CN107045517A - The method that new energy manufacturing operation analyzes integral system - Google Patents
The method that new energy manufacturing operation analyzes integral system Download PDFInfo
- Publication number
- CN107045517A CN107045517A CN201610898265.7A CN201610898265A CN107045517A CN 107045517 A CN107045517 A CN 107045517A CN 201610898265 A CN201610898265 A CN 201610898265A CN 107045517 A CN107045517 A CN 107045517A
- Authority
- CN
- China
- Prior art keywords
- data
- user
- new energy
- analyzes
- operation system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 32
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 28
- 238000004458 analytical method Methods 0.000 claims abstract description 30
- 238000010276 construction Methods 0.000 claims abstract description 17
- 238000013499 data model Methods 0.000 claims abstract description 14
- 238000009417 prefabrication Methods 0.000 claims abstract description 4
- 230000001360 synchronised effect Effects 0.000 claims abstract description 4
- 238000002955 isolation Methods 0.000 claims description 9
- 238000010586 diagram Methods 0.000 claims description 4
- 238000000605 extraction Methods 0.000 claims 1
- 230000005540 biological transmission Effects 0.000 description 4
- 238000007726 management method Methods 0.000 description 4
- 230000010354 integration Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/25—Integrating or interfacing systems involving database management systems
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Tourism & Hospitality (AREA)
- Databases & Information Systems (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Economics (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Data Mining & Analysis (AREA)
- Health & Medical Sciences (AREA)
- General Engineering & Computer Science (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- General Business, Economics & Management (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to a kind of method that new energy manufacturing operation analyzes integral system, it comprises the following steps:S1:Obtain the data in each operation system of photovoltaic plant, and set different frequencies to be synchronized to project intermediate data pond according to the demand of the data characteristicses of each operation system, and then data cleansing and data correlation are carried out, by satisfactory data pick-up to platform database;Wherein, each operation system includes dividing the investment system to be formed, capital construction system and operation system according to the life cycle of photovoltaic plant;S2:In platform database, according to the data characteristicses demand prefabrication system data model of each operation system, and/or, according to the prefabricated corresponding customer requirement model of the functional divided rank of user's request and the user, wherein, the spatial point of the life cycle of photovoltaic plant of the functional divided rank of user according to residing for user is determined;S3:Analysis result is showed according to prefabricated system data model and/or customer requirement model.
Description
Technical field
The present invention relates to a kind of method that new energy manufacturing operation analyzes integral system, belong to energy management field.
Background technology
With the progress in epoch, and country advocates, and new energy technology has reached its maturity, the investment of current new energy,
Preliminary service coverage has been realized in capital construction, operation three digest journals, but independent toward each other, and data interaction is limited, fails to realize letter
The fully shared transmission of breath, it is impossible to which the progress to project overall process is effectively managed.Comprehensive current business and system application feelings
Condition, in the urgent need to the integral system of an integration to understand various regions project distribution, tracking project dynamic, construction progress are runed
Situation etc..
The content of the invention
It is an object of the invention to provide the method that new energy manufacturing operation analyzes integral system, it can realize information
Fully shared transmission, so as to carry out effective management to project.
To reach above-mentioned purpose, the present invention provides following technical scheme:A kind of new energy manufacturing operation analysis integration system
The method of system, comprises the following steps:
S1:Obtain the data in each operation system of photovoltaic plant, and the demand of the data characteristicses according to each operation system
Different frequencies is set to be synchronized to project intermediate data pond, and then carries out data cleansing and data correlation, will be met the requirements
Data pick-up to platform database;Wherein, each operation system includes being divided to be formed according to the life cycle of photovoltaic plant
Investment system, capital construction system and operation system;
S2:In platform database, according to the data characteristicses demand prefabrication system data model of each operation system, and/or,
According to the prefabricated corresponding customer requirement model of the functional divided rank of user's request and the user, wherein, the function division of user
The spatial point of the life cycle of photovoltaic plant of the grade according to residing for user is determined;
S3:Analysis result is showed according to prefabricated system data model and/or customer requirement model.
Further:In the step S1, the method for " data cleansing and the data correlation " is as follows:
S11:When photovoltaic plant life cycle starts initialization, bullets mark is carried out to the data in operation system
Note, wherein, in photovoltaic plant life cycle, the movement in each operation system is straight with its corresponding data for the bullets
Terminate to whole life cycle;
S12:When extracting the data of each operation system, the bullets in each operation system of matching is forced, according to project
The business datum of each system is associated, screened by numbering;
S13:The data pick-up of matching relationship will be met to platform database.
Further:In the step S1, the operation system also includes financial system.
Further:According to the life cycle of photovoltaic plant, in the investment system, capital construction system and operation system,
The investment system is initial operation system, and the operation system is last operation system in three;The finance system
Financial set of books coding is preset in system, in the step S11, in operation system, to the data of generation finance income according to
Financial set of books coding carries out finance numbering mark.
Further:The method of the new energy manufacturing operation analysis integral system also includes:System Privileges isolate and
Data isolation;
The System Privileges isolation includes:New energy manufacturing operation analyzes integral system according to user's application for each
User sets menu authority;
The data isolation includes:The new energy manufacturing operation analysis integral system is adjusted according to the menu authority of user
With according to prefabricated system data model and/or customer requirement model, and then show analysis result.
Further:In the step S2, the system data model is set up in the following way:
Prototype and requirement documents that user confirms are analyzed, the displaying of selective analysis function is required;
The service logic shown according to function, carries out data source availability analysis:The existing table included in current data source
Whether information meets, if being unsatisfactory for obtaining from operation system, it is necessary to set up excessive data interface;
Develop, different pieces of information table is modeled, finally draw required data structure.
Further:In the step S2, the customer requirement model is set up in the following way:
The first edition business demand of collection is analyzed, including shows form and data source;
The design of the page and Function Prototypes is carried out using prototype tool;
Prototype is shown to user, is collected and is fed back and iterated, until user accepts prototype;
Requirement documents are worked out, are confirmed to come into force by user.
Further:In the step S3, the data results to show method as follows:
S31:Analyze prototype and requirement documents that user confirms, selective analysis functional requirement;
S32:According to the service logic of functional requirement, the analysis of data source and display technique is carried out;
S33:Show form, including block diagram, curve map, pie chart needed for selection user;
S34:Select user needed for report mode, including year-on-year, ring ratio, growth rate, it is monthly collect, year collects;
S35:Develop, different pieces of information table is developed into modeling, finally draw required data structure, and according to step
Rapid S3 and/or step S4 is presented.
Further:In the step S3, user passes through EIP portal websites single-sign-on.
The beneficial effects of the present invention are:By the new energy manufacturing operation analyze integral system method can will respectively
The Data Integration of operation system, to realize that information fully shares transmission, so as to carry out effective management to project.
Described above is only the general introduction of technical solution of the present invention, in order to better understand the technological means of the present invention,
And can be practiced according to the content of specification, below with presently preferred embodiments of the present invention and coordinate accompanying drawing describe in detail as after.
Brief description of the drawings
Fig. 1 is the network topological diagram of the new energy performance analysis integral system shown in the present invention;
Fig. 2 is the flow chart for the method that new energy manufacturing operation analyzes integral system;
Fig. 3 is a kind of ways of presentation of data results.
Embodiment
With reference to the accompanying drawings and examples, the embodiment to the present invention is described in further detail.Implement below
Example is used to illustrate the present invention, but is not limited to the scope of the present invention.
Fig. 1 is referred to, the new energy performance analysis integral system shown in a preferred embodiment of the present invention includes database
Server 1, Web server 2, fire wall 3 and the internal customer's machine 4 being connected with the Web server 2 and with the fire wall 3
The remote client 5 of network connection.The database server 1, Web server 2 and fire wall 3 are interconnected.
Incorporated by reference to Fig. 2, the new energy manufacturing operation on above-mentioned new energy performance analysis integral system is applied to analyze one
The method of body system, comprises the following steps:
S1:The data (data are project data) in each operation system of photovoltaic plant are obtained, and according to each business system
The demand of the data characteristicses of system sets different frequencies to be synchronized to project intermediate data pond, and then carries out data cleansing and data
Association, by satisfactory data pick-up to platform database;Wherein, each operation system is included according to photovoltaic plant
Life cycle (including investment stage, constructin phase, operation stage) divides the investment system formed, capital construction system and operation system
System.In this step, the investment system realizes that, by Frequency Synchronization, the investment system leads to by updating a business datum daily
Following manner is crossed to realize Frequency Synchronization:Using the business datum API of Windows service call investment systems, and set execution
Time is the daily set time.The capital construction system is realized Frequency Synchronization, capital construction system by updating a business datum daily
System is realized Frequency Synchronization in the following way:Using the business datum API of Windows service call capital construction systems, and set
The execution time is the daily set time.The operation system realized Frequency Synchronization by updating business datum per hour,
Operation system is realized Frequency Synchronization in the following way:Using the business datum API of Windows service call capital construction systems,
And the execution time is set as per hour;
S2:In platform database, according to the data characteristicses demand prefabrication system data model of each operation system, and/or,
According to the prefabricated corresponding customer requirement model of the functional divided rank of user's request and the user, wherein, the function division of user
The spatial point of the life cycle of photovoltaic plant of the grade according to residing for user determines that the spatial point includes the development phase, builds rank
Section, operation stage, development phase correspondence investment system, construction period correspondence capital construction system, operation stage correspondence operation system, no
Different operation systems is used with phase, there are different focus to project data;
S3:Analysis result is showed according to prefabricated system data model and/or customer requirement model.In this step, use
Family passes through EIP portal websites single-sign-on.The data results to show method as follows:
S31:Analyze prototype and requirement documents that user confirms, selective analysis functional requirement;
S32:According to the service logic of functional requirement, the analysis of data source and display technique is carried out;
S33:Show form, including block diagram, curve map, pie chart needed for selection user;
S34:Select user needed for report mode, including year-on-year, ring ratio, growth rate, it is monthly collect, year collects;
S35:Develop, different pieces of information table is developed into modeling, finally draw required data structure, and according to step
Rapid S3 and/or step S4 is presented, and presentation mode can be such as Fig. 3.
In above-mentioned steps S1, the method for " data cleansing and the data correlation " is as follows:
S11:When photovoltaic plant life cycle starts initialization, bullets mark is carried out to the data in operation system
Note, wherein, in photovoltaic plant life cycle, the movement in each operation system is straight with its corresponding data for the bullets
Terminate to whole life cycle.According to the life cycle of photovoltaic plant, in the investment system, capital construction system and operation system
In, the investment system is initial operation system, and the operation system is last operation system in three;Bullets
For the displacement identifier of data, when data turn the initialization of capital construction from investment, the bullets of the data is from investment system band
Enter to capital construction system, when initialization of the data from investment transhipment battalion, the bullets of the data is brought into fortune from investment system
Battalion's system;
S12:When extracting the data of each operation system, the bullets in each operation system of matching is forced, according to project
The business datum of each system is associated, screened by numbering;
S13:The data pick-up of matching relationship will be met to platform database.
In the step S2, the system data model is set up in the following way:
Prototype and requirement documents that a, analysis user confirm, selective analysis function displaying are required;
B, the service logic shown according to function, carry out data source availability analysis:What is included in current data source is existing
Whether table information meets, if being unsatisfactory for obtaining from operation system, it is necessary to set up excessive data interface;
C, develop, different pieces of information table is modeled, finally draw required data structure.
In the step S2, the customer requirement model is set up in the following way:
The first step:The first edition business demand of collection is analyzed, including shows form and data source;
Second step:The design of the page and Function Prototypes is carried out using prototype tool (Qlikview);
3rd step:Prototype is shown to user, is collected and is fed back and iterated, until user accepts prototype;
4th step:Requirement documents are worked out, are confirmed to come into force by user.
In the present embodiment, the operation system may also include financial system.Financial account is preset in the financial system
The data for producing finance income in the step S11, in operation system, are encoded and carried out by set coding according to financial set of books
Finance numbering mark.
The method of the new energy manufacturing operation analysis integral system also includes:System Privileges are isolated every discrete data.
Authority isolation is directed to user, and data isolation sets browsable data area, i.e. identical page then according to company where user
Face shows different content, although such as user of provincial company investment department can see the investment page, content only relates to place province
Investment project.And investment department of general headquarters can then see the investment project in all provinces.The System Privileges isolation includes:New energy
Manufacturing operation analyzes integral system and sets menu authority for each user according to user's application;The data isolation includes:
The new energy manufacturing operation analysis integral system is called according to prefabricated system data model according to the menu authority of user
And/or customer requirement model, and then show analysis result.
In summary:The method for analyzing integral system by the new energy manufacturing operation can be whole by each subsystem data
Close, to realize that information fully shares transmission, so as to carry out effective management to project.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality
Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, the scope of this specification record is all considered to be.
Embodiment described above only expresses the several embodiments of the present invention, and it describes more specific and detailed, but simultaneously
Can not therefore it be construed as limiting the scope of the patent.It should be pointed out that coming for one of ordinary skill in the art
Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention
Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (9)
1. a kind of method that new energy manufacturing operation analyzes integral system, it is characterised in that comprise the following steps:
S1:The data in each operation system of photovoltaic plant are obtained, and are set according to the demand of the data characteristicses of each operation system
Different frequencies carries out data cleansing and data correlation to be synchronized to project intermediate data pond, by satisfactory number
According to extraction to platform database;Wherein, each operation system includes dividing the throwing to be formed according to the life cycle of photovoltaic plant
Resource system, capital construction system and operation system;
S2:In platform database, according to the data characteristicses demand prefabrication system data model of each operation system, and/or, according to
The prefabricated corresponding customer requirement model of functional divided rank of user's request and the user, wherein, the functional divided rank of user
The spatial point of the life cycle of photovoltaic plant according to residing for user is determined;
S3:Analysis result is showed according to prefabricated system data model and/or customer requirement model.
2. the method that new energy manufacturing operation as claimed in claim 1 analyzes integral system, it is characterised in that in the step
In rapid S1, the method for " data cleansing and the data correlation " is as follows:
S11:When photovoltaic plant life cycle starts initialization, bullets mark is carried out to the data in operation system, its
In, in photovoltaic plant life cycle, the bullets is moved until whole with its corresponding data in each operation system
Individual life cycle terminates;
S12:When extracting the data of each operation system, the bullets in each operation system of matching is forced, according to bullets
The business datum of each system is associated, screened;
S13:The data pick-up of matching relationship will be met to platform database.
3. the method that new energy manufacturing operation as claimed in claim 2 analyzes integral system, it is characterised in that in the step
In rapid S1, the operation system also includes financial system.
4. the method that new energy manufacturing operation as claimed in claim 3 analyzes integral system, it is characterised in that according to photovoltaic
The life cycle in power station, in the investment system, capital construction system and operation system, the investment system is initial business system
System, the operation system is last operation system in three;Financial set of books coding is preset in the financial system, in institute
State in step S11, in operation system, finance numbering is carried out according to financial set of books coding to the data for producing finance income and marked
Note.
5. the method that new energy manufacturing operation as claimed in claim 1 analyzes integral system, it is characterised in that the new energy
The method of source manufacturing operation analysis integral system also includes:System Privileges are isolated every discrete data;
The System Privileges isolation includes:New energy manufacturing operation analyzes integral system and is directed to each user according to user's application
Menu authority is set;
The data isolation includes:The new energy manufacturing operation analysis integral system calls root according to the menu authority of user
According to prefabricated system data model and/or customer requirement model, and then show analysis result.
6. the method that new energy manufacturing operation as claimed in claim 1 analyzes integral system, it is characterised in that in the step
In rapid S2, the system data model is set up in the following way:
Prototype and requirement documents that user confirms are analyzed, the displaying of selective analysis function is required;
The service logic shown according to function, carries out data source availability analysis:The existing table information included in current data source
Whether meet, if being unsatisfactory for obtaining from operation system, it is necessary to set up excessive data interface;
Develop, different pieces of information table is modeled, finally draw required data structure.
7. the method that new energy manufacturing operation as claimed in claim 1 analyzes integral system, it is characterised in that in the step
In rapid S2, the customer requirement model is set up in the following way:
The first edition business demand of collection is analyzed, including shows form and data source;
The design of the page and Function Prototypes is carried out using prototype tool;
Prototype is shown to user, is collected and is fed back and iterated, until user accepts prototype;
Requirement documents are worked out, are confirmed to come into force by user.
8. the method that new energy manufacturing operation as claimed in claim 1 analyzes integral system, it is characterised in that in the step
In rapid S3, the data results to show method as follows:
S31:Analyze prototype and requirement documents that user confirms, selective analysis functional requirement;
S32:According to the service logic of functional requirement, the analysis of data source and display technique is carried out;
S33:Show form, including block diagram, curve map, pie chart needed for selection user;
S34:Select user needed for report mode, including year-on-year, ring ratio, growth rate, it is monthly collect, year collects;
S35:Develop, different pieces of information table is developed into modeling, finally draw required data structure, and according to step S3
And/or step S4 is presented.
9. the method that new energy manufacturing operation as claimed in claim 1 analyzes integral system, it is characterised in that in the step
In rapid S3, user passes through EIP portal websites single-sign-on.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610898265.7A CN107045517A (en) | 2016-10-13 | 2016-10-13 | The method that new energy manufacturing operation analyzes integral system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610898265.7A CN107045517A (en) | 2016-10-13 | 2016-10-13 | The method that new energy manufacturing operation analyzes integral system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107045517A true CN107045517A (en) | 2017-08-15 |
Family
ID=59543422
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610898265.7A Pending CN107045517A (en) | 2016-10-13 | 2016-10-13 | The method that new energy manufacturing operation analyzes integral system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107045517A (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103093392A (en) * | 2011-10-31 | 2013-05-08 | 河南省电力公司 | Electrical power system three-dimensional digitalization operation platform |
KR20150012741A (en) * | 2013-07-26 | 2015-02-04 | 현대중공업 주식회사 | System for constructing integrated database |
-
2016
- 2016-10-13 CN CN201610898265.7A patent/CN107045517A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103093392A (en) * | 2011-10-31 | 2013-05-08 | 河南省电力公司 | Electrical power system three-dimensional digitalization operation platform |
KR20150012741A (en) * | 2013-07-26 | 2015-02-04 | 현대중공업 주식회사 | System for constructing integrated database |
Non-Patent Citations (1)
Title |
---|
王丹丹: ""电力公司运营监测支撑系统设计与实现"", 《中国优秀硕士学位论文全文数据库 信息科技辑》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104317806B (en) | Financial data inquiry method and financial data system | |
CN104573915B (en) | Bullet train product structure tree constructing method and device | |
CN101645036B (en) | Method for automatically distributing test tasks based on capability level of test executor | |
CN104978411B (en) | A kind of automobile development method and apparatus of bullet train | |
CN104615658B (en) | A kind of method for determining user identity | |
CN109558962A (en) | Predict device, method and storage medium that telecommunication user is lost | |
CN104573184B (en) | Bullet train product meta-model construction method and device | |
CN109462736B (en) | Road and bridge engineering construction video conference management method and system based on BIM + GIS modeling | |
CN107784033A (en) | A kind of dialogue-based method and apparatus recommended | |
CN108229921A (en) | National tax land tax combines data collecting system and its operating method | |
CN105607997A (en) | Background service test method, apparatus and system for software product | |
CN109101590A (en) | Configuration item CI topological relation method for visualizing based on CMDB | |
CN104881739A (en) | Marketing and distribution data consistency verification method based on IEC61970-61968 CIM standard | |
CN104899426A (en) | Processing method and apparatus for high speed train indicator system | |
CN105578395B (en) | A kind of method and device updating terminal attribute in end message library | |
CN105743952B (en) | A kind of method for processing business, server and ERP client | |
CN104615709B (en) | Method for information display and device | |
CN109656979A (en) | Data statistical analysis method, device and storage medium | |
CN104731804B (en) | A kind of method and device for establishing general polling frame | |
CN106203632B (en) | A kind of limited knowledge collection recombinant and study and the application system method for being distributed extraction | |
CN109063223A (en) | The light weight method and device of BIM model and the processing method and system of BIM model | |
CN107045517A (en) | The method that new energy manufacturing operation analyzes integral system | |
CN107147520B (en) | Network mining method for terrorist organization | |
CN110928526A (en) | Processing device for Internet of things | |
CN109992614A (en) | Data capture method, device and server |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170815 |