasticity is good.Substrate is made using aluminium alloy, The bulk strength of Side Template can either be ensured, have the weight that can mitigate Side Template, be easy to constructing operation.
During concrete operations:The first coating lubricating oil in groove, in the uniform brushing separating powder in the both sides of Side Template, first by groove The center protrusion portion of waterstop is directed at by one end of waterstop, the centre for being connected to waterstop along the slip of waterstop length direction is dashed forward In the portion of rising, passed through with long bolt from the through hole of base ends, then one end is fastened with wing nut and pad, grabbed from the other end Firmly screw rod is pulled outwardly, and the template of the other end is internally moved, is then turned on wing nut and pad, is installing second piece of mould Plate, and wing nut and pad are installed from new, catch screw rod to be pulled outwardly from the other end, the template of the other end is internally moved, Then wing nut and pad are turned on, the 3rd piece of template is then installed, operated repeatedly until all Side Templates are all connected to After on waterstop, fastened at two ends and with wing nut and pad, all Side Templates are fixed into an entirety, finally poured Concrete.After after concrete final set, the wing nut of one end is removed, is catching screw rod to be pulled outwardly end module from one end of dismounting Extracted out from movement joint, extract one piece out and remove one piece, until being completely drawn out, polystyrene foam plate is finally put into deformation Filled in seam.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not limitation, all essences in the present invention with the present invention Any modifications, equivalent substitutions and improvements made within refreshing and principle etc., should be included in the scope of the protection.

Claims (5)

1. a kind of construction method of pipe gallery movement joint, first installs fixed waterstop, then props Side Template, coagulation is finally carried out The step of soil is poured, it is characterised in that when propping Side Template, using following steps:
A, the Side Template for first obtaining following structure, including overall rectangular substrate(1)And it is wrapped in the substrate(1)On Polyurethane rubber layer(2), the substrate(1)Width be more than movement joint to be onstructed where wall thickness;The substrate(1)With The polyurethane rubber layer(2)Gross thickness it is consistent with the width of pipe gallery movement joint;The substrate(1)Width one The polyurethane rubber layer of side(2)It is upper that there is the groove being engaged with the center protrusion portion of waterstop(3), the groove(3)Along institute State substrate(1)Length direction insertion set, make the groove(3)It can slide and be connected to only from the end of waterstop to middle part On water band;The substrate(1)The middle part of length direction side has the through hole that through substrate and polyurethane rubber layer are set;
When B, concrete operations, first in the groove coating lubricating oil, in the both sides brushing separating powder of Side Template, then by groove by One end of waterstop is directed at the center protrusion portion of waterstop, and the center protrusion for being connected to waterstop is slided along waterstop length direction In portion, after all Side Templates are all connected on waterstop, are passed through, be used in combination from the through hole of base ends using long bolt Bolt is fastened, and all Side Templates are fixed into an entirety.
2. the construction method of pipe gallery movement joint as claimed in claim 1, it is characterised in that base described in the step A Plate(1)Length be 500mm~1000mm.
3. the construction method of pipe gallery movement joint as claimed in claim 1, it is characterised in that base described in the step A Plate(1)The lightening hole of insertion setting is densely covered with thickness direction side.
4. the construction method of pipe gallery movement joint as claimed in claim 3, it is characterised in that subtract described in the step A A diameter of 5~10mm of repeated hole, the spacing of two neighboring lightening hole is 3~5mm.
5. the construction method of pipe gallery movement joint as claimed in claim 3, it is characterised in that base described in the step A Plate(1)Made using aluminum alloy materials.
CN201710267373.9A 2017-04-21 2017-04-21 A kind of construction method of pipe gallery deformation joint Active CN107059922B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710267373.9A CN107059922B (en) 2017-04-21 2017-04-21 A kind of construction method of pipe gallery deformation joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710267373.9A CN107059922B (en) 2017-04-21 2017-04-21 A kind of construction method of pipe gallery deformation joint

Publications (2)

Publication Number Publication Date
CN107059922A true CN107059922A (en) 2017-08-18
CN107059922B CN107059922B (en) 2018-11-27

Family

ID=59603337

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710267373.9A Active CN107059922B (en) 2017-04-21 2017-04-21 A kind of construction method of pipe gallery deformation joint

Country Status (1)

Country Link
CN (1) CN107059922B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235497A (en) * 2018-11-02 2019-01-18 中国十七冶集团有限公司 A kind of fixed structure and its construction method of the external labeling type waterstop for piping lane gap location
CN113914362A (en) * 2021-09-30 2022-01-11 国网北京市电力公司 Shape memory alloy driving fiber reinforced polymer material, and preparation method and application thereof
CN114775689A (en) * 2022-06-08 2022-07-22 山东汇通建设集团有限公司 Pipe gallery water stop belt construction device and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09279616A (en) * 1996-04-18 1997-10-28 Nishikawa Rubber Co Ltd Pipe connecting device for manhole with invert
CN101691739A (en) * 2009-08-31 2010-04-07 天津市水利科学研究院 Composite type self-adhesion water stop band, manufacturing method and construction method
CN102817382A (en) * 2012-08-30 2012-12-12 苏州市建筑科学研究院有限公司 Repair constructing method of basement deformation joint leakage
CN103669292A (en) * 2013-12-24 2014-03-26 河南省水利勘测设计研究有限公司 Concrete joint water stop structure and construction method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09279616A (en) * 1996-04-18 1997-10-28 Nishikawa Rubber Co Ltd Pipe connecting device for manhole with invert
CN101691739A (en) * 2009-08-31 2010-04-07 天津市水利科学研究院 Composite type self-adhesion water stop band, manufacturing method and construction method
CN102817382A (en) * 2012-08-30 2012-12-12 苏州市建筑科学研究院有限公司 Repair constructing method of basement deformation joint leakage
CN103669292A (en) * 2013-12-24 2014-03-26 河南省水利勘测设计研究有限公司 Concrete joint water stop structure and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235497A (en) * 2018-11-02 2019-01-18 中国十七冶集团有限公司 A kind of fixed structure and its construction method of the external labeling type waterstop for piping lane gap location
CN113914362A (en) * 2021-09-30 2022-01-11 国网北京市电力公司 Shape memory alloy driving fiber reinforced polymer material, and preparation method and application thereof
CN113914362B (en) * 2021-09-30 2023-11-14 国网北京市电力公司 Shape memory alloy driven fiber reinforced polymer material, and preparation method and application thereof
CN114775689A (en) * 2022-06-08 2022-07-22 山东汇通建设集团有限公司 Pipe gallery water stop belt construction device and construction method thereof

Also Published As

Publication number Publication date
CN107059922B (en) 2018-11-27

Similar Documents

Publication Publication Date Title
CN107401207B (en) The construction method of drainage pipeline
CN108914965B (en) Continuous construction method of aluminum alloy template for comprehensive pipe gallery
CN107059917B (en) Split component prefabricated comprehensive pipe gallery and construction method thereof
CN107059922A (en) A kind of construction method of pipe gallery movement joint
CN103422674A (en) Cast-in-place section concrete construction method of assembling-type concrete structure
CN204000965U (en) The discontinuous vibration isolation empty well structure that subtracts of a kind of railway
CN103233476A (en) Deep foundation pit supporting structure as well as construction method and demolishing method thereof
CN111878095A (en) Construction method for existing underground structure of newly-built channel connection without reserved interface
CN208380578U (en) Precast construction in a kind of roads and tunnels
CN102352690B (en) Construction method of anti-floating locating system of cast-in-place concrete hollow floorslab steel tube
CN205135661U (en) Support frame is pour to tunnel secondary
CN108505411B (en) Structure for tunnel cement concrete pavement and laying method
CN112962590B (en) Large-diameter cast-in-situ thin-wall prestressed concrete steel pipe pile and construction method thereof
CN206769180U (en) A kind of shaped steel hole prefabricated section through walls
CN206693269U (en) A kind of pipe gallery deformation joint construction Side Template
CN104563497A (en) Novel beam slab supported construction method
CN207905825U (en) A kind of circular cross section tunnel lining construction device three times
CN206328777U (en) A kind of prefabricated piping lane suitable for narrow construction site
CN109083165B (en) Use method of foaming self-breaking cement mortar in anchoring section of anchor rod or anchor cable
CN103132517A (en) Ground source heat energy anchor rod with expansion heat exchanger and construction method
CN111333390A (en) Concrete prefabricated hollow column and production method thereof
CN206752474U (en) A kind of foundation pit steel support bracket pre-embedded device
CN107304566B (en) A kind of detachable soil nailing wall board structure
CN109667278A (en) Tower crane anti-cracking and seepage control construction method is set under underground garage isolated footing
CN210342674U (en) I-steel wall-penetrating hole-reserving die

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant