CN107040408A - Network electric power method of testing based on SDN automation equipments - Google Patents
Network electric power method of testing based on SDN automation equipments Download PDFInfo
- Publication number
- CN107040408A CN107040408A CN201710178240.4A CN201710178240A CN107040408A CN 107040408 A CN107040408 A CN 107040408A CN 201710178240 A CN201710178240 A CN 201710178240A CN 107040408 A CN107040408 A CN 107040408A
- Authority
- CN
- China
- Prior art keywords
- sdn
- electric power
- network
- network electric
- portable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010998 test method Methods 0.000 title claims abstract description 16
- 238000012360 testing method Methods 0.000 claims abstract description 27
- 238000000034 method Methods 0.000 claims abstract description 7
- 238000009413 insulation Methods 0.000 claims description 11
- 238000004804 winding Methods 0.000 claims description 7
- 230000006870 function Effects 0.000 claims description 6
- 238000002955 isolation Methods 0.000 claims description 4
- 230000008569 process Effects 0.000 claims description 4
- 230000008859 change Effects 0.000 claims description 3
- 239000011159 matrix material Substances 0.000 claims description 3
- 238000001514 detection method Methods 0.000 claims description 2
- 230000005540 biological transmission Effects 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 description 4
- 238000012217 deletion Methods 0.000 description 2
- 230000037430 deletion Effects 0.000 description 2
- 230000000903 blocking effect Effects 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 230000011664 signaling Effects 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/08—Configuration management of networks or network elements
- H04L41/0889—Techniques to speed-up the configuration process
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/08—Configuration management of networks or network elements
- H04L41/0803—Configuration setting
- H04L41/084—Configuration by using pre-existing information, e.g. using templates or copying from other elements
- H04L41/0846—Configuration by using pre-existing information, e.g. using templates or copying from other elements based on copy from other elements
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/08—Configuration management of networks or network elements
- H04L41/0893—Assignment of logical groups to network elements
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/12—Discovery or management of network topologies
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L47/00—Traffic control in data switching networks
- H04L47/10—Flow control; Congestion control
- H04L47/12—Avoiding congestion; Recovering from congestion
- H04L47/125—Avoiding congestion; Recovering from congestion by balancing the load, e.g. traffic engineering
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/2866—Architectures; Arrangements
- H04L67/30—Profiles
Abstract
The invention solves the problems that configuration of the SDN controllers in different computer rooms, while setting an equipment to allow SDN setting up procedure to configure the download optimized with practical operation situation according to computer room.Network electric power method of testing of the invention based on SDN automation equipments, it uses portable SDN deployment terminal to be arranged in the computer room based on power test business, as a result of methods described, in segregate computer room the configuration that terminal carries out SDN controllers is disposed by connecting portable SDN, the state of net where the configuration of SDN controllers is collected, and the routing policy of business is obtained according to the different QoS requirements of business, improve the quality of flow transmission;Net state uses different network electric power Test Strategies where another aspect SDN controllers can be integrated, and reduces regulation and control granularity, and net where improving carries out the flexibility of network electric power test.
Description
Technical field
The present invention relates to a kind of power test method, it is based on after the transformation for concretely relating to legacy network architectural framework
The network electric power method of testing of SDN automation equipments.
Background technology
With the complication of application, people's information requirement is continuously increased, and available data center is occurred in that much itself can not
The problem of solution, it is necessary to which available data center is optimized or rebuild, especially data center network will be rebuild.So
Background under, expedited the emergence of many data center network new technologies.Following data center network includes three-major-items:SDN、
The virtual private data center of Overlay stateless network, vDC.The core concept of this three-major-items is all around software, automation
Management, grand designs, people is freed from cumbersome configuration, data center network can be disposed more extensive,
This is exactly required for large-scale corporation.
SDN is well known earliest, i.e. software defined network.Core concept is by network function and service processing function
Decoupled with network device hardware, become the function of abstract, then control by external controller these abstract objects.It is logical
The frameworks close coupling framework of legacy network is split as applying, controlled, is forwarded three layers of separation are crossed, network will no longer turn into restriction
The bottleneck that business is reached the standard grade with cloud efficiency, but while data transfer task is completed, calculating after also becoming and virtualize,
Storage resource is the same, as a kind of resource that can flexibly allocate.In data center, network technology is one closed the most
Point, this causes the bottleneck that network develops as data center for a long time, and the investment of network portion also occupies data center
A big chunk of gross investment.SDN arrival seeks to break the closure of this network, allows network to move towards opening.
SDN includes controller and openflow two large divisions, and controller is a software, and whole network equipment can be entered
Row management and control, management include issuing forwarding-table item, and control includes being monitored all-network equipment running status.
Openflow is the language of intercommunication between controller and the network equipment, and controller is carried out by Openflow to all-network equipment
Forwarding-table item is issued, equipment control.For a long time, people be intended to by data center can become it is a kind of it is more flexible, convenient, by
The resource that demand takes, can just free " software " from " hardware " platform by disposing SDN, realize the hope of people
Hope.
But for the general a set of SDN of multiple computer rooms in the case of, need to be respectively configured SDN in multiple computer rooms and bar be set
Part, the efficiency manually set is very low, and can not carry out unmanned automatic setting on duty.It is disposable in the prior art to set
Equipment of the good configuration file due to configuration in different computer rooms is different, also can not be general.
The content of the invention
The invention solves the problems that configuration of the SDN controllers in different computer rooms, while setting an equipment to cause SDN to set
The download that journey can be configured according to computer room and practical operation situation is optimized.
It should be noted that the present invention is used in power test work, kiowatt is due to safety reasons, each region
Network is not attached in outer net, but is connected by Intranet, and physical isolation is also provided with the Intranet of different zones, because
This many content directly can not need human configuration by network configuration.And can be led if the unified download using mechanization
Cause single SDN strategies can not adapt to the different actual conditions of each computer room.
For solution described problem, the network electric power method of testing of the invention based on SDN automation equipments, it uses portable
SDN deployment terminal is arranged in the computer room based on power test business, and the portable SDN deployment terminal includes:
Insulate antistatic casing:For modules to be fixed together;Integral insulation protection is played simultaneously, it is to avoid due to
Electrostatic causes module damage in casing.
Independent current source module:For being powered to portable SDN deployment terminal;Independent current source is avoided due to computer room voltage instability
Surely cause configuration process to interrupt conductance cause system and run quickly routed.
Equipment test adaptor:For detecting device configuration in computer room;
Memory:Usually two pieces of SSD hard disks, one of is Primary Hard Drive, and another piece is daily record of work recording disk;
SDN configures main control chip, and the calculator room equipment selection for being detected according to equipment test adaptor is suitable default
SDN is configured;
Coffret:For being connected with interchanger;
Multiple spaces are divided into by inner division plate in the insulation antistatic casing, wherein equipment test adaptor is set
In insulation antistatic casing front end, it is connected directly between on coffret, SDN configuration main control chips are arranged on insulation antistatic casing
Center, two pieces of SSD hard disks set up the SDN configuration side positions of main control chip two separately;By portable SDN deployment terminal accesses during work
Computer room SDN switch can carry out SDN configurations, and implement network electric power test.
It is preferred that, also it is in series with authentication means on the coffret.Such structure avoids being missed by unrelated person
Operate portable SDN deployment terminal.Usual authentication means are Fingerprint Lock.
It is preferred that, the cabinet sides are additionally provided with winding box, and the winding box is arranged close to independent current source module side.
Because portable SDN deployment terminals need to be easy to carry, therefore use storage just extremely important, the take-up for finishing rear cable
Wrapping post is provided with box, cable is around being connected on wrapping post and carry out cable storage by closing winding box.
It is preferred that, the insulation antistatic casing is cylinder.
It is preferred that, described portable SDN deployment terminal is linked into after SDN switch, the detection of equipment test adaptor
The equipment that SDN switch is connected, and matched with the allocation plan preloaded in memory, find in Primary Hard Drive after matching scheme
SDN configuration files are written in SDN switch, and datum plane is formed in SDN switch, and data are instructed and plan according to key-course
Slightly forwarded the packet in datum plane, while being deleted after the control ability of original network equipment is extracted, by independent SDN
Controller is controlled, and these control abilities include determining the forward-path of each Business Stream in network, while being provided to application layer
The interface of corresponding function controlling, finally by application, the interface for calling key-course to provide realizes Topology Discovery, flow work
Journey and flow isolation features carry out network electric power test job.The extraction and deletion of the control ability of original network equipment are not
Only to the deletion of original control software, and port unnecessary in the work of SDN controllers is closed, while also deleting
The backup resetted.But the daily record of work of control program will be backed up on will recording disk on weekdays before.
It is preferred that, SDN controllers pass through SDN according to current network Link State and the control of the traffic matrix of current network
The forwarding strategy of the network traffic of router, reaches the load balancing of network., can be in work if network load reaches the upper limit
Make log recording hard disk remarks prompting message, it is necessary to additionally increase hardware device.
It is preferred that, portable SDN deployment terminal can change forwarding strategy in real time when being linked into SDN switch, but work as
Portable SDN deployment terminal departs from after SDN switch, using only the forwarding strategy of the SDN selections finally used.It thus is avoided that
SDN deployment is beyond control.
It is preferred that, portable SDN deployment terminal is linked into after SDN switch, and daily record of work recording disk is started working simultaneously
Whole operation process is recorded, is disconnected until portable SDN disposes terminal and SDN switch.
As a result of methods described, terminal progress SDN controls are disposed by connecting portable SDN in segregate computer room
The configuration of device, the state of net where the configuration of SDN controllers is collected, and according to the road of the different QoS requirements of business acquisition business
By strategy, the quality of flow transmission is improved;Net state where another aspect SDN controllers can be integrated is using different network electricity
Power Test Strategy, reduces regulation and control granularity, and net where improving carries out the flexibility of network electric power test.
Brief description of the drawings
The embodiment to the present invention is described further below in conjunction with the accompanying drawings:
Fig. 1 disposes the whole of terminal for portable SDN in the network electric power method of testing of the invention based on SDN automation equipments
Body structural representation.
Embodiment
The configuration of SDN controllers has been in industry more ripe technology, and its principle is not also repeated herein.But for
The regional network being relatively isolated of power system, how to configure SDN controllers is always a problem.Present invention mainly solves
Be the configuration of SDN controllers the problem of.
To this as shown in figure 1, the network electric power method of testing based on SDN automation equipments, is disposed eventually using portable SDN
End is arranged in the computer room based on power test business, and the portable SDN deployment terminal includes:
Insulate antistatic casing 1:For modules to be fixed together;
Independent current source module 2:For being powered to portable SDN deployment terminal;
Equipment test adaptor 3:For detecting device configuration in computer room;
Memory:Usually two pieces of SSD hard disks, one of is Primary Hard Drive 4, and another piece is daily record of work recording disk 5;
SDN configures main control chip 6, and the calculator room equipment for being detected according to equipment test adaptor 3 selects suitable pre-
If SDN is configured;
Coffret 7:For being connected with interchanger;
Multiple spaces are divided into by inner division plate in the insulation antistatic casing 1, wherein equipment test adaptor 3 is set
Put in insulation antistatic casing 1 front end, be connected directly between on coffret 7, it is anti-quiet that SDN configuration main control chips 6 are arranged on insulation
The center of motor casing 1, two pieces of SSD hard disks set up SDN configuration 6 liang of side positions of main control chip separately;Portable SDN is disposed during work
Terminal access computer room SDN switch can carry out SDN configurations, and implement network electric power test.Also connected on the coffret 7
There is the Fingerprint Lock as authentication means 8.The cabinet sides are additionally provided with winding box 9, and the winding box 9 is arranged close to solely
The vertical side of power module 2.The insulation antistatic casing 1 is cylinder.
During configuration, portable SDN deployment terminal is linked into after SDN switch by staff, and equipment test adaptor 3 is examined
The equipment that SDN switch is connected is surveyed, and is matched with the allocation plan preloaded in memory, is found Primary Hard Drive after matching scheme
SDN configuration files are written in SDN switch in 4, and datum plane is formed in SDN switch, and data are instructed according to key-course
Forwarded the packet with strategy in datum plane, while being deleted after the control ability of original network equipment is extracted, by independence
SDN controllers be controlled, these control abilities include determining the forward-path of each Business Stream in network, while to application layer
The interface of corresponding function controlling is provided, finally by application, the interface for calling key-course to provide realizes Topology Discovery, stream
Measure engineering and flow isolation features carry out network electric power test job.Configuration is completed.
During work, SDN controllers monitor network link load conditions in real time, and such as terminal A accesses terminal B and normally walks link
A, when detecting link a and blocking, SDN controllers issue control signaling, change the flow table of interchanger, terminal A is accessed
Terminal B flow switch realizes the scheduling of flow to link b.
SDN controllers pass through SDN routers according to current network Link State and the control of the traffic matrix of current network
Network traffic forwarding strategy, reach the load balancing of network.SDN automation equipments can be with when being linked into SDN switch
Forwarding strategy is changed in real time, but after SDN automation equipments depart from SDN switch, using only the SDN selections finally used
Forwarding strategy.Portable SDN deployment terminal is linked into after SDN switch, and daily record of work recording disk 5 is started working and recorded
Whole operation process, until portable SDN disposes terminal and SDN switch is disconnected.
In addition to above preferred embodiment, the present invention also has other embodiments, and those skilled in the art can be according to this
Invention is variously modified and deformed, and without departing from the spirit of the present invention, all should belong to appended claims of the present invention and determine
The scope of justice.
Claims (8)
1. the network electric power method of testing based on SDN automation equipments, it is characterised in that:Set using portable SDN deployment terminal
It is placed in the computer room based on power test business, the portable SDN deployment terminal includes:
Insulate antistatic casing (1):For modules to be fixed together;
Independent current source module (2):For being powered to portable SDN deployment terminal;
Equipment test adaptor (3):For detecting device configuration in computer room;
Memory:Usually two pieces of SSD hard disks, one of is Primary Hard Drive (4), and another piece is daily record of work recording disk (5);
SDN configuration main control chips (6), the calculator room equipment for being detected according to equipment test adaptor (3) selects suitable pre-
If SDN is configured;
Coffret (7):For being connected with interchanger;
Multiple spaces are divided into by inner division plate in the insulation antistatic casing (1), wherein equipment test adaptor (3) is set
Put in insulation antistatic casing (1) front end, be connected directly between on coffret (7), SDN configuration main control chips (6) are arranged on absolutely
Edge antistatic casing (1) center, two pieces of SSD hard disks set up the SDN configuration side positions of main control chip (6) two separately;Will just during work
SDN configurations can be carried out by taking formula SDN deployment terminal access computer room SDN switches, and implement network electric power test.
2. the network electric power method of testing according to claim 1 based on SDN automation equipments, it is characterised in that:It is described
Authentication means (8) are also in series with coffret (7).
3. the network electric power method of testing according to claim 1 based on SDN automation equipments, it is characterised in that:It is described
Cabinet sides are additionally provided with winding box (9), and the winding box (9) is arranged close to independent current source module (2) side.
4. the network electric power method of testing according to claim 1 based on SDN automation equipments, it is characterised in that:It is described
The antistatic casing (1) that insulate is cylinder.
5. the network electric power method of testing based on SDN automation equipments, it is characterised in that:Will be portable described in claim 1
Formula SDN deployment terminal is linked into after SDN switch, the equipment that equipment test adaptor (3) detection SDN switch is connected, and
With the allocation plan matching preloaded in memory, find after matching scheme and SDN configuration files in Primary Hard Drive (4) are written to SDN
In interchanger, datum plane is formed in SDN switch, data are grouped according to key-course instruction and strategy in datum plane
Forwarding, while being deleted after the control ability of original network equipment is extracted, is controlled by independent SDN controllers, these
Control ability includes determining the forward-path of each Business Stream in network, while providing connecing for corresponding function controlling to application layer
Mouthful, finally by application, the interface for calling key-course to provide realizes Topology Discovery, traffic engineering and flow isolation features
Carry out network electric power test job.
6. the network electric power method of testing as claimed in claim 5 based on SDN automation equipments, it is characterised in that:SDN controllers
Pass through the forwarding of the network traffic of SDN routers according to current network Link State and the control of the traffic matrix of current network
Strategy, reaches the load balancing of network.
7. the network electric power method of testing as claimed in claim 5 based on SDN automation equipments, it is characterised in that:SDN is automated
Equipment can change forwarding strategy in real time when being linked into SDN switch, but after SDN automation equipments depart from SDN switch,
Using only the forwarding strategy of the SDN selections finally used.
8. the network electric power method of testing as claimed in claim 5 based on SDN automation equipments, it is characterised in that:Portable SDN
Deployment terminal is linked into after SDN switch, and daily record of work recording disk (5) is started working and records whole operation process, directly
Terminal is disposed to portable SDN and SDN switch is disconnected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710178240.4A CN107040408B (en) | 2017-03-23 | 2017-03-23 | Network power testing method based on SDN automation equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710178240.4A CN107040408B (en) | 2017-03-23 | 2017-03-23 | Network power testing method based on SDN automation equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107040408A true CN107040408A (en) | 2017-08-11 |
CN107040408B CN107040408B (en) | 2023-10-24 |
Family
ID=59534611
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710178240.4A Active CN107040408B (en) | 2017-03-23 | 2017-03-23 | Network power testing method based on SDN automation equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107040408B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111782622A (en) * | 2020-09-04 | 2020-10-16 | 阿里云计算有限公司 | Log processing method, device, server and storage medium |
CN114567578A (en) * | 2022-03-14 | 2022-05-31 | 重庆紫光华山智安科技有限公司 | Pressure testing method, device, testing platform and storage medium |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103795596A (en) * | 2014-03-03 | 2014-05-14 | 北京邮电大学 | Programmable control SDN measuring system and method |
EP2787698A2 (en) * | 2013-04-03 | 2014-10-08 | Deutsche Telekom AG | A method and device for incremental deployment of software-defined networking into an enterprise network |
CN104539457A (en) * | 2014-12-30 | 2015-04-22 | 北京邮电大学 | Device unified control method, device and system based on software definition technology |
CN104753713A (en) * | 2013-12-31 | 2015-07-01 | 华为技术有限公司 | SDN (Self-Defending Network) service deployment method and SDN controller |
CN105282004A (en) * | 2014-07-25 | 2016-01-27 | 中兴通讯股份有限公司 | Network virtualization processing method, device and system |
CN105915407A (en) * | 2016-04-13 | 2016-08-31 | 重庆邮电大学 | Flow generator virtualization realization system and flow generator virtualization realization method based on SDN |
CN205754380U (en) * | 2016-05-14 | 2016-11-30 | 国网安徽省电力公司信息通信分公司 | A kind of Electric Power Communication Data network quality monitoring system based on SDN framework |
US20160373310A1 (en) * | 2015-06-19 | 2016-12-22 | International Business Machines Corporation | Automated configuration of software defined network controller |
CN106452850A (en) * | 2016-09-23 | 2017-02-22 | 西安交通大学 | SDN controller performance testing method and system |
CN206759479U (en) * | 2017-03-23 | 2017-12-15 | 国网浙江省电力公司 | Automation equipment based on SDN |
-
2017
- 2017-03-23 CN CN201710178240.4A patent/CN107040408B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2787698A2 (en) * | 2013-04-03 | 2014-10-08 | Deutsche Telekom AG | A method and device for incremental deployment of software-defined networking into an enterprise network |
CN104753713A (en) * | 2013-12-31 | 2015-07-01 | 华为技术有限公司 | SDN (Self-Defending Network) service deployment method and SDN controller |
WO2015101169A1 (en) * | 2013-12-31 | 2015-07-09 | 华为技术有限公司 | Method for deploying service by sdn and sdn controller |
CN103795596A (en) * | 2014-03-03 | 2014-05-14 | 北京邮电大学 | Programmable control SDN measuring system and method |
CN105282004A (en) * | 2014-07-25 | 2016-01-27 | 中兴通讯股份有限公司 | Network virtualization processing method, device and system |
CN104539457A (en) * | 2014-12-30 | 2015-04-22 | 北京邮电大学 | Device unified control method, device and system based on software definition technology |
US20160373310A1 (en) * | 2015-06-19 | 2016-12-22 | International Business Machines Corporation | Automated configuration of software defined network controller |
CN105915407A (en) * | 2016-04-13 | 2016-08-31 | 重庆邮电大学 | Flow generator virtualization realization system and flow generator virtualization realization method based on SDN |
CN205754380U (en) * | 2016-05-14 | 2016-11-30 | 国网安徽省电力公司信息通信分公司 | A kind of Electric Power Communication Data network quality monitoring system based on SDN framework |
CN106452850A (en) * | 2016-09-23 | 2017-02-22 | 西安交通大学 | SDN controller performance testing method and system |
CN206759479U (en) * | 2017-03-23 | 2017-12-15 | 国网浙江省电力公司 | Automation equipment based on SDN |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111782622A (en) * | 2020-09-04 | 2020-10-16 | 阿里云计算有限公司 | Log processing method, device, server and storage medium |
CN114567578A (en) * | 2022-03-14 | 2022-05-31 | 重庆紫光华山智安科技有限公司 | Pressure testing method, device, testing platform and storage medium |
CN114567578B (en) * | 2022-03-14 | 2023-09-26 | 重庆紫光华山智安科技有限公司 | Pressure testing method and device, testing platform and storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN107040408B (en) | 2023-10-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7350052B2 (en) | Network system and method for setting volume group in the network system | |
US20190260630A1 (en) | Hierarchical network managers | |
CN104836753B (en) | SDN data plane carrier states switching equipment, system and method for processing forwarding | |
CN104468212B (en) | A kind of cloud computation data center network intelligence linkage collocation method and system | |
US20160156504A1 (en) | Controlling forwarding devices in software defined networks | |
CN102684970B (en) | Thin-client environment providing system, server and thin-client environmental management technique | |
US10411949B2 (en) | Method and system for virtual network mapping protection and computer storage medium | |
US20080304423A1 (en) | Network traffic monitoring in a server network environment | |
US10499531B2 (en) | Rack level network switch | |
US9319264B1 (en) | Networking systems with dynamically changing topologies | |
CN107979636B (en) | Cold and hot data split-medium storage platform design system and method | |
CN103685250A (en) | Virtual machine security policy migration system and method based on SDN | |
CN103853678B (en) | Board managing device and use its plate card management system and control card | |
CN107547943A (en) | A kind of journal file is derived automatically from method and set top box | |
CN107040408A (en) | Network electric power method of testing based on SDN automation equipments | |
CN106850286A (en) | The baseboard management controller of baseboard management controller and NE management disk on veneer | |
JP4653965B2 (en) | I / O interface module management method | |
US20130073706A1 (en) | Network management system, and network device | |
WO2014029111A1 (en) | Processing system and method for user behaviour | |
JP2015528650A (en) | Information processing apparatus, construction method, communication system, and program | |
CN109510777A (en) | Flow table method of combination, device and SDN controller | |
CN106326082A (en) | Method and device for recording log in network system | |
CN206759479U (en) | Automation equipment based on SDN | |
JP6299753B2 (en) | Control device, control method, communication system, and program | |
JP6299754B2 (en) | Control device, control method, communication system, and program |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |