CN107044571A - Connecting line - Google Patents

Connecting line Download PDF

Info

Publication number
CN107044571A
CN107044571A CN201710456201.6A CN201710456201A CN107044571A CN 107044571 A CN107044571 A CN 107044571A CN 201710456201 A CN201710456201 A CN 201710456201A CN 107044571 A CN107044571 A CN 107044571A
Authority
CN
China
Prior art keywords
pipeline
bellows
flange
telescoping tube
piston
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710456201.6A
Other languages
Chinese (zh)
Other versions
CN107044571B (en
Inventor
张兴达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Hengtang Technology Industry Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710456201.6A priority Critical patent/CN107044571B/en
Publication of CN107044571A publication Critical patent/CN107044571A/en
Application granted granted Critical
Publication of CN107044571B publication Critical patent/CN107044571B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L27/00Adjustable joints, Joints allowing movement
    • F16L27/12Adjustable joints, Joints allowing movement allowing substantial longitudinal adjustment or movement
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L23/00Flanged joints
    • F16L23/02Flanged joints the flanges being connected by members tensioned axially
    • F16L23/024Flanged joints the flanges being connected by members tensioned axially characterised by how the flanges are joined to, or form an extension of, the pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Joints Allowing Movement (AREA)

Abstract

The claimed connecting line of the present invention, including the first pipeline, the second pipeline and pipeline connection mechanism;Wherein pipeline connection mechanism includes telescoping tube, is socketed in the first bellows and counter flange disk on telescoping tube pipeline end, and the second bellows;The pipeline end of wherein telescoping tube is fixed with a flange collar at the position of mounting flange, flange collar outwards fits with mounting flange, and an elongated slot is offered in flange collar, the feed pathway of the first bellows is flowed to for use as the second pipeline, mounting flange is outwards communicated with an auxiliary piping on the pipeline section between two flange ends, auxiliary piping is equipped with a piston by spring, and available piston is obstructed to the elongated slot in telescoping tube flange collar, second bellows-sheathed is connected on the first pipeline, its one end is fixed with flange fixed on the first pipeline, the other end is fixedly connected with the first bellows.The present invention can substitute the first bellows that rupture with the second bellows, it is to avoid the loss repaired and caused that stops production.

Description

Connecting line
Technical field
It is more particularly to a kind of to be used for liquid medium transmission the invention belongs to pipeline technical field, and satisfaction is expanded with heat and contract with cold and wanted The connecting line asked.
Background technology
Connecting line be with pipe, pipe connector and valve etc. be connected into be used for convey gas, liquid or with solid The device of the fluid of particle.
It is appreciated that connecting line is during pumped (conveying) medium, according to the temperature of its pumped (conveying) medium height, it can draw The physical phenomenon that hair connecting line itself expands with heat and contract with cold;At present, in the prior art in order to avoid connecting line is because occurring heat Swollen shrinkage and trigger cracking, using being hinged with bellows between the connecting line of segmentation, and using bellows expansion performance come Offset the deformation that connecting line occurs because expanding with heat and contract with cold.
Above-mentioned scheme solves the technical problem in the presence of generation cracking when connecting line expands with heat and contract with cold, but draws again The problem of having sent out new, because bellows is mounted connected between the connecting line of two segmentations, that is, bellows is also played simultaneously The function of pumped (conveying) medium, so as bellows is ftractureed, this requires that stopping conveying of the connecting line to medium can just put The bellows renewed, that is, the maintenance that stops production is needed, this can have larger loss for production enterprise.
The content of the invention
It is an object of the invention to provide a kind of connecting line for being used to solve above-mentioned technical problem.
Specifically, claimed connecting line of the invention, including the first pipeline, the second pipe set with respect to the first pipeline Road, and for connecting the pipeline connection mechanism of the first pipeline and the second pipeline;Wherein described pipeline connection mechanism includes flexible Pipe, the first bellows, mounting flange and the second bellows;The flange end of the flange end of the telescoping tube and the first pipeline is fixed Connection, pipe ends point are stretched in the second pipeline, and it is small that the external diameter at the pipeline end of the second pipeline is stretched on the telescoping tube In the internal diameter of second pipeline;The flange end of the telescoping tube, the first bellows, the flange of mounting flange and the second pipeline End is sequentially connected fixation;The pipeline end of the telescoping tube is fixed with a flange collar at the position of mounting flange, the flange collar to Fitted outside with mounting flange, and an elongated slot is offered in the flange collar, the first bellows is flowed to for use as the second pipeline Feed pathway;The mounting flange is outwards communicated with an auxiliary piping, the auxiliary tube on the pipeline section between two flange ends Road is equipped with a piston by spring, and available piston is obstructed to the elongated slot in telescoping tube flange collar;3rd bellows One end be fixedly connected with the flange plate on the first pipeline, the other end is fixedly connected with the first bellows, and when the 3rd bellows When being assembled on the first pipeline, the ripple of the 3rd bellows is in tightening state.
As the preferred scheme of the present invention, the height of the piston is more than the height of the telescoping tube upper convex ring.
As the preferred scheme of the present invention, the piston is set to hollow-core construction, and a water injection hole is offered thereon, and when work When plug is assembled on auxiliary piping by spring, the water injection hole on the piston is arranged in auxiliary piping.
Threadedly connect solid as the preferred scheme of the present invention, between the auxiliary piping and mounting flange It is fixed.
As the preferred scheme of the present invention, second bellows is arranged on the outside of telescoping tube, and first pipeline Flange end, the flange end of the flange end of telescoping tube and the first bellows offer multiple one-to-one screwed holes respectively, and Fixation is attached with many first bolts.
As the preferred scheme of the present invention, with the of annular array between the flange end of the telescoping tube and the first bellows Two bolts are attached fixation.
Due to the utilization of above-mentioned technical proposal, the present invention has following advantages compared with prior art:
Connecting line provided by the present invention, passes through rational structure setting so that the connecting line can use when in use The flexible of first bellows offsets the first pipeline and stretching that the second pipeline triggers during pumped (conveying) medium because expanding with heat and contract with cold Contracting amount, and when the first bellows ruptures, the flange end of telescoping tube and the flange end of the first pipeline can be unclamped, with second Bellows uses to substitute the first bellows, is so achieved that while medium transmission is not stopped and uses, and then avoids The loss that enterprise's stopping production is repaired and caused.
Brief description of the drawings
Fig. 1 is the structural representation of connecting line provided by the present invention.
Fig. 2 is the structural representation of telescoping tube in the present invention.
Embodiment
To make the object, technical solutions and advantages of the present invention of greater clarity, with reference to embodiment and join According to accompanying drawing, the present invention is described in more detail.It should be understood that these descriptions are merely illustrative, and it is not intended to limit this hair Bright scope.In addition, in the following description, the description to known features and technology is eliminated, to avoid unnecessarily obscuring this The concept of invention.
Fig. 1, Fig. 2, connecting line 100 provided by the present invention, including the first pipeline 10 are referred to, with respect to the first pipeline 10 The second pipeline 20 set, and for connecting the pipeline connection mechanism of the first pipeline 10 and the second pipeline 20.Wherein described One pipeline 10 and any two part that the second pipeline 20 is connecting line 100, in practice, the first pipeline 10 and the second pipeline 20 caliber may be configured as equally, may be alternatively provided as the pipe of different the first pipeline 10 and the second pipeline 20 in the present embodiment Footpath size is identical.
In the present embodiment, on the one hand the pipeline connection mechanism is to be used to connect the first pipeline 10 and the second pipeline 20 , with overcome the first pipeline 10 and the second pipeline 20 during the use because expand with heat and contract with cold and caused by pipeline cracking.
Specifically, the pipeline connection mechanism includes telescoping tube 31, the first bellows 32, the ripple of counter flange disk 33 and second Line pipe 34.The telescoping tube 31 is interconnected with the first pipeline 10 and the second pipeline 20, wherein the flange end of telescoping tube 31 311 are fixedly connected with the flange end 11 of the first pipeline 10, and the part of pipeline end 312 of telescoping tube 31 stretches to the second pipeline 20 It is interior, and internal diameter of the external diameter of pipeline end 312 less than second pipeline 10 of the telescoping tube 31.First bellows 32 and mistake Cross ring flange 33 and be set in the outside of telescoping tube 31.
The flange end 311 of the telescoping tube 31, the first bellows 32, the flange end of the pipeline 20 of mounting flange 33 and second 21 are sequentially connected fixation.Wherein, the pipeline end 312 of the telescoping tube 31 is fixed with a flange collar at the position of mounting flange 33 313, the flange collar 313 is outwards fitted with mounting flange 33, and an elongated slot 314 is offered in the flange collar 313, for use as Second pipeline 20 flows to the feed pathway of the first bellows 32;Correspondingly, the mounting flange 33 is between two flange ends An auxiliary piping 331 outwards is communicated with pipeline section, is specifically the pipeline section for being assemblied in mounting flange 33 threadably On.And the auxiliary piping 331 is equipped with a piston 333 by spring 332, and available piston 333 is to the flange collar 313 of telescoping tube 31 On elongated slot 314 obstructed, and then realize the path that the second pipeline 20 flows to the first bellows 32 obstructed.So It is appreciated that the auxiliary piping 331 is assemblied at the position at the place of elongated slot 314 of the flange collar 313 of telescoping tube 31.
In the present embodiment, the height of the piston 333 is more than the height of the upper convex ring 313 of telescoping tube 31.So when When being obstructed with piston 333 to the elongated slot 314 in flange collar 313, its part of piston 333 is still in auxiliary piping 331, so When ensuring that piston 333 is obstructed to feed pathway, it, can effective manner quilt by the position-limiting action of auxiliary piping 331 The pressure that medium positioned at the outside of piston 333 is produced to piston 333.Further, the piston 333 is set to hollow-core construction, A water injection hole (not shown) is offered thereon, and when piston 333 is assembled on auxiliary piping 331 by spring 332, the work Water injection hole on plug 333 is arranged in auxiliary piping 331.
From the foregoing, it will be observed that when the first bellows 32 occurs to rupture and leak, pressure of the medium to piston 333 will be reduced, The gravity of piston 333 can thus be broken, medium is to the pressure and spring 332 of piston 333 between the active force of piston 333 Balance, piston 333 declines therewith, so that the water injection hole on piston 333 exposes from auxiliary piping 331, correspondingly, positioned at convex The medium enclosed in 313 elongated slots 314 will enter to piston 333 by water injection hole, and provide the gravity suffered by piston 333, with Piston 333 in medium entrance, piston 333 is gradually reduced and finally realizes the barrier to elongated slot 314 in flange collar 313, so It is achieved that the feed pathway for entering to the first bellows 32 to the second pipeline 20 is obstructed, i.e. by above-mentioned rational knot Structure is set, and realizes the operation obstructed automatically.
Second bellows 34 is applied in the pipeline connection mechanism, is to be used to substitute when the Cracking Failure of the first bellows 32 The dilatation that the first pipeline 10 and the second pipeline 20 are produced because expanding with heat and contract with cold is offset with the second bellows 34 afterwards.Described Two bellowss 34 are socketed on the first pipeline 10, wherein, one end of the 3rd bellows on the first pipeline 10 with fixing Some flange plates 12 are fixedly connected, and the other end is fixedly connected with the first bellows 32.And when the second bellows 34 is assembled to When on the first pipeline 10, the ripple of second bellows 34 is in tightening state.That is, the 3rd bellows 35 is to be in It is assembled in the state of compression on pipeline 100.
In the present embodiment, second bellows 34 is provided in the outside at the upper flange end 311 of telescoping tube 31, and described The flange end 11 of first pipeline 10, the flange end of the bellows 32 of flange end 311 and first of telescoping tube 31 offer multiple respectively One-to-one screwed hole (not shown), and it is attached fixation with many first bolt (not shown).So the pipeline is connected Mechanism is applied normally to be used on connecting line, and the first pipeline 10 and the second pipeline 20 can be offset with the first bellows 32 because of heat Swollen shrinkage and the dilatation produced.And when the first bellows 32 ruptures, the first bolt can be turned, make the first pipeline 10 The flange end 311 of flange end 11 and telescoping tube 31 depart from, and the flange of the bellows 32 of flange end 311 and first of telescoping tube 31 End is fixedly connected, further, with annular array between the bellows 32 of flange end 311 and first of the telescoping tube 31 Second bolt (not shown) is attached fixation.To ensure people during the first bolt is turned, the flange of telescoping tube 31 End 311 ensures to be connected all the time with the first bellows 32.Simultaneously, between the first bellows 32 and the second bellows 34 It is fixedly connected.It is under compressive state and is assembled in conjunction with the second bellows 34, such second bellows 34 is just The first bellows 32, one of movement one end distance of telescoping tube 31 and excessive ring flange 33 can be promoted.Accordingly, it should be understood that, Second bellows 34 will be connected with the first pipeline 10.
To sum up, connecting line provided by the present invention, passes through rational structure setting so that the connecting line is when in use It can be triggered with the flexible of the first bellows to offset the first pipeline with the second pipeline during pumped (conveying) medium because expanding with heat and contract with cold Stroke, and when the first bellows ruptures, the flange end of telescoping tube and the flange end of the first pipeline can be unclamped, with Second bellows uses to substitute the first bellows, is so achieved that while medium transmission is not stopped and uses, and then keeps away The loss that the stopping production of Mian Liao enterprises is repaired and caused.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention God is with principle, and any modification, equivalent substitution and improvements done etc. all should be included within the scope of protection of the invention.

Claims (6)

1. a kind of connecting line, it is characterised in that:Including the first pipeline, the second pipeline set with respect to the first pipeline, Yi Jiyong In the pipeline connection mechanism for connecting the first pipeline and the second pipeline;Wherein described pipeline connection mechanism includes telescoping tube, first wave Line pipe, mounting flange and the second bellows;The flange end of the telescoping tube is fixedly connected with the flange end of the first pipeline, pipeline Hold part to stretch in the second pipeline, and the external diameter at the pipeline end of the second pipeline is stretched on the telescoping tube and be less than described second The internal diameter of pipeline;The flange end of the telescoping tube, the first bellows, the flange end of mounting flange and the second pipeline are sequentially connected It is fixed;The pipeline end of the telescoping tube is fixed with a flange collar at the position of mounting flange, and the flange collar is outwards and connection method Blue disk is fitted, and an elongated slot is offered in the flange collar, and the feed pathway of the first bellows is flowed to for use as the second pipeline;Institute State mounting flange and be outwards communicated with an auxiliary piping on the pipeline section between two flange ends, the auxiliary piping is filled by spring Equipped with a piston, and available piston is obstructed to the elongated slot in telescoping tube flange collar;One end and first of 3rd bellows Flange plate on pipeline is fixedly connected, and the other end is fixedly connected with the first bellows, and when the 3rd bellows is assembled to the first pipe When on road, the ripple of the 3rd bellows is in tightening state.
2. connecting line according to claim 1, it is characterised in that:It is convex that the height of the piston is more than the telescoping tube The height of circle.
3. connecting line according to claim 2, it is characterised in that:The piston is set to hollow-core construction, opens up thereon There is a water injection hole, and when piston is assembled on auxiliary piping by spring, the water injection hole on the piston is arranged on auxiliary tube In road.
4. connecting line according to claim 1, it is characterised in that:Pass through between the auxiliary piping and mounting flange Engagement thread is connected.
5. connecting line according to claim 1, it is characterised in that:Second bellows is arranged on the outer of telescoping tube Side, and the flange end of the flange end of first pipeline, the flange end of telescoping tube and the first bellows offers multiple one respectively One corresponding screwed hole, and it is attached fixation with many first bolts.
6. connecting line according to claim 5, it is characterised in that:The flange end of the telescoping tube and the first bellows it Between be attached fixation with the second bolt of annular array.
CN201710456201.6A 2017-06-16 2017-06-16 Connecting line Active CN107044571B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710456201.6A CN107044571B (en) 2017-06-16 2017-06-16 Connecting line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710456201.6A CN107044571B (en) 2017-06-16 2017-06-16 Connecting line

Publications (2)

Publication Number Publication Date
CN107044571A true CN107044571A (en) 2017-08-15
CN107044571B CN107044571B (en) 2018-11-23

Family

ID=59547458

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710456201.6A Active CN107044571B (en) 2017-06-16 2017-06-16 Connecting line

Country Status (1)

Country Link
CN (1) CN107044571B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108798801A (en) * 2018-06-25 2018-11-13 王秀娟 A kind of marine steam turbine high-pressure steam pipe pipeline connector

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4215882A (en) * 1977-04-02 1980-08-05 J. M. Voith Gmbh Joint structure
US5299841A (en) * 1993-02-08 1994-04-05 Adsco Manufacturing Corp. Safety flow restrictor for expansion joints
CN203718254U (en) * 2014-03-08 2014-07-16 江苏恒丰波纹管有限公司 Corrugated expansion joint with alarm device
CN204300602U (en) * 2014-12-02 2015-04-29 江苏恒丰波纹管有限公司 Be provided with the non-maintaining compensator of on-line measuring device
CN106015812A (en) * 2016-07-11 2016-10-12 洛阳双瑞特种装备有限公司 Straight-through type external pressure straight pipe pressure balancing expansion joint with leakage monitoring function
CN106641546A (en) * 2015-10-29 2017-05-10 江苏百新波纹管有限公司 Directly-buried compound sleeve compensator

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4215882A (en) * 1977-04-02 1980-08-05 J. M. Voith Gmbh Joint structure
US5299841A (en) * 1993-02-08 1994-04-05 Adsco Manufacturing Corp. Safety flow restrictor for expansion joints
CN203718254U (en) * 2014-03-08 2014-07-16 江苏恒丰波纹管有限公司 Corrugated expansion joint with alarm device
CN204300602U (en) * 2014-12-02 2015-04-29 江苏恒丰波纹管有限公司 Be provided with the non-maintaining compensator of on-line measuring device
CN106641546A (en) * 2015-10-29 2017-05-10 江苏百新波纹管有限公司 Directly-buried compound sleeve compensator
CN106015812A (en) * 2016-07-11 2016-10-12 洛阳双瑞特种装备有限公司 Straight-through type external pressure straight pipe pressure balancing expansion joint with leakage monitoring function

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108798801A (en) * 2018-06-25 2018-11-13 王秀娟 A kind of marine steam turbine high-pressure steam pipe pipeline connector

Also Published As

Publication number Publication date
CN107044571B (en) 2018-11-23

Similar Documents

Publication Publication Date Title
CN105135136A (en) Rubber expansion joint resisting axial deformation
CN109854818B (en) Sealed pipeline elasticity cross cabin vibration isolation device
CN107044571A (en) Connecting line
CN102003430A (en) Hydraulic cylinder
CN103672246A (en) Oil tube telescoping mechanism
CN204805827U (en) Incessantly defeated area is pressed and is changed high -pressure undergauge shutoff head for ball valve
CN205716144U (en) A kind of packing type extension section for pressure steel pipeline
CN109630774B (en) High-strength threaded joint
CN106594448A (en) Broadband gas-liquid two-phase spring pulsation damper
CN203286174U (en) Universal telescopic pipeline connecting device
CN107152581B (en) Pipeline
CN107218466A (en) Tipping formula pipeline
JP2014131558A (en) Double corrugated pipe artificial muscle
JP5651319B2 (en) damper
CA2992842C (en) Thyristor assembly radiator for dc converter valve
CN107255197B (en) A kind of tipping formula pipeline
CN201944533U (en) Automobile chassis oil injection connecting piece
CN103032642A (en) High-pressure pipeline and vibration attenuation device thereof
CN205537248U (en) Plate heat exchanger unit flexible coupling strutting arrangement
CN207921407U (en) A kind of end valve for tube-in-tube pipeline
JP2004324769A (en) Displacement restriction equipment of expansible/contractible flexible pipe
CN105673981B (en) Resistance-free balanced-type ripple compensator
CN103775308A (en) Buffer piston structure of compressor
CN220286758U (en) Pipeline expansion joint
CN107091387B (en) A kind of pipeline

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20181015

Address after: 312400 56 Yao Ao village, Sanjie Town, Shengzhou City, Shaoxing, Zhejiang

Applicant after: Shengzhou Sen Hui Intellectual Property Operation Co.,Ltd.

Address before: 315200 18 Yanhe Road, Zhenhai District, Ningbo, Zhejiang

Applicant before: Zhang Xingda

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201030

Address after: Group 3, Jianyang Town, Jiandong village, Jianhu County, Yancheng City, Jiangsu Province

Patentee after: Jianhu Wanyun Technology Co.,Ltd.

Address before: 312400 56 Yao Ao village, Sanjie Town, Shengzhou City, Shaoxing, Zhejiang

Patentee before: Shengzhou Sen Hui Intellectual Property Operation Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201126

Address after: 213000 No. 11 Qingyang North Road, Tianning District, Changzhou, Jiangsu

Patentee after: Changzhou Hong quantity Electronic Technology Co.,Ltd.

Address before: Group 3, Jianyang Town, Jiandong village, Jianhu County, Yancheng City, Jiangsu Province

Patentee before: Jianhu Wanyun Technology Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220823

Address after: Tianning District Hehai road 213000 Jiangsu city of Changzhou province No. 9

Patentee after: Changzhou Tianning Communication Technology Industrial Park Co.,Ltd.

Address before: 213000 No. 11 Qingyang North Road, Tianning District, Changzhou City, Jiangsu Province

Patentee before: Changzhou Hong quantity Electronic Technology Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221223

Address after: Tianning District Hehai road 213000 Jiangsu city of Changzhou province No. 9

Patentee after: Changzhou Hengtang Technology Industry Co.,Ltd.

Address before: Tianning District Hehai road 213000 Jiangsu city of Changzhou province No. 9

Patentee before: Changzhou Tianning Communication Technology Industrial Park Co.,Ltd.