CN107037358A - 便携式断路器非全相保护时间测试仪及测试方法 - Google Patents
便携式断路器非全相保护时间测试仪及测试方法 Download PDFInfo
- Publication number
- CN107037358A CN107037358A CN201710458799.2A CN201710458799A CN107037358A CN 107037358 A CN107037358 A CN 107037358A CN 201710458799 A CN201710458799 A CN 201710458799A CN 107037358 A CN107037358 A CN 107037358A
- Authority
- CN
- China
- Prior art keywords
- contact
- phase
- time
- handle
- phase transformation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/327—Testing of circuit interrupters, switches or circuit-breakers
Abstract
便携式断路器非全相保护时间测试仪及测试方法,在箱体内面板上镶装秒表计时器及设置三相转换把手及三相位置接线端子,所述转换把手具有位置一、位置二和位置三,每个转换把手分别设有4对接点,转换把手置“一”时接点①、③接通以及接点⑤、⑦接通,置“二”时接点空接,置“三”时,接点②、④及接点⑥、⑧接通;每相转换把手中接点③、④短接以及接点⑦、⑧短接,接点③、⑦分别接对应相的位置常闭辅助接点;将三相转换把手中接点①短接、接点②短接、接点⑤短接、接点⑥短接,并且接点①和接点⑤、接点②、接点⑥分别接在秒表计时器计时启动端和计时结束端。本发明试验时接线简单、使用方便,测试准确,可以准确的测出动作时间,适用范围广。
Description
技术领域
本发明涉及一种便携式断路器非全相保护时间测试仪及测试方法。
背景技术
在220KV及以上电压等级的电网中,会普遍采用分相操作的断路器。由于各种原因,如果断路器三相断开一相或者两相,系统就会处于非全相运行状态。当在断路器发生非全相运行时,会对电力系统运行产生很大的危害,断路器非全相运行会使电网产生负序和零序电流(电压),使电网的发、供、用电设备受到损害,因此是不允许的。
断路器非全相保护能反映断路器非全相运行状态,作用于跳开已处于不正常状态的断路器。断路器的非全相保护至关重要,其准确、可靠的动作将关系到整个电网的安全稳定运行,因此需要我们对它的保护功能及动作时间进行严格的试验及测试。
传统断路器非全相保护的试验,由于目前断路器非全相保护一般都装设在断路器本身当中,因此在整定其动作时间方面不能准确的输入具体数值,需按非全相保护时间继电器旋钮数值刻度进行设置。在进行非全相保护动作试验时,若模拟单相故障使其一相断路器断开后,其它两相断路器会经过一定延时断开,虽然可校验保护功能正确、回路正确,但是具体动作时间断路器本身不能准确表示出来。
传统的试验方法只能利用微机保护试验仪器,具体使用方法为:(模拟A相故障)在整组试验界面,设置按键启动,取一开出量,接在线路0①、A①③③跳闸回路当中,时间设置为0.3秒,使保护动作跳A相断路器。装置开入量接断路器B相或C相开关关辅助位置接点,试验时间结束后,试验仪器测出断路器B或C的跳开时间。
这种试验方法存在的问题是:
1、利用微机保护试验仪器开入、开出量输出端子分别引线去断路器辅助接点进行接线的试验方法使用起来比较复杂,在微机保护试验仪器的试验界面设置不能出错,并且试验仪器开入、开出量不能用反,试验接线还需要查找断路器图纸找到所接位置否则不能停表计算不出其它两相的断路器的跳闸时间。因此在试验时需要非常认真仔细,才能测试出非全相动作时间值,增加了试验难度。
2、由于目前断路器非全相保护一般都装设在断路器本身当中。因此我们的工作地点会在220KV开关场中进行,其路程比较远。并且使用的微机保护试验仪器非常笨重,一般需要两个人抬才能进入,使用起来非常不方便,增加了试验时间。
发明内容
本发明是要提高一种能准确测出断路器非全相保护的动作时间,以便对其时间继电器进行调整到规程要求的便携式断路器非全相保护时间测试仪及测试方法。
本发明涉及的技术解决方案是:
便携式断路器非全相保护时间测试仪,包括箱体和箱盖,在箱体内面板镶装带有复归按钮的秒表计时器,在箱体内面板上设置A、B、C相转换把手及A、B、C相位置接线端子,所述转换把手具有三个位置分别为位置一、位置二和位置三,每个转换把手分别设有4对接点,分别为接点①、②、③、④、⑤、⑥、⑦、⑧,转换把手置“一”时接点①、③接通以及接点⑤、⑦接通;转换把手置“二”时接点空接;转换把手置“三”时,接点②、④及接点⑥、⑧接通;每相转换把手中接点③、④短接以及接点⑦、⑧短接,接点③、⑦分别接对应相的位置常闭辅助接点;将A、B、C三相转换把手中三个接点①短接、三个接点②短接、三个接点⑤短接、三个接点⑥短接,并且接点①和接点⑤分别接在秒表计时器计时启动端,接点②、接点⑥分别接在秒表计时器计时结束端。
便携式断路器非全相保护时间测试方法,其步骤如下:
1、分别引用两根试验线将A、B、C相断路器常闭的辅助接点中,首先将A相转换把手置“一”位置、B相转换把手置“三”、C相转换把手置“二”,将A相转换把手的接点①、③接通以及接点⑤、⑦接通,将B相转换把手的接点②、④及接点⑥、⑧接通,C相转换把手的接点空接;
2、模拟主变、线路或母联A相断路器动作跳闸,非全相保护动作,利用A相断路器位置常闭辅助接点动作,接通A相转换把手的接点①和接点⑤,通过秒表计时器的启动端去启动秒表计时器;
3、经过一定时间延时后B相断路器跳开,B相断路器常闭辅助接点动作,使B相转换把手的接点②和接点⑥接通,使秒表计时器停止计时,得到非全相保护实测动作时间;
4、比对非全相保护时间整定值,判断非全相保护实测动作时间是否在要求范围内,如果合格,则按下复归按钮,将秒表计时器时间归零;如果不合格,对断路器非全相时间继电器进行调整直至符合规程要求;
5、将A相转换把手置“一”位置、C相转换把手置“三”、B相转换把手置“二”,将A相转换把手的接点①、③接通以及接点⑤、⑦接通,将C相转换把手的接点②、④及接点⑥、⑧接通,B相转换把手的接点空接;
6、重复步骤2;
7、经过一定时间延时后C相断路器跳开,C相断路器常闭辅助接点动作,使C相转换把手的接点②和接点⑥接通,使秒表计时器停止计时,得到非全相保护实测动作时间;
8、重复步骤4;
9、同理,得到B相跳开时,A相和C相非全相保护实测动作时间,以及C相跳开时,A相和B相非全相保护实测动作时间,重复步骤4。
本发明的有益效果是:
1、试验时接线简单、使用方便,避免了微机保护试验仪器开入、开出量输出端子分别引线去断路器辅助接点进行接线的试验方法以及查验图纸、设置界面的繁琐步骤。测试准确,可以准确的测出动作时间。可以按照规程要求进行调整到规定要求;操作起来十分便捷,一人便可完成之前三四人的工作量,可有效提高工作效率。
2、体积小,重量轻,小巧、可以随身携带,跟原来需要两人才能抬起的试验仪相比优势明显。无需外置电源,且功能专用,试验前不需要对装置进行设置。
3、易于组接安装,维护方便,可为电力部门节省大量资金。
4、断路器非全相保护试验仪结构、原理简单,适用范围广,包括220kV及以上电压等级的断路器非全相保护,并且测试准确。
附图说明
图1是本发明的外形图;
图2是本发明的电路原理图。
图中:①、②、③、④、⑤、⑥、⑦、⑧-接点,1-箱盖,2-箱体,3-秒表计时器,4-转换把手,5-位置接线端子,6-复归按钮。
具体实施方式
如图所示,该便携式断路器非全相保护时间测试仪,包括箱体2和箱盖1,在箱体1内面板上镶装带有复归按钮6的秒表计时器3,在箱体1内面板上设置A、B、C相转换把手4及A、B、C相位置接线端子5,所述转换把手4具有三个位置分别为位置一、位置二和位置三,每个转换把手分别设有4对接点,分别为接点①、②、③、④、⑤、⑥、⑦、⑧;转换把手置“一”时接点①、③接通以及接点⑤、⑦接通;转换把手置“二”时接点空接;转换把手置“三”时,接点②、④及接点⑥、⑧接通;每相转换把手中接点③、④短接以及接点⑦、⑧短接,接点③、⑦分别接对应相的位置常闭辅助接点;将A、B、C三相转换把手中三个接点①短接、三个接点②短接、三个接点⑤短接、三个接点⑥短接,并且接点①和接点⑤分别接在秒表计时器3计时启动端,接点②、接点⑥分别接在秒表计时器3计时结束端。
便携式断路器非全相保护时间测试方法,其步骤如下:
1、分别引用两根试验线将A、B、C相断路器常闭的辅助接点中,首先将A相转换把手置“一”位置、B相转换把手置“三”、C相转换把手置“二”,将A相转换把手的接点①、③接通以及接点⑤、⑦接通,将B相转换把手的接点②、④及接点⑥、⑧接通,C相转换把手的接点空接;
2、模拟主变、线路或母联A相断路器动作跳闸,非全相保护动作,利用A相断路器位置常闭辅助接点动作,接通A相转换把手的接点①和接点⑤,通过秒表计时器的启动端去启动秒表计时器;
3、经过一定时间延时后B相断路器跳开,B相断路器常闭辅助接点动作,使B相转换把手的接点②和接点⑥接通,使秒表计时器停止计时,得到非全相保护实测动作时间;
4、比对非全相保护时间整定值,判断非全相保护实测动作时间是否在要求范围内,如果合格,则按下复归按钮,将秒表计时器时间归零;如果不合格,对断路器非全相时间继电器进行调整直至符合规程要求;
5、将A相转换把手置“一”位置、C相转换把手置“三”、B相转换把手置“二”,将A相转换把手的接点①、③接通以及接点⑤、⑦接通,将C相转换把手的接点②、④及接点⑥、⑧接通,B相转换把手的接点空接;
6、重复步骤2;
7、经过一定时间延时后C相断路器跳开,C相断路器常闭辅助接点动作,使C相转换把手的接点②和接点⑥接通,使秒表计时器停止计时,得到非全相保护实测动作时间;
8、重复步骤4;
9、同理,得到B相跳开时,A相和C相非全相保护实测动作时间,以及C相跳开时,A相和B相非全相保护实测动作时间,重复步骤4。
以上仅为本发明的具体实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (2)
1.便携式断路器非全相保护时间测试仪,包括箱体和箱盖,其特征是:在箱体内面板上镶装带复归按钮的秒表计时器,在箱体内面板上设置A、B、C相转换把手及A、B、C相位置接线端子,所述转换把手具有三个位置分别为位置一、位置二和位置三,每个转换把手分别设有4对接点,分别为接点①、②、③、④、⑤、⑥、⑦、⑧,转换把手置“一”时接点①、③接通以及接点⑤、⑦接通;转换把手置“二”时接点空接;转换把手置“三”时,接点②、④及接点⑥、⑧接通;每相转换把手中接点③、④短接以及接点⑦、⑧短接,接点③、⑦分别接对应相的位置常闭辅助接点;将A、B、C三相转换把手中三个接点①短接、三个接点②短接、三个接点⑤短接、三个接点⑥短接,并且接点①和接点⑤分别接在秒表计时器计时启动端,接点②、接点⑥分别接在秒表计时器计时结束端。
2.便携式断路器非全相保护时间测试方法,其特征是:步骤如下:
1)、分别引用两根试验线将A、B、C相断路器常闭的辅助接点中,首先将A相转换把手置“一”位置、B相转换把手置“三”、C相转换把手置“二”,将A相转换把手的接点①、③接通以及接点⑤、⑦接通,将B相转换把手的接点②、④及接点⑥、⑧接通,C相转换把手的接点空接;
2)、模拟主变、线路或母联A相断路器动作跳闸,非全相保护动作,利用A相断路器位置常闭辅助接点动作,接通A相转换把手的接点①和接点⑤,通过秒表计时器的启动端去启动秒表计时器;
3)、经过一定时间延时后B相断路器跳开,B相断路器常闭辅助接点动作,使B相转换把手的接点②和接点⑥接通,使秒表计时器停止计时,得到非全相保护实测动作时间;
4)、比对非全相保护时间整定值,判断非全相保护实测动作时间是否在要求范围内,如果合格,则按下复归按钮,将秒表计时器时间归零;如果不合格,对断路器非全相时间继电器进行调整直至符合规程要求;
5)、将A相转换把手置“一”位置、C相转换把手置“三”、B相转换把手置“二”,将A相转换把手的接点①、③接通以及接点⑤、⑦接通,将C相转换把手的接点②、④及接点⑥、⑧接通,B相转换把手的接点空接;
6)、重复步骤2;
7)、经过一定时间延时后C相断路器跳开,C相断路器常闭辅助接点动作,使C相转换把手的接点②和接点⑥接通,使秒表计时器停止计时,得到非全相保护实测动作时间;
8)、重复步骤4;
9)、同理,得到B相跳开时,A相和C相非全相保护实测动作时间,以及C相跳开时,A相和B相非全相保护实测动作时间,重复步骤4。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710458799.2A CN107037358B (zh) | 2017-06-16 | 2017-06-16 | 一种断路器非全相保护时间测试方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710458799.2A CN107037358B (zh) | 2017-06-16 | 2017-06-16 | 一种断路器非全相保护时间测试方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107037358A true CN107037358A (zh) | 2017-08-11 |
CN107037358B CN107037358B (zh) | 2020-08-04 |
Family
ID=59542198
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710458799.2A Active CN107037358B (zh) | 2017-06-16 | 2017-06-16 | 一种断路器非全相保护时间测试方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107037358B (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110687386A (zh) * | 2019-11-05 | 2020-01-14 | 国网山西省电力公司阳泉供电公司 | 断路器本体三相不一致保护试验箱 |
CN111398797A (zh) * | 2019-12-24 | 2020-07-10 | 国网浙江省电力有限公司金华供电公司 | 一种手持式断路器校验装置 |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87212598U (zh) * | 1987-12-19 | 1988-11-16 | 葛友发 | 带换相开关的电源插头 |
ES2108608A1 (es) * | 1994-07-01 | 1997-12-16 | Lau Tronic S A | Sistema de medicion y control para seccionadores trifasicos de alta tension. |
CN201993444U (zh) * | 2010-12-09 | 2011-09-28 | 华北电网有限公司计量中心 | 一种继电器的测试设备及系统 |
CN202512211U (zh) * | 2012-04-06 | 2012-10-31 | 宁夏电力公司银川供电局 | 继电保护装置跳闸出口时间计时仪 |
CN103033743A (zh) * | 2012-12-08 | 2013-04-10 | 青岛大学 | 开关元件的动作时间测量装置 |
CN203587767U (zh) * | 2013-11-28 | 2014-05-07 | 国家电网公司 | 一种断路器时间测试装置 |
PL218499B1 (pl) * | 2010-09-30 | 2014-12-31 | Towarzystwo Gospodarki Energetycznej | Układ do pomiaru całki Joule'a oraz czasu zadziałania bezpieczników topikowych i wyłączników |
CN104614671A (zh) * | 2015-02-02 | 2015-05-13 | 苏州市计量测试研究所 | 时间继电器校准辅助装置和校准方法 |
CN204389647U (zh) * | 2015-01-14 | 2015-06-10 | 国家电网公司 | 一种便捷式断路器非全相保护检验装置 |
CN205193238U (zh) * | 2015-12-11 | 2016-04-27 | 国网冀北电力有限公司唐山供电公司 | 一种非全相保护试验综合测试仪 |
CN206057506U (zh) * | 2016-08-31 | 2017-03-29 | 国网宁夏电力公司银川供电公司 | 多功能继电器校验仪 |
-
2017
- 2017-06-16 CN CN201710458799.2A patent/CN107037358B/zh active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87212598U (zh) * | 1987-12-19 | 1988-11-16 | 葛友发 | 带换相开关的电源插头 |
ES2108608A1 (es) * | 1994-07-01 | 1997-12-16 | Lau Tronic S A | Sistema de medicion y control para seccionadores trifasicos de alta tension. |
PL218499B1 (pl) * | 2010-09-30 | 2014-12-31 | Towarzystwo Gospodarki Energetycznej | Układ do pomiaru całki Joule'a oraz czasu zadziałania bezpieczników topikowych i wyłączników |
CN201993444U (zh) * | 2010-12-09 | 2011-09-28 | 华北电网有限公司计量中心 | 一种继电器的测试设备及系统 |
CN202512211U (zh) * | 2012-04-06 | 2012-10-31 | 宁夏电力公司银川供电局 | 继电保护装置跳闸出口时间计时仪 |
CN103033743A (zh) * | 2012-12-08 | 2013-04-10 | 青岛大学 | 开关元件的动作时间测量装置 |
CN203587767U (zh) * | 2013-11-28 | 2014-05-07 | 国家电网公司 | 一种断路器时间测试装置 |
CN204389647U (zh) * | 2015-01-14 | 2015-06-10 | 国家电网公司 | 一种便捷式断路器非全相保护检验装置 |
CN104614671A (zh) * | 2015-02-02 | 2015-05-13 | 苏州市计量测试研究所 | 时间继电器校准辅助装置和校准方法 |
CN205193238U (zh) * | 2015-12-11 | 2016-04-27 | 国网冀北电力有限公司唐山供电公司 | 一种非全相保护试验综合测试仪 |
CN206057506U (zh) * | 2016-08-31 | 2017-03-29 | 国网宁夏电力公司银川供电公司 | 多功能继电器校验仪 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110687386A (zh) * | 2019-11-05 | 2020-01-14 | 国网山西省电力公司阳泉供电公司 | 断路器本体三相不一致保护试验箱 |
CN111398797A (zh) * | 2019-12-24 | 2020-07-10 | 国网浙江省电力有限公司金华供电公司 | 一种手持式断路器校验装置 |
Also Published As
Publication number | Publication date |
---|---|
CN107037358B (zh) | 2020-08-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204497589U (zh) | 多功能配电控制柜 | |
JP2018183034A (ja) | 電力供給システムの保護装置及びそれを備えたシステム | |
CN105301426B (zh) | 一种多层级选择性低压短路保护实验系统 | |
CN107037358A (zh) | 便携式断路器非全相保护时间测试仪及测试方法 | |
CN105203948A (zh) | 断路器综合测试装置 | |
CN102944762B (zh) | 发电机组投运前同期点两侧回路相序调试方法 | |
CN107748311B (zh) | 一种电力变压器的短路承受能力验证系统 | |
CN108345706B (zh) | 一种电源快切的仿真方法及模型 | |
CN110174560B (zh) | 一种继电保护装置状态变量测试方法 | |
CN102866310B (zh) | 一种电力系统线路保护装置柔性仿真测试平台 | |
CN109375047B (zh) | 一种高压输电线路双端异步极性测试系统及方法 | |
Idris et al. | Auto-reclose Relay Simulation for Research and Education | |
CN105487005B (zh) | 一种多功能非全相继电器校验仪 | |
CN110112788A (zh) | 一种发电厂同期系统调试方法 | |
CN110687386B (zh) | 断路器本体三相不一致保护试验箱 | |
Guo-yang et al. | Modeling of protective relay systems for power system dynamic simulations | |
Huang et al. | Adaptive residual current compensation for robust fault-type selection in mho elements | |
CN211014553U (zh) | 一种分界开关功能检测电路 | |
CN206340238U (zh) | 多功能漏电保护器操作培训台 | |
Dyrstad | Relay lab at NTNU | |
Nomandela et al. | Transformer Differential Protection System Testing for Scholarly Benefits Using RTDS Hardware-in-the-Loop Technique | |
CN104078951A (zh) | 一种基于相间弧光电压特性线路相间故障双端保护方法 | |
TW201516425A (zh) | 符合接地安全之低電壓微電網人工故障試驗方法 | |
RU55153U1 (ru) | Устройство для определения места повреждения электрической сети напряжения 6( 10 )-35 кв с изолированной или компенсированной нейтралью | |
CN216622554U (zh) | 一种智能保护器维修试验装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |