CN107045517A CN201610898265.7A CN201610898265A CN107045517A CN 107045517 A CN107045517 A CN 107045517A CN 201610898265 A CN201610898265 A CN 201610898265A CN 107045517 A CN107045517 A CN 107045517A
Authority
CN
China
Prior art keywords
data
user
new energy
analyzes
operation system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610898265.7A
Other languages
Chinese (zh)
Inventor
方炜
程凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Gcl New Energy Developments Ltd
Original Assignee
Nanjing Gcl New Energy Developments Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Gcl New Energy Developments Ltd filed Critical Nanjing Gcl New Energy Developments Ltd
Priority to CN201610898265.7A priority Critical patent/CN107045517A/en
Publication of CN107045517A publication Critical patent/CN107045517A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/25Integrating or interfacing systems involving database management systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • Databases & Information Systems (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Economics (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Data Mining & Analysis (AREA)
  • Health & Medical Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of method that new energy manufacturing operation analyzes integral system, it comprises the following steps:S1:Obtain the data in each operation system of photovoltaic plant, and set different frequencies to be synchronized to project intermediate data pond according to the demand of the data characteristicses of each operation system, and then data cleansing and data correlation are carried out, by satisfactory data pick-up to platform database;Wherein, each operation system includes dividing the investment system to be formed, capital construction system and operation system according to the life cycle of photovoltaic plant;S2:In platform database, according to the data characteristicses demand prefabrication system data model of each operation system, and/or, according to the prefabricated corresponding customer requirement model of the functional divided rank of user's request and the user, wherein, the spatial point of the life cycle of photovoltaic plant of the functional divided rank of user according to residing for user is determined;S3:Analysis result is showed according to prefabricated system data model and/or customer requirement model.

Description

The method that new energy manufacturing operation analyzes integral system
Technical field
The present invention relates to a kind of method that new energy manufacturing operation analyzes integral system, belong to energy management field.
Background technology
With the progress in epoch, and country advocates, and new energy technology has reached its maturity, the investment of current new energy, Preliminary service coverage has been realized in capital construction, operation three digest journals, but independent toward each other, and data interaction is limited, fails to realize letter The fully shared transmission of breath, it is impossible to which the progress to project overall process is effectively managed.Comprehensive current business and system application feelings Condition, in the urgent need to the integral system of an integration to understand various regions project distribution, tracking project dynamic, construction progress are runed Situation etc..
The content of the invention
It is an object of the invention to provide the method that new energy manufacturing operation analyzes integral system, it can realize information Fully shared transmission, so as to carry out effective management to project.
To reach above-mentioned purpose, the present invention provides following technical scheme:A kind of new energy manufacturing operation analysis integration system The method of system, comprises the following steps:
S1:Obtain the data in each operation system of photovoltaic plant, and the demand of the data characteristicses according to each operation system Different frequencies is set to be synchronized to project intermediate data pond, and then carries out data cleansing and data correlation, will be met the requirements Data pick-up to platform database;Wherein, each operation system includes being divided to be formed according to the life cycle of photovoltaic plant Investment system, capital construction system and operation system;
S2:In platform database, according to the data characteristicses demand prefabrication system data model of each operation system, and/or, According to the prefabricated corresponding customer requirement model of the functional divided rank of user's request and the user, wherein, the function division of user The spatial point of the life cycle of photovoltaic plant of the grade according to residing for user is determined;
S3:Analysis result is showed according to prefabricated system data model and/or customer requirement model.
Further:In the step S1, the method for " data cleansing and the data correlation " is as follows:
S11:When photovoltaic plant life cycle starts initialization, bullets mark is carried out to the data in operation system Note, wherein, in photovoltaic plant life cycle, the movement in each operation system is straight with its corresponding data for the bullets Terminate to whole life cycle;
S12:When extracting the data of each operation system, the bullets in each operation system of matching is forced, according to project The business datum of each system is associated, screened by numbering;
S13:The data pick-up of matching relationship will be met to platform database.
Further:In the step S1, the operation system also includes financial system.
Further:According to the life cycle of photovoltaic plant, in the investment system, capital construction system and operation system, The investment system is initial operation system, and the operation system is last operation system in three;The finance system Financial set of books coding is preset in system, in the step S11, in operation system, to the data of generation finance income according to Financial set of books coding carries out finance numbering mark.
Further:The method of the new energy manufacturing operation analysis integral system also includes:System Privileges isolate and Data isolation;
The System Privileges isolation includes:New energy manufacturing operation analyzes integral system according to user's application for each User sets menu authority;
The data isolation includes:The new energy manufacturing operation analysis integral system is adjusted according to the menu authority of user With according to prefabricated system data model and/or customer requirement model, and then show analysis result.
Further:In the step S2, the system data model is set up in the following way:
Prototype and requirement documents that user confirms are analyzed, the displaying of selective analysis function is required;
The service logic shown according to function, carries out data source availability analysis:The existing table included in current data source Whether information meets, if being unsatisfactory for obtaining from operation system, it is necessary to set up excessive data interface;
Develop, different pieces of information table is modeled, finally draw required data structure.
Further:In the step S2, the customer requirement model is set up in the following way:
The first edition business demand of collection is analyzed, including shows form and data source;
The design of the page and Function Prototypes is carried out using prototype tool;
Prototype is shown to user, is collected and is fed back and iterated, until user accepts prototype;
Requirement documents are worked out, are confirmed to come into force by user.
Further:In the step S3, the data results to show method as follows:
S31:Analyze prototype and requirement documents that user confirms, selective analysis functional requirement;
S32:According to the service logic of functional requirement, the analysis of data source and display technique is carried out;
S33:Show form, including block diagram, curve map, pie chart needed for selection user;
S34:Select user needed for report mode, including year-on-year, ring ratio, growth rate, it is monthly collect, year collects;
S35:Develop, different pieces of information table is developed into modeling, finally draw required data structure, and according to step Rapid S3 and/or step S4 is presented.
Further:In the step S3, user passes through EIP portal websites single-sign-on.
The beneficial effects of the present invention are:By the new energy manufacturing operation analyze integral system method can will respectively The Data Integration of operation system, to realize that information fully shares transmission, so as to carry out effective management to project.
Described above is only the general introduction of technical solution of the present invention, in order to better understand the technological means of the present invention, And can be practiced according to the content of specification, below with presently preferred embodiments of the present invention and coordinate accompanying drawing describe in detail as after.
Brief description of the drawings
Fig. 1 is the network topological diagram of the new energy performance analysis integral system shown in the present invention;
Fig. 2 is the flow chart for the method that new energy manufacturing operation analyzes integral system;
Fig. 3 is a kind of ways of presentation of data results.
Embodiment
With reference to the accompanying drawings and examples, the embodiment to the present invention is described in further detail.Implement below Example is used to illustrate the present invention, but is not limited to the scope of the present invention.
Fig. 1 is referred to, the new energy performance analysis integral system shown in a preferred embodiment of the present invention includes database Server 1, Web server 2, fire wall 3 and the internal customer's machine 4 being connected with the Web server 2 and with the fire wall 3 The remote client 5 of network connection.The database server 1, Web server 2 and fire wall 3 are interconnected.
Incorporated by reference to Fig. 2, the new energy manufacturing operation on above-mentioned new energy performance analysis integral system is applied to analyze one The method of body system, comprises the following steps:
S1:The data (data are project data) in each operation system of photovoltaic plant are obtained, and according to each business system The demand of the data characteristicses of system sets different frequencies to be synchronized to project intermediate data pond, and then carries out data cleansing and data Association, by satisfactory data pick-up to platform database;Wherein, each operation system is included according to photovoltaic plant Life cycle (including investment stage, constructin phase, operation stage) divides the investment system formed, capital construction system and operation system System.In this step, the investment system realizes that, by Frequency Synchronization, the investment system leads to by updating a business datum daily Following manner is crossed to realize Frequency Synchronization:Using the business datum API of Windows service call investment systems, and set execution Time is the daily set time.The capital construction system is realized Frequency Synchronization, capital construction system by updating a business datum daily System is realized Frequency Synchronization in the following way:Using the business datum API of Windows service call capital construction systems, and set The execution time is the daily set time.The operation system realized Frequency Synchronization by updating business datum per hour, Operation system is realized Frequency Synchronization in the following way:Using the business datum API of Windows service call capital construction systems, And the execution time is set as per hour;
S2:In platform database, according to the data characteristicses demand prefabrication system data model of each operation system, and/or, According to the prefabricated corresponding customer requirement model of the functional divided rank of user's request and the user, wherein, the function division of user The spatial point of the life cycle of photovoltaic plant of the grade according to residing for user determines that the spatial point includes the development phase, builds rank Section, operation stage, development phase correspondence investment system, construction period correspondence capital construction system, operation stage correspondence operation system, no Different operation systems is used with phase, there are different focus to project data;
S3:Analysis result is showed according to prefabricated system data model and/or customer requirement model.In this step, use Family passes through EIP portal websites single-sign-on.The data results to show method as follows:
S31:Analyze prototype and requirement documents that user confirms, selective analysis functional requirement;
S32:According to the service logic of functional requirement, the analysis of data source and display technique is carried out;
S33:Show form, including block diagram, curve map, pie chart needed for selection user;
S34:Select user needed for report mode, including year-on-year, ring ratio, growth rate, it is monthly collect, year collects;
S35:Develop, different pieces of information table is developed into modeling, finally draw required data structure, and according to step Rapid S3 and/or step S4 is presented, and presentation mode can be such as Fig. 3.
In above-mentioned steps S1, the method for " data cleansing and the data correlation " is as follows:
S11:When photovoltaic plant life cycle starts initialization, bullets mark is carried out to the data in operation system Note, wherein, in photovoltaic plant life cycle, the movement in each operation system is straight with its corresponding data for the bullets Terminate to whole life cycle.According to the life cycle of photovoltaic plant, in the investment system, capital construction system and operation system In, the investment system is initial operation system, and the operation system is last operation system in three;Bullets For the displacement identifier of data, when data turn the initialization of capital construction from investment, the bullets of the data is from investment system band Enter to capital construction system, when initialization of the data from investment transhipment battalion, the bullets of the data is brought into fortune from investment system Battalion's system;
S12:When extracting the data of each operation system, the bullets in each operation system of matching is forced, according to project The business datum of each system is associated, screened by numbering;
S13:The data pick-up of matching relationship will be met to platform database.
In the step S2, the system data model is set up in the following way:
Prototype and requirement documents that a, analysis user confirm, selective analysis function displaying are required;
B, the service logic shown according to function, carry out data source availability analysis:What is included in current data source is existing Whether table information meets, if being unsatisfactory for obtaining from operation system, it is necessary to set up excessive data interface;
C, develop, different pieces of information table is modeled, finally draw required data structure.
In the step S2, the customer requirement model is set up in the following way:
The first step:The first edition business demand of collection is analyzed, including shows form and data source;
Second step:The design of the page and Function Prototypes is carried out using prototype tool (Qlikview);
3rd step:Prototype is shown to user, is collected and is fed back and iterated, until user accepts prototype;
4th step:Requirement documents are worked out, are confirmed to come into force by user.
In the present embodiment, the operation system may also include financial system.Financial account is preset in the financial system The data for producing finance income in the step S11, in operation system, are encoded and carried out by set coding according to financial set of books Finance numbering mark.
The method of the new energy manufacturing operation analysis integral system also includes:System Privileges are isolated every discrete data. Authority isolation is directed to user, and data isolation sets browsable data area, i.e. identical page then according to company where user Face shows different content, although such as user of provincial company investment department can see the investment page, content only relates to place province Investment project.And investment department of general headquarters can then see the investment project in all provinces.The System Privileges isolation includes:New energy Manufacturing operation analyzes integral system and sets menu authority for each user according to user's application;The data isolation includes: The new energy manufacturing operation analysis integral system is called according to prefabricated system data model according to the menu authority of user And/or customer requirement model, and then show analysis result.
In summary:The method for analyzing integral system by the new energy manufacturing operation can be whole by each subsystem data Close, to realize that information fully shares transmission, so as to carry out effective management to project.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope of this specification record is all considered to be.
Embodiment described above only expresses the several embodiments of the present invention, and it describes more specific and detailed, but simultaneously Can not therefore it be construed as limiting the scope of the patent.It should be pointed out that coming for one of ordinary skill in the art Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (9)

1. a kind of method that new energy manufacturing operation analyzes integral system, it is characterised in that comprise the following steps:
S1:The data in each operation system of photovoltaic plant are obtained, and are set according to the demand of the data characteristicses of each operation system Different frequencies carries out data cleansing and data correlation to be synchronized to project intermediate data pond, by satisfactory number According to extraction to platform database;Wherein, each operation system includes dividing the throwing to be formed according to the life cycle of photovoltaic plant Resource system, capital construction system and operation system;
S2:In platform database, according to the data characteristicses demand prefabrication system data model of each operation system, and/or, according to The prefabricated corresponding customer requirement model of functional divided rank of user's request and the user, wherein, the functional divided rank of user The spatial point of the life cycle of photovoltaic plant according to residing for user is determined;
S3:Analysis result is showed according to prefabricated system data model and/or customer requirement model.
2. the method that new energy manufacturing operation as claimed in claim 1 analyzes integral system, it is characterised in that in the step In rapid S1, the method for " data cleansing and the data correlation " is as follows:
S11:When photovoltaic plant life cycle starts initialization, bullets mark is carried out to the data in operation system, its In, in photovoltaic plant life cycle, the bullets is moved until whole with its corresponding data in each operation system Individual life cycle terminates;
S12:When extracting the data of each operation system, the bullets in each operation system of matching is forced, according to bullets The business datum of each system is associated, screened;
S13:The data pick-up of matching relationship will be met to platform database.
3. the method that new energy manufacturing operation as claimed in claim 2 analyzes integral system, it is characterised in that in the step In rapid S1, the operation system also includes financial system.
4. the method that new energy manufacturing operation as claimed in claim 3 analyzes integral system, it is characterised in that according to photovoltaic The life cycle in power station, in the investment system, capital construction system and operation system, the investment system is initial business system System, the operation system is last operation system in three;Financial set of books coding is preset in the financial system, in institute State in step S11, in operation system, finance numbering is carried out according to financial set of books coding to the data for producing finance income and marked Note.
5. the method that new energy manufacturing operation as claimed in claim 1 analyzes integral system, it is characterised in that the new energy The method of source manufacturing operation analysis integral system also includes:System Privileges are isolated every discrete data;
The System Privileges isolation includes:New energy manufacturing operation analyzes integral system and is directed to each user according to user's application Menu authority is set;
The data isolation includes:The new energy manufacturing operation analysis integral system calls root according to the menu authority of user According to prefabricated system data model and/or customer requirement model, and then show analysis result.
6. the method that new energy manufacturing operation as claimed in claim 1 analyzes integral system, it is characterised in that in the step In rapid S2, the system data model is set up in the following way:
Prototype and requirement documents that user confirms are analyzed, the displaying of selective analysis function is required;
The service logic shown according to function, carries out data source availability analysis:The existing table information included in current data source Whether meet, if being unsatisfactory for obtaining from operation system, it is necessary to set up excessive data interface;
Develop, different pieces of information table is modeled, finally draw required data structure.
7. the method that new energy manufacturing operation as claimed in claim 1 analyzes integral system, it is characterised in that in the step In rapid S2, the customer requirement model is set up in the following way:
The first edition business demand of collection is analyzed, including shows form and data source;
The design of the page and Function Prototypes is carried out using prototype tool;
Prototype is shown to user, is collected and is fed back and iterated, until user accepts prototype;
Requirement documents are worked out, are confirmed to come into force by user.
8. the method that new energy manufacturing operation as claimed in claim 1 analyzes integral system, it is characterised in that in the step In rapid S3, the data results to show method as follows:
S31:Analyze prototype and requirement documents that user confirms, selective analysis functional requirement;
S32:According to the service logic of functional requirement, the analysis of data source and display technique is carried out;
S33:Show form, including block diagram, curve map, pie chart needed for selection user;
S34:Select user needed for report mode, including year-on-year, ring ratio, growth rate, it is monthly collect, year collects;
S35:Develop, different pieces of information table is developed into modeling, finally draw required data structure, and according to step S3 And/or step S4 is presented.
9. the method that new energy manufacturing operation as claimed in claim 1 analyzes integral system, it is characterised in that in the step In rapid S3, user passes through EIP portal websites single-sign-on.
CN201610898265.7A 2016-10-13 2016-10-13 The method that new energy manufacturing operation analyzes integral system Pending CN107045517A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610898265.7A CN107045517A (en) 2016-10-13 2016-10-13 The method that new energy manufacturing operation analyzes integral system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610898265.7A CN107045517A (en) 2016-10-13 2016-10-13 The method that new energy manufacturing operation analyzes integral system

Publications (1)

Publication Number Publication Date
CN107045517A true CN107045517A (en) 2017-08-15

Family

ID=59543422

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610898265.7A Pending CN107045517A (en) 2016-10-13 2016-10-13 The method that new energy manufacturing operation analyzes integral system

Country Status (1)

Country Link
CN (1) CN107045517A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103093392A (en) * 2011-10-31 2013-05-08 河南省电力公司 Electrical power system three-dimensional digitalization operation platform
KR20150012741A (en) * 2013-07-26 2015-02-04 현대중공업 주식회사 System for constructing integrated database

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103093392A (en) * 2011-10-31 2013-05-08 河南省电力公司 Electrical power system three-dimensional digitalization operation platform
KR20150012741A (en) * 2013-07-26 2015-02-04 현대중공업 주식회사 System for constructing integrated database

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王丹丹: ""电力公司运营监测支撑系统设计与实现"", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *

Similar Documents

Publication Publication Date Title
CN104317806B (en) Financial data inquiry method and financial data system
CN104573915B (en) Bullet train product structure tree constructing method and device
CN101645036B (en) Method for automatically distributing test tasks based on capability level of test executor
CN104978411B (en) A kind of automobile development method and apparatus of bullet train
CN104615658B (en) A kind of method for determining user identity
CN109558962A (en) Predict device, method and storage medium that telecommunication user is lost
CN104573184B (en) Bullet train product meta-model construction method and device
CN109462736B (en) Road and bridge engineering construction video conference management method and system based on BIM + GIS modeling
CN107784033A (en) A kind of dialogue-based method and apparatus recommended
CN108229921A (en) National tax land tax combines data collecting system and its operating method
CN105607997A (en) Background service test method, apparatus and system for software product
CN109101590A (en) Configuration item CI topological relation method for visualizing based on CMDB
CN104881739A (en) Marketing and distribution data consistency verification method based on IEC61970-61968 CIM standard
CN104899426A (en) Processing method and apparatus for high speed train indicator system
CN105578395B (en) A kind of method and device updating terminal attribute in end message library
CN105743952B (en) A kind of method for processing business, server and ERP client
CN104615709B (en) Method for information display and device
CN109656979A (en) Data statistical analysis method, device and storage medium
CN104731804B (en) A kind of method and device for establishing general polling frame
CN106203632B (en) A kind of limited knowledge collection recombinant and study and the application system method for being distributed extraction
CN109063223A (en) The light weight method and device of BIM model and the processing method and system of BIM model
CN107045517A (en) The method that new energy manufacturing operation analyzes integral system
CN107147520B (en) Network mining method for terrorist organization
CN110928526A (en) Processing device for Internet of things
CN109992614A (en) Data capture method, device and server

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170815