CN107054479A - Floor assembly before a kind of Integral forming type SUV - Google Patents

Floor assembly before a kind of Integral forming type SUV Download PDF

Info

Publication number
CN107054479A
CN107054479A CN201710313896.2A CN201710313896A CN107054479A CN 107054479 A CN107054479 A CN 107054479A CN 201710313896 A CN201710313896 A CN 201710313896A CN 107054479 A CN107054479 A CN 107054479A
Authority
CN
China
Prior art keywords
preceding floor
floor upper
installing plate
blast pipe
integral forming
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710313896.2A
Other languages
Chinese (zh)
Inventor
徐忠浪
董炜江
杨波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEFEI EVER-WIN MACHINERY Co Ltd
Original Assignee
HEFEI EVER-WIN MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEFEI EVER-WIN MACHINERY Co Ltd filed Critical HEFEI EVER-WIN MACHINERY Co Ltd
Priority to CN201710313896.2A priority Critical patent/CN107054479A/en
Publication of CN107054479A publication Critical patent/CN107054479A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B62LAND VEHICLES FOR TRAVELLING OTHERWISE THAN ON RAILS
    • B62DMOTOR VEHICLES; TRAILERS
    • B62D25/00Superstructure or monocoque structure sub-units; Parts or details thereof not otherwise provided for
    • B62D25/20Floors or bottom sub-units

Abstract

The present invention relates to technical field of automobile parts, more particularly, to floor assembly before a kind of Integral forming type SUV, including preceding floor body, centre gangway is provided with the preceding floor body position of center line, centered on the centre gangway in left and right distribution be successively preceding floor upper left frame beam and preceding floor upper right crossbeam, the left back installing plate of left front seat and right front seat it is right after installing plate, the left front hook of blast pipe and the right front hook of blast pipe, hand braking wire drawing guide pin bushing is provided between the preceding floor upper left frame beam and the preceding floor upper right crossbeam.The present invention will need the left and right front beam that punching press makes respectively originally, be converted to the preceding floor assembly of global formation, so just can be by the more than ten road punching presses needed originally and the work of hundreds of road welding sequences completions, and now tapering to can be completed by a few road stamping procedures.This structure can farthest lower production cost and improve production efficiency, and in addition, monolithic construction intensity will be significantly larger than package assembly.

Description

Floor assembly before a kind of Integral forming type SUV
Technical field
The present invention relates to technical field of automobile parts, more particularly, to floor assembly before a kind of Integral forming type SUV.
Background technology
Floor assembly is that metal plate is welded to form part before existing SUV, by suspension spot welding, plants welding machine, the spelling that artificial operation is completed Weld product;Preceding floor assembly is related to the use of mould, fixture, cubing, working position apparatus, and wherein fixture amounts to 15 pairs, passes through flowing water Line operation 292 solder joints of welding complete total member welding.It is last to carry out 19 by planting weldering post and plant weldering nail operations, production cost compared with Height, the wasting of resources is larger, reduces the whole economic efficiency of enterprise.
The content of the invention
It is an object of the invention to provide floor assembly before a kind of Integral forming type SUV, in order to solve the above technical problems, this Invention is adopted the following technical scheme that:
Floor assembly before a kind of Integral forming type SUV, including preceding floor body, described preceding floor body position of center line are provided with Centre gangway, in left and right distribution is that preceding floor upper left frame beam and preceding floor upper right are horizontal successively centered on the centre gangway The left front hook of installing plate, blast pipe and the right front hook of blast pipe after the left back installing plate of beam, left front seat and right front seat are right, in institute State and hand braking wire drawing guide pin bushing is provided between preceding floor upper left frame beam and the preceding floor upper right crossbeam.
Compared with prior art, beneficial effects of the present invention are:
Floor assembly before a kind of Integral forming type SUV of the present invention, the left and right front beam that punching press makes respectively will be needed originally, turned The preceding floor assembly of global formation is changed to, just the more than ten road punching presses needed originally and hundreds of road welding sequences can so be completed Work, now tapering to can be completed by a few road stamping procedures.This structure can farthest reduce production cost and improve life Efficiency is produced, in addition, monolithic construction intensity will significantly larger than assemble the structure on preceding floor.
Brief description of the drawings
Fig. 1 is main structure diagram of the present invention.
Embodiment
Referring to shown in accompanying drawing 1, floor assembly before a kind of Integral forming type SUV, including preceding floor body 1, described preceding The position of center line of plate body 1 be provided with centre gangway 1-1, centered on the centre gangway 1-1 in left and right distribution be successively before Installing plate after floor upper left frame beam 1-2 and preceding floor upper right crossbeam 1-3, the left back installing plate 1-4 of left front seat and right front seat are right 1-5, blast pipe left front hook 1-6 and the right front hook 1-7 of blast pipe, in the preceding floor upper left frame beam 1-2 and the preceding floor Hand braking wire drawing guide pin bushing 1-8 is provided between upper right crossbeam 1-3.Floor assembly before a kind of Integral forming type SUV of the present invention, will be original The left and right front beam that punching press makes respectively is needed, be converted to the preceding floor assembly of global formation, just will can so need originally The work that more than ten road punching presses and hundreds of road welding sequences are completed, now tapering to can be completed by a few road stamping procedures.This structure Production cost can farthest be reduced and production efficiency is improved, in addition, before monolithic construction intensity will be assembled significantly larger than The structure on floor.
It is described above, it is only the preferred embodiments of the present invention, is not the limitation that other forms are done to the present invention, Any those skilled in the art are changed or are modified as equivalent variations possibly also with the technology contents of the disclosure above Equivalent embodiment.But, every without departing from the present invention program content, the technical spirit according to the present invention is done to above example Any simple modification, equivalent variations and remodeling, still fall within protection scope of the present invention.

Claims (1)

1. floor assembly before a kind of Integral forming type SUV, including preceding floor body, it is characterised in that:In the preceding floor body Position of center line be provided with centre gangway, centered on the centre gangway in left and right distribution be successively preceding floor upper left frame beam and Installing plate, the left front hook of blast pipe and blast pipe after preceding floor upper right crossbeam, the left back installing plate of left front seat and right front seat are right Right front hook, is provided with hand braking wire drawing guide pin bushing between the preceding floor upper left frame beam and the preceding floor upper right crossbeam.
CN201710313896.2A 2017-05-05 2017-05-05 Floor assembly before a kind of Integral forming type SUV Pending CN107054479A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710313896.2A CN107054479A (en) 2017-05-05 2017-05-05 Floor assembly before a kind of Integral forming type SUV

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710313896.2A CN107054479A (en) 2017-05-05 2017-05-05 Floor assembly before a kind of Integral forming type SUV

Publications (1)

Publication Number Publication Date
CN107054479A true CN107054479A (en) 2017-08-18

Family

ID=59596656

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710313896.2A Pending CN107054479A (en) 2017-05-05 2017-05-05 Floor assembly before a kind of Integral forming type SUV

Country Status (1)

Country Link
CN (1) CN107054479A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5619784A (en) * 1991-05-10 1997-04-15 Mazda Motor Corporation Vehicle assembling method
KR20020090411A (en) * 2001-05-25 2002-12-05 현대자동차주식회사 center floor panel structure of vehicle
JP2004001668A (en) * 2001-07-30 2004-01-08 Mazda Motor Corp Automobile floor structure and automobile with the floor structure
CN205097930U (en) * 2015-10-28 2016-03-23 北京汽车股份有限公司 Exhaust lifting hook installing support and car
CN105644627A (en) * 2014-12-08 2016-06-08 广州汽车集团股份有限公司 Platform lower automobile body for automobile
CN105667471A (en) * 2016-04-20 2016-06-15 重庆长安汽车股份有限公司 Automobile parking brake mounting bracket structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5619784A (en) * 1991-05-10 1997-04-15 Mazda Motor Corporation Vehicle assembling method
KR20020090411A (en) * 2001-05-25 2002-12-05 현대자동차주식회사 center floor panel structure of vehicle
JP2004001668A (en) * 2001-07-30 2004-01-08 Mazda Motor Corp Automobile floor structure and automobile with the floor structure
CN105644627A (en) * 2014-12-08 2016-06-08 广州汽车集团股份有限公司 Platform lower automobile body for automobile
CN205097930U (en) * 2015-10-28 2016-03-23 北京汽车股份有限公司 Exhaust lifting hook installing support and car
CN105667471A (en) * 2016-04-20 2016-06-15 重庆长安汽车股份有限公司 Automobile parking brake mounting bracket structure

Similar Documents

Publication Publication Date Title
CN201644696U (en) Multi-point rivet-sharing fixture
CN107054479A (en) Floor assembly before a kind of Integral forming type SUV
CN102430654B (en) Bent die of small motor junction box main structure
CN210614951U (en) Movable steel strand bending and clamping combination tool
CN107520531A (en) A kind of puppet mechanism of automatic welding
CN204262640U (en) A kind of tower machine main chord of standard section adapter sleeve integrated positioning Welding device
CN204956504U (en) Framework of a cast joint body structure
CN205763166U (en) A kind of shaped device of inflation type evaporator extension tube attached
CN203853718U (en) Welding fixture for automobile pipe beam side reinforcing plate assembly
CN204052493U (en) A kind of flat steel lateral-bending device
CN208996321U (en) Clear distance control device between a kind of steel mesh
CN102974667A (en) Elbow rough machining device
CN205187664U (en) A balanced davit for deck pipe fitting
CN204673209U (en) A kind of frock clamp being exclusively used in mine backhoe loader walked frame
CN203944777U (en) A kind of square heavy truck nut cold upsetting die of car
CN204295172U (en) Reinforcing ring for automobile skylight welding bracing frame
CN210792924U (en) Novel punching press headrest skeleton
CN207655821U (en) A kind of aluminum alloy forged combination backward extrusion lever apparatus
CN202951826U (en) High-strength aluminum-alloy rivet pressing device
CN205684892U (en) A kind of separator blade spot welding device
CN204975072U (en) Multi -functional forming device
CN208417369U (en) Aluminum barrel damper
CN201752823U (en) Angle welding machine for double guide wheel
CN205852097U (en) Steel tower iron fitting intelligence automatic soldering device
CN207925865U (en) Foot-operated copper wire docks cold welding device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 230601 intersection of Tiandu road and Tang Kou Road, Hefei economic and Technological Development Zone, Anhui, China

Applicant after: HEFEI YIHENG INTELLIGENT TECHNOLOGY CO.,LTD.

Address before: 230601 intersection of Tiandu road and Tang Kou Road, Hefei economic and Technological Development Zone, Anhui, China

Applicant before: HEFEI YI-HENG MACHINERY CO.,LTD.

SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170818