CN107035917A - 顶管施工结构 - Google Patents

顶管施工结构 Download PDF

Info

Publication number
CN107035917A
CN107035917A CN201710370556.3A CN201710370556A CN107035917A CN 107035917 A CN107035917 A CN 107035917A CN 201710370556 A CN201710370556 A CN 201710370556A CN 107035917 A CN107035917 A CN 107035917A
Authority
CN
China
Prior art keywords
construction structure
jacking construction
well
channel side
excavate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710370556.3A
Other languages
English (en)
Inventor
罗永强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710370556.3A priority Critical patent/CN107035917A/zh
Publication of CN107035917A publication Critical patent/CN107035917A/zh
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground
    • F16L1/036Laying or reclaiming pipes on land, e.g. above the ground in the ground the pipes being composed of sections of short length

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明公开了一种顶管施工结构,包括工作井和收口井,在工作井的两个相对侧依次设有后背、液压油缸、千斤顶和顶铁,顶铁紧贴预开挖通道侧,后背贴靠预开挖通道侧的对侧。本发明的顶管施工结构,方便开挖,使用和操作均较为方便,可有效避免开挖的通道坍塌。

Description

顶管施工结构
技术领域
本发明涉及建筑结构技术领域,尤其涉及一种顶管施工结构。
背景技术
传统的开挖技术是人工将预制管道装入到开挖的通道内,劳动强度大,效率低,而且存在危险性。
发明内容
本发明的目的是提供一种顶管施工结构,方便开挖,使用和操作均较为方便,可有效避免开挖的通道坍塌,减低了劳动强度和危险性。
为实现上述目的,本发明提供一种顶管施工结构,包括工作井和收口井,在工作井的两个相对侧依次设有后背、液压油缸、千斤顶和顶铁,顶铁紧贴预开挖通道侧,后背贴靠预开挖通道侧的对侧。
作为本发明的进一步改进,所述液压油缸上设有读表。
与现有技术相比,本发明的顶管施工结构的有益效果如下:
(1)采用后背、液压油缸、千斤顶和顶铁,方便开挖,使用和操作均较为方便,可有效避免开挖的通道坍塌,减低了劳动强度和危险性。
通过以下的描述并结合附图,本发明将变得更加清晰,这些附图用于解释本发明的实施例。
附图说明
图1为顶管施工结构的示意图。
具体实施方式
现在参考附图描述本发明的实施例,附图中类似的元件标号代表类似的元件。
请参考图1,所述的顶管施工结构包括工作井1和收口井2,在工作井1的两个相对侧依次设有后背3、液压油缸4、千斤顶5和顶铁6,顶铁6紧贴预开挖通道侧,后背3贴靠预开挖通道侧的对侧。所述液压油缸4上设有读表,随时可检测压力。在开挖工作井1与收口井2之间的通道a时,通道a每挖出一部分,则用顶铁6将预制管道顶入开挖的通道a内,再继续开挖,顶铁6退回装上预制管道,再将下一个预制管道顶入开挖出的通道a内,如此,开挖的通道a不会坍塌,方便开挖,设备使用和操作均较为方便。
以上结合最佳实施例对本发明进行了描述,但本发明并不局限于以上揭示的实施例,而应当涵盖各种根据本发明的本质进行的修改、等效组合。

Claims (2)

1.一种顶管施工结构,包括工作井和收口井,其特征在于:在工作井的两个相对侧依次设有后背、液压油缸、千斤顶和顶铁,顶铁紧贴预开挖通道侧,后背贴靠预开挖通道侧的对侧。
2.根据权利要求1所述的顶管施工结构,其特征在于:所述液压油缸上设有读表。
CN201710370556.3A 2017-05-23 2017-05-23 顶管施工结构 Pending CN107035917A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710370556.3A CN107035917A (zh) 2017-05-23 2017-05-23 顶管施工结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710370556.3A CN107035917A (zh) 2017-05-23 2017-05-23 顶管施工结构

Publications (1)

Publication Number Publication Date
CN107035917A true CN107035917A (zh) 2017-08-11

Family

ID=59540306

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710370556.3A Pending CN107035917A (zh) 2017-05-23 2017-05-23 顶管施工结构

Country Status (1)

Country Link
CN (1) CN107035917A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112267889A (zh) * 2020-10-26 2021-01-26 中铁八局集团第一工程有限公司 一种穿越溶腔充填物的施工方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH102191A (ja) * 1996-06-17 1998-01-06 Tokyo Gas Co Ltd 推進装置
CN106369223A (zh) * 2016-10-31 2017-02-01 中铁二十局集团第五工程有限公司 一种粉砂土地层顶管施工方法
CN206738711U (zh) * 2017-05-23 2017-12-12 罗永强 顶管施工结构

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH102191A (ja) * 1996-06-17 1998-01-06 Tokyo Gas Co Ltd 推進装置
CN106369223A (zh) * 2016-10-31 2017-02-01 中铁二十局集团第五工程有限公司 一种粉砂土地层顶管施工方法
CN206738711U (zh) * 2017-05-23 2017-12-12 罗永强 顶管施工结构

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112267889A (zh) * 2020-10-26 2021-01-26 中铁八局集团第一工程有限公司 一种穿越溶腔充填物的施工方法

Similar Documents

Publication Publication Date Title
CN206738711U (zh) 顶管施工结构
CN104047623B (zh) 一种大跨洞室开挖施工方法
CN103510957B (zh) 一种组合式石门揭煤方法
CN107448214B (zh) 大型地质构造裂隙煤岩体超深孔高压两巷预注浆方法
CN104912101A (zh) 一种综合管廊的掘进拼装结构及其施工方法
CN104847362A (zh) 硬岩地层大跨地铁车站暗挖施工方法
CN109707399A (zh) 隧道出洞支护构造及其施工方法
CN103235853B (zh) 用于采煤沉陷地边采边复的基于土方平衡的基塘布局方法
CN103867209A (zh) 一种地铁竖井分层、分段转横通道施工开挖进洞的方法
CN107035917A (zh) 顶管施工结构
AU2014393189A1 (en) Method for filling open stope with aeolian sand in shallow coal seam in western desertified mining areas
CN107908901A (zh) 一种基坑施工中承压水降水对周边环境影响的计算方法
CN108242604B (zh) 一种输电线路杆塔水平接地降阻装置及施工方法
CN204703907U (zh) 一种新型盾构机
CN201756710U (zh) 一种沙石挖掘机
CN102536213B (zh) 煤矿瓦斯渗流范围观测方法
CN203271702U (zh) 井下水力压裂高压密封孔内压裂管
CN106761742B (zh) 一种深部孤岛工作面沿空掘巷围岩稳定性控制方法
CN204456024U (zh) 用于水电站输水隧洞钢衬段的接地设备
CN209703451U (zh) 岔洞与调压室一体式结构
CN210440045U (zh) 一种蛋壳形灌浆隧洞避车洞结构
CN208545859U (zh) 便于电缆敷设的地下车库顶板结构
CN202493250U (zh) 可保留通径的换层喷砂装置
CN204626421U (zh) 一种可回收锚索
CN110905558A (zh) 一种可互锁的隧道围岩超前支护管棚结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170811