CN107037388A - A kind of Secondary Load of Voltage Transformer improves device - Google Patents

A kind of Secondary Load of Voltage Transformer improves device Download PDF

Info

Publication number
CN107037388A
CN107037388A CN201611254149.8A CN201611254149A CN107037388A CN 107037388 A CN107037388 A CN 107037388A CN 201611254149 A CN201611254149 A CN 201611254149A CN 107037388 A CN107037388 A CN 107037388A
Authority
CN
China
Prior art keywords
load
voltage transformer
transformer
tested
improves device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611254149.8A
Other languages
Chinese (zh)
Inventor
刘罡
王钟辉
路俊海
黄旭
李丹
马晓奇
李永臣
孙长河
芦嘉辉
郝新
杨璐羽
范维
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201611254149.8A priority Critical patent/CN107037388A/en
Publication of CN107037388A publication Critical patent/CN107037388A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/02Testing or calibrating of apparatus covered by the other groups of this subclass of auxiliary devices, e.g. of instrument transformers according to prescribed transformation ratio, phase angle, or wattage rating

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Measurement Of Resistance Or Impedance (AREA)

Abstract

The present invention relates to electricity consumption pressure transformer technical field, more particularly to a kind of Secondary Load of Voltage Transformer improvement device is measured in power system, specifically a kind of three-phase three-wire electric energy meter improves device with Secondary Load of Voltage Transformer.The present invention includes tested voltage transformer, standard potential transformer and mutual-inductor tester, is that shunt load improves device in tested Secondary Circuit of Potential Transformer, and the regulation switched by improving load device carries out the measurement of rated value and lower limit;Then the secondary terminals of standard potential transformer and tested voltage transformer are connected with mutual-inductor tester.Three-phase three-wire electric energy meter voltage transformer error measurement problem can be effectively solved, the voltage transformer Burden box of tradition calibrating can be replaced, be directly parallel in tested Secondary Circuit of Potential Transformer, different from voltage transformer Burden box without dismounting.With low cost with simple in construction, it is easy to implement, the advantages of without carrying voltage transformer Burden box.

Description

A kind of Secondary Load of Voltage Transformer improves device
Technical field
The present invention relates to electricity consumption pressure transformer technical field, more particularly to a kind of voltage transformer two are measured in power system Secondary load improves device, and specifically a kind of three-phase three-wire electric energy meter improves device with Secondary Load of Voltage Transformer.
Background technology
According to JJG 314-2010《Measurement voltage ct calibrating code》It is required that, error inspection is carried out to voltage transformer Timing, it is necessary to examine respectively to secondary load rated value and lower limit.Traditional calibrating mode is in tested voltage transformer Voltage transformer Burden box in parallel in secondary circuit, is allocated to corresponding numerical value by Burden box and carries out rated value and lower limit survey Amount.However, for power system standard potential transformer, secondary rated load is generally 0.07VA, voltage transformer is born Lotus case minimum range is 1.25VA, it is impossible to meet the measurement to rated value, generally surveys rated value by the equivalent 0VA of lower limit Amount, did not both make a distinction rated value and lower limit, the error of voltage transformer when increasing rated value again.
The content of the invention
For above-mentioned the shortcomings of the prior art, the present invention proposes that a kind of Secondary Load of Voltage Transformer is improved Device, specifically a kind of three-phase three-wire electric energy meter improves device with Secondary Load of Voltage Transformer, and its purpose is to reach The voltage transformer Burden box of tradition calibrating is replaced using the present apparatus, is directly parallel in tested Secondary Circuit of Potential Transformer, Goal of the invention different from voltage transformer Burden box without dismounting.By the regulation to switch, rated value can be carried out respectively With the error testing of lower limit
In order to reach foregoing invention purpose, the technical solution adopted for the present invention to solve the technical problems is:
A kind of Secondary Load of Voltage Transformer improves device, including tested voltage transformer, standard potential transformer and mutually Sensor tester, is that shunt load improves device in tested Secondary Circuit of Potential Transformer, is opened by improving device to load The regulation of pass carries out the measurement of rated value and lower limit;Then by the secondary terminals of standard potential transformer and tested voltage transformer Son is connected with mutual-inductor tester.
The load improves device parallel connection and is inserted into the tested transformer jack of mutual-inductor tester, load is improved dress Put and be integrated with mutual-inductor tester;It is insulated conductor that load, which improves device inner lead, and load resistance and switch are connected on absolutely On edge wire;
The insulated conductor is general 6 squares of insulated conductors.
The tested voltage transformer select three-phase three-wire electric energy meter voltage transformer, secondary load improve device with The secondary circuit of three-phase three-wire electric energy meter voltage transformer is in parallel.
The load improves device and is broadly divided into resistance and switch two parts, because standard potential transformer rated load is 0.07VA, three-phase three-wire electric energy meter is 100V, standard potential transformer bearing power factor with voltage transformer secondary voltage COS Ф=1.0, load capacity formulaTherefore Z is about 143k Ω, and is purely resistive load.
The purely resistive load, is that resistance is fixed value 143k Ω, and error does not surpass when environment temperature is (20 ± 5) DEG C ± 3% is crossed, environment temperature often changes 10 DEG C, and the error change of load is no more than ± 2%.
When the load improves the switch closure of device, rated value measurement is carried out, the load that load is improved into device is served as The secondary load of tested voltage transformer;When carrying out lower limit measurement, load is improved into switching off for device, test device Open circuit, it is zero load to be detected the secondary load of voltage transformer.
The beneficial effects of the invention are as follows:
The present invention can effectively solve three-phase three-wire electric energy meter voltage transformer error measurement problem, it is possible to use this Device replaces the voltage transformer Burden box of tradition calibrating, is directly parallel in tested Secondary Circuit of Potential Transformer, is different from Voltage transformer Burden box is without dismounting.The present invention can also carry out rated value and lower limit respectively by the regulation to switch Error testing, rated value and lower limit are measured respectively.It is with low cost simultaneously also with simple in construction, implement easy, The advantages of voltage transformer Burden box need not be carried.
Below in conjunction with the accompanying drawings and specific embodiment, the present invention is further detailed explanation, but not by the present embodiment institute Limit.
Brief description of the drawings
Fig. 1 is the system position figure of the present invention;
Fig. 2 is the simplified structure diagram of the present invention.
In figure:Standard potential transformer 1, is detected voltage transformer 2, mutual-inductor tester 3, switch 4.
Embodiment
The present invention is that a kind of Secondary Load of Voltage Transformer improves device, is the secondary circuit in tested voltage transformer 2 A middle relatively-stationary load in parallel improves device, and the regulation switched by improving load device carries out rated value and lower limit Measurement.The tested voltage transformer 2 selects three-phase three-wire electric energy meter voltage transformer, secondary load improve device with The secondary circuit of three-phase three-wire electric energy meter voltage transformer is in parallel, without extra shunt voltage transformer load in experiment Case, while off-test by load without improving device dismounting.
Embodiment is as follows:
According to shown in Fig. 1, Fig. 1 is the system position figure of the present invention, with low potential measurement error.
Load improvement device parallel connection is inserted into the tested transformer jack of mutual-inductor tester first, load improves dress Put can regard as with mutual-inductor tester be " one ".Load improves device inner lead and uses general 6 squares of insulated conductors, Load resistance and switch are connected on insulated conductor.
Then by the secondary terminals of standard potential transformer 1 and tested voltage transformer 2 as shown in Figure 1 with transducer check Instrument 3 is connected.
Load improves the simplification structure of device as shown in Fig. 2 being broadly divided into resistance and switch two parts.Due to normal voltage Transformer rated load is generally 0.07VA, and three-phase three-wire electric energy meter is 100V, normal voltage with voltage transformer secondary voltage Bearing power factor COS Ф=1.0 of transformer 1, load capacity formulaTherefore Z is about 143k Ω, and negative for purely resistive Carry.
The purely resistive load, is that resistance is fixed value 143k Ω, and error does not surpass when environment temperature is (20 ± 5) DEG C Cross ± 3%.Environment temperature often changes 10 DEG C, and the error change of load is no more than ± 2%.
Ax represents standard potential transformer first winding below Fig. 2 Plays voltage transformer, is detected under voltage transformer Square Ax represents tested voltage transformer first winding.
When carrying out rated value measurement, the switch 4 that load is improved into device is closed, and it is mutual that tested voltage is served as in the load of device The secondary load of sensor 2;When carrying out lower limit measurement, the switch 4 that load is improved into device disconnects, test device open circuit, quilt It is zero load to examine the secondary load of voltage transformer 2.

Claims (7)

1. a kind of Secondary Load of Voltage Transformer improves device, including tested voltage transformer, standard potential transformer and mutual inductance Device tester, it is characterized in that:Shunt load improves device in tested Secondary Circuit of Potential Transformer, is filled by improving load The regulation for putting switch carries out the measurement of rated value and lower limit;Then by the two of standard potential transformer and tested voltage transformer Secondary terminal is connected with mutual-inductor tester.
2. a kind of Secondary Load of Voltage Transformer according to claim 1 improves device, it is characterized in that:The load is improved Device parallel connection is inserted into the tested transformer jack of mutual-inductor tester, and it is one load is improved device with mutual-inductor tester Body;It is insulated conductor that load, which improves device inner lead, and load resistance and switch are connected on insulated conductor.
3. a kind of Secondary Load of Voltage Transformer according to claim 2 improves device, it is characterized in that:The insulated conductor For general 6 squares of insulated conductors.
4. a kind of Secondary Load of Voltage Transformer according to claim 1 improves device, it is characterized in that:The tested voltage Transformer selects three-phase three-wire electric energy meter voltage transformer, and secondary load improves device and three-phase three-wire electric energy meter electricity consumption Press the secondary circuit of transformer in parallel.
5. a kind of Secondary Load of Voltage Transformer according to claim 1 improves device, it is characterized in that:The load is improved Device is broadly divided into resistance and switch two parts, because standard potential transformer rated load is 0.07VA, three-phase three-wire system electricity Energy table is 100V, standard potential transformer bearing power factor COS Ф=1.0, load capacity with voltage transformer secondary voltage FormulaTherefore Z is about 143k Ω, and is purely resistive load.
6. a kind of Secondary Load of Voltage Transformer according to claim 5 improves device, it is characterized in that:The purely resistive is born Carry, be that resistance is fixed value 143k Ω when environment temperature is (20 ± 5) DEG C, error is no more than ± 3%, and environment temperature often becomes Change 10 DEG C, the error change of load is no more than ± 2%.
7. a kind of Secondary Load of Voltage Transformer according to claim 1 improves device, it is characterized in that:The load is improved During the switch closure of device, rated value measurement is carried out, the secondary of tested voltage transformer is served as in the load that load is improved into device Load;When carrying out lower limit measurement, load is improved into switching off for device, test device open circuit is detected voltage transformer Secondary load for zero load.
CN201611254149.8A 2016-12-30 2016-12-30 A kind of Secondary Load of Voltage Transformer improves device Pending CN107037388A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611254149.8A CN107037388A (en) 2016-12-30 2016-12-30 A kind of Secondary Load of Voltage Transformer improves device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611254149.8A CN107037388A (en) 2016-12-30 2016-12-30 A kind of Secondary Load of Voltage Transformer improves device

Publications (1)

Publication Number Publication Date
CN107037388A true CN107037388A (en) 2017-08-11

Family

ID=59531293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611254149.8A Pending CN107037388A (en) 2016-12-30 2016-12-30 A kind of Secondary Load of Voltage Transformer improves device

Country Status (1)

Country Link
CN (1) CN107037388A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110888099A (en) * 2019-12-09 2020-03-17 国网山东省电力公司电力科学研究院 Test control system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101819264A (en) * 2010-05-10 2010-09-01 山西省机电设计研究院 Portable type current transformer calibrating device
WO2012142736A1 (en) * 2011-04-22 2012-10-26 四川电力科学研究院 Field integral detecting system of three-phase electric energy measuring system of electric distribution network
CN204287463U (en) * 2014-11-28 2015-04-22 国家电网公司 A kind of three-phase four-wire system standard potential transformer secondary load modifying device
CN205157757U (en) * 2015-11-23 2016-04-13 国家电网公司 Standard current transformer secondary load improves device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101819264A (en) * 2010-05-10 2010-09-01 山西省机电设计研究院 Portable type current transformer calibrating device
WO2012142736A1 (en) * 2011-04-22 2012-10-26 四川电力科学研究院 Field integral detecting system of three-phase electric energy measuring system of electric distribution network
CN204287463U (en) * 2014-11-28 2015-04-22 国家电网公司 A kind of three-phase four-wire system standard potential transformer secondary load modifying device
CN205157757U (en) * 2015-11-23 2016-04-13 国家电网公司 Standard current transformer secondary load improves device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110888099A (en) * 2019-12-09 2020-03-17 国网山东省电力公司电力科学研究院 Test control system and method

Similar Documents

Publication Publication Date Title
CN103267933B (en) The method of shelf depreciation in measuring transformer induced voltage test device
CN106226564B (en) Routine test transfer box for high-voltage capacitance type voltage transformer without disassembling lead
CN108761375A (en) A kind of low-power consumption program control type current mutual inductor field detecting device
CN208818818U (en) A kind of low-power consumption program control type current mutual inductor field detecting device
CN104344907A (en) Distribution transformer temperature rise test winding temperature on-line test system and method
CN102540128A (en) Method for automatically calibrating error of combined three-phase current transformer
CN204575760U (en) A kind of assembled electric cabinet pick-up unit with reactive-load compensation verification
CN107748295A (en) A kind of device and method of GIS disc insulators dielectric loss test
CN109283421B (en) Low-voltage power-on detection test method and device for railway traction substation
CN107037388A (en) A kind of Secondary Load of Voltage Transformer improves device
CN104007294B (en) Overhead line parameter measurement wiring device
CN103176048B (en) A kind of method of quick measuring transformer delta connection mode winding D.C. resistance
CN206193101U (en) FGHL 200 loop resistance tester
CN107843760A (en) A kind of facies tract zero sequence AC voltage sensor of resistance-capacitance differential pressure type three
CN205157757U (en) Standard current transformer secondary load improves device
CN202013414U (en) Integral calibrating apparatus of three-phase combination instrument transformer based on electron source
CN207472974U (en) A kind of device of GIS disc insulators dielectric loss test
CN106908683A (en) A kind of multifunctional semiconductor electrical properties device for quick testing and method
CN204287463U (en) A kind of three-phase four-wire system standard potential transformer secondary load modifying device
CN203084124U (en) Multi-parameter batch test system of transformer
CN106405316B (en) Judgment method for equal-turn test of parallel branch of semi-finished transformer
CN209514950U (en) Instrument uses training and examination device
CN208568654U (en) Diadust degree of oxidation detector
CN207851157U (en) The high voltage dielectric loss test device of comparison current signal is acquired using resitstance voltage divider
Zhang et al. Determination of the phase error of 8∶ 1 Inductive Voltage Divider

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170811

RJ01 Rejection of invention patent application after publication