CN107038512A - A kind of index system method for building up - Google Patents

A kind of index system method for building up Download PDF

Info

Publication number
CN107038512A
CN107038512A CN201610075242.6A CN201610075242A CN107038512A CN 107038512 A CN107038512 A CN 107038512A CN 201610075242 A CN201610075242 A CN 201610075242A CN 107038512 A CN107038512 A CN 107038512A
Authority
CN
China
Prior art keywords
index
building
index system
big data
analysis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610075242.6A
Other languages
Chinese (zh)
Inventor
周小明
陶蕾
狄方春
李功新
任晓辉
林静怀
陈郑平
谢巧云
李大鹏
谢涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Fujian Electric Power Co Ltd
State Grid Shanghai Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
State Grid Fujian Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI, State Grid Fujian Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610075242.6A priority Critical patent/CN107038512A/en
Publication of CN107038512A publication Critical patent/CN107038512A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of index system method for building up based on power regulation big data analysis mining, and methods described comprises the following steps:I, index is classified;II, set up metric tree;III, set up Raw performance system;IV, the application integration built under big data platform web portal;V, improve index system.The present invention is automatically generated calculation formula, computation rule, calculating data and the storage of index by the way of semi-automatic and semi-artificial, reduces workload, improve accuracy according to the calculation formula of index, computation rule, calculating data;On the basis of existing index system, using big data visual analyzing digging technology, senior, macroscopical New Set is formed, index system is improved.

Description

A kind of index system method for building up
Technical field
The invention belongs to technical field of electric power automation, a kind of index system method for building up of specific design.
Background technology
With rapid economic development, the dependence of social production and life to electric power is increasingly severe, the safety of electric power, Reliable and economic, high-quality supply are directly connected to the major issue of the relation national destiny such as national economy, economic development, closely A series of Nian Lai, large-scale blackouts bring serious loss to economic development, while greatly affected the people's Normal production and life, the safety and stability problem of power network are held the balance.
Operation of power networks index is reflection current electric grid running situation, weighs dispatching of power netwoks or monitoring business situation Important evidence.Loaded increasingly with the business information of power scheduling control centre, data scale is sharply increased, respectively The vocational work of individual professional sections is increasingly complicated and each professional information exchange enhancing, and original different system is more The index of application is unable to fast reaction business demand, it is impossible to effectively support analysis decision.Current big data platform collection Closed the data (EMS, PMS, OMS) of different system, but existing index not comprehensively, imperfection, Level of intelligence is low, and interface is unfriendly, few using support, it is difficult to comprehensively accurate to grasp operation of power networks index.In order to Make regulation and control personnel preferably O&A grid operating conditions, improve the pipe of power grid regulation level and regulating and controlling mechanism Reason level, it is necessary to collect integrate multisystem power grid regulation related data, preferably analyzed using big data technology With the running situation of displaying power network, index management and control system is set up.
The content of the invention
To solve the deficiency that prior art is present, this hair provides a kind of index system method for building up, methods described bag Include following steps:
I, index is classified;
II, set up metric tree;
III, set up Raw performance system;
IV, the application integration built under big data platform web portal;
V, improve index system.
It is preferred that, the index of the step I includes:Operation of power networks in EMS, PMS and OMS The performance assessment criteria of each professional sections under level of control, and power regulation center;
The classification includes:The multi-disciplinary index of the multi-specialized index formation cross-system of multisystem that index is collected System.
It is preferred that, it is theoretical based on big data analysis method and data modeling, according to subject area, theme collection, master The order of topic sets up the metric tree of the step II.
It is preferred that, the Raw performance system of the step III is set up with modification method;
The modification method includes:External representational index is calculated with descriptive statistics method;Use inferential statistics method Index is handled, and analyzes and speculates overall feature and rule;
The establishment of the Raw performance system includes:According to analysis dimension statistical analysis index calculation formula, Computation rule, calculating data source and measurement period are set up.
It is preferred that, the application integration under structure big data platform web portal in the step IV includes index Definition instrument.
It is preferred that, the index definition instrument includes:With patterned mode realize Index System Model foundation, Modification is with deleting;
The index definition instrument includes:With J2EE, JSP, Structs, Spring and JavaScriptWeb Integration and development is carried out based on framework, by calling general-purpose interface to access database, calls security service interface to obtain Take personnel's logging status and authority information.
It is preferred that, the step V includes:Analysis mining algorithm and big number based on power regulation big data platform According to visualization analysis technique, form New Set and be added to index system;
The big data visualization analysis technique includes:User mutual formula analyze data is realized, and with visual Mode is presented to user.
It is preferred that, the subject area includes:Operation of power networks analysis, fellow peers' evaluation, teams and groups are to mark, comprehensive assessment;
The theme collection includes:Power network scale, equipment, management and running, monitoring operation, protection operation, Operation plan, automatic operating and new energy level;
The theme includes:Generating scale, transmission of electricity scale, power transformation scale and equipment.
It is preferred that, the analysis dimension includes time dimension, isobaric grade, dispatching management scope, ownership plant stand And device type.
The calculation formula includes:Relational calculus, mathematical operation, logical operation, numerical computations, date calculate;
The computation rule includes:Addition, subtraction, multiplication, division, remainder, position and, position or, position XOR Negated with position;
The calculating data source includes:, the data of lookup index needs are come in former EMS, PMS and OMS From which field of which table;
The measurement period includes:Year, season, the moon, day and hour.
It is preferred that, the Index System Model includes:Index is extracted in database and calculates the calculating source institute needed Corresponding storehouse table and field;
The general-purpose interface includes:Hive and JDBC.
Compared with prior art, have the beneficial effect that:
1st, a kind of index system method for building up for providing of the present invention, according to the calculation formula of index, computation rule, Data are calculated, the calculation formula of index, computation rule, meter are automatically generated by the way of semi-automatic and semi-artificial Count according to this and storage, overcome that index level of intelligence is low, using supporting few shortcoming.
2nd, the analysis mining technology of the invention based on power regulation big data platform, with reference to big data visualization point Analysis instrument, the multiple indexs of independent assortment form senior, macroscopical New Set, improve index system, can be achieved Demand of the user to New Set.
Brief description of the drawings
Fig. 1 is the system demonstration figure of the index system of the present invention;
Fig. 2 is the logical schematic of the metric tree method for building up of the present invention;
Fig. 3 is index definition tool technique configuration diagram of the invention;
Fig. 4 is the functional module form of the index definition instrument of the present invention;
Fig. 5 is index system theme collection information table of the invention;
Fig. 6 is the definition information table of the index of the present invention;
Embodiment
For a better understanding of the present invention, with reference to Figure of description and specific embodiment to present disclosure It is described further.
The present invention provides a kind of index system method for building up, and methods described comprises the following steps:
I, index is classified;
II, set up metric tree;
III, set up Raw performance system;
IV, the application integration built under big data platform web portal;
V, improve index system.
Step I is combed and is counted the Regulation index in EMS, PMS and OMS, in conjunction with electricity The performance assessment criteria of each professional sections under power regulation and control center, collects to form the multi-specialized index of multisystem.Formed interdepartmental The multi-disciplinary index system of system.
As shown in Fig. 2 by certain standard to unordered, scattered, not system the index that is collected into according to should Packet is carried out with demand to collect or list, so that firsthand information is simplified, visualized, systematization, and can be just The characteristic of division of step reflection index.
It is theoretical based on big data analysis method and data modeling according to the index tentatively collected, according to subject area, Theme collection, the order of theme set up the metric tree of power regulation.
Subject area includes:Operation of power networks analysis, fellow peers' evaluation, teams and groups are to mark, comprehensive assessment;
As shown in figure 5, theme collection includes:Power network scale, equipment, management and running, monitoring operation, guarantor Ship sth. under guard row, operation plan, automatic operating and new energy level;
Theme includes:Generating scale, transmission of electricity scale, power transformation scale and equipment.
The Raw performance system of the step III is set up with modification method;
Index analysis is divided into two levels, and first level is to calculate reflection index set with the method for descriptive statistics Middle trend, dispersion degree and correlation intensity have an external representational index;Second level is in description system On the basis of meter, index is handled with the method for inferential statistics, general status is inferred with sample information, and divide Analysis and the feature and rule for speculating totality.
The establishment of Raw performance system, the index segmented according to metric tree, the calculating of each index of statistical analysis is public Formula, computation rule, calculating data source and measurement period, are administered according to time dimension, isobaric grade, scheduling Scope, ownership plant stand and device type analysis dimension, preliminary set up form.
Analyzing dimension includes time dimension, isobaric grade, dispatching management scope, ownership plant stand and device type.
Calculation formula includes:Relational calculus, mathematical operation, logical operation, numerical computations, date calculate;
Computation rule includes:Addition, subtraction, multiplication, division, remainder, position and, position or, position XOR and position Negate;
Calculating data source includes:, the data of index needs are searched in former EMS, PMS and OMS from which Which field of several tables;
Measurement period includes:Year, season, the moon, day and hour.
The work(of index definition tool technique configuration diagram as shown in Figure 3 and the index definition instrument shown in Fig. 4 The application integration under structure big data platform web portal in energy module form, the step IV includes index Definition instrument.
Index definition instrument is the foundation, modification and deletion work(that Index System Model is realized in patterned mode Energy;
Index definition instrument is entered based on J2EE/JSP/Structs/Spring/JavaScriptWeb frameworks Row integration and development, by calling Hive, JDBC general-purpose interface to access database, calls security service interface to obtain Take personnel's logging status and authority information.
Index System Model is that the calculating source that each index calculating in the index system arranged needs exists Corresponding storehouse table and field are extracted in database.
HBase is primarily used for storing the data source needed for the calculating of each index of index system, and index Required calculating data source and the result of calculation of each index be per year, the moon, Time of Day dimension storage, because This needs HBase distributed data library storage magnanimity power network historical datas;Hive is the number in Hadoop systems According to warehouse instrument, based on big data platform, the storage mode of Index System Model is structuring, and Hive It can realize and the magnanimity power network unstructured data stored in big data platform is converted to structuring in index model Data;Relational database, in index definition framework the metadata database table structure in main storage Hive storehouses and The configuration file of index definition instrument.
According to the index system tentatively set up, the calculating of index is realized using index definition instrument, realization body domain, Theme collection, main body, analysis dimension management, and the parsing of calculation formula is completed, calculate the acquisition of data source.With Family can realize that complicated index is calculated with custom algorithm bag.The last exhibition scheme according to metric tree, with reference to point Analysis dimension realizes the displaying of index, sets up final index system.
Step V, to the demand of New Set, preferably analyzes operation of power networks situation according to existing index and user, Based on the analysis mining algorithm of power regulation big data platform, with reference to big data visualization analysis tools, free group Multiple indexs are closed, senior, macroscopical New Set is formed, and are added to index system, index system is improved.
Big data visualization analysis technique is to realize user mutual formula analyze data, and is showed in visual mode To user.
These are only embodiments of the invention, be not intended to limit the invention, it is all the present invention spirit and Within principle, any modification, equivalent substitution and improvements done etc. are all contained in application pending of the invention Within right.

Claims (10)

1. a kind of index system method for building up, it is characterised in that methods described comprises the following steps:
I, index is classified;
II, set up metric tree;
III, set up Raw performance system;
IV, the application integration built under big data platform web portal;
V, improve index system.
2. index system method for building up as claimed in claim 1, it is characterised in that the institute of the step I Stating index includes:Regulation index in EMS, PMS and OMS, and power regulation center Under each professional sections performance assessment criteria;
The classification includes:The multi-disciplinary index of the multi-specialized index formation cross-system of multisystem that index is collected System.
3. index system method for building up as claimed in claim 1, it is characterised in that based on big data analysis Method and data modeling are theoretical, set up the step II's according to the order of subject area, theme collection, theme Metric tree.
4. index system method for building up as claimed in claim 1, it is characterised in that built with modification method Found the Raw performance system of the step III;
The modification method includes:External representational index is calculated with descriptive statistics method;Use inferential statistics method Index is handled, and analyzes and speculates overall feature and rule;
The establishment of the Raw performance system includes:According to analysis dimension statistical analysis index calculation formula, Computation rule, calculating data source and measurement period are set up.
5. index system method for building up as claimed in claim 1, it is characterised in that in the step IV The application integration built under big data platform web portal includes index definition instrument.
6. index system method for building up as claimed in claim 5, it is characterised in that the index definition work Tool includes:The foundation, modification and deletion of Index System Model are realized in patterned mode;
The index definition instrument includes:With J2EE, JSP, Structs, Spring and JavaScriptWeb Integration and development is carried out based on framework, by calling general-purpose interface to access database, calls security service interface to obtain Take personnel's logging status and authority information.
7. index system method for building up as claimed in claim 1, it is characterised in that the step V includes: Analysis mining algorithm and big data visualization analysis technique based on power regulation big data platform, form New Set It is added to index system;
The big data visualization analysis technique includes:User mutual formula analyze data is realized, and with visual Mode is presented to user.
8. index system method for building up as claimed in claim 3, it is characterised in that the subject area includes: Operation of power networks analysis, fellow peers' evaluation, teams and groups are to mark, comprehensive assessment;
The theme collection includes:Power network scale, equipment, management and running, monitoring operation, protection operation, Operation plan, automatic operating and new energy level;
The theme includes:Generating scale, transmission of electricity scale, power transformation scale and equipment.
9. index system method for building up as claimed in claim 4, it is characterised in that the analysis dimension bag Include time dimension, isobaric grade, dispatching management scope, ownership plant stand and device type;
The calculation formula includes:Relational calculus, mathematical operation, logical operation, numerical computations, date calculate;
The computation rule includes:Addition, subtraction, multiplication, division, remainder, position and, position or, position XOR Negated with position;
The calculating data source includes:The data that index is searched in former EMS, PMS and OMS to be needed are come From which field of which table;
The measurement period includes:Year, season, the moon, day and hour.
10. index system method for building up as claimed in claim 6, it is characterised in that the index system mould Type includes:The storehouse table and field corresponding to the calculating source that index calculating needs are extracted in database;
The general-purpose interface includes:Hive and JDBC.
CN201610075242.6A 2016-02-03 2016-02-03 A kind of index system method for building up Pending CN107038512A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610075242.6A CN107038512A (en) 2016-02-03 2016-02-03 A kind of index system method for building up

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610075242.6A CN107038512A (en) 2016-02-03 2016-02-03 A kind of index system method for building up

Publications (1)

Publication Number Publication Date
CN107038512A true CN107038512A (en) 2017-08-11

Family

ID=59532807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610075242.6A Pending CN107038512A (en) 2016-02-03 2016-02-03 A kind of index system method for building up

Country Status (1)

Country Link
CN (1) CN107038512A (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107945047A (en) * 2017-10-26 2018-04-20 中国南方电网有限责任公司 A kind of visual configuration system for the automatic recursive calculation of index for being used to dispatch daily paper
CN109146281A (en) * 2018-08-15 2019-01-04 国网江西省电力有限公司上饶供电分公司 For quickly calculating the calculation method of fellow peers' evaluation ranking
CN109684161A (en) * 2018-11-02 2019-04-26 深圳壹账通智能科技有限公司 Data analysing method, device, server and storage medium
CN109726879A (en) * 2017-10-27 2019-05-07 中移(苏州)软件技术有限公司 A kind of evaluation method of data model, device and equipment
CN110264089A (en) * 2019-06-24 2019-09-20 浪潮软件股份有限公司 A method of operational indicator is showed based on rich text format and is illustrated
CN110363383A (en) * 2019-06-03 2019-10-22 华东电力试验研究院有限公司 A kind of distributed power generation monitoring technology based under digital development
CN110503384A (en) * 2019-07-12 2019-11-26 广州穗能通综合能源有限责任公司 Power index generation method and device, computer equipment and storage medium
CN110570084A (en) * 2019-08-01 2019-12-13 南京信业能源科技有限公司 Index system implementation method based on industrial time sequence data
CN110659655A (en) * 2018-06-28 2020-01-07 北京三快在线科技有限公司 Index classification method and device and computer readable storage medium
CN113537271A (en) * 2020-10-06 2021-10-22 翁海坤 Big data mining method and system based on artificial intelligence and cloud service center
CN113742311A (en) * 2020-05-29 2021-12-03 北京滴普科技有限公司 Index model management method, storage medium and device based on data warehouse
CN114238665A (en) * 2021-11-22 2022-03-25 中冶赛迪重庆信息技术有限公司 Multi-theme benchmarking analysis method and system
CN115374187A (en) * 2022-10-24 2022-11-22 北京国电通网络技术有限公司 Index data acquisition method and device, electronic equipment and computer readable medium
CN117369813A (en) * 2023-10-13 2024-01-09 湖北华中电力科技开发有限责任公司 Visual display method of energy consumption monitoring index system based on data center
CN118296389A (en) * 2024-06-05 2024-07-05 北京云成金融信息服务有限公司 Construction and evaluation method of data index model

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107945047A (en) * 2017-10-26 2018-04-20 中国南方电网有限责任公司 A kind of visual configuration system for the automatic recursive calculation of index for being used to dispatch daily paper
CN109726879A (en) * 2017-10-27 2019-05-07 中移(苏州)软件技术有限公司 A kind of evaluation method of data model, device and equipment
CN109726879B (en) * 2017-10-27 2020-12-01 中移(苏州)软件技术有限公司 Data model evaluation method, device and equipment
CN110659655A (en) * 2018-06-28 2020-01-07 北京三快在线科技有限公司 Index classification method and device and computer readable storage medium
CN110659655B (en) * 2018-06-28 2021-03-02 北京三快在线科技有限公司 Index classification method and device and computer readable storage medium
CN109146281A (en) * 2018-08-15 2019-01-04 国网江西省电力有限公司上饶供电分公司 For quickly calculating the calculation method of fellow peers' evaluation ranking
CN109684161A (en) * 2018-11-02 2019-04-26 深圳壹账通智能科技有限公司 Data analysing method, device, server and storage medium
WO2020087830A1 (en) * 2018-11-02 2020-05-07 深圳壹账通智能科技有限公司 Data analysis method and apparatus, server, and storage medium
CN110363383A (en) * 2019-06-03 2019-10-22 华东电力试验研究院有限公司 A kind of distributed power generation monitoring technology based under digital development
CN110264089A (en) * 2019-06-24 2019-09-20 浪潮软件股份有限公司 A method of operational indicator is showed based on rich text format and is illustrated
CN110503384A (en) * 2019-07-12 2019-11-26 广州穗能通综合能源有限责任公司 Power index generation method and device, computer equipment and storage medium
CN110503384B (en) * 2019-07-12 2021-09-28 广州穗能通能源科技有限责任公司 Power index generation method and device, computer equipment and storage medium
CN110570084A (en) * 2019-08-01 2019-12-13 南京信业能源科技有限公司 Index system implementation method based on industrial time sequence data
CN113742311A (en) * 2020-05-29 2021-12-03 北京滴普科技有限公司 Index model management method, storage medium and device based on data warehouse
CN113537271B (en) * 2020-10-06 2022-09-27 思玛特健康科技(苏州)有限公司 Big data mining method and system based on artificial intelligence and cloud service center
CN113537271A (en) * 2020-10-06 2021-10-22 翁海坤 Big data mining method and system based on artificial intelligence and cloud service center
CN114238665A (en) * 2021-11-22 2022-03-25 中冶赛迪重庆信息技术有限公司 Multi-theme benchmarking analysis method and system
CN115374187A (en) * 2022-10-24 2022-11-22 北京国电通网络技术有限公司 Index data acquisition method and device, electronic equipment and computer readable medium
CN115374187B (en) * 2022-10-24 2023-01-13 北京国电通网络技术有限公司 Index data acquisition method and device, electronic equipment and computer readable medium
CN117369813A (en) * 2023-10-13 2024-01-09 湖北华中电力科技开发有限责任公司 Visual display method of energy consumption monitoring index system based on data center
CN118296389A (en) * 2024-06-05 2024-07-05 北京云成金融信息服务有限公司 Construction and evaluation method of data index model
CN118296389B (en) * 2024-06-05 2024-10-15 北京云成金融信息服务有限公司 Construction and evaluation method of data index model

Similar Documents

Publication Publication Date Title
CN107038512A (en) A kind of index system method for building up
CN108959424B (en) Operation method of urban electricity utilization map for monitoring load of power system
CN104820670B (en) A kind of acquisition of power information big data and storage method
CN107133255B (en) Panoramic security defense method and system for large power grid
CN107918830B (en) Power distribution network running state evaluation method based on big data technology
CN105447623B (en) Automatic early warning method for tree obstacle hidden danger of overhead transmission line
CN110362894A (en) Distribution line, transformer synthesis decreasing loss and energy saving calculation analysis method and system
CN109523446A (en) A kind of big data processing analysis system towards price field
CN105574593B (en) Track state static detection and control system and method based on cloud computing and big data
CN105184455A (en) High dimension visualized analysis method facing urban electric power data analysis
CN107609835A (en) A kind of power network manapower allocation application system and method
CN109740872A (en) The diagnostic method and system of a kind of area's operating status
CN109242248A (en) Cigarette machine multidimensional data comprehensive analysis platform and method
CN115908046A (en) Visual power distribution system based on airport terminal building BIM
CN111985716B (en) Passenger traffic volume prediction system with passenger traffic information visualization function
CN108647860A (en) Power equipment state monitoring based on OpenStack and assessment cloud platform
CN110245163A (en) A kind of Operation of Electric Systems hidden troubles removing method
CN111127186A (en) Application method of customer credit rating evaluation system based on big data technology
CN108052637B (en) Real-time image-text monitoring method for power grid time scale measurement data access full life cycle
Xueliang et al. Study of power grid planning integrated information platform based on big-data technology
Ya’An Application of artificial intelligence in computer network technology in the era of big data
CN109284314A (en) A kind of high pressure customer access system and method based on power grid visualization
CN115147086A (en) Monitoring and early warning platform system and method for salary payment of agricultural workers
Su et al. A framework research of power grid knowledge recommendation and situation reasoning based on cloud computing and CEP
CN104537469A (en) Power grid enterprise team work load quantitative method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: No. 15, Qinghe Xiaoying East Road, Haidian District, Beijing

Applicant after: CHINA ELECTRIC POWER RESEARCH INSTITUTE Co.,Ltd.

Applicant after: STATE GRID CORPORATION OF CHINA

Applicant after: STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

Address before: No. 15, Qinghe Xiaoying East Road, Haidian District, Beijing

Applicant before: China Electric Power Research Institute

Applicant before: State Grid Corporation of China

Applicant before: STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

CB02 Change of applicant information
TA01 Transfer of patent application right

Effective date of registration: 20180904

Address after: No. 15, Qinghe Xiaoying East Road, Haidian District, Beijing

Applicant after: CHINA ELECTRIC POWER RESEARCH INSTITUTE Co.,Ltd.

Applicant after: STATE GRID CORPORATION OF CHINA

Applicant after: STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

Applicant after: STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER Co.

Address before: No. 15, Qinghe Xiaoying East Road, Haidian District, Beijing

Applicant before: CHINA ELECTRIC POWER RESEARCH INSTITUTE Co.,Ltd.

Applicant before: STATE GRID CORPORATION OF CHINA

Applicant before: STATE GRID FUJIAN ELECTRIC POWER Co.,Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20170811

RJ01 Rejection of invention patent application after publication