CN107044145A - A kind of pipeline garbage cleaning device and its system - Google Patents

A kind of pipeline garbage cleaning device and its system Download PDF

Info

Publication number
CN107044145A
CN107044145A CN201710217597.9A CN201710217597A CN107044145A CN 107044145 A CN107044145 A CN 107044145A CN 201710217597 A CN201710217597 A CN 201710217597A CN 107044145 A CN107044145 A CN 107044145A
Authority
CN
China
Prior art keywords
pipeline
cleaning plant
cleaning
mud
plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710217597.9A
Other languages
Chinese (zh)
Inventor
李新安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710217597.9A priority Critical patent/CN107044145A/en
Publication of CN107044145A publication Critical patent/CN107044145A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/46Dredgers; Soil-shifting machines mechanically-driven with reciprocating digging or scraping elements moved by cables or hoisting ropes ; Drives or control devices therefor
    • E02F3/47Dredgers; Soil-shifting machines mechanically-driven with reciprocating digging or scraping elements moved by cables or hoisting ropes ; Drives or control devices therefor with grab buckets
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/46Dredgers; Soil-shifting machines mechanically-driven with reciprocating digging or scraping elements moved by cables or hoisting ropes ; Drives or control devices therefor
    • E02F3/48Drag-lines
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures
    • E03F5/22Adaptations of pumping plants for lifting sewage

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Cleaning In General (AREA)

Abstract

It is a kind of garbage cleaning device the present invention relates to municipal apparatus field, specially pipeline integrates cleaning plant and its system.A kind of pipeline integrates cleaning plant, including draw-gear and multiple cleaning mechanisms for be connected with draw-gear, and multiple cleaning mechanisms are distinguished optionally to be connected with draw-gear.Multiple cleaning mechanisms include sandstone cleaning plant, mud cleaning plant and sewage-treatment plant, and sandstone cleaning plant, mud cleaning plant and sewage-treatment plant are connected with draw-gear respectively in different time.A kind of pipeline cleaning system, including multiple above-mentioned pipelines integrate cleaning plant.

Description

A kind of pipeline garbage cleaning device and its system
Technical field
Be a kind of garbage cleaning device the present invention relates to municipal apparatus field, specially pipeline integrate cleaning plant and its System.
Background technology
Municipal pipeline is buried in underground, after the completion of construction, if the rubbish do not cleared up in pipeline for a long time:Such as stone The junks such as head, mud and the sewage caused by raining then easily cause the blocking of pipeline, and having a strong impact on the normal of pipeline makes With because the particularity of municipal pipeline, then can directly have a strong impact on civic life
At present, in the cleaning of municipal pipeline, usually using the method for manual cleaning.But manual cleaning have it is more Defect, the first pipeline be in underground state pipeline in oxygen it is insufficient, easily cause workmen because oxygen supply deficiency production It is raw dangerous;The environment of second underground is complex, easily causes industrial accident.
Mechanical chipping equipment can be also used in the prior art, but all with efficiency is low, cost is high and movement is inconvenient Can not nonexpondable technological deficiency.
The content of the invention
The present invention for the technological deficiency for overcoming conventional pipeline cleaning plant and pipeline cleaning method efficiency is low, cost is high, There is provided a kind of pipeline garbage-cleaning system and pipeline garbage-cleaning method, the machinery of pipeline cleaning is realized by hydraulic-driven Chemical industry is made.
What the present invention was realized in:
A kind of pipeline integrates cleaning plant, including draw-gear and when carrying out prune job independently and alternatively with Multiple cleaning mechanisms of draw-gear connection.Multiple cleaning mechanisms are included at sandstone cleaning plant, mud cleaning plant and sewage Manage device.
Further, draw-gear is included in the mobile device of the neighboring area movement of pipeline and is installed on the mobile dress The hauling machine put, hauling machine is used to drive multiple cleaning mechanisms to move in the pipeline.
Further, mobile device includes fork truck.Fork truck includes fork truck body and the fork truck vertically moved along fork truck body Frame.
Further, Forklift truck rack includes the lifting arm for being used for the hoistable platform of fixed traction machine and being connected with hoistable platform.
Further, hauling machine includes being fixed on the capstan winch of hoistable platform and is wrapped in the pull rope of capstan winch.
Further, sandstone cleaning plant includes the grab bucket mechanism being connected with pull rope.Grab bucket mechanism includes and pull rope The fixed disk of connection and the crawl section being flexibly connected with fixed disk.
Further, crawl section includes the multiple grab buckets for being configured as in closure state and released state to switch.
Further, mud cleaning plant includes being used for scraping mud in pipeline for clearance with what mobile mode cleared up mud Disk and row's silt sleeve pipe that moving track is provided for mud scraping disc.
Further, sewage-treatment plant includes the sand discharging pump being connected with pull rope and the draining being connected with sand discharging pump Pipe, the free end of drainpipe is located at outside pipeline for clearance.
The present invention also provides a kind of pipeline and integrates cleaning system, realizes multiple pipelines and integrates cleaning plant while carrying out not With the effect of pipeline cleaning operation.
What the present invention was realized in:
A kind of pipeline integrates cleaning system, including multiple pipelines integrate cleaning plant.
The beneficial effect of such scheme:
Cleaning plant is integrated the invention provides a kind of pipeline, is mainly used in municipal pipeline, is more mainly used in municipal pipeline Build the processing for remaining in stone therein, mud and sewage.The present invention is also set up by being provided with basic haulage gear There are the sandstone cleaning plant being flexibly connected with cleaning mechanism, mud cleaning plant and sewage-treatment plant, realize to for clearance The selectable sweetly disposition of stone, mud and sewage in pipeline, and pipeline integrates the movement and cleaning in cleaning plant Power is implemented by hydraulic means, with automaticity simple to operate it is high, clean out, reduce disposal costs Technique effect.
Cleaning system is integrated present invention also offers a kind of pipeline, cleaning plant is integrated by being provided with multiple pipelines, it is real The realization for different pipelines clear up purpose within the same time is showed.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be attached to what is used required in embodiment Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, therefore is not construed as pair The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this A little accompanying drawings obtain other related accompanying drawings.
Fig. 1 integrates cleaning plant structural representation for a kind of pipeline that the present invention is provided;
Fig. 2 is that the pipeline that embodiment 1 is provided integrates cleaning plant structural representation;
Fig. 3 is grab bucket mechanism structural representation in embodiment 1;
Fig. 4 is the pipeline comprehensive management apparatus structural representation that embodiment 3 is provided;
Fig. 5 is mud cleaning plant structural representation;
Fig. 6 is desilting tube road structural representation;
Fig. 7 is mud scraping disc structural representation;
Fig. 8 is sewage-treatment plant structural representation.
Icon:100- pipelines integrate cleaning plant;200- pipelines for clearance;110- draw-gears;120- sandstones cleaning dress Put;130- mud cleaning plants;140- sewage-treatment plants;111- fork trucks;112- hauling machines;113- hoistable platforms;114- liters Arm drops;115- capstan winches;116- pull ropes;117- pulleys;121- fixed disks;122- crawl sections;123- captures assisted parts;124- is grabbed Bucket;125- expansion links;The fix bars of 126- first;The fix bars of 127- second;131- mud scraping discs;132- desilting tubes road;133- through holes; 134- wires;135- sleeve pipes;136- inner tubes;137- supports;141- sand discharging pumps;142- drainpipes.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is A part of embodiment of the present invention, rather than whole embodiments.The present invention implementation being generally described and illustrated herein in the accompanying drawings The component of example can be arranged and designed with a variety of configurations.Therefore, reality of the invention below to providing in the accompanying drawings The detailed description for applying example is not intended to limit the scope of claimed invention, but is merely representative of the selected implementation of the present invention Example.Based on the embodiment in the present invention, what those of ordinary skill in the art were obtained under the premise of creative work is not made Every other embodiment, belongs to the scope of protection of the invention.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi It is defined in individual accompanying drawing, then it further need not be defined and explained in subsequent accompanying drawing.
In the description of the invention, it is necessary to explanation, the orientation or position of the instruction such as term " on ", " under ", " interior ", " outer " It is or the orientation or position that the invention product is usually put when using based on orientation shown in the drawings or position relationship to put relation Relation is put, the description present invention is for only for ease of and simplifies description, rather than indicate or imply that the device or element of meaning are necessary With specific orientation, with specific azimuth configuration and operation, therefore it is not considered as limiting the invention.
In the description of the invention, in addition it is also necessary to explanation, unless otherwise clearly defined and limited, term " setting ", " installation ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or one Connect body;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirect by intermediary It is connected, can is the connection of two element internals.For the ordinary skill in the art, on being understood with concrete condition State the concrete meaning of term in the present invention.
Referring to Fig. 1, present embodiments providing a kind of pipeline integrates cleaning plant 100, including draw-gear 110 and entering During row prune job independently and multiple cleaning mechanisms for being alternatively connected with draw-gear 110.In the present embodiment, descaling machine The connection of structure and draw-gear 110 is is flexibly connected, and the optional meaning in the present embodiment is multiple cleaning mechanisms in difference Time be connected with draw-gear 110, i.e., multiple cleaning mechanisms can not the same time simultaneously be connected with draw-gear 110.
In the present embodiment, multiple cleaning mechanisms include sandstone cleaning plant 120, mud cleaning plant 130 and sewage disposal Device 140.Sandstone processing unit is substantially carried out the cleaning work to the relatively ratchel in pipeline 200 for clearance in the present embodiment, Mud cleaning plant 130 is substantially carried out carrying out the mud in pipeline 200 for clearance and sandstone at the work of cleaning accumulation, sewage Reason device 140 is substantially carried out to sewage and part mud are cleared up in pipeline 200 for clearance work.
Referring to Fig. 1, draw-gear 110 be included in pipeline neighboring area movement mobile device (not shown) and It is installed on the hauling machine 112 of mobile device.By the accompanying drawing in this implementation, the main movement of described draw-gear 110 is axle To it is mobile and and vertically move, axial movement is mobile device (not shown), vertically move for hauling machine 112.At this In embodiment, mobile device is provided on level ground, i.e., be spatially arranged on the top of pipeline 200 for clearance.
In the present embodiment, mobile device is fork truck 111, and fork truck 111 includes fork truck body (not shown) and along fork truck car The Forklift truck rack (not shown) that body is vertically moved.Forklift truck rack includes for the hoistable platform 113 of fixed traction machine 112 and flat with lifting The lifting arm 114 that platform 113 is connected.It will be appreciated, however, that outside the present embodiment, mobile device can also can be realized for other The car body of axial movement.
In the present embodiment, in the present embodiment, lifting arm 114 is that the offer power of hoistable platform 113 makes hoistable platform 113 exist Back and forth movement is carried out on vertical direction.
Hauling machine 112 includes being fixed on the capstan winch 115 of hoistable platform 113 and is wrapped in the pull rope 116 of capstan winch 115.Lead The length of messenger 116 can be according to pipeline 200 for clearance apart from ground depth set, when pipeline 200 for clearance is apart from ground When face is deeper, the length of pull rope 116 is settable longer, when pipeline 200 for clearance is shallower apart from ground, pull rope 116 Length is settable shorter.
Referring to Fig. 2, in the present embodiment, sandstone cleaning plant 120 includes the grab bucket mechanism being connected with pull rope 116, Referring to Fig. 3 grab buckets mechanism includes the fixed disk 121 being connected with pull rope 116 and the crawl section being flexibly connected with fixed disk 121 122。
Refering to Fig. 3, in the present embodiment, crawl section 122 is connected with fixed disk 121 by capturing assisted parts 123, please again Refering to Fig. 3, crawl assisted parts 123 includes the expansion link 125 for being arranged at fixed disk 121 and is in the center of circle along multiple expansion links 125 It is symmetrical arranged and carries out the first fix bar 126 of circular motion.
In the present embodiment, expansion link 125 is hydraulic column, and one end of expansion link 125 is connected other end work with fixed disk 121 Dynamic to be connected with connector, the connected mode at the two ends of expansion link 125 is attached by plug connector, and is carried out with grafting Circular motion is carried out centered on part.
One end of the first fix bar 126 in the present embodiment is similarly connected with connector, different from expansion link 125 It is that the first fix bar 126 is connected to the another side of connector.First fix bar 126 is lived with connector also by plug connector Dynamic connection, can make the first fix bar 126 carry out circular motion centered on plug connector.
In the present embodiment, crawl section 122 includes the grab bucket 124 connected one to one with the first fix bar 126, and first consolidates The quantity of fixed pole 126 is identical with the quantity of grab bucket 124.It can be seen from Fig. 3, the number of grab bucket 124 is four in the present embodiment, Then the quantity of the first fix bar 126 is also four.
It is worth noting that, in other embodiments, the quantity of grab bucket 124 can also for it is any be more than or equal to two amount, For example, in other embodiments, the quantity of grab bucket 124 can be two, three or five, as long as can make multiple grab buckets 124 form the entirety of closing.
Grab bucket 124 is connected by the second fix bar 127 with fixed disk 121, and individually each grab bucket 124 is connected with Second fix bar 127, and the second fix bar 127 is connected with fixed disk 121.
Please continue to refer to Fig. 3, the two ends of the second fix bar 127 are flexibly connected with grab bucket 124 and fixed disk 121 respectively, this Be flexibly connected in embodiment to be connected by plug connector, i.e., the two ends of the second fix bar 127 by plug connector with grab bucket 124 and admittedly Price fixing 121 is connected.
In the present embodiment, fixed disk 121 is circular pan-like structure, it will be appreciated, however, that in other examples, Gu Price fixing 121 can also be configured for any one shapes such as square plate, triangle disks.
One end of pull rope 116 is connected with fixed disk 121, and the other end of pull rope 116 is wound in capstan winch 115 and set Put.Hoistable platform 113 is provided with second pulley 117 close to one end of grab bucket 124.
In the present embodiment, second pulley 117 offers cell body, and one end of pull rope 116 is connected with fixed disk 121, led The emperor's body of messenger 116, which is arranged on, makes the other end of pull rope 116 be connected with capstan winch 115 in cell body, 124 mechanisms of grab bucket are connected Connect.
In the present embodiment, in order that the more stable of mechanism fixation of grabbing bucket, optionally sets in the upper surface of fixed disk 121 Telescopic fix bar is equipped with to be fixedly connected with hoistable platform 113.
Refering to Fig. 4, the mud cleaning plant 130 in the present embodiment includes the row's silt machine being arranged in pipeline 200 for clearance The haulage gear that structure and Shi Paiyu mechanisms of connection Pai Yu mechanisms are moved repeatedly with first direction opposite direction in a first direction.
In the present embodiment, first direction is the direction moved by A to B.The opposite direction of first direction is moved by B to A Direction.
Hauling machine 112 can drive direction of the Pai Yu mechanisms along A to B to be moved, and can also drive Pai Yu mechanisms along B to A Direction moved so that Pai Yu mechanisms carry out row's stasis of blood operation, Ji Paiyu mechanisms in A to B direction and B to A direction The distance passed by by Pai Yu mechanisms and inner-walls of duct contact surface area on A to B and B to A directions of row's stasis of blood area.
When hauling machine 112 drives direction of the Pai Yu mechanisms along A to B to be moved, i.e., hauling machine 112 drives Pai Yu mechanisms Carry out row the stasis of blood operation when, hoistable platform 113 can it is constant with hold mode, moved or kept below in a second direction and led The speed for drawing the motion of machine 112 carries out the motion of second direction opposite direction.
Refering to Fig. 5, desilting tube road 132 is arranged in mud scraping disc 131.
Desilting tube road 132 is that stationary state, i.e. desilting tube road 132 are fixedly installed in pipeline 200 for clearance.Refering to Fig. 6, Mud scraping disc 131 includes being used to be arranged the through hole 133 in desilting tube road 132 and becoming silted up around the multiple rows set along around through hole 133 Row's silt group in group, the present embodiment is made up of the wire 134 of dense arrangement.
Referring to Fig. 6, in the present embodiment, desilting tube road 132 includes sleeve pipe 135 and is flexibly connected with sleeve pipe 135 Inner tube 136.
One end of sleeve pipe 135 is connected with the surface of mud scraping disc 131, and one end of inner tube 136 is fixedly connected, and the other end wears row The through hole 133 of silt center.
In the present embodiment, in order that setting more stable in the pipeline 200 for clearance of inner tube 136, can be selected in for clearance The support frame set on vertical direction, the one end of inner tube 136 and the branch being arranged in pipeline 200 for clearance are provided with pipeline 200 Support is fixedly connected.
One end of support frame in the present embodiment is fixedly connected with the other end with pipeline 200 for clearance and consolidated with hoistable platform 113 Fixed connection.Medium support frame of the present embodiment is Collapsible structure, with the raising and lowering of hoistable platform 113 carry out it is flexible and Expansion, make desilting tube road 132 will not with hoistable platform 113 mobile generation vertical direction movement.
Refering to Fig. 7, the mud scraping disc 131 in the present embodiment is connected with pull rope 116, by pull rope 116 in vertical direction On mobile carry out first direction or first direction movement in the reverse direction, i.e. pull rope 116 moves up in vertical direction When, mud scraping disc 131 carries out the motion of first direction or first direction opposite direction in inner tube 136.
In the present embodiment, the one end of inner tube 136 away from sleeve pipe 135 is provided with support 137, is set in the upper end of support 137 There is lug, first pulley is connected with by lug.In the present embodiment, pull rope 116 passes through first pulley and mud scraping disc 131 Connection.
It is worth noting that, mud scraping disc 131 is and the discoid knot of the shape identical of pipeline 200 for clearance in the present embodiment Structure, but in other embodiments mud scraping disc 131 can as the case may be in pipeline for clearance 200 shape determine, that is, scrape mud Disk 131 can be the other shapes such as square, oval, can also be other profiled shapes.
One end concentrated setting of wire 134 in the present embodiment is another in edge of the mud scraping disc 131 away from through hole 133 End is positioned close to the edge of through hole 133.In the present embodiment, the row of many one metal wires 134 set away from the edge of through hole 133 Cloth is more dissipated, and many one metal wires 134 on the other side set close to the edge of through hole 133 are arranged more intensive.
It is worth noting that, wire 134 is iron wire or steel wire, but metal in other embodiments in the present embodiment Silk 134 can also be the larger wire 134 of other hardness.
Understood refering to Fig. 8, sewage-treatment plant 140 includes the sand discharging pump 141 and and sand discharging pump being connected with pull rope 116 141 connections extend the drainpipe 142 outside pipeline 200 for clearance, and sand discharging pump 141 is connected as sand discharging pump with extraneous supply unit 141 offer power are drawn water, and are discharged from drainpipe 142.
The present embodiment additionally provides a kind of utilization pipeline and integrates the pipeline cleaning method that cleaning system is realized, this method is utilized Pipeline, which integrates cleaning system, realizes the method all cleaned out the stone in pipeline, mud and sewage in pipeline 200 for clearance.
The method of sandstone cleaning is to capture in pipeline 200 for clearance sandstone using sandstone cleaning plant 120 and put sandstone Put the process outside pipeline 200 for clearance.
The method of mud cleaning is to utilize mud cleaning plant 130 by the process of slurry collecting in pipeline 200 for clearance.
Sewage in pipeline 200 for clearance is discharged pipeline for clearance by the method for sewage disposal using sewage-treatment plant 140 Process outside 200.
Concretely comprise the following steps:First the sandstone in pipeline 200 for clearance is cleared up with sandstone cleaning plant 120, then transported The mud in pipeline 200 for clearance is cleared up with mud cleaning plant 130, will finally be treated with sewage-treatment plant 140 Clear up sewage in pipeline 200 and carry out cleaning discharge.
It is worth noting that, in the present embodiment cleaning order according to specific rubbish quantity in pipeline 200 for clearance with Rubbish species is determined.Such as stone when having only existed larger rubbish object in pipeline 200 for clearance, can only use sandstone Cleaning plant 120 is cleared up pipeline 200 for clearance.Exist again when there is larger rubbish object in pipeline 200 for clearance During sewage, first with the cleaning of sandstone cleaning plant 120 sewage cleaning plant can be recycled to enter the sewage in pipeline 200 for clearance Row discharge.When larger rubbish object, sewage and mud in pipeline 200 for clearance and in the case of depositing, filled first with garbage-cleaning Put and stone is cleared up, sewage-treatment plant 140 is recycled to sewage carrying out cleaning to mud using silt cleaning device Carry out cleaning discharge.
Understanding, when there is substantial amounts of long-pending stone in pipeline 200 for clearance, entering to pipeline 200 for clearance specifically, combining figure During row cleaning, first fork truck 111 is moved to by pipeline 200 for clearance, hoistable platform 113 is lifted by lifting arm 114, So as to drive the grab bucket mechanism being connected with pull rope 116 to carry out the surface that lifting makes grab bucket mechanism be located at pipeline 200 for clearance Position.
When mechanism of grabbing bucket can just reach region for clearance by the position movement of lifting arm 114, stretch expansion link 125 Exhibition, the elongation of expansion link 125 makes the multiple grab buckets 124 closed up originally outwards be deployed, and will be stretched when deploying to a certain extent Sleeve pipe 135 in contracting bar 125 is returned by former route shrinks expansion link 125, is closed up multiple grab buckets 124, what is closed up During can close up progress aggregation so as to be stored in many with grab bucket 124 with multiple rubbish for clearance for contact of grab bucket 124 In the cavity that individual grab bucket 124 is formed, the collection of rubbish is completed.
After collection terminates, mud and sewage are also remained in pipeline 200 for clearance, first with mud cleaning plant 130 Mud is cleared up, is specially to be connected mud cleaning plant 130 with hoistable platform 113, mud cleaning plant 130 includes knot The traction unit of structure identical first and the second traction unit.When operation starts, open what is be correspondingly arranged on the first traction unit Capstan winch 115 moves downward pull rope 116 to drive direction of the mud scraping disc 131 along A to B to move so that pipeline for clearance Mud in 200 is moved and cleared up with mud scraping disc 131, when mud scraping disc 131 is moved to the position of support 137, is closed Stop the capstan winch 115 that the first traction unit is correspondingly arranged.Open the second capstan winch 115 for being correspondingly arranged of rope immediately, make pull rope 116 to Lower motion, so as to drive direction of the mud scraping disc 131 along B to A to move, realizes the silt not being cleaned in pipeline 200 for clearance The discharge of mud, the corresponding capstan winch 115 of the second traction unit is closed down when mud scraping disc 131 is moved to 137 position of support, is completed once The work of complete cleaning mud.
The cleaning of mud carries out unified collection but not discharged to treat clear to will be attached to the mud on inner-walls of duct actually Manage in pipeline 200, the mud in pipeline 200 for clearance and sewage can be purged by using sewage-treatment plant 140.Tool Body is to stretch in the side of pipeline 200 for clearance sand discharging pump 141 by pull rope 116, pass through the drainpipe 142 of connection Mud and sewage in pipeline 200 for clearance is expelled to outside pipeline 200 for clearance.
The pipeline cleaning method that a kind of pipeline integrates cleaning system is present embodiments provided, by being provided with sandstone cleaning dress 120, silt cleaning device and sewage-treatment plant 140 is put to be cleared up the rubbish in pipeline 200 for clearance.The present embodiment is carried The movement of the hoistable platform 113 and lifting arm 114 of confession be by hydraulic pressure be driven so as to implement state change, and profit With the engine of fork truck 111 as power source, crawl function is added while the utility function of fork truck 111 is not influenceed, so It can be achieved the debris and sewage in municipal rain pipe, sewage pipe and plant effuent pipe, community wastewater pipe and plant effuent pond All it is transferred out of by capturing and discharging in pipeline, solves city political staff, artificial underground and draw clearly, the technology of inefficiencies is difficult Topic, and annual because drawing gassing has greatly generation clearly, by the equipment of mechanization reduce municipal officer property and The guarantee of life security.
The grasp speed that pipeline in the present embodiment integrates cleaning plant 100 is fast, and crawl every time can capture the side's of debris 0.1 Sandstone, mud, crawl strength are big, and maximum can capture 1500 kilograms of weights, and crawl diameter reaches 1.5 squares.
The pipeline that the present embodiment is provided integrates the not electricity consumption of cleaning plant 100, without generating, and energy-conserving and environment-protective directly use liquid Pressure power, energy loss is few, and conversion ratio is high, reduces the personal injury that who is caused with other equipment because of electric leakage with people.It is mobile compared with For convenience of, it is quick, after the end of job can special show immediately, prestowage is taken away at random, it is achieved thereby that desilting is efficient.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (10)

1. a kind of pipeline integrates cleaning plant, it is characterised in that including draw-gear and when carrying out prune job independently And the multiple cleaning mechanisms being alternatively connected with the draw-gear;The multiple cleaning mechanism includes sandstone cleaning plant, mud Starch cleaning plant and sewage-treatment plant.
2. pipeline according to claim 1 integrates cleaning plant, it is characterised in that the draw-gear is included in the pipe The mobile device of the neighboring area movement in road and the hauling machine for being installed on the mobile device, the hauling machine are described for driving Multiple cleaning mechanisms are moved in the pipeline.
3. pipeline according to claim 2 integrates cleaning plant, it is characterised in that the mobile device includes fork truck, institute Stating fork truck includes fork truck body and the Forklift truck rack vertically moved along the fork truck body.
4. pipeline according to claim 3 integrates cleaning plant, it is characterised in that the Forklift truck rack includes being used to fix institute The lifting arm stated the hoistable platform of hauling machine and be connected with the hoistable platform.
5. pipeline according to claim 4 integrates cleaning plant, it is characterised in that the hauling machine is described including being fixed on The capstan winch of hoistable platform and the pull rope for being wrapped in the capstan winch.
6. pipeline according to claim 5 integrates cleaning plant, it is characterised in that the sandstone cleaning plant includes and institute State the grab bucket mechanism of pull rope connection;The grab bucket mechanism include the fixed disk that is connected with the pull rope and with the fixed part The crawl section of flexible connection.
7. pipeline according to claim 6 integrates cleaning plant, it is characterised in that the crawl section includes being configured as can The multiple grab buckets switched in closure state and released state.
8. pipeline according to claim 1 integrates cleaning plant, it is characterised in that the mud cleaning plant includes being used for The mud scraping disc of mud is cleared up in mobile mode in pipeline for clearance and become silted up for the row that the mud scraping disc provides moving track Sleeve pipe.
9. pipeline according to claim 5 integrates cleaning plant, it is characterised in that the sewage-treatment plant includes and institute The drainpipe stated the sand discharging pump of pull rope connection and be connected with sand discharging pump, the free end of the drainpipe is located at pipeline for clearance Outside.
10. a kind of pipeline integrates cleaning system, it is characterised in that integrated including the pipeline described in any one of claim 1~9 clear Manage device.
CN201710217597.9A 2017-04-05 2017-04-05 A kind of pipeline garbage cleaning device and its system Pending CN107044145A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710217597.9A CN107044145A (en) 2017-04-05 2017-04-05 A kind of pipeline garbage cleaning device and its system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710217597.9A CN107044145A (en) 2017-04-05 2017-04-05 A kind of pipeline garbage cleaning device and its system

Publications (1)

Publication Number Publication Date
CN107044145A true CN107044145A (en) 2017-08-15

Family

ID=59544776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710217597.9A Pending CN107044145A (en) 2017-04-05 2017-04-05 A kind of pipeline garbage cleaning device and its system

Country Status (1)

Country Link
CN (1) CN107044145A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115532741A (en) * 2022-09-16 2022-12-30 中煤能源研究院有限责任公司 Long-distance slurry conveying pipeline rapid dredging device and dredging method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2912763A1 (en) * 2007-02-16 2008-08-22 Lyonnaise Des Eaux France Sa Sewer cleaning truck, has drain device completely draining waste water from compartment of tank, and controller connected to on-board weighing system and flow-meter for determining mass of sewage residue
CN201559947U (en) * 2009-12-22 2010-08-25 南京金长江交通设施有限公司 Grab bucket type garbage truck
CN102864837A (en) * 2012-09-18 2013-01-09 泉州市泉港迅达石化设备安装有限公司 Novel multifunctional device for mechanically clearing blow-off pipeline
CN106320510A (en) * 2016-11-16 2017-01-11 湖南奇思环保设备制造有限公司 Drain device and deep well dredging grab bucket loader
CN206815418U (en) * 2017-04-05 2017-12-29 李新安 A kind of pipeline synthesis cleaning plant and its system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2912763A1 (en) * 2007-02-16 2008-08-22 Lyonnaise Des Eaux France Sa Sewer cleaning truck, has drain device completely draining waste water from compartment of tank, and controller connected to on-board weighing system and flow-meter for determining mass of sewage residue
CN201559947U (en) * 2009-12-22 2010-08-25 南京金长江交通设施有限公司 Grab bucket type garbage truck
CN102864837A (en) * 2012-09-18 2013-01-09 泉州市泉港迅达石化设备安装有限公司 Novel multifunctional device for mechanically clearing blow-off pipeline
CN106320510A (en) * 2016-11-16 2017-01-11 湖南奇思环保设备制造有限公司 Drain device and deep well dredging grab bucket loader
CN206815418U (en) * 2017-04-05 2017-12-29 李新安 A kind of pipeline synthesis cleaning plant and its system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115532741A (en) * 2022-09-16 2022-12-30 中煤能源研究院有限责任公司 Long-distance slurry conveying pipeline rapid dredging device and dredging method

Similar Documents

Publication Publication Date Title
CN206815508U (en) A kind of pipeline sludge cleaning plant and its system
CN106194060A (en) A kind of global design of Cabon-fibre continuous sucker rod operating vehicles
CN203583655U (en) Inspection well dredging and cleaning machine
CN110644556A (en) Deep hole drainage building block dredging device and dredging method
CN105019552B (en) Municipal sewage system continuous desilting machine
CN206815418U (en) A kind of pipeline synthesis cleaning plant and its system
CN107100222B (en) Construction diversion tunnel bottom gate way silt sand cleaning device
CN107044145A (en) A kind of pipeline garbage cleaning device and its system
CN206815507U (en) A kind of pipeline garbage cleaning device and its system
CN202315437U (en) Lifting device for dross well of sewage treatment primary settling tank
CN209144900U (en) A kind of WR and hydropower construction water channel Accrete clearing device
CN202990001U (en) Amphibious river channel working platform
CN213668066U (en) Movable sludge discharge device for coal-containing wastewater pool
CN207314414U (en) A kind of dredging device for water conservancy projects
CN207047929U (en) A kind of Construction diversion tunnel bottom gate slot mud sand cleaning plant
CN106013412B (en) A kind of municipal works road sewer intelligence cleaning equipment
CN204608861U (en) A kind of cleaning plant effectively can clearing up mud
CN201817211U (en) Movable integrated grab sewage disposal and grating and gate hoisting machine
CN201321659Y (en) Sewage well cleaning plant
CN211006554U (en) Rotary hydraulic grab bucket type trash remover
CN210564473U (en) Monitoring well bottom dredging device
CN209885307U (en) Sedimentation tank mud cleaning device
CN204826185U (en) Continuous silt remover of municipal sewage system
CN210887377U (en) Deep hole drainage building dredging device
CN109701300B (en) Sedimentation tank mud cleaning device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170815

RJ01 Rejection of invention patent application after publication