CN107035915A - A kind of ventilation shaft construction method - Google Patents

A kind of ventilation shaft construction method Download PDF

Info

Publication number
CN107035915A
CN107035915A CN201710356820.8A CN201710356820A CN107035915A CN 107035915 A CN107035915 A CN 107035915A CN 201710356820 A CN201710356820 A CN 201710356820A CN 107035915 A CN107035915 A CN 107035915A
Authority
CN
China
Prior art keywords
airduct
construction method
ventilation shaft
suspension bracket
shaft construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710356820.8A
Other languages
Chinese (zh)
Other versions
CN107035915B (en
Inventor
李贵兴
张生统
高扬
任义亮
铁福春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Engineering Bureau 4 Co Ltd
Original Assignee
Sinohydro Engineering Bureau 4 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Engineering Bureau 4 Co Ltd filed Critical Sinohydro Engineering Bureau 4 Co Ltd
Priority to CN201710356820.8A priority Critical patent/CN107035915B/en
Publication of CN107035915A publication Critical patent/CN107035915A/en
Application granted granted Critical
Publication of CN107035915B publication Critical patent/CN107035915B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L23/00Flanged joints
    • F16L23/12Flanged joints specially adapted for particular pipes
    • F16L23/14Flanged joints specially adapted for particular pipes for rectangular pipes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L23/00Flanged joints
    • F16L23/16Flanged joints characterised by the sealing means
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L58/00Protection of pipes or pipe fittings against corrosion or incrustation
    • F16L58/18Protection of pipes or pipe fittings against corrosion or incrustation specially adapted for pipe fittings
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/02Ducting arrangements
    • F24F13/0209Ducting arrangements characterised by their connecting means, e.g. flanges
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/02Ducting arrangements
    • F24F13/0245Manufacturing or assembly of air ducts; Methods therefor
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/02Ducting arrangements
    • F24F13/0254Ducting arrangements characterised by their mounting means, e.g. supports

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Manufacturing & Machinery (AREA)
  • Building Environments (AREA)
  • Ventilation (AREA)

Abstract

The present invention relates to building engineering field, more particularly to a kind of ventilation shaft construction method.Comprise the following steps:Airduct is made, support and suspension bracket installation, airduct installation and connection, fire resisting damper and air port are installed and assembling.A kind of ventilation construction method of the present invention, compared to existing existing ventilation construction, efficiency high, is efficiently monitored, it is ensured that ventilation is smooth, fire protecting performance strengthens to airduct connection Air Leakage;Cost is low;Construction period is effectively reduced, construction quality is improved, and the quality problems occurred in building construction process can in time be notified to safeguard unit.

Description

A kind of ventilation shaft construction method
Technical field
The present invention relates to building engineering field, more particularly to a kind of ventilation shaft construction method.
Background technology
In the ventilation work progress of piping lane, the problems such as frequently encountering not smooth ventilation, fire protecting performance difference causes efficiency of construction Low, cost is high.To solve these problems, a kind of applicable ventilation shaft construction method need to be invented.
The content of the invention
Present invention aim to address in existing ventilation work progress due to matter caused by not smooth, fire protecting performance difference of ventilation etc. There is provided a kind of ventilation construction method for amount problem.
A kind of ventilation shaft construction method, described method comprises the following steps:
Step one, airduct makes:Rectangular air duct is connected with angle steel flange using flange riveting, rectangular air duct and angle steel Flange zinc plated rivets rivet clasp;
Step 2, support and suspension bracket are installed:Support and suspension bracket are arranged at air port or valve, inspection door and automatic control mechanism it Outside, installation site is apart from air port >=200mm;Support and suspension bracket are fixed using expansion bolt, and the vertical rod of suspension bracket is hung using full thread Bar;Support and suspension bracket are located on bracket;
Step 3, airduct is installed and connected:It is attached between airduct by angle steel flange, using thickness between angle steel flange 4mm, rigidity >=FB3 asbestos rubber cushion make pad, and packing matcrial, inductor are installed outside it, by the wind connected Pipe is placed on suspension bracket, adjusts level, checks the installation quality of airduct;
Step 4, fire resisting damper and air port are installed:Airduct through fire wall is by fire resisting damper control, adjustable draught for shutter and wind Pipe is connected;
Step 5, assembling:Blower fan is hung to construction working face, adjusts level, completes ventilation shaft construction.
Further, the material of angle steel flange described in step one is carbon steel, and surface carries out chromium plating or zinc-plated processing, First derusted before rivet clasp, then brush twice minium, prevent angle steel flange from getting rusty.
Further, suspension bracket spacing described in step 2 is 1500mm.
Further, bracket described in step 2 applies 2 times antirust paints after derusting, bright dew part 2 times finish paints of brush again, prevents Get rusty again.
Further, encapsulant described in step 3 is incombustible material, and non-ignitable requirement is A grades.
Further, the inductor described in step 3 is vibration sensor.If sensed during ventilation test or use Device measurement obtain leaking out value be more than it is specific leak out value when, then metrical information is sent to engineering by inductor by cordless communication network Control centre, ECC engineering control center is received after metrical information, by the engineering maintenance personnel at the metrical information scene of issuing, and sends letter Breath order request inductor sends red light and alarm sound.Wherein, the metrical information includes the value of leaking out, inductor Position etc..
Further, metal grill, mesh dead size≤10mm*10mm are installed described in step 4 on the inside of air port.
A kind of ventilation construction method that the present invention is provided, is asked by inductor monitoring by airduct connection with the presence or absence of leaking out Topic, is effectively reduced construction period, improves construction quality, and can notify the quality problems occurred in building construction process in time Safeguard unit.
It is an advantage of the invention that:
A kind of ventilation shaft construction method of the present invention, compared to existing existing ventilation construction, efficiency high, connects to airduct and leaks Wind problem is efficiently monitored, it is ensured that ventilation is smooth, fire protecting performance enhancing;Cost is low;Construction period is effectively reduced, construction is improved Quality, and the quality problems occurred in building construction process can in time be notified to safeguard unit.
Other features and advantages of the present invention will be illustrated in the following description, also, partly becomes from specification Obtain it is clear that or being understood by implementing the present invention.The purpose of the present invention and other advantages can be by the explanations write Structure specifically noted by book and claims is realized and obtained.
Embodiment
Embodiments of the invention are illustrated below.It should be noted that in the case where not conflicting, reality of the invention Applying the technical characteristic in example and embodiment can be combined with each other, within protection scope of the present invention.In addition, for the ease of retouching State, step number has been used below, but this should not be construed as limiting the invention, in some cases, can be with difference Shown or described step is performed in order herein.
Embodiment of the method 1
A kind of embodiments in accordance with the present invention, it is proposed that ventilation shaft construction method, comprise the following steps:
Step one, airduct makes:Rectangular air duct is connected with angle steel flange using flange riveting, rectangular air duct and angle steel Flange zinc plated rivets rivet clasp;
Step 2, support and suspension bracket are installed:Support and suspension bracket are arranged at air port or valve, inspection door and automatic control mechanism it Outside, installation site is apart from air port >=200mm;Support and suspension bracket are fixed using expansion bolt, and the vertical rod of suspension bracket is hung using full thread Bar;Support and suspension bracket are located on bracket;
Step 3, airduct is installed and connected:It is attached between airduct by angle steel flange, using thickness between angle steel flange 4mm, rigidity >=FB3 asbestos rubber cushion make pad, and packing matcrial, inductor are installed outside it, by the wind connected Pipe is placed on suspension bracket, adjusts level, checks the installation quality of airduct;
Step 4, fire resisting damper and air port are installed:Airduct through fire wall is by fire resisting damper control, adjustable draught for shutter and wind Pipe is connected;
Step 5, assembling:Blower fan is hung to construction working face, adjusts level, completes ventilation shaft construction.
Further, the material of angle steel flange described in step one is carbon steel, and surface carries out chromium plating or zinc-plated processing, First derusted before rivet clasp, then brush twice minium, prevent angle steel flange from getting rusty.
Further, suspension bracket spacing described in step 2 is 1500mm.
Further, bracket described in step 2 applies 2 times antirust paints after derusting, bright dew part 2 times finish paints of brush again, prevents Get rusty again.
Further, encapsulant described in step 3 is incombustible material, and non-ignitable requirement is A grades.
Further, the inductor described in step 3 is vibration sensor.If sensed during ventilation test or use Device measurement obtain leaking out value be more than it is specific leak out value when, then metrical information is sent to engineering by inductor by cordless communication network Control centre, ECC engineering control center is received after metrical information, by the engineering maintenance personnel at the metrical information scene of issuing, and sends letter Breath order request inductor sends red light and alarm sound.Wherein, the metrical information includes the value of leaking out, inductor Position etc..
Further, metal grill, mesh dead size≤10mm*10mm are installed described in step 4 on the inside of air port.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (7)

1. a kind of ventilation shaft construction method, it is characterised in that:Described method comprises the following steps:
Step one, airduct makes:Rectangular air duct is connected with angle steel flange using flange riveting, rectangular air duct and angle steel flange Use zinc plated rivets rivet clasp;
Step 2, support and suspension bracket are installed:Support and suspension bracket are arranged at air port or valve, inspection door and automatic control mechanism outside, Installation site is apart from air port >=200mm;Support and suspension bracket are fixed using expansion bolt, and the vertical rod of suspension bracket uses full thread suspension rod; Support and suspension bracket are located on bracket;
Step 3, airduct is installed and connected:Be attached between airduct by angle steel flange, between angle steel flange using thickness 4mm, Rigidity >=FB3 asbestos rubber cushion makees pad, and packing matcrial, and inductor is installed outside it, and the airduct connected is pacified It is placed on suspension bracket, adjusts level, checks the installation quality of airduct;
Step 4, fire resisting damper and air port are installed:Airduct through fire wall is by fire resisting damper control, and adjustable draught for shutter connects with airduct Connect;
Step 5, assembling:Blower fan is hung to construction working face, adjusts level, completes ventilation shaft construction.
2. a kind of ventilation shaft construction method according to claim 1, it is characterised in that:Angle steel flange described in step one Material be carbon steel, surface carries out chromium plating or zinc-plated processing, first derusted before rivet clasp, then brush twice minium.
3. a kind of ventilation shaft construction method according to claim 1, it is characterised in that:Suspension bracket spacing described in step 2 For 1500mm.
4. a kind of ventilation shaft construction method according to claim 1, it is characterised in that:Bracket described in step 2 except 2 times antirust paints, bright dew part 2 times finish paints of brush again are applied after rust.
5. a kind of ventilation shaft construction method according to claim 1, it is characterised in that:Encapsulant is described in step 3 Incombustible material, and non-ignitable requirement is A grades.
6. a kind of ventilation shaft construction method according to claim 1, it is characterised in that:Inductor described in step 3 is Vibration sensor.
7. a kind of ventilation shaft construction method according to claim 1, it is characterised in that:Pacify on the inside of air port described in step 4 Fill metal grill, mesh dead size≤10mm*10mm.
CN201710356820.8A 2017-05-19 2017-05-19 A kind of ventilation shaft construction method Active CN107035915B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710356820.8A CN107035915B (en) 2017-05-19 2017-05-19 A kind of ventilation shaft construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710356820.8A CN107035915B (en) 2017-05-19 2017-05-19 A kind of ventilation shaft construction method

Publications (2)

Publication Number Publication Date
CN107035915A true CN107035915A (en) 2017-08-11
CN107035915B CN107035915B (en) 2019-05-03

Family

ID=59538859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710356820.8A Active CN107035915B (en) 2017-05-19 2017-05-19 A kind of ventilation shaft construction method

Country Status (1)

Country Link
CN (1) CN107035915B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107965624A (en) * 2017-11-22 2018-04-27 广州正德工业工程技术有限公司 Lithium battery film applicator air hose prepares and mounting process
CN110440379A (en) * 2019-07-16 2019-11-12 上海一建安装工程有限公司 Ventilating system construction method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000257945A (en) * 1999-03-10 2000-09-22 Tosetz Kk Air-conditioning duct unit and installation method of air-conditioning duct using the same
CN201050645Y (en) * 2007-05-31 2008-04-23 崔玉音 Super-clean wind pipe for semiconductor air conditioner system
CN101236099A (en) * 2007-02-02 2008-08-06 河南光力科技股份有限公司 Integral flux, wind velocity sensor
CN103452583A (en) * 2013-09-02 2013-12-18 江苏中煤机电科技有限公司 Coal mine ventilation lifesaving pipeline
CN103604007A (en) * 2013-11-26 2014-02-26 中国建筑第八工程局有限公司 Composite blast pipe construction method
CN204084759U (en) * 2014-08-20 2015-01-07 江苏扬安集团有限公司 A kind of thermal-insulating type fiberglass composite air duct construction and installation system
CN104458295A (en) * 2014-12-29 2015-03-25 成都市第一建筑工程公司 Construction method for crosswind multiphase flow system for high speed train test
CN205426449U (en) * 2015-11-30 2016-08-03 国家电网公司 Boiler powder process system blast pipe linking department detection device that leaks out

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000257945A (en) * 1999-03-10 2000-09-22 Tosetz Kk Air-conditioning duct unit and installation method of air-conditioning duct using the same
CN101236099A (en) * 2007-02-02 2008-08-06 河南光力科技股份有限公司 Integral flux, wind velocity sensor
CN201050645Y (en) * 2007-05-31 2008-04-23 崔玉音 Super-clean wind pipe for semiconductor air conditioner system
CN103452583A (en) * 2013-09-02 2013-12-18 江苏中煤机电科技有限公司 Coal mine ventilation lifesaving pipeline
CN103604007A (en) * 2013-11-26 2014-02-26 中国建筑第八工程局有限公司 Composite blast pipe construction method
CN204084759U (en) * 2014-08-20 2015-01-07 江苏扬安集团有限公司 A kind of thermal-insulating type fiberglass composite air duct construction and installation system
CN104458295A (en) * 2014-12-29 2015-03-25 成都市第一建筑工程公司 Construction method for crosswind multiphase flow system for high speed train test
CN205426449U (en) * 2015-11-30 2016-08-03 国家电网公司 Boiler powder process system blast pipe linking department detection device that leaks out

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107965624A (en) * 2017-11-22 2018-04-27 广州正德工业工程技术有限公司 Lithium battery film applicator air hose prepares and mounting process
CN110440379A (en) * 2019-07-16 2019-11-12 上海一建安装工程有限公司 Ventilating system construction method
CN110440379B (en) * 2019-07-16 2021-06-15 上海一建安装工程有限公司 Ventilation system construction method

Also Published As

Publication number Publication date
CN107035915B (en) 2019-05-03

Similar Documents

Publication Publication Date Title
CN107035915A (en) A kind of ventilation shaft construction method
CN104748228B (en) A kind of modular wall hanging indoor air conditioner of nuclear safe level
CN206646712U (en) A kind of high-level clean room's furred ceiling
EP3061503A1 (en) Fire damper
CN108286585A (en) A kind of damping pipeline elevator
CN201514007U (en) Self-support type fire-resistant ventilation duct structure
CN206478768U (en) A kind of central air conditioning project is installed and uses outdoor unit support frame
CN217683771U (en) Air conditioner heat supply and ventilation pipeline convenient to install
Carrie et al. Improving ductwork
CN217683663U (en) Fire-proof mounting structure of wall-through air duct
CN216977126U (en) Multilayer air outlet reinforcing apparatus
US20080202617A1 (en) Air supply pipe
Coyne A million of miles of ducts: duct sealing update.
CN212004731U (en) Combined air pipe
CN209415725U (en) A kind of follow-on noise reducing device of air conditioner
CN209241296U (en) A kind of gravitational equilibrium air lock of ship ventilation
CN109263846B (en) Optimized structure of ventilation pipeline of large container ship cargo hold
CN109405133A (en) Conveniently install the complete door of air conditioning piping
Gilbride et al. Home Improvement Expert Checklist: Gas Tank Water Heater
PIPE SECTION 23 21 13 MECHANICAL PIPE AND PIPING ACCESSORIES PART 1-GENERAL
Superseding USACE/NAVFAC/AFCESA/NASA UFGS-23 00 00 (August 2010)
Manufacturers 2.05 NATURAL GAS BOILER
CN204185972U (en) The high sealability of toilet's heating and ventilating equipment receives limit
CN112555807A (en) Horizontal superheater mounting device applied to biomass layer combustion boiler of high-temperature ultrahigh-pressure reheating-free system
Carson Air Handling Unit Design for High Performance Buildings

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant