CN107040408A - Network electric power method of testing based on SDN automation equipments - Google Patents

Network electric power method of testing based on SDN automation equipments Download PDF

Info

Publication number
CN107040408A
CN107040408A CN201710178240.4A CN201710178240A CN107040408A CN 107040408 A CN107040408 A CN 107040408A CN 201710178240 A CN201710178240 A CN 201710178240A CN 107040408 A CN107040408 A CN 107040408A
Authority
CN
China
Prior art keywords
sdn
electric power
network
network electric
portable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710178240.4A
Other languages
Chinese (zh)
Other versions
CN107040408B (en
Inventor
龚小刚
张彩友
王志强
王红凯
蒋鸿城
叶卫
王以良
郭亚琼
夏威
吴昊
裘炜浩
沈潇军
谢若承
韦金良
甘文杰
张景明
冯宇
刘摩西
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201710178240.4A priority Critical patent/CN107040408B/en
Publication of CN107040408A publication Critical patent/CN107040408A/en
Application granted granted Critical
Publication of CN107040408B publication Critical patent/CN107040408B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/08Configuration management of networks or network elements
    • H04L41/0889Techniques to speed-up the configuration process
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/08Configuration management of networks or network elements
    • H04L41/0803Configuration setting
    • H04L41/084Configuration by using pre-existing information, e.g. using templates or copying from other elements
    • H04L41/0846Configuration by using pre-existing information, e.g. using templates or copying from other elements based on copy from other elements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/08Configuration management of networks or network elements
    • H04L41/0893Assignment of logical groups to network elements
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/12Discovery or management of network topologies
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L47/00Traffic control in data switching networks
    • H04L47/10Flow control; Congestion control
    • H04L47/12Avoiding congestion; Recovering from congestion
    • H04L47/125Avoiding congestion; Recovering from congestion by balancing the load, e.g. traffic engineering
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L67/00Network arrangements or protocols for supporting network services or applications
    • H04L67/2866Architectures; Arrangements
    • H04L67/30Profiles

Abstract

The invention solves the problems that configuration of the SDN controllers in different computer rooms, while setting an equipment to allow SDN setting up procedure to configure the download optimized with practical operation situation according to computer room.Network electric power method of testing of the invention based on SDN automation equipments, it uses portable SDN deployment terminal to be arranged in the computer room based on power test business, as a result of methods described, in segregate computer room the configuration that terminal carries out SDN controllers is disposed by connecting portable SDN, the state of net where the configuration of SDN controllers is collected, and the routing policy of business is obtained according to the different QoS requirements of business, improve the quality of flow transmission;Net state uses different network electric power Test Strategies where another aspect SDN controllers can be integrated, and reduces regulation and control granularity, and net where improving carries out the flexibility of network electric power test.

Description

Network electric power method of testing based on SDN automation equipments
Technical field
The present invention relates to a kind of power test method, it is based on after the transformation for concretely relating to legacy network architectural framework The network electric power method of testing of SDN automation equipments.
Background technology
With the complication of application, people's information requirement is continuously increased, and available data center is occurred in that much itself can not The problem of solution, it is necessary to which available data center is optimized or rebuild, especially data center network will be rebuild.So Background under, expedited the emergence of many data center network new technologies.Following data center network includes three-major-items:SDN、 The virtual private data center of Overlay stateless network, vDC.The core concept of this three-major-items is all around software, automation Management, grand designs, people is freed from cumbersome configuration, data center network can be disposed more extensive, This is exactly required for large-scale corporation.
SDN is well known earliest, i.e. software defined network.Core concept is by network function and service processing function Decoupled with network device hardware, become the function of abstract, then control by external controller these abstract objects.It is logical The frameworks close coupling framework of legacy network is split as applying, controlled, is forwarded three layers of separation are crossed, network will no longer turn into restriction The bottleneck that business is reached the standard grade with cloud efficiency, but while data transfer task is completed, calculating after also becoming and virtualize, Storage resource is the same, as a kind of resource that can flexibly allocate.In data center, network technology is one closed the most Point, this causes the bottleneck that network develops as data center for a long time, and the investment of network portion also occupies data center A big chunk of gross investment.SDN arrival seeks to break the closure of this network, allows network to move towards opening.
SDN includes controller and openflow two large divisions, and controller is a software, and whole network equipment can be entered Row management and control, management include issuing forwarding-table item, and control includes being monitored all-network equipment running status. Openflow is the language of intercommunication between controller and the network equipment, and controller is carried out by Openflow to all-network equipment Forwarding-table item is issued, equipment control.For a long time, people be intended to by data center can become it is a kind of it is more flexible, convenient, by The resource that demand takes, can just free " software " from " hardware " platform by disposing SDN, realize the hope of people Hope.
But for the general a set of SDN of multiple computer rooms in the case of, need to be respectively configured SDN in multiple computer rooms and bar be set Part, the efficiency manually set is very low, and can not carry out unmanned automatic setting on duty.It is disposable in the prior art to set Equipment of the good configuration file due to configuration in different computer rooms is different, also can not be general.
The content of the invention
The invention solves the problems that configuration of the SDN controllers in different computer rooms, while setting an equipment to cause SDN to set The download that journey can be configured according to computer room and practical operation situation is optimized.
It should be noted that the present invention is used in power test work, kiowatt is due to safety reasons, each region Network is not attached in outer net, but is connected by Intranet, and physical isolation is also provided with the Intranet of different zones, because This many content directly can not need human configuration by network configuration.And can be led if the unified download using mechanization Cause single SDN strategies can not adapt to the different actual conditions of each computer room.
For solution described problem, the network electric power method of testing of the invention based on SDN automation equipments, it uses portable SDN deployment terminal is arranged in the computer room based on power test business, and the portable SDN deployment terminal includes:
Insulate antistatic casing:For modules to be fixed together;Integral insulation protection is played simultaneously, it is to avoid due to Electrostatic causes module damage in casing.
Independent current source module:For being powered to portable SDN deployment terminal;Independent current source is avoided due to computer room voltage instability Surely cause configuration process to interrupt conductance cause system and run quickly routed.
Equipment test adaptor:For detecting device configuration in computer room;
Memory:Usually two pieces of SSD hard disks, one of is Primary Hard Drive, and another piece is daily record of work recording disk;
SDN configures main control chip, and the calculator room equipment selection for being detected according to equipment test adaptor is suitable default SDN is configured;
Coffret:For being connected with interchanger;
Multiple spaces are divided into by inner division plate in the insulation antistatic casing, wherein equipment test adaptor is set In insulation antistatic casing front end, it is connected directly between on coffret, SDN configuration main control chips are arranged on insulation antistatic casing Center, two pieces of SSD hard disks set up the SDN configuration side positions of main control chip two separately;By portable SDN deployment terminal accesses during work Computer room SDN switch can carry out SDN configurations, and implement network electric power test.
It is preferred that, also it is in series with authentication means on the coffret.Such structure avoids being missed by unrelated person Operate portable SDN deployment terminal.Usual authentication means are Fingerprint Lock.
It is preferred that, the cabinet sides are additionally provided with winding box, and the winding box is arranged close to independent current source module side. Because portable SDN deployment terminals need to be easy to carry, therefore use storage just extremely important, the take-up for finishing rear cable Wrapping post is provided with box, cable is around being connected on wrapping post and carry out cable storage by closing winding box.
It is preferred that, the insulation antistatic casing is cylinder.
It is preferred that, described portable SDN deployment terminal is linked into after SDN switch, the detection of equipment test adaptor The equipment that SDN switch is connected, and matched with the allocation plan preloaded in memory, find in Primary Hard Drive after matching scheme SDN configuration files are written in SDN switch, and datum plane is formed in SDN switch, and data are instructed and plan according to key-course Slightly forwarded the packet in datum plane, while being deleted after the control ability of original network equipment is extracted, by independent SDN Controller is controlled, and these control abilities include determining the forward-path of each Business Stream in network, while being provided to application layer The interface of corresponding function controlling, finally by application, the interface for calling key-course to provide realizes Topology Discovery, flow work Journey and flow isolation features carry out network electric power test job.The extraction and deletion of the control ability of original network equipment are not Only to the deletion of original control software, and port unnecessary in the work of SDN controllers is closed, while also deleting The backup resetted.But the daily record of work of control program will be backed up on will recording disk on weekdays before.
It is preferred that, SDN controllers pass through SDN according to current network Link State and the control of the traffic matrix of current network The forwarding strategy of the network traffic of router, reaches the load balancing of network., can be in work if network load reaches the upper limit Make log recording hard disk remarks prompting message, it is necessary to additionally increase hardware device.
It is preferred that, portable SDN deployment terminal can change forwarding strategy in real time when being linked into SDN switch, but work as Portable SDN deployment terminal departs from after SDN switch, using only the forwarding strategy of the SDN selections finally used.It thus is avoided that SDN deployment is beyond control.
It is preferred that, portable SDN deployment terminal is linked into after SDN switch, and daily record of work recording disk is started working simultaneously Whole operation process is recorded, is disconnected until portable SDN disposes terminal and SDN switch.
As a result of methods described, terminal progress SDN controls are disposed by connecting portable SDN in segregate computer room The configuration of device, the state of net where the configuration of SDN controllers is collected, and according to the road of the different QoS requirements of business acquisition business By strategy, the quality of flow transmission is improved;Net state where another aspect SDN controllers can be integrated is using different network electricity Power Test Strategy, reduces regulation and control granularity, and net where improving carries out the flexibility of network electric power test.
Brief description of the drawings
The embodiment to the present invention is described further below in conjunction with the accompanying drawings:
Fig. 1 disposes the whole of terminal for portable SDN in the network electric power method of testing of the invention based on SDN automation equipments Body structural representation.
Embodiment
The configuration of SDN controllers has been in industry more ripe technology, and its principle is not also repeated herein.But for The regional network being relatively isolated of power system, how to configure SDN controllers is always a problem.Present invention mainly solves Be the configuration of SDN controllers the problem of.
To this as shown in figure 1, the network electric power method of testing based on SDN automation equipments, is disposed eventually using portable SDN End is arranged in the computer room based on power test business, and the portable SDN deployment terminal includes:
Insulate antistatic casing 1:For modules to be fixed together;
Independent current source module 2:For being powered to portable SDN deployment terminal;
Equipment test adaptor 3:For detecting device configuration in computer room;
Memory:Usually two pieces of SSD hard disks, one of is Primary Hard Drive 4, and another piece is daily record of work recording disk 5;
SDN configures main control chip 6, and the calculator room equipment for being detected according to equipment test adaptor 3 selects suitable pre- If SDN is configured;
Coffret 7:For being connected with interchanger;
Multiple spaces are divided into by inner division plate in the insulation antistatic casing 1, wherein equipment test adaptor 3 is set Put in insulation antistatic casing 1 front end, be connected directly between on coffret 7, it is anti-quiet that SDN configuration main control chips 6 are arranged on insulation The center of motor casing 1, two pieces of SSD hard disks set up SDN configuration 6 liang of side positions of main control chip separately;Portable SDN is disposed during work Terminal access computer room SDN switch can carry out SDN configurations, and implement network electric power test.Also connected on the coffret 7 There is the Fingerprint Lock as authentication means 8.The cabinet sides are additionally provided with winding box 9, and the winding box 9 is arranged close to solely The vertical side of power module 2.The insulation antistatic casing 1 is cylinder.
During configuration, portable SDN deployment terminal is linked into after SDN switch by staff, and equipment test adaptor 3 is examined The equipment that SDN switch is connected is surveyed, and is matched with the allocation plan preloaded in memory, is found Primary Hard Drive after matching scheme SDN configuration files are written in SDN switch in 4, and datum plane is formed in SDN switch, and data are instructed according to key-course Forwarded the packet with strategy in datum plane, while being deleted after the control ability of original network equipment is extracted, by independence SDN controllers be controlled, these control abilities include determining the forward-path of each Business Stream in network, while to application layer The interface of corresponding function controlling is provided, finally by application, the interface for calling key-course to provide realizes Topology Discovery, stream Measure engineering and flow isolation features carry out network electric power test job.Configuration is completed.
During work, SDN controllers monitor network link load conditions in real time, and such as terminal A accesses terminal B and normally walks link A, when detecting link a and blocking, SDN controllers issue control signaling, change the flow table of interchanger, terminal A is accessed Terminal B flow switch realizes the scheduling of flow to link b.
SDN controllers pass through SDN routers according to current network Link State and the control of the traffic matrix of current network Network traffic forwarding strategy, reach the load balancing of network.SDN automation equipments can be with when being linked into SDN switch Forwarding strategy is changed in real time, but after SDN automation equipments depart from SDN switch, using only the SDN selections finally used Forwarding strategy.Portable SDN deployment terminal is linked into after SDN switch, and daily record of work recording disk 5 is started working and recorded Whole operation process, until portable SDN disposes terminal and SDN switch is disconnected.
In addition to above preferred embodiment, the present invention also has other embodiments, and those skilled in the art can be according to this Invention is variously modified and deformed, and without departing from the spirit of the present invention, all should belong to appended claims of the present invention and determine The scope of justice.

Claims (8)

1. the network electric power method of testing based on SDN automation equipments, it is characterised in that:Set using portable SDN deployment terminal It is placed in the computer room based on power test business, the portable SDN deployment terminal includes:
Insulate antistatic casing (1):For modules to be fixed together;
Independent current source module (2):For being powered to portable SDN deployment terminal;
Equipment test adaptor (3):For detecting device configuration in computer room;
Memory:Usually two pieces of SSD hard disks, one of is Primary Hard Drive (4), and another piece is daily record of work recording disk (5);
SDN configuration main control chips (6), the calculator room equipment for being detected according to equipment test adaptor (3) selects suitable pre- If SDN is configured;
Coffret (7):For being connected with interchanger;
Multiple spaces are divided into by inner division plate in the insulation antistatic casing (1), wherein equipment test adaptor (3) is set Put in insulation antistatic casing (1) front end, be connected directly between on coffret (7), SDN configuration main control chips (6) are arranged on absolutely Edge antistatic casing (1) center, two pieces of SSD hard disks set up the SDN configuration side positions of main control chip (6) two separately;Will just during work SDN configurations can be carried out by taking formula SDN deployment terminal access computer room SDN switches, and implement network electric power test.
2. the network electric power method of testing according to claim 1 based on SDN automation equipments, it is characterised in that:It is described Authentication means (8) are also in series with coffret (7).
3. the network electric power method of testing according to claim 1 based on SDN automation equipments, it is characterised in that:It is described Cabinet sides are additionally provided with winding box (9), and the winding box (9) is arranged close to independent current source module (2) side.
4. the network electric power method of testing according to claim 1 based on SDN automation equipments, it is characterised in that:It is described The antistatic casing (1) that insulate is cylinder.
5. the network electric power method of testing based on SDN automation equipments, it is characterised in that:Will be portable described in claim 1 Formula SDN deployment terminal is linked into after SDN switch, the equipment that equipment test adaptor (3) detection SDN switch is connected, and With the allocation plan matching preloaded in memory, find after matching scheme and SDN configuration files in Primary Hard Drive (4) are written to SDN In interchanger, datum plane is formed in SDN switch, data are grouped according to key-course instruction and strategy in datum plane Forwarding, while being deleted after the control ability of original network equipment is extracted, is controlled by independent SDN controllers, these Control ability includes determining the forward-path of each Business Stream in network, while providing connecing for corresponding function controlling to application layer Mouthful, finally by application, the interface for calling key-course to provide realizes Topology Discovery, traffic engineering and flow isolation features Carry out network electric power test job.
6. the network electric power method of testing as claimed in claim 5 based on SDN automation equipments, it is characterised in that:SDN controllers Pass through the forwarding of the network traffic of SDN routers according to current network Link State and the control of the traffic matrix of current network Strategy, reaches the load balancing of network.
7. the network electric power method of testing as claimed in claim 5 based on SDN automation equipments, it is characterised in that:SDN is automated Equipment can change forwarding strategy in real time when being linked into SDN switch, but after SDN automation equipments depart from SDN switch, Using only the forwarding strategy of the SDN selections finally used.
8. the network electric power method of testing as claimed in claim 5 based on SDN automation equipments, it is characterised in that:Portable SDN Deployment terminal is linked into after SDN switch, and daily record of work recording disk (5) is started working and records whole operation process, directly Terminal is disposed to portable SDN and SDN switch is disconnected.
CN201710178240.4A 2017-03-23 2017-03-23 Network power testing method based on SDN automation equipment Active CN107040408B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710178240.4A CN107040408B (en) 2017-03-23 2017-03-23 Network power testing method based on SDN automation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710178240.4A CN107040408B (en) 2017-03-23 2017-03-23 Network power testing method based on SDN automation equipment

Publications (2)

Publication Number Publication Date
CN107040408A true CN107040408A (en) 2017-08-11
CN107040408B CN107040408B (en) 2023-10-24

Family

ID=59534611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710178240.4A Active CN107040408B (en) 2017-03-23 2017-03-23 Network power testing method based on SDN automation equipment

Country Status (1)

Country Link
CN (1) CN107040408B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111782622A (en) * 2020-09-04 2020-10-16 阿里云计算有限公司 Log processing method, device, server and storage medium
CN114567578A (en) * 2022-03-14 2022-05-31 重庆紫光华山智安科技有限公司 Pressure testing method, device, testing platform and storage medium

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103795596A (en) * 2014-03-03 2014-05-14 北京邮电大学 Programmable control SDN measuring system and method
EP2787698A2 (en) * 2013-04-03 2014-10-08 Deutsche Telekom AG A method and device for incremental deployment of software-defined networking into an enterprise network
CN104539457A (en) * 2014-12-30 2015-04-22 北京邮电大学 Device unified control method, device and system based on software definition technology
CN104753713A (en) * 2013-12-31 2015-07-01 华为技术有限公司 SDN (Self-Defending Network) service deployment method and SDN controller
CN105282004A (en) * 2014-07-25 2016-01-27 中兴通讯股份有限公司 Network virtualization processing method, device and system
CN105915407A (en) * 2016-04-13 2016-08-31 重庆邮电大学 Flow generator virtualization realization system and flow generator virtualization realization method based on SDN
CN205754380U (en) * 2016-05-14 2016-11-30 国网安徽省电力公司信息通信分公司 A kind of Electric Power Communication Data network quality monitoring system based on SDN framework
US20160373310A1 (en) * 2015-06-19 2016-12-22 International Business Machines Corporation Automated configuration of software defined network controller
CN106452850A (en) * 2016-09-23 2017-02-22 西安交通大学 SDN controller performance testing method and system
CN206759479U (en) * 2017-03-23 2017-12-15 国网浙江省电力公司 Automation equipment based on SDN

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2787698A2 (en) * 2013-04-03 2014-10-08 Deutsche Telekom AG A method and device for incremental deployment of software-defined networking into an enterprise network
CN104753713A (en) * 2013-12-31 2015-07-01 华为技术有限公司 SDN (Self-Defending Network) service deployment method and SDN controller
WO2015101169A1 (en) * 2013-12-31 2015-07-09 华为技术有限公司 Method for deploying service by sdn and sdn controller
CN103795596A (en) * 2014-03-03 2014-05-14 北京邮电大学 Programmable control SDN measuring system and method
CN105282004A (en) * 2014-07-25 2016-01-27 中兴通讯股份有限公司 Network virtualization processing method, device and system
CN104539457A (en) * 2014-12-30 2015-04-22 北京邮电大学 Device unified control method, device and system based on software definition technology
US20160373310A1 (en) * 2015-06-19 2016-12-22 International Business Machines Corporation Automated configuration of software defined network controller
CN105915407A (en) * 2016-04-13 2016-08-31 重庆邮电大学 Flow generator virtualization realization system and flow generator virtualization realization method based on SDN
CN205754380U (en) * 2016-05-14 2016-11-30 国网安徽省电力公司信息通信分公司 A kind of Electric Power Communication Data network quality monitoring system based on SDN framework
CN106452850A (en) * 2016-09-23 2017-02-22 西安交通大学 SDN controller performance testing method and system
CN206759479U (en) * 2017-03-23 2017-12-15 国网浙江省电力公司 Automation equipment based on SDN

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111782622A (en) * 2020-09-04 2020-10-16 阿里云计算有限公司 Log processing method, device, server and storage medium
CN114567578A (en) * 2022-03-14 2022-05-31 重庆紫光华山智安科技有限公司 Pressure testing method, device, testing platform and storage medium
CN114567578B (en) * 2022-03-14 2023-09-26 重庆紫光华山智安科技有限公司 Pressure testing method and device, testing platform and storage medium

Also Published As

Publication number Publication date
CN107040408B (en) 2023-10-24

Similar Documents

Publication Publication Date Title
US7350052B2 (en) Network system and method for setting volume group in the network system
US20190260630A1 (en) Hierarchical network managers
CN104836753B (en) SDN data plane carrier states switching equipment, system and method for processing forwarding
CN104468212B (en) A kind of cloud computation data center network intelligence linkage collocation method and system
US20160156504A1 (en) Controlling forwarding devices in software defined networks
CN102684970B (en) Thin-client environment providing system, server and thin-client environmental management technique
US10411949B2 (en) Method and system for virtual network mapping protection and computer storage medium
US20080304423A1 (en) Network traffic monitoring in a server network environment
US10499531B2 (en) Rack level network switch
US9319264B1 (en) Networking systems with dynamically changing topologies
CN107979636B (en) Cold and hot data split-medium storage platform design system and method
CN103685250A (en) Virtual machine security policy migration system and method based on SDN
CN103853678B (en) Board managing device and use its plate card management system and control card
CN107547943A (en) A kind of journal file is derived automatically from method and set top box
CN107040408A (en) Network electric power method of testing based on SDN automation equipments
CN106850286A (en) The baseboard management controller of baseboard management controller and NE management disk on veneer
JP4653965B2 (en) I / O interface module management method
US20130073706A1 (en) Network management system, and network device
WO2014029111A1 (en) Processing system and method for user behaviour
JP2015528650A (en) Information processing apparatus, construction method, communication system, and program
CN109510777A (en) Flow table method of combination, device and SDN controller
CN106326082A (en) Method and device for recording log in network system
CN206759479U (en) Automation equipment based on SDN
JP6299753B2 (en) Control device, control method, communication system, and program
JP6299754B2 (en) Control device, control method, communication system, and program

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant