CN1070558C - Steam ironing means - Google Patents

Steam ironing means Download PDF

Info

Publication number
CN1070558C
CN1070558C CN96101522A CN96101522A CN1070558C CN 1070558 C CN1070558 C CN 1070558C CN 96101522 A CN96101522 A CN 96101522A CN 96101522 A CN96101522 A CN 96101522A CN 1070558 C CN1070558 C CN 1070558C
Authority
CN
China
Prior art keywords
water
storage tank
vaporizer
water storage
pump installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN96101522A
Other languages
Chinese (zh)
Other versions
CN1154427A (en
Inventor
下坂喜一
清水政雄
松尾敦志
赤井德明
小林伸一郎
藤本洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Holdings Corp
Original Assignee
Matsushita Electric Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Matsushita Electric Industrial Co Ltd filed Critical Matsushita Electric Industrial Co Ltd
Priority to CN96101522A priority Critical patent/CN1070558C/en
Publication of CN1154427A publication Critical patent/CN1154427A/en
Application granted granted Critical
Publication of CN1070558C publication Critical patent/CN1070558C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The present invention relates to a steam iron which is provided with a pump device which is used for ejecting increased steam. A discharge opening 36 of the pump device 32 and a nozzle part 28 which is opened or closed by an opening and closing device 29 are arranged on a member 27b at the bottom of a water storage tank, and a cover body 39 which is arranged at one side of outlets of the discharge opening 36 and the nozzle part 28 is fixed and covered on the lower side surface of the member 27b at the bottom of the water storage tank. The cover body 39 and the member 27b at the bottom of the water storage tank form a water passage, which causes an opening part 41 arranged on the cover body 39 to be connected with a water guiding passage 43 which is communicated to a vaporizing chamber 23. The water storage tank and the vaporizing chamber are reliably connected in a water tightness way, and water can be smoothly supplied to the vaporizing chamber from the water storage tank.

Description

Steam generating iron
The present invention relates to supply moisture such as clothes, to press the steam generating iron of gauffer.
Traditional this steam generating iron for example discloses shown in 1985 No. 129095 communique as Japanese patent of invention, and its structure as shown in Figure 8.That is, be provided with vaporizer 3 on the base 2 by heater 1 heating, make the water in the water storage tank 4 splash into vaporizer 3 and spray steam from spray nozzle part 5, spray nozzle part 5 carries out opening and closing by the headstock gear 7 by 6 operations of steam button.
In order to improve the gauffer ironing effect of ironed clothes, be provided with pump installation 8, can be temporary to a large amount of water of vaporizer 3 coercively feds, make the ejection of increment steam.
But this traditional structure is because being located at the spray nozzle part 5 and the pump installation 8 of water storage tank 4 is to combine with vaporizer 3 respectively separately, so have seal structure complex and be difficult to prevent the long-term problem of using the joint portion, back to leak.
In addition, after heater 1 energising, before vaporizer 3 also do not reach the gasification temperature of water, if user's maloperation steam button 6, open spray nozzle part 5 and bring into use, the water that then splashes into vaporizer 3 does not evaporate and flows out with the state of hot water, can pollute clothes.
In addition, when the frequent pump installation 7, vaporizer 3 of using in the flatiron operation is cooled to the gasification temperature of water when following rapidly because of water,,, the water that vaporizer can occur supplying with flows out the problem of pollution clothes thereby not evaporating with the state of hot water with above-mentioned the same.
In addition, if forgotten shut-off nozzle portion 5 under water storage tank 4 internal memories leave the state of water after using, the problem that vaporizer 3 makes it to corrode of can bleeding of water storage tank 4 interior water in the keeping process can take place then.
In order to solve the problem of above-mentioned existence, for example can adopt as Japanese patent of invention and disclose the steam generating iron shown in the communique 1986 No. 263493.Specifically as shown in Figure 9, on the penstock 9 that connects water storage tank 4 and vaporizer 3, thermal response valve gear 10 is set, when vaporizer 3 was heated to the gasification temperature of water, bimetallic 11 predicted the heat of base 2 and upwards upset, thermal response valve gear 10 is upwards pushed away and opens penstock 9.
Have again, on penstock 9, be provided with pump installation 12, this pump installation 12 is supplied to vaporizer 3 to a large amount of water by operating portion 13 being moved up and down, the water in the water storage tank 4 are discharged to vaporizer 3 one sides of penstock 9 again after penstock 9 being introduced in the cylinder bodies 14, and the increment steam is sprayed.
In addition, keep pressing to the state of below by the operating portion 13 that makes this pump installation 12, can close penstock 9, stop to supply with water to vaporizer 3 from water storage tank 4, simultaneously, keep pushing to the state of top, can open penstock 9 by making operating portion 13, water is supplied to vaporizer 3, makes common steam ejection.
Aforesaid formation, its structure is subjected to must be the restriction of the water out of water storage tank and pump installation 12 and thermal response valve gear 10 staggered positions configuration in the horizontal direction, so, penstock 9 exports the distance of extending along the upper side of base 2 from entering the mouth to very long, therefore, exist from the keying of carrying out penstock 9 operate the steam ejection, stop till the time stagger, the problem of bad response.
In addition, if use stopping to spray under the state of steam, then temperature is too high because penstock 9 is subjected to from the heat of base 2, so, if from then on state allows water flow into penstock 9 for making steam ejection, bubble that water seethe with excitement penstock 9 in, produces then can take place be trapped in the penstock 9 and stop up the smooth and easy mobile of narrow penstock 9, obstruction water and can not spray the problem of stable steam.
In addition, because carry out the operation that steam sprays and stops by an operating portion 13, and the operation that makes the ejection of increment steam, but so though the advantage of simplified structure is arranged, but there is following problem in its reverse side, that is, and and when making pump installation 12 actions, if mistakenly operating portion 13 is pushed away more than the ormal weight, then can switch to the halted state of steam mistakenly downwards.
If address the above problem and be provided with and prevent to press down because of carelessness the suitable restraint device of using more than the ormal weight, when steam is stopped, must overcoming this restraint device with strong pushing force to operate, so aspect ease of use, there is conflicting problem.
Again, when the thin of the head portion ironing clothes that utilizes base 2, the state that is difficult to see clothes for sight line is not covered by the front portion of flatiron body for example can adopt as Japanese patent of invention discloses described, the structure as shown in figure 10 of communique 1991 No. 295597.
That is,, reduce the tilt angle alpha of the bottom surface of relative base 2 by the leading flank of water storage tank 15 being made circular-arc and being tilted greatly backward, when improving flatiron to the visuality of clothes.
But, because when constituting like this, the water filling port 16 that injection water is used in water storage tank 15 also is obliquely installed along leading flank, so there are the following problems: when water storage tank 15 is taken off when injecting water from the flatiron body, if make 16 one-tenth levels of water filling port, then water storage tank 15 tilts and is difficult to keep, and water storage tank 15 is vertically stable to be kept if allow, then water filling port 16 tilts greatly, is difficult to water filling.
In addition, when in the use when adding water with empty water storage tank 15, and after using when staying water in the water storage tank 15 and pour out etc., water storage tank 15 when the flatiron body that is heated to high temperature takes off, or when water storage tank 15 packed into the flatiron body, hand is run into the front portion of covering base lid 17 2 upper sides, that be in the condition of high temperature easily, does not note just may scalding.
In order to eliminate the problem that above-mentioned prior art exists, steam generating iron easy to use is provided, and the 1st purpose of the present invention is, the watertight of water storage tank and vaporizer is connected reliably, simultaneously water is supplied to vaporizer swimmingly from water storage tank, to obtain good steam and increment steam.
The 2nd purpose of the present invention is, steam is reliably stopped improving the flatiron processing effect of clothes.The 3rd purpose of the present invention is, improve steam ejection, stop and the operability of increment steam.The 4th purpose of the present invention is, when improving flatiron to the visuality of clothes, and convenient water filling to water storage tank.The 5th purpose of the present invention is, the security when improving the loading, unloading water storage tank.
In order to reach above-mentioned the 1st purpose, the 1st problem solution of the present invention is a kind of steam generating iron, comprise: by the base of heater heating, be formed on this base, produce the vaporizer that steam is used, be located at described base top and the handle of hand grip portion is arranged, be located at described base top and combine with described vaporizer watertightness, store the water storage tank of the water of supplying with described vaporizer, be located at the spray nozzle part of this water tank bottom, open, close this spray nozzle part, control is supplied the water of described vaporizer, but the headstock gear that easy on and off moves, operate first operating portion of this pump installation, the water that described water storage tank is stored is supplied to vaporizer, the pump installation that the increment steam is taken place, and second operating portion of operating this pump installation, and, cover the outlet of described pump installation and the outlet side of described spray nozzle part by lid, and below water storage tank, form aquaporin, be provided with the peristome that is connected with described vaporizer side at described lid simultaneously by described water storage tank and lid.
In order to reach above-mentioned the 1st purpose, the 2nd problem solution of the present invention is, in the steam generating iron of the 1st problem solution, also be provided with the peristome and the vaporizer that are connected at lid, penstock with the guiding of the water in described water storage tank vaporizer with water out, and, when described vaporizer is heated to the gasification temperature of water, open described penstock and make water flow to the thermal response valve gear of described vaporizer through described aquaporin, and described thermal response valve gear is configured in the portion of confluxing of the water that flows out from the outlet and the spray nozzle part of pump installation between the water out from described water storage tank.
In addition, the 3rd problem solution of the present invention is, does the peristome diameter in the 1st problem solution greatlyyer than the hole diameter of spray nozzle part, makes described opening simultaneously under nozzle.
In addition, the 4th problem solution of the present invention is, the downstream of the peristome in the 1st problem solution is provided with the penstock that leads to vaporizer, simultaneously the thermal response valve gear of opening described penstock when vaporizer is heated to gasification temperature is being set below the described peristome.
In order to reach above-mentioned the 2nd purpose, the 5th problem solution of the present invention is, use the outlet of the pump installation that the closed check valve of the tubular that is made of flexible material communicates with aquaporin, and support this check valve, from the described outlet of aquaporin side closure by the lid that constitutes described aquaporin.
The present invention's the 6th problem solution is to the check valve in the 5th problem solution, to carry out clamping with the water tank bottom member and the lid that constitute water tank bottom.
In order to reach above-mentioned the 3rd purpose, the 7th problem solution of the present invention is, first operating portion of the described headstock gear of operation and second operating portion of operating described pump installation are set up in parallel in the direction that the hand grip portion direction with handle intersects, simultaneously the area of the top operating surface of described second operating portion are set at area greater than the top operating surface of described first operating portion.
In order to reach above-mentioned the 4th purpose, the 8th problem solution of the present invention is, upper front part at described water storage tank is equipped with water filling portion, and be provided with water filling port at this water filling portion leading flank, front end at the water storage tank upper component that constitutes described water storage tank top is formed with protuberance, this protuberance more forwards stretches out than the lower end of described water filling portion, is provided with depression simultaneously between described protuberance and water filling portion.
In order to reach above-mentioned the 5th purpose, the 9th problem solution of the present invention is, extend downwards and the protuberance that forms covers the upper side and the two sides of described lid front portion with the front portion that makes described water storage tank, simultaneously described protuberance is located at than the lower position of water tank bottom member that constitutes described water tank bottom.
By adopting above-mentioned the 1st problem solution, water that drips from spray nozzle part and the water of discharging from pump installation can be supplied to vaporizer one side from a peristome, can make vaporizer and water storage tank realize sealing combination reliably.
By adopting above-mentioned the 2nd problem solution, even utilizing in the thermal response valve gear cuts out penstock, also can make the pump installation action, can make simultaneously the water that enters in the penstock not supply with vaporizer, but return in the water storage tank, and can use the water washer jet portion of pressurizeing by pump installation by the aperture of spray nozzle part.
In addition, by adopting above-mentioned the 3rd problem solution, the water that drips from spray nozzle part can not rest on and be supplied to the vaporizer side in the aquaporin, can improve the gasification response performance when using steam.
In addition,, can shorten to the length of the penstock of vaporizer, can prevent that the water generation in the penstock is overheated, eliminate the generation of bubble by adopting above-mentioned the 4th problem solution.
In addition, by adopting above-mentioned the 5th problem solution, can prevent that the vibration and the collision that produce because of flatiron from causing check valve to be opened, and when using, can prevent that the water in the pump installation from escaping to vaporizer through aquaporin under the state of shut-off nozzle portion.
In addition, by adopting above-mentioned the 6th problem solution, the water of discharging to pressing down check valve can the flow of water spread in aquaporin strong, rinses out the impurity in the aquaporin.
In addition, by adopting above-mentioned the 7th problem solution, can be the roughly equidistant configuration of the hand grip portion of first and second operating portions and handle, the displacement of finger in the time of reducing operation, and can alleviate move up and down repeatedly operation make the pump installation action time the burden of finger.
In addition,, can make the angle of inclination of the angle of inclination of water filling portion greater than lid by adopting above-mentioned the 8th problem solution, can be under the condition of not damaging the clothes visuality, the operation convenience when improving water filling.
In addition; by adopting above-mentioned the 9th problem solution, can be by because of the water that is stored in the water storage tank keep the protuberance of low temperature to protect lid, the exposing surface that reduces the lid front portion is long-pending; in the time of preventing to carry out the loading, unloading operation of water storage tank, the operator runs into lid because of carelessness.
Brief description:
Fig. 1 is the pith cutaway view of steam generating iron one embodiment of the present invention.
Fig. 2 is the pith cutaway view of the water storage tank of the invention described above steam generating iron.
Fig. 3 is the pith vertical view of the base of the invention described above steam generating iron.
Fig. 4 is the cutaway view along the A-A line of the base of the invention described above steam generating iron.
Fig. 5 is the pith vertical view of the invention described above steam generating iron.
Fig. 6 is the side view of the invention described above steam generating iron.
Fig. 7 is the pith cutaway view of other embodiment of steam generating iron of the present invention.
Fig. 8 is the pith cutaway view of traditional steam generating iron.
Fig. 9 is the pith cutaway view of traditional other steam generating irons.
Figure 10 is the pith cutaway view of traditional other steam generating irons.
Following with reference to description of drawings one embodiment of the present of invention.
In Fig. 1-Fig. 6, the 20th, by the base of heater 21 heating, be formed with the vaporizer 23 that covers with gasification chamber cap 22.The 24th, cover the lid that the heat stable resin of a top side of described base 20 is made, the upper back of this lid 24 is equipped with the handle that is provided with hand grip portion 25 26 of fore-and-aft direction.
The 27th, the water storage tank of the water of described vaporizer 23 is supplied with in storage, can be installed on the described lid 24 with freely loading and unloading, and handle 26 is provided with installment state that keeps this water storage tank and the locking device (not shown) that can unlock.
In addition, the water tank bottom member 27b of the bottom that this water storage tank 27 has the water storage tank upper component 27a that constitutes its top, constitute water storage tank 27 and the 27c of water filling portion that is installed in the front upper of water storage tank upper component 27a are provided with on the leading flank of the 27c of this water filling portion water are injected the water filling port 27d that uses in the water storage tank 27.
Front end at water storage tank upper component 27a is provided with the protuberance 27e that stretches out more forward than the lower end of the 27c of water filling portion, is provided with depression 27f between this protuberance 27e and the 27c of water filling portion.This depression 27f is actually that difference by the tilt angle alpha 1 of the relative base of protuberance 27e 2 bottom surfaces and the tilt angle alpha 2 of the water filling portion 27c bigger than this α 1 forms.
In addition, this protuberance 27e is from the upper side and the two sides of outer side covers lid 24 front portions, and makes it downward-sloping so that lid 24 to expose the side anterior and diminish gradually along with trend, protuberance 27e is located at the lower position than water tank bottom member 27b.
The 28th, be located at the spray nozzle part of water tank bottom member 27b, aperture 28a is arranged on it, make the water in the water storage tank 27 go into vaporizer 23 1 sides by this aperture 28a with the minim of regulation.This spray nozzle part 28 is to constitute with materials such as metal, pottery and resin, and by ultrasonic bonding, produced by insert molding or clip seal and be fixed on the water tank bottom member 27b with screw with twisting solid etc. conventional method watertightness.In addition, also can on water tank bottom member 27b, directly offer aperture 28a.
The 29th, but lower end and described spray nozzle part 28 relative to and the headstock gear that moves of easy on and off, be subjected to the active force that makes progress of spring 30, and the operation of manually carrying out up and down by first operating portion 31 that constitutes by the steam button, opening and closing spray nozzle part 28, control is to the supply of the water of vaporizer 23.
In addition, this first operating portion 31 protrudes on the water storage tank 27, by being loaded on the ratchet spline mechanism in the 27c of water filling portion, can keep the closed condition and the opening of spray nozzle part 28.
The 32nd, the pump installation that the water in the water storage tank 27 are supplied to vaporizer, the increment steam is produced, by being located at the reciprocating motion of the piston 34 in the cylinder body 33, the water in the water storage tank 27 is sucked and discharges from the outlet 36 that is opened on water tank bottom member 27b from suction inlet 35.Second operating portion 37 that described piston 34 usefulness protrude on the water storage tank 27 carries out manual operation, and applies active force upwards by spring 38.
The 39th, cover the outlet side of the outlet 36 of pump installation 32 and spray nozzle part 28 and be fixed on lid on the water tank bottom member 27b, and form aquaporin 40 between the described water tank bottom member 27b, and under spray nozzle part 28, being provided with peristome 41 towards vaporizer 23, the diameter of this peristome 41 is arranged to bigger than the diameter of the aperture 28a of spray nozzle part 28.
The 42nd, relative with the outlet 36 of pump installation 32 check valve of being located in the aquaporin 40 has been made bottom tube-like by flexible material, and by water tank bottom member 27b and lid 39 clampings.
First operating portion 31 of described headstock gear and second operating portion 37 of pump installation 32 are disposed at the direction that the direction with the hand grip portion 25 that extends at the fore-and-aft direction of flatiron intersects side by side, and make the area of the area of the smooth operating surface 37a that is located at second operating portion, 37 tops greater than the smooth operating surface 31a that is located at first operating portion, 31 tops.
The 43rd, connection opening portion 41 and vaporizer 23, the water in the water storage tank 27 are guided into the penstock of vaporizer 23, be arranged on the supporting mass 44 that is installed on the base 20, be disposed at the spatial portion that is formed between base 20 and the lid 24, when water storage tank 27 is installed, by the bottom surface, top of facing lid 24 and the seal 45 that is fixed on base 20 1 sides, be connected with peristome 41 watertightnesses of lid 39.
The 46th, be located at the thermal response valve gear of penstock 43, it opens and closes penstock 43 with the action interlock of the bimetallic 47 that can free be located at base 20 turningly, be configured in the below of peristome 41, when vaporizer 23 is heated to the gasification temperature of water, be moved upward and open penstock 43, when gasification temperature is following, move downwards and close penstock 43.
The below effect of explanation the foregoing description.At first, when to heater 21 energising, when vaporizer 23 is heated to the gasification temperature of water, bimetallic 47 overturns upward, makes thermal response valve gear 46 displacement upward, opens penstock 43, and water storage tank 27 and vaporizer 23 are connected.
At this, if operation first operating portion 31 is opened spray nozzle part 28, the water that then is stored in the water storage tank 27 flows into vaporizer 23 again from aperture 28a in peristome 41 splashes into penstock 43, and the gasification back is from steam hole 48 ejection steams.
When making steam stop to spray, come shut-off nozzle portion 28, can stop to supply with water, can respond mutually, switch rapidly with the operation of first operating portion 31 to vaporizer 23 by operating first operating portion 31.
When will when clothes is supplied with a large amount of water, making pump installation 32 actions by second operating portion 37 is moved up and down.By the reciprocating motion of piston 34, the water in the cylinder body 33 overcome the active force of the check valve 42 of closing outlet 36 and this check valve 42 are pushed away downwards, outlet 36 surging pour in aquaporin 40 in of water from having opened.
The water that is discharged to aquaporin 40 enters penstock 43 from aquaporin 40 through peristome 41, flows into vaporizer 23, produces a large amount of steams, so, from steam hole 48 ejection increment steams.This increment steam is relevant with the temperature decline of vaporizer 23, can continue official hour by the operation of second operating portion 37.
When the temperature of vaporizer 23 drops to the gasification temperature of water when following, bimetallic 47 predicts this temperature and produces downward rotary movement, and closes penstock 43 by thermal response valve gear 46.At this state, even make pump installation 32 actions, water can not be supplied to vaporizer 23 yet, and the water that is discharged to aquaporin 40 oppositely flows back in the water storage tank 27 from the downstream through the aperture 28a of spray nozzle part 28.
At this moment, attached on spray nozzle part 28 upper sides, with common from the slow-flowing stream inexpungible rubbish of water storage tank 27 1 sides by aperture 28a etc., also can make water pass through aperture 28a strong by utilizing pump installation 32 from the opposite direction flow of water, it is removed easily, can make under the water droplet to all-the-time stable.
Like this, can both be supplied to vaporizer 23 through peristome 41, can simplify and being connected of vaporizer 23 1 sides, guarantee watertightness combination reliably from the water of two different parts of water storage tank 27.
Again because thermal response valve gear 46 is located at the below of peristome 41,, can shorten along the length of the penstock 43 of the upper side extension of base 20 so the water by this thermal response valve gear 46 can be supplied to vaporizer 23 immediately.
In addition, because the check valve 42 that is oppositely arranged with the outlet 36 of pump installation 32 is the active forces that constitute and be subjected to closing direction with the flexible material of making tubular, so, can not open because of vibration and collision that when flatiron produces, when under spray nozzle part 28 closed conditions, using, water in the cylinder body 33 aquaporin 40 that bleeds can be prevented, the halted state of steam can be reliably kept.
Fig. 7 shows other embodiment of the present invention.Wherein the part identical with first embodiment put on identical symbol, and omitted its explanation.As shown in the figure, the water storage tank 27 that present embodiment need not freely load and unload, and use the water storage tank 51 that constitutes by handle 49 and cover cap 50 with its replacement.
Promptly, fixing lid 39 on the downside of cover cap 50, so that cover the outlet 36 of pump installation 32 and the outlet side of spray nozzle part 28, between this lid 39 and cover cap 50, form aquaporin 40, and the peristome 41 that leads to vaporizer 23 be located at spray nozzle part 28 under.
This embodiment is also the same with the foregoing description, can both be supplied to vaporizer 23 through peristome 41 from the water of two different parts of water storage tank 51, can simplify and being connected of vaporizer 23 1 sides, and guarantees watertightness combination reliably.
Certainly, present embodiment also can be used penstock 43 connection opening portions 41 and vaporizer 23, and opens and closes this penstock 43 by thermal response valve gear 46.
As mentioned above, steam generating iron of the present invention, comprise: by the base of heater heating, be formed at the vaporizer of this base, be located at the handle of described base top, store the water storage tank of the water of supplying with described vaporizer, be located at the spray nozzle part of this water tank bottom, open, close this spray nozzle part, control is to the headstock gear of the water supply of described vaporizer, the water that described water storage tank is stored is supplied to vaporizer in a large number, the pump installation that the increment steam is taken place, and, cover the outlet side of this pump installation and described spray nozzle part and below water storage tank, form aquaporin, be provided with the lid of the peristome that is connected with described vaporizer side simultaneously, therefore, the water that drips from spray nozzle part and can both supply with through the peristome that leads to vaporizer from the water that pump installation is discharged can reduce and the seal junction of vaporizer, makes the watertightness combination reliably of water storage tank and vaporizer, simultaneously can be supplied to vaporizer to the water in the water storage tank swimmingly, make its ejection good steam and increment steam.
In addition, steam generating iron of the present invention, because comprise: by the base of heater heating, be formed at the vaporizer of this base, be located at the handle of described base top, store the water storage tank of the water of supplying with described vaporizer, be located at the spray nozzle part of this water tank bottom, open, close this spray nozzle part, control is to the headstock gear of the water supply of described vaporizer, the water that described water storage tank is stored is supplied to vaporizer in a large number, the pump installation that the increment steam is taken place, be provided with penstock with the water out of the guiding of the water in described water storage tank vaporizer, and, when described vaporizer is heated to the gasification temperature of water, open described penstock and make the logical thermal response valve gear of current, and described thermal response valve gear is configured in the portion of confluxing of the water that flows out from pump installation and spray nozzle part between the water out, therefore, in the thermal response valve gear cuts out penstock, even make the pump installation action, also can prevent from water is supplied to vaporizer, and, can make the water that is discharged to penstock return water storage tank by the aperture of spray nozzle part, can utilize water washer jet portion, remove the impurity of attachment removal, prevent to stop up by the pump installation pressurization.
In addition,, make described opening simultaneously under nozzle, can directly be supplied to vaporizer one side to the water that drips from spray nozzle part, can improve the gasification response, steam is sprayed rapidly by doing the peristome diameter greatlyyer than the hole diameter of spray nozzle part.
In addition, by downstream the penstock that leads to vaporizer is set at peristome, simultaneously the thermal response valve gear of opening described penstock when vaporizer is heated to gasification temperature is being set below the described peristome, can shorten the length that penstock exports from entering the mouth to, water in the water storage tank is supplied to vaporizer rapidly, can reliably prevents that the accident of the hot water that maloperation causes from flowing out simultaneously.
In addition, the outlet of the pump installation that communicates with aquaporin by the closed check valve of using the tubular that is made of flexible material in the spray nozzle part closed condition, when promptly doing flatiron, can reliably prevent the steam ejection, can remove the moisture on the ironed clothes at short notice.
In addition, by coming the clamping check valve, when making the pump installation action, can make the water flow of water be diffused in the aquaporin strong with the water tank bottom member and the lid that constitute water tank bottom, clean this aquaporin inside, and can make it to spray all the time stable steam and increment steam.
In addition, steam generating iron of the present invention, because comprise: by the base of heater heating, be formed at the vaporizer of this base, be located at the handle of described base top, store the water storage tank of the water of supplying with described vaporizer, be located at the spray nozzle part of this water tank bottom, open, close this spray nozzle part, control is to the headstock gear of the water supply of described vaporizer, water is supplied to vaporizer in a large number, the pump installation that the increment steam is taken place, operate first operating portion of described headstock gear, and second operating portion of operating described pump installation, and described first operating portion and second operating portion be set up in parallel in the direction that the hand grip portion direction with handle intersects, simultaneously the area of the top operating surface of described second operating portion is set at area greater than the top operating surface of described first operating portion, so, can be the roughly equidistant configuration of the hand grip portion of first operating portion and second operating portion and handle, can reduce the displacement of finger, operate reliably, can alleviate simultaneously the operation that moves up and down repeatedly make the pump installation action time the fatigue of finger, improve operability.
In addition, steam generating iron of the present invention, owing to have base by the heater heating, be formed at the vaporizer of this base, cover the lid of a side above the described base, be located at the handle on the described lid, the water of the described vaporizer of storage supply, the water storage tank that can freely load and unload, be contained in the water filling portion of the upper front part of this water storage tank, and the water filling port of being located at this water filling portion leading flank, and be formed with protuberance at the front end of the water storage tank upper component that constitutes described water storage tank top, and its lower end than described water filling portion is more forwards stretched out, between described protuberance and water filling portion, depression is set simultaneously, so, can in iron process, not damage under the condition of visuality of clothes, keep water storage tank evenly, easily water filling.
In addition, by cover the upper side and the two sides of described lid front portion with the protuberance of being located at water storage tank, simultaneously described protuberance is located at the lower position of water tank bottom member than the bottom that constitutes described water storage tank, careless danger of being scalded can improve security in the time of can reducing to load and unload water storage tank.

Claims (10)

1. steam generating iron, it is characterized in that, comprise: by the base of heater heating, be formed on this base, produce the vaporizer that steam is used, be located at described base top and the handle of hand grip portion is arranged, be located at described base top and combine with described vaporizer watertightness, store the water storage tank of the water of supplying with described vaporizer, be located at the spray nozzle part of this water tank bottom, open, close this spray nozzle part, control is supplied the water of described vaporizer, but the headstock gear that easy on and off moves, operate first operating portion of this pump installation, the water that described water storage tank is stored is supplied to vaporizer, the pump installation that the increment steam is taken place, and second operating portion of operating this pump installation, and, cover the outlet of described pump installation and the outlet side of described spray nozzle part by lid, and below water storage tank, form aquaporin, be provided with the peristome that is connected with described vaporizer side at described lid simultaneously by described water storage tank and lid.
2. steam generating iron according to claim 1 is characterized in that, makes the diameter of described peristome bigger than the diameter of spray nozzle part aperture, makes described opening simultaneously under nozzle.
3. steam generating iron according to claim 1, it is characterized in that, downstream at described peristome is provided with the penstock that leads to vaporizer, simultaneously the thermal response valve gear of opening described penstock when vaporizer is heated to gasification temperature is being set below the described peristome.
4. steam generating iron according to claim 1, it is characterized in that, use the outlet of the pump installation that the closed check valve of the tubular that is made of flexible material communicates with aquaporin, and support this check valve, from the described outlet of aquaporin side closure by the lid that constitutes described aquaporin.
5. steam generating iron according to claim 4 is characterized in that, with the water tank bottom member and the described check valve of lid clamping that constitute water tank bottom.
6. according to each described steam generating iron among the claim 1-5, it is characterized in that, described headstock gear, pump installation and lid are located at water storage tank, and by keeping described water storage tank to the installment state of flatiron body and can remove the locking device of this maintenance, this water storage tank flatiron ontological idea of freedom relatively loads and unloads.
7. steam generating iron according to claim 1, it is characterized in that, also be provided with the peristome that is connected at lid and vaporizer, with the penstock with water out of the guiding of the water in described water storage tank vaporizer, and, when described vaporizer is heated to the gasification temperature of water, open described penstock and make water flow to the thermal response valve gear of described vaporizer through described aquaporin from described water storage tank, and described thermal response valve gear is configured in the portion of confluxing from the water of the outlet of pump installation and spray nozzle part outflow between the water out.
8. steam generating iron according to claim 1, it is characterized in that, first operating portion of the described headstock gear of operation and second operating portion of operating described pump installation are set up in parallel in the direction that the hand grip portion direction with handle intersects, simultaneously the area of the top operating surface of described second operating portion are set at area greater than the top operating surface of described first operating portion.
9. steam generating iron according to claim 1, upper front part at described water storage tank is equipped with water filling portion, and be provided with water filling port at this water filling portion leading flank, front end at the water storage tank upper component that constitutes described water storage tank top is formed with protuberance, this protuberance more forwards stretches out than the lower end of described water filling portion, is provided with depression simultaneously between described protuberance and water filling portion.
10. steam generating iron according to claim 9, it is characterized in that, extend downwards and the protuberance that forms covers the upper side and the two sides of described lid front portion with the front portion that makes described water storage tank, simultaneously described protuberance is located at than the lower position of water tank bottom member that constitutes described water tank bottom.
CN96101522A 1996-01-08 1996-01-08 Steam ironing means Expired - Fee Related CN1070558C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN96101522A CN1070558C (en) 1996-01-08 1996-01-08 Steam ironing means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN96101522A CN1070558C (en) 1996-01-08 1996-01-08 Steam ironing means

Publications (2)

Publication Number Publication Date
CN1154427A CN1154427A (en) 1997-07-16
CN1070558C true CN1070558C (en) 2001-09-05

Family

ID=5117094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN96101522A Expired - Fee Related CN1070558C (en) 1996-01-08 1996-01-08 Steam ironing means

Country Status (1)

Country Link
CN (1) CN1070558C (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7065907B2 (en) * 2002-08-26 2006-06-27 Koninklijke Philips Electronics N.V. Electric steaming device
RU2651499C2 (en) * 2013-01-14 2018-04-19 Конинклейке Филипс Н.В. Hand-held appliance
JP7157947B2 (en) * 2017-12-26 2022-10-21 パナソニックIpマネジメント株式会社 steam ejector

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2072988U (en) * 1990-06-23 1991-03-13 薛金廷 Press iron of steaming electric iron
CN2148090Y (en) * 1992-07-31 1993-12-01 章建义 Input type electric steam spray iron

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2072988U (en) * 1990-06-23 1991-03-13 薛金廷 Press iron of steaming electric iron
CN2148090Y (en) * 1992-07-31 1993-12-01 章建义 Input type electric steam spray iron

Also Published As

Publication number Publication date
CN1154427A (en) 1997-07-16

Similar Documents

Publication Publication Date Title
EP3195783B1 (en) Water cleaning device and cleaner having the same
CN2803368Y (en) Steam generator
KR100966365B1 (en) Container cleaning device, container cleaning method, and tank
JP5148156B2 (en) Substrate cleaning apparatus and substrate cleaning method
CN1203291A (en) Steam iron with spray mist
US5829085A (en) Apparatus and method for repeated, automatic metering of precisely metered quantities of a powdered detergent into water-carrying cleaning machines, in particular household and household washing machines
CN1070558C (en) Steam ironing means
US8904830B2 (en) Front-loading laundry appliance having a steam generator device
KR0159171B1 (en) Steam iron
JP2006314943A (en) Apparatus and method for cleaning vessel
CN1316226A (en) Bowl washing machine
US6854381B2 (en) Steam docking unit of an espresso machine
JPH0638818U (en) Electric hot water storage container
AU4800699A (en) Container with manual pump
US20080295547A1 (en) Device for generating steam in a laundry appliance, and laundry appliance
CN1539369A (en) Exhaust airflow system for surface cleaner
CN113832668B (en) Cleaning treatment agent feeding device, cleaning equipment and control method thereof
JP3166767B2 (en) Steam iron
JPH02191498A (en) Steam iron
US20060049217A1 (en) Tool for hydro cleaner machine suitable for cleaning of surfaces
KR830000392Y1 (en) Blanket body cleaning equipment in printing presses
FR2759394A1 (en) STEAM IRON WITH SIMPLIFIED FILLING WATER TANK
JPH04371126A (en) Tableware washing device
KR0126712Y1 (en) Water jet device of a washing machine
KR200150980Y1 (en) Removable washer tank

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee