CN107023211A - A kind of ultra-high performance concrete electric pole containing composite fibre - Google Patents

A kind of ultra-high performance concrete electric pole containing composite fibre Download PDF

Info

Publication number
CN107023211A
CN107023211A CN201710446330.7A CN201710446330A CN107023211A CN 107023211 A CN107023211 A CN 107023211A CN 201710446330 A CN201710446330 A CN 201710446330A CN 107023211 A CN107023211 A CN 107023211A
Authority
CN
China
Prior art keywords
ultra
high performance
performance concrete
composite bed
electric pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710446330.7A
Other languages
Chinese (zh)
Other versions
CN107023211B (en
Inventor
黄福云
杨芳芳
陈汉伦
龙腾飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuzhou University
Original Assignee
Fuzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou University filed Critical Fuzhou University
Priority to CN201710446330.7A priority Critical patent/CN107023211B/en
Publication of CN107023211A publication Critical patent/CN107023211A/en
Application granted granted Critical
Publication of CN107023211B publication Critical patent/CN107023211B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/12Structures made of specified materials of concrete or other stone-like material, with or without internal or external reinforcements, e.g. with metal coverings, with permanent form elements
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/02Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
    • C04B28/04Portland cements
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Materials Engineering (AREA)
  • Ceramic Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Inorganic Chemistry (AREA)
  • Wood Science & Technology (AREA)
  • Organic Chemistry (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The present invention relates to a kind of ultra-high performance concrete electric pole containing composite fibre, the ultra-high performance concrete electric pole includes the hollow rod body with sandwich construction, and the sandwich construction includes the first composite bed, the second composite bed and the triplex layer being sequentially coaxially distributed from inside to outside;First composite bed is the vinal composite bed being made using the ultra-high performance concrete containing vinal;Second composite bed is the carbon fiber composite bed being made using the ultra-high performance concrete of carbon fiber-containing;The triplex layer is the steel fibre composite bed being made using the ultra-high performance concrete containing steel fibre.Compared with prior art, the present invention there is tensile strength height, it is service life length, wide, safe using scope.

Description

A kind of ultra-high performance concrete electric pole containing composite fibre
Technical field
The present invention relates to converting electricity field, more particularly, to a kind of ultra-high performance concrete electricity containing composite fibre Bar.
Background technology
At present, the most of electric poles of China are generally that the normal concrete for being configured with framework of steel reinforcement is made, and small part is using wood Electric pole processed, and start progressively to use the electric pole of ultra-high performance concrete.
But, the normal concrete electric wire club body concrete strength for being configured with framework of steel reinforcement is not high, especially common mixed The tensile strength for coagulating soil is relatively low.When circuit is longer, act on electric pole termination eccentric force it is very big when, easily there is drawing crack and broken in shaft It is bad, cause its durability poor, to the repairing in later stage, replacement brings many troubles, also causes very big to economy, material resources, manpower Pressure.Also, due to needing assembling reinforcement before the forming, not only cause that the quality of common electric pole is big, operational procedure is cumbersome, takes When it is laborious.Because it is from great, when the location of electric pole is in the not convenient area such as mountain area, the transport of electric pole, peace Dress will have very big difficulty.
In addition, wooden pole is lightweight, set up convenient, the load-bearing of some circuits such as telephone wire and pulling force are small, rod It can be competent at, if telephone line has change, move bar also very convenient.But, applicable timber is progressively rare, concrete wire pole outward appearance Smooth and beautiful appearance, urban beautification of being more convenient for, but concrete wire pole is also perishable, and cause maintenance cost higher.
When only mixing fiber, it is more prone to for being centrifuged into tapered electric pole, and the use of tapered electric pole is to long-term The area blown hard provides safer selection.
Although ultra-high performance concrete electric pole, which compares traditional concurrent or wooden electric pole, has more advantages, its It is difficult to centrifugal forming, it is impossible to extensive, factorial praluction, thus current ultra-high performance concrete electric pole is frequently with die perfusion Method.Even if in addition, UHPC can centrifugal forming, but because steel fibre density is big, steel fibre is mainly distributed on outer layer during shaping, when When internal layer concrete cracking, outer layer steel fibre are extracted, electric pole loses bearing capacity soon.Therefore, find one kind and make simple, warp Help, convenient and good stress performance electric pole of constructing, for improve China transmission of electricity cause it is significant.
The content of the invention
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide a kind of containing composite fibre Ultra-high performance concrete electric pole.By that can surpass its compression strength after increasing high efficiency water reducing agent, the control ratio of mud below 0.18 Cross 100MPa;Meanwhile, by centrifuging moulding, make three kinds(Steel fibre, carbon fiber, PVA)The distribution of composite fibre is more normal than in building UHPC is more distributed in order and respectively cement pole inner, middle and outer layer by the difference of its density, is improved with carrying so as to more significant Its tensile strength.The ultra-high performance concrete(UHPC)The raising of Tensile strength is remarkably improved the use effect of cement pole Benefit.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of ultra-high performance concrete electric pole containing composite fibre, the ultra-high performance concrete electric pole is included with sandwich construction Hollow rod body, the sandwich construction includes the first composite bed, the second composite bed and the triplex being sequentially coaxially distributed from inside to outside Layer;
First composite bed is the vinal being made using the ultra-high performance concrete containing vinal Composite bed;
Second composite bed is the carbon fiber composite bed being made using the ultra-high performance concrete of carbon fiber-containing;
The triplex layer is the steel fibre composite bed being made using the ultra-high performance concrete containing steel fibre.
The making raw material of first composite bed includes ultra-high performance concrete raw material and vinal, described second The making raw material of composite bed includes ultra-high performance concrete raw material and carbon fiber, and the making raw material of the triplex layer includes surpassing High performance concrete raw material and steel fibre;
Wherein, the ratio of mud is not more than 0.18 in ultra-high performance concrete raw material, and vinal accounts for the making of the first composite bed Raw material mixing after cumulative volume 5.8 ~ 6.2%, carbon fiber account for the second composite bed make raw material mixing after cumulative volume 5.8 ~ 6.2%, steel fibre accounts for make cumulative volume after raw material mixing the 5.8 ~ 6.2% of triplex layer.
The ultra-high performance concrete raw material includes cement, silica flour, fine sand, metakaolin, magnesia, water and efficient diminishing Agent, wherein, cement, silica flour, fine sand, metakaolin, magnesia, the mass ratio of water and high efficiency water reducing agent are:0.8 ~ 1.2 ︰ The ︰ 0.01 ~ 0.014 of 0.23 ~ 0.27 ︰, 1 ~ 1.4 ︰, 0.08 ~ 0.12 ︰, 0.08 ~ 0.12 ︰ 0.2 ~ 0.24.
The cement is cement P .O 42.5;
The average grain diameter of the silica flour be 0.18 ~ 0.22 μm, SiO2 contents be more than or equal to 90%, specific surface area be 18.9 ~ 18.94m2/ g, density is 1.8 ~ 2.2g/cm3
The average grain diameter of the fine sand is not more than 0.63mm, and density is 2.4 ~ 2.8g/cm3
The average grain diameter of the metakaolin is 10.64 ~ 10.68 um;
The average grain diameter of the magnesia is 72 ~ 76um;
The water-reducing rate of the high efficiency water reducing agent is more than 25%.
Radial thickness, the radial thickness of the second composite bed, the radial thickness ratio of triplex layer of first composite bed Example is the ︰ 2.8 ~ 3.2 of 0.8 ~ 1.2 ︰ 1.8 ~ 2.2.
The hollow rod body is multistage, and multistage hollow rod body is from top to bottom set gradually, on the bottom of every section of hollow rod body Ring flange is arranged with, the bottom external diameter of every section of hollow rod body is less than the top internal diameter of next section of hollow rod body, every section of hollow rod body The ring flange of bottom be connected by bolt with the top end face of next section of hollow rod body, provided with buffering between the adjacent hollow body of rod Pad, between the cushion pad is filled between the ring flange of the bottom of every section of hollow rod body and the top end face of next section of hollow rod body Gap between the top inwall of the bottom outer wall and next section of hollow rod body of gap and every section of hollow rod body.
A kind of preparation method of the ultra-high performance concrete electric pole described above containing composite fibre, comprises the following steps:
S1:Polishing centrifuge inwall, corrects sample dimensions, coating release agent;
S2:Cement, silica flour, fine sand, metakaolin, magnesia and the vinal that amount is weighed up successively pour into agitated kettle, Dry mixing, then the moisture being well mixed with high efficiency water reducing agent is slowly added into stirring twice, obtain making the mixing of the first composite bed Thing;
Vinal is replaced with into carbon fiber and steel fibre, using identical stirring means, obtain make the second composite bed and The mixture of triplex layer;
S3:After three kinds of mixtures are weighed, layering from outside to inside is poured into centrifuge, using the closely knit shaping of centrifuging process;
S4:It is quiet after shaping to stop after setting time, carry out steam heating curing;
S5:Demoulding maintenance, obtains hollow rod body.
The detailed process of centrifuging process is in the step S3:With 1.4 ~ 1.8g of acceleration low speed rotation 2 ~ 4 minutes;With 6.1 ~ 6.5g of acceleration middling speed rotates 4 ~ 6 minutes;Rotated 4 ~ 6 minutes with 25 ~ 25.4g of acceleration high speed;With acceleration 6.1 ~ 6.5g middling speed rotates 0.8 ~ 1.5 minute;With 1.4 ~ 1.8g of acceleration low speed rotation 0.8 ~ 1.5 minute.
The rotating speed of low speed is 80 ~ 100r/min;The rotating speed of middling speed is 170 ~ 190r/min;The rotating speed of high speed be 350 ~ 370r/min。
It is the ︰ 34 ~ 38 of 7 ~ 11 ︰ 13 ~ 17 that three kinds of mixtures, which weigh ratio, in the step S3.
Compared with prior art, the present invention has advantages below:
1. using the ultra-high performance concrete for mixing composite fibre of above-mentioned technical proposal(UHPC)Electric pole, is less than reinforcing bar with density Composite fibre replace traditional vertical muscle, not only keep electric pole bending resistance on the basis of reduce the ratio of reinforcement, and Compensate for traditional electric pole because of the cumbersome technique of assembling reinforcement and the big ratio of reinforcement and caused by from great shortcoming.It is not added with reinforcing bar Cage, eliminates steel bar meter and fabrication of reinforcing cage process, the protective layer thickness problem without considering vertical muscle in electric pole, hence it is evident that reduce Time that electric pole makes.
2. using the ultra-high performance concrete for mixing composite fibre of above-mentioned technical proposal(UHPC)Electric pole shaft uses superelevation Performance concrete is poured, and it has high intensity, high-durability and improved corrosion performance, is avoided that electric wire club body due to collision etc. Physical factor and the problem of ftracture and common wiring bar and rigid steel conduit bar cause perishable due to chemical factor Problem, reduces the high cost of maintenance.
3. using the ultra-high performance concrete for mixing composite fibre of above-mentioned technical proposal(UHPC)Electric pole due to by three kinds not With steel fibre mixture stirring is newly mixed with UHPC respectively, it is to avoid the problem of fibrous caking, enable the fiber preferably along electric pole Genesis analysis.The different fiber fractionation distribution of three kinds of density can more uniformly increase the ductility of electric pole cross section.
4. using the ultra-high performance concrete for mixing composite fibre of above-mentioned technical proposal(UHPC)Electric pole is due to two sections of diameters Inconsistent electric pole connection, top shaft is smaller so reduce the consumption that its diameter saves concrete due to bearing moment of flexure, makes The problem of being caused with rubber buffer with the significant portion reduction abrupt change of cross-section.And it on the one hand can buffer squeezing for two sections of shafts Pressure, on the other hand for reducing between ring flange and hypomere shaft because of the fixation of bolt to the damage of concrete.
5. common electric pole can be made, it is adaptable to which different power networks are installed, compression strength may replace steel tower more than 100MPa, practical Property is strong.
6. rationally the thickness proportion between three composite beds of design, improves the body of rod overall axial strength and ring intensity.
7. it can be used according to the actual requirements after being divided into two sections or multistage assembling, wider using scope, security is higher, makes Service free is safeguarded during, and service life is long.
Brief description of the drawings
Fig. 1 is the hollow rod body schematic diagram after present invention shaping;
Fig. 2 is the hollow rod body cross-sectional view after shaping;
Fig. 3 is the connection profile of two sections of hollow rod bodies of different-diameter.
In figure:1st, hollow rod body, 2, triplex layer, the 3, second composite bed, the 4, first composite bed, 5, cushion pad, 6, spiral shell Bolt, 7, ring flange, 8, nut.
Embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention Premised on implemented, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to Following embodiments.
Embodiment one
A kind of ultra-high performance concrete electric pole containing composite fibre includes the hollow rod body 1 with sandwich construction, the sandwich construction Including the first composite bed 4, the second composite bed 3 and the triplex layer 2 being sequentially coaxially distributed from inside to outside, such as Fig. 1 and Fig. 2 institutes Show;
First composite bed 4 is the polyvinyl alcohol being made using the ultra-high performance concrete containing vinal(PVA)It is fine Tie up composite bed;
Second composite bed 3 is the carbon fiber composite bed being made using the ultra-high performance concrete of carbon fiber-containing;
Triplex layer 2 is the steel fibre composite bed being made using the ultra-high performance concrete containing steel fibre.
The making raw material of first composite bed 4 includes ultra-high performance concrete raw material and vinal, the second composite bed 3 Making raw material include ultra-high performance concrete raw material and carbon fiber, the making raw material of triplex layer 2 is mixed including very-high performance Solidifying soil raw material and steel fibre;
Wherein, the ratio of mud is not more than 0.18 in ultra-high performance concrete raw material, and vinal accounts for the making of the first composite bed 4 The 6% of cumulative volume after raw material mixing, carbon fiber accounts for make cumulative volume after raw material mixing the 6% of the second composite bed 3, and steel fibre accounts for the Make cumulative volume after raw material mixing the 6% of triplex layer 2.
Ultra-high performance concrete raw material is made up of following raw material:
Cement, the normal concrete acid salt cements of P .O 42.5;
Silica flour, average grain diameter is 0.20 μm, and SiO2 contents are more than or equal to 90%, and specific surface area is 18.92m2/ g, density is 2.0g/ cm3
Fine sand, average grain diameter is not more than 0.63mm, and density is 2.6g/cm3
Metakaolin, average grain diameter is 10.66 um;
Magnesia, average grain diameter is 74um, is used as catalyst;
Water, using ordinary tap water;
High efficiency water reducing agent, water-reducing rate is more than 25%;
The ratio of the quality of above-mentioned each material is:
The Shui Ni ︰ Gui Fen ︰ Xi Sha ︰ Pian Gao Ling Tu ︰ Yangization Mei ︰ Shui ︰ high efficiency water reducing agents=︰ of 1 ︰, 0.25 ︰, 1.2 ︰, 0.1 ︰, 0.1 ︰ 0.22 0.012。
A kind of preparation method of the ultra-high performance concrete electric pole described above containing composite fibre, comprises the following steps:
S1:Polishing centrifuge inwall, corrects sample dimensions, coating release agent;
S2:Cement, silica flour, fine sand, metakaolin, magnesia and the vinal that amount is weighed up successively pour into agitated kettle, Pot cover, dry mixing 4-6min are covered, then the moisture being well mixed with high efficiency water reducing agent is slowly added into agitated kettle twice, pot is covered Lid, stirring are until matrix has certain mobility, and about 2-3min obtains making the mixture of the first composite bed 4;
Vinal is replaced with into carbon fiber and steel fibre, using identical stirring means, obtains making the second composite bed 3 The mixture of mixture and triplex layer 2;
S3:After three kinds of mixtures are weighed, layering from outside to inside is poured into centrifuge, using the closely knit shaping of centrifuging process;
S4:It is quiet after shaping to stop after setting time, carry out steam heating curing;
S5:Demoulding maintenance, obtains hollow rod body 1.
The detailed process of centrifuging process is in step S3:Centrifuging process demixing is poured into, i.e., three layers demixing Another after all pouring into play centrifugation, it is the ︰ 36 of 9 ︰ 15 that three kinds of mixtures, which weigh ratio, and centrifuging process see the table below:
Circular pole parameter of noncentricity
Wherein g=9.8m/s2, is acceleration of gravity, and the length of hollow rod body 1 can be to finally give sky in 11 ~ 15m, the present embodiment The length of core bar body 1 be 13m, and the radial thickness of the first composite bed 4, the radial thickness of the second composite bed 3, triplex layer 2 Radial thickness ratio be the ︰ 3 of 1 ︰ 2.The ultra-high performance concrete that the preparation method is used is by increasing high efficiency water reducing agent, control water Gray scale below 0.18 after can make its compression strength more than 100MPa;Meanwhile, by centrifuging moulding, make three kinds(Steel fibre, carbon are fine Dimension, PVA)The distribution of composite fibre is more orderly than the UHPC commonly used in building and is distributed in cement pole respectively by the difference of its density Inner, middle and outer layer, its tensile strength is improved so as to more significant with putting forward.The ultra-high performance concrete(UHPC)Tensile strength Raising be remarkably improved the utilization benefit of cement pole.
During project installation, prepare multistage hollow rod body 1, hollow rod body 1 is shaped as cylinder, multistage hollow rod body 1 by Up to set gradually down, ring flange 7 is arranged with the bottom of every section of hollow rod body 1, ring flange 7 is used to connect two sections of shafts, often The bottom external diameter of section hollow rod body 1 is less than the top internal diameter of next section of hollow rod body 1, the flange of the bottom of every section of hollow rod body 1 Disk 7 is connected by bolt 6 with the top end face of next section of hollow rod body 1, and cushion pad 5, buffering are provided between the adjacent hollow body of rod 1 Pad 5 fill gap between the ring flange 7 of the bottom of every section of hollow rod body 1 and the top end face of next section of hollow rod body 1 and Gap between the bottom outer wall of every section of hollow rod body 1 and the top inwall of next section of hollow rod body 1, plays the work of buffer unit With buffering hollow rod body 1 and the extruding of hollow rod body 1 and the extruding of hollow rod body 1 and ring flange 7 improve service life, delayed Rush pad 5 and use rubber buffer.
The top end face of every section of hollow rod body 1 is provided with multiple bolts hole, and multiple bolts hole are uniformly distributed along the circumference, each bolt The nut 8 coordinated with bolt 6 is reserved with hole, reserved nut 8 is extended type nut, to ensure the hollow stem of two sections Body 1 is just embedded in electric pole using ring flange 7 and the connection fastening of nut 8, nut 8 in centrifugal forming electric pole, and bolt 6 is used for will Ring flange 7 and nut 8 are connected.
The number of bolt hole is 6 ~ 10, using the structure that 8 bolts hole are symmetrical in the present embodiment.
As shown in figure 3, the shaft of hollow rod body 1 is by ultra-high performance concrete(UHPC)It is made, first configures UHPC materials, so Batch production moulding making is carried out afterwards, and the shaft diameter of the hollow rod body 1 of two sections is inconsistent, the external diameter of hollow rod body 1 on top The internal diameter of hollow rod body 1 than bottom is small, and centre can place rubber buffer.UHPC constituent is cement, silicon Powder, fine sand, water, metakaolin, magnesia, composite fibre and high efficiency water reducing agent etc., UHPC have high intensity, high tenacity, height resistance to The long performance such as property and high corrosion resistance, can be good at providing efficient electric pole service behaviour.
Embodiment two
A kind of ultra-high performance concrete electric pole containing composite fibre, the ultra-high performance concrete electric pole is included with sandwich construction Hollow rod body 1, the first composite bed 4, the second composite bed 3 and the 3rd that the sandwich construction includes sequentially coaxially being distributed from inside to outside is multiple Close layer 2;
First composite bed 4 is that the vinal being made using the ultra-high performance concrete containing vinal is combined Layer;
Second composite bed 3 is the carbon fiber composite bed being made using the ultra-high performance concrete of carbon fiber-containing;
Triplex layer 2 is the steel fibre composite bed being made using the ultra-high performance concrete containing steel fibre.
The making raw material of first composite bed 4 includes ultra-high performance concrete raw material and vinal, the second composite bed 3 Making raw material include ultra-high performance concrete raw material and carbon fiber, the making raw material of triplex layer 2 is mixed including very-high performance Solidifying soil raw material and steel fibre;
Wherein, the ratio of mud is not more than 0.18 in ultra-high performance concrete raw material, and vinal accounts for the making of the first composite bed 4 The 5.8% of cumulative volume after raw material mixing, carbon fiber accounts for make cumulative volume after raw material mixing the 5.8% of the second composite bed 3, steel fibre Account for make cumulative volume after raw material mixing the 5.8% of triplex layer 2.
Ultra-high performance concrete raw material includes cement, silica flour, fine sand, metakaolin, magnesia, water and high efficiency water reducing agent, Wherein, the mass ratio of cement, silica flour, fine sand, metakaolin, magnesia, water and high efficiency water reducing agent is:The ︰ of 0.8 ︰, 0.23 ︰ 1 The ︰ 0.01 of 0.08 ︰, 0.08 ︰ 0.2.
Cement is cement P .O 42.5;
The average grain diameter of silica flour is 0.18 μm, and SiO2 contents are more than or equal to 90%, and specific surface area is 18.9m2/ g, density is 1.8g/ cm3
The average grain diameter of fine sand is not more than 0.63mm, and density is 2.4g/cm3
The average grain diameter of metakaolin is 10.64 um;
The average grain diameter of magnesia is 72um;
The water-reducing rate of high efficiency water reducing agent is more than 25%.
The radial thickness of first composite bed 4, the radial thickness of the second composite bed 3, the radial thickness ratio of triplex layer 2 For the ︰ 2.8 of 0.8 ︰ 1.8.
A kind of preparation method of the ultra-high performance concrete electric pole described above containing composite fibre, comprises the following steps:
S1:Polishing centrifuge inwall, corrects sample dimensions, coating release agent;
S2:Cement, silica flour, fine sand, metakaolin, magnesia and the vinal that amount is weighed up successively pour into agitated kettle, Dry mixing, then the moisture being well mixed with high efficiency water reducing agent is slowly added into stirring twice, obtain making the mixing of the first composite bed 4 Thing;
Vinal is replaced with into carbon fiber and steel fibre, using identical stirring means, obtains making the He of the second composite bed 3 The mixture of triplex layer 2;
S3:After three kinds of mixtures are weighed, layering from outside to inside is poured into centrifuge, using the closely knit shaping of centrifuging process;
S4:It is quiet after shaping to stop after setting time, carry out steam heating curing;
S5:Demoulding maintenance, obtains hollow rod body 1.
The detailed process of centrifuging process is in step S3:With acceleration 1.4g, rotating speed 80r/min low speed rotation 2 minutes; Rotated 4 minutes with acceleration 6.1g, rotating speed 170r/min middling speed;4 are rotated with acceleration 25g, rotating speed 350r/min high speed Minute;Rotated 0.8 minute with acceleration 6.1g, rotating speed 170r/min middling speed;With acceleration 1.4g, rotating speed 80r/min it is low Speed rotation 0.8 minute.
It is the ︰ 34 of 7 ︰ 13 that three kinds of mixtures, which weigh ratio, in step S3.
Embodiment three
A kind of ultra-high performance concrete electric pole containing composite fibre, the ultra-high performance concrete electric pole is included with sandwich construction Hollow rod body 1, the first composite bed 4, the second composite bed 3 and the 3rd that the sandwich construction includes sequentially coaxially being distributed from inside to outside is multiple Close layer 2;
First composite bed 4 is that the vinal being made using the ultra-high performance concrete containing vinal is combined Layer;
Second composite bed 3 is the carbon fiber composite bed being made using the ultra-high performance concrete of carbon fiber-containing;
Triplex layer 2 is the steel fibre composite bed being made using the ultra-high performance concrete containing steel fibre.
The making raw material of first composite bed 4 includes ultra-high performance concrete raw material and vinal, the second composite bed 3 Making raw material include ultra-high performance concrete raw material and carbon fiber, the making raw material of triplex layer 2 is mixed including very-high performance Solidifying soil raw material and steel fibre;
Wherein, the ratio of mud is not more than 0.18 in ultra-high performance concrete raw material, and vinal accounts for the making of the first composite bed 4 The 6.2% of cumulative volume after raw material mixing, carbon fiber accounts for make cumulative volume after raw material mixing the 6.2% of the second composite bed 3, steel fibre Account for make cumulative volume after raw material mixing the 6.2% of triplex layer 2.
Ultra-high performance concrete raw material includes cement, silica flour, fine sand, metakaolin, magnesia, water and high efficiency water reducing agent, Wherein, the mass ratio of cement, silica flour, fine sand, metakaolin, magnesia, water and high efficiency water reducing agent is:The ︰ of 1.2 ︰, 0.27 ︰ 1.4 The ︰ 0.014 of 0.12 ︰, 0.12 ︰ 0.24.
Cement is cement P .O 42.5;
The average grain diameter of silica flour is 0.22 μm, and SiO2 contents are more than or equal to 90%, and specific surface area is 18.94m2/ g, density is 2.2g/cm3
The average grain diameter of fine sand is not more than 0.63mm, and density is 2.8g/cm3
The average grain diameter of metakaolin is 10.68 um;
The average grain diameter of magnesia is 76um;
The water-reducing rate of high efficiency water reducing agent is more than 25%.
The radial thickness of first composite bed 4, the radial thickness of the second composite bed 3, the radial thickness ratio of triplex layer 2 For the ︰ 3.2 of 1.2 ︰ 2.2.
A kind of preparation method of the ultra-high performance concrete electric pole described above containing composite fibre, comprises the following steps:
S1:Polishing centrifuge inwall, corrects sample dimensions, coating release agent;
S2:Cement, silica flour, fine sand, metakaolin, magnesia and the vinal that amount is weighed up successively pour into agitated kettle, Dry mixing, then the moisture being well mixed with high efficiency water reducing agent is slowly added into stirring twice, obtain making the mixing of the first composite bed 4 Thing;
Vinal is replaced with into carbon fiber and steel fibre, using identical stirring means, obtains making the He of the second composite bed 3 The mixture of triplex layer 2;
S3:After three kinds of mixtures are weighed, layering from outside to inside is poured into centrifuge, using the closely knit shaping of centrifuging process;
S4:It is quiet after shaping to stop after setting time, carry out steam heating curing;
S5:Demoulding maintenance, obtains hollow rod body 1.
The detailed process of centrifuging process is in step S3:With acceleration 1.8g, rotating speed 100r/min 4 points of low speed rotation Clock;Rotated 6 minutes with acceleration 6.5g, rotating speed 190r/min middling speed;With acceleration 25.4g, rotating speed 370r/min high speed Rotation 6 minutes;Rotated 1.5 minutes with acceleration 6.5g, rotating speed 190r/min middling speed;With acceleration 1.8g, rotating speed 100r/ Min low speed rotation 1.5 minutes.
It is the ︰ 38 of 11 ︰ 17 that three kinds of mixtures, which weigh ratio, in step S3.

Claims (10)

1. a kind of ultra-high performance concrete electric pole containing composite fibre, it is characterised in that the ultra-high performance concrete electric pole includes Hollow rod body with sandwich construction, the sandwich construction include sequentially coaxially be distributed from inside to outside the first composite bed, second answer Close layer and triplex layer;
First composite bed is the vinal being made using the ultra-high performance concrete containing vinal Composite bed;
Second composite bed is the carbon fiber composite bed being made using the ultra-high performance concrete of carbon fiber-containing;
The triplex layer is the steel fibre composite bed being made using the ultra-high performance concrete containing steel fibre.
2. a kind of ultra-high performance concrete electric pole containing composite fibre according to claim 1, it is characterised in that described The making raw material of one composite bed includes ultra-high performance concrete raw material and vinal, and the making of second composite bed is former Material includes ultra-high performance concrete raw material and carbon fiber, and the making raw material of the triplex layer includes ultra-high performance concrete original Material and steel fibre;
Wherein, the ratio of mud is not more than 0.18 in ultra-high performance concrete raw material, and vinal accounts for the making of the first composite bed Raw material mixing after cumulative volume 5.8 ~ 6.2%, carbon fiber account for the second composite bed make raw material mixing after cumulative volume 5.8 ~ 6.2%, steel fibre accounts for make cumulative volume after raw material mixing the 5.8 ~ 6.2% of triplex layer.
3. a kind of ultra-high performance concrete electric pole containing composite fibre according to claim 2, it is characterised in that described super High performance concrete raw material includes cement, silica flour, fine sand, metakaolin, magnesia, water and high efficiency water reducing agent, wherein, cement, Silica flour, fine sand, metakaolin, magnesia, the mass ratio of water and high efficiency water reducing agent are:The ︰ of 0.8 ~ 1.2 ︰, 0.23 ~ 0.27 ︰ 1 ~ 1.4 The ︰ 0.01 ~ 0.014 of 0.08 ~ 0.12 ︰, 0.08 ~ 0.12 ︰ 0.2 ~ 0.24.
4. a kind of ultra-high performance concrete electric pole containing composite fibre according to claim 3, it is characterised in that the water Mud is cement P .O 42.5;
The average grain diameter of the silica flour is 0.18 ~ 0.22 μm, SiO2Content be more than or equal to 90%, specific surface area be 18.9 ~ 18.94m2/ g, density is 1.8 ~ 2.2g/cm3
The average grain diameter of the fine sand is not more than 0.63mm, and density is 2.4 ~ 2.8g/cm3
The average grain diameter of the metakaolin is 10.64 ~ 10.68 um;
The average grain diameter of the magnesia is 72 ~ 76um;
The water-reducing rate of the high efficiency water reducing agent is more than 25%.
5. a kind of ultra-high performance concrete electric pole containing composite fibre according to claim 1, it is characterised in that described The radial thickness of one composite bed, the radial thickness of the second composite bed, the radial thickness ratio of triplex layer are 0.8 ~ 1.2 ︰ 1.8 ~ 2.2 ︰ 2.8 ~ 3.2.
6. a kind of ultra-high performance concrete electric pole containing composite fibre according to claim 1, it is characterised in that the sky Core bar body is multistage, and multistage hollow rod body is from top to bottom set gradually, and ring flange is arranged with the bottom of every section of hollow rod body, often The bottom external diameter of section hollow rod body is less than the top internal diameter of next section of hollow rod body, and the ring flange of the bottom of every section of hollow rod body leads to The top end face that bolt is crossed with next section of hollow rod body is connected, and cushion pad is provided between the adjacent hollow body of rod, and the cushion pad is filled out The gap filled between the ring flange of the bottom of every section of hollow rod body and the top end face of next section of hollow rod body and every section it is hollow Gap between the top inwall of the bottom outer wall of the body of rod and next section of hollow rod body.
7. a kind of preparation method of the ultra-high performance concrete electric pole as claimed in claim 1 containing composite fibre, its feature exists In comprising the following steps:
S1:Polishing centrifuge inwall, corrects sample dimensions, coating release agent;
S2:Cement, silica flour, fine sand, metakaolin, magnesia and the vinal that amount is weighed up successively pour into agitated kettle, Dry mixing, then the moisture being well mixed with high efficiency water reducing agent is slowly added into stirring twice, obtain making the mixing of the first composite bed Thing;
Vinal is replaced with into carbon fiber and steel fibre, using identical stirring means, obtain make the second composite bed and The mixture of triplex layer;
S3:After three kinds of mixtures are weighed, layering from outside to inside is poured into centrifuge, using the closely knit shaping of centrifuging process;
S4:It is quiet after shaping to stop after setting time, carry out steam heating curing;
S5:Demoulding maintenance, obtains hollow rod body.
8. a kind of preparation method of ultra-high performance concrete electric pole containing composite fibre according to claim 7, its feature It is, the detailed process of centrifuging process is in the step S3:With 1.4 ~ 1.8g of acceleration low speed rotation 2 ~ 4 minutes;To add 6.1 ~ 6.5g of speed middling speed rotates 4 ~ 6 minutes;Rotated 4 ~ 6 minutes with 25 ~ 25.4g of acceleration high speed;With acceleration 6.1 ~ 6.5g middling speed rotates 0.8 ~ 1.5 minute;With 1.4 ~ 1.8g of acceleration low speed rotation 0.8 ~ 1.5 minute.
9. a kind of preparation method of ultra-high performance concrete electric pole containing composite fibre according to claim 8, its feature It is, the rotating speed of low speed is 80 ~ 100r/min;The rotating speed of middling speed is 170 ~ 190r/min;The rotating speed of high speed is 350 ~ 370r/ min。
10. a kind of preparation method of ultra-high performance concrete electric pole containing composite fibre according to claim 7, its feature It is, it is the ︰ 34 ~ 38 of 7 ~ 11 ︰ 13 ~ 17 that three kinds of mixtures, which weigh ratio, in the step S3.
CN201710446330.7A 2017-06-14 2017-06-14 Ultra-high performance concrete pole containing composite fibers Active CN107023211B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710446330.7A CN107023211B (en) 2017-06-14 2017-06-14 Ultra-high performance concrete pole containing composite fibers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710446330.7A CN107023211B (en) 2017-06-14 2017-06-14 Ultra-high performance concrete pole containing composite fibers

Publications (2)

Publication Number Publication Date
CN107023211A true CN107023211A (en) 2017-08-08
CN107023211B CN107023211B (en) 2023-04-28

Family

ID=59531749

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710446330.7A Active CN107023211B (en) 2017-06-14 2017-06-14 Ultra-high performance concrete pole containing composite fibers

Country Status (1)

Country Link
CN (1) CN107023211B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108327064A (en) * 2018-02-07 2018-07-27 四川省川铁枕梁工程有限公司 A kind of multiple field lightweight RPC electric poles and preparation method thereof
CN108360909A (en) * 2018-02-07 2018-08-03 四川省川铁枕梁工程有限公司 Axial distributed lightweight RPC electric poles of a kind of steel fibre and preparation method thereof
CN108360910A (en) * 2018-02-07 2018-08-03 四川省川铁枕梁工程有限公司 A kind of multisectional multilayer formula lightweight RPC electric poles and preparation method thereof
CN109025460A (en) * 2018-09-18 2018-12-18 福建瑞森水泥制品发展有限公司 A kind of assembled light thin-wall composite pole and preparation method thereof and connection type
CN110116449A (en) * 2018-02-07 2019-08-13 四川省川铁枕梁工程有限公司 Durable electric pole of a kind of multisection type lightweight height and preparation method thereof
CN115974493A (en) * 2023-01-13 2023-04-18 中铁十五局集团有限公司 Anti-freezing and anti-cracking high-performance concrete and preparation method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1958261A (en) * 2006-11-17 2007-05-09 河南省电力勘测设计院 Method for manufacturing wire pole from steel fiber concrete with no bracing wire
JP2009114815A (en) * 2007-11-09 2009-05-28 C I Kasei Co Ltd Reinforcing structure of hollow concrete structure, and reinforcing method of hollow concrete structure
KR100909864B1 (en) * 2008-12-12 2009-07-29 강원대학교산학협력단 Three-layer centrifugal pipe using glass fiber-polymer concrete composites and manufacturing method thereof
CN103496894A (en) * 2013-09-16 2014-01-08 北京工业大学 Steel fiber and high-performance synthetic fiber mixed toughened RPC (reactive powder concrete) and preparation method
CN105016670A (en) * 2014-04-29 2015-11-04 黄贺明 Concrete annular pole and preparation method thereof
CN105481323A (en) * 2016-02-02 2016-04-13 金陵科技学院 Carbon fiber composite concrete and preparation method thereof
CN105781017A (en) * 2016-05-06 2016-07-20 温州大学 Ultrahigh-performance assembly column and manufacturing method thereof
CN206245845U (en) * 2016-11-28 2017-06-13 河南省电力勘测设计院 High intensity thinner tube centrifuge concrete filled steel tubular substation framework post

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1958261A (en) * 2006-11-17 2007-05-09 河南省电力勘测设计院 Method for manufacturing wire pole from steel fiber concrete with no bracing wire
JP2009114815A (en) * 2007-11-09 2009-05-28 C I Kasei Co Ltd Reinforcing structure of hollow concrete structure, and reinforcing method of hollow concrete structure
KR100909864B1 (en) * 2008-12-12 2009-07-29 강원대학교산학협력단 Three-layer centrifugal pipe using glass fiber-polymer concrete composites and manufacturing method thereof
CN103496894A (en) * 2013-09-16 2014-01-08 北京工业大学 Steel fiber and high-performance synthetic fiber mixed toughened RPC (reactive powder concrete) and preparation method
CN105016670A (en) * 2014-04-29 2015-11-04 黄贺明 Concrete annular pole and preparation method thereof
CN105481323A (en) * 2016-02-02 2016-04-13 金陵科技学院 Carbon fiber composite concrete and preparation method thereof
CN105781017A (en) * 2016-05-06 2016-07-20 温州大学 Ultrahigh-performance assembly column and manufacturing method thereof
CN206245845U (en) * 2016-11-28 2017-06-13 河南省电力勘测设计院 High intensity thinner tube centrifuge concrete filled steel tubular substation framework post

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108327064A (en) * 2018-02-07 2018-07-27 四川省川铁枕梁工程有限公司 A kind of multiple field lightweight RPC electric poles and preparation method thereof
CN108360909A (en) * 2018-02-07 2018-08-03 四川省川铁枕梁工程有限公司 Axial distributed lightweight RPC electric poles of a kind of steel fibre and preparation method thereof
CN108360910A (en) * 2018-02-07 2018-08-03 四川省川铁枕梁工程有限公司 A kind of multisectional multilayer formula lightweight RPC electric poles and preparation method thereof
CN110116449A (en) * 2018-02-07 2019-08-13 四川省川铁枕梁工程有限公司 Durable electric pole of a kind of multisection type lightweight height and preparation method thereof
CN109025460A (en) * 2018-09-18 2018-12-18 福建瑞森水泥制品发展有限公司 A kind of assembled light thin-wall composite pole and preparation method thereof and connection type
CN115974493A (en) * 2023-01-13 2023-04-18 中铁十五局集团有限公司 Anti-freezing and anti-cracking high-performance concrete and preparation method thereof

Also Published As

Publication number Publication date
CN107023211B (en) 2023-04-28

Similar Documents

Publication Publication Date Title
CN107023211A (en) A kind of ultra-high performance concrete electric pole containing composite fibre
CN103396063B (en) Lightweight high-strength ceramsite concrete and concrete pole
CN101718153A (en) Partially prestressed concrete electric pole and preparation method thereof
CN109837831A (en) A kind of centrifugation prefabricated assembled concrete bridge pier and construction method
CN101806096A (en) Steel tube-concrete composite structure
CN202519664U (en) High tensile reinforcement reinforced prestressed UHPC (Ultra High Performance Concrete) thin-wall tubular pile component
CN102587578A (en) High-strength steel bar enhanced engineered cementitious composites (ECC)-hollow steel pipe ultra high performance concrete (UHPC) combination column member and manufacturing method thereof
CN112695953A (en) Fiber reinforced material and ultra-high performance concrete pipe filled common concrete combined column and production method thereof
CN102276214A (en) High-durability and high-bearing-capacity concrete pipe pile
CN108532833A (en) A kind of regeneration concrete coupled column and preparation method thereof
CN213710595U (en) Glass fiber reinforced plastic pipe composite electric pole
CN201850702U (en) Hollow steel tube and active powder concrete combined member
CN109555267A (en) A kind of complex coagulation earth pillar and preparation method thereof
CN114396192A (en) Plug-in type concrete-filled steel tube column base for large power transmission tower and construction method thereof
CN113802455A (en) Anchor device for carbon fiber parallel inhaul cable and anchoring method thereof
CN109676752B (en) Porous cement pipe and manufacturing process thereof
CN109437687B (en) High-durability light typhoon-resistant electric pole and manufacturing method thereof
CN204828974U (en) Prefabricated pipe of reinforced concrete
CN201943186U (en) FRP pipe-RPC-steel pipe combined member
CN206971881U (en) A kind of ultra-high performance concrete electric pole containing composite fibre
CN207063665U (en) A kind of thin-wall steel pipe concrete tower
CN102733381B (en) Rotary type composite pile foundation, and preparation method of rotary type composite pile foundation
CN104308986B (en) The system of reinforced concrete pipe is produced by the extruding demoulding of double vibration sources
CN211368685U (en) Stability tubular pile for geotechnical engineering
CN112872298A (en) Lightweight high-strength sand core mold forming method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant