CN107014596A - A kind of towing winch pilot system - Google Patents

A kind of towing winch pilot system Download PDF

Info

Publication number
CN107014596A
CN107014596A CN201710171029.XA CN201710171029A CN107014596A CN 107014596 A CN107014596 A CN 107014596A CN 201710171029 A CN201710171029 A CN 201710171029A CN 107014596 A CN107014596 A CN 107014596A
Authority
CN
China
Prior art keywords
pulley
steel wire
wire rope
fixed
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710171029.XA
Other languages
Chinese (zh)
Other versions
CN107014596B (en
Inventor
白宗
艾龙超
张勇勇
许有良
徐锡锋
李钊
李建正
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Marine Machinery Plant Co Ltd
Original Assignee
Wuhan Marine Machinery Plant Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Marine Machinery Plant Co Ltd filed Critical Wuhan Marine Machinery Plant Co Ltd
Priority to CN201710171029.XA priority Critical patent/CN107014596B/en
Publication of CN107014596A publication Critical patent/CN107014596A/en
Application granted granted Critical
Publication of CN107014596B publication Critical patent/CN107014596B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M13/00Testing of machine parts

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses a kind of towing winch pilot system, belong to Marine engineering technical field, the towing winch pilot system includes installation pedestal, pulley gear and experiment pylon, installation pedestal includes the first mounting seat and the second mounting seat for being used to place towing winch to be tested;Towing winch pilot system also includes the first steel wire rope and the second steel wire rope, the first end of first steel wire rope, which is fixed on, to be arranged on the reel of the towing winch of the first mounting seat or the second mounting seat, the first end of second steel wire rope is bypassed after pulley gear, experiment pylon straight down successively, and is connected with balancing weight in the first end of the second steel wire rope;When the first end of the first steel wire rope, which is fixed on, to be arranged in the first mounting seat, the second end of the first steel wire rope is fixed on movable pulley, and the second end of the second steel wire rope is fixed in bollard;Or, when the first end of the first steel wire rope, which is fixed on, to be arranged in the second mounting seat, the second end of the first steel wire rope is connected with the second end of the second steel wire rope.

Description

A kind of towing winch pilot system
Technical field
The present invention relates to Marine engineering technical field, and in particular to a kind of towing winch pilot system.
Background technology
Application of the towing winch in Marine engineering and ocean engineering is more and more extensive, and towing winch is mainly used in rising for ship and thrown Anchor and towing operation, to ensure that the service load of towing winch meets design requirement, before towing winch comes into operation, need to be directed to it Load capacity is tested.
The test method of conventional towing winch is to drawing using frock winch with towing winch.During experiment, by one end of steel wire rope It is fixed on towing winch, the other end is fixed on frock winch, towing winch is run simultaneously with frock winch, passes through frock winch Loading provides load to towing winch, whether meets design requirement with the service load for detecting towing winch.
During the present invention is realized, inventor has found that prior art at least has problems with:
Load to car of closing back needs to be designed according to towing winch rated load to be tested, when needs are to different specified loads When the towing winch of lotus carries out load test, it is necessary to every kind of towing winch is corresponded to respectively design to car of closing back, experimentation cost is high.
The content of the invention
In order to solve during the towing winch progress load test to different rated loads, it is necessary to be corresponded to respectively to every kind of towing winch Design is to car of closing back, the problem of experimentation cost is high, and the embodiments of the invention provide a kind of towing winch pilot system.The technical side Case is as follows:
The embodiments of the invention provide a kind of towing winch pilot system, the towing winch pilot system includes being arranged on experiment Installation pedestal, pulley gear and experiment pylon on ground, the installation pedestal include being used to place towing winch to be tested First mounting seat and the second mounting seat, the bottom and top of the experiment pylon are respectively equipped with bottom leading block and top guide Pulley;
The towing winch pilot system also includes the first steel wire rope and the second steel wire rope, the first end of first steel wire rope It is fixed on and is arranged on the reel of the towing winch of first mounting seat or second mounting seat, second steel wire The first end of rope is bypassed after the pulley gear, the bottom leading block and the top guide pulley straight down successively, And it is connected with balancing weight in the first end of second steel wire rope;
The pulley gear is moved including some fixed pulleys being arranged on the experiment ground, some horizontal pulleys, one Pulley and the bollard being fixed on the experiment ground;
When the second end of first steel wire rope is fixed on the movable pulley, the second end of second steel wire rope is consolidated It is scheduled in the bollard, the first end of second steel wire rope bypasses the movable pulley, a fixed pulley and a horizontal cunning The bottom leading block is bypassed after wheel, Part I and the Part II of second steel wire rope are tested on ground described Projection is parallel, and the projection of the Part II of second steel wire rope on the experiment ground is vertical with Part III, and described the A part is located at the part between the bollard and the movable pulley for second steel wire rope, and the Part II is described Second steel wire rope is located at the part between the movable pulley and the horizontal pulley, and the Part III is second steel wire rope Part between the horizontal pulley and the bottom leading block;Or,
When the second end of first steel wire rope is connected with the second end of second steel wire rope, second steel wire rope First end bypass a fixed pulley and at least one horizontal pulley after bypass the bottom leading block, second steel wire rope The projection on the experiment ground of Part III and Part IV it is vertical, the Part III is second steel wire rope Part between fixed pulley and first horizontal pulley, the Part IV is that second steel wire rope is sleeping positioned at last Part between formula pulley and the bottom leading block.
In a kind of implementation of the embodiment of the present invention, the pulley gear includes two fixed pulleys and two horizontal cunnings Wheel;A fixed pulley in described two fixed pulleys is just set to second mounting seat, another in described two fixed pulleys Individual fixed pulley is arranged between a horizontal pulley in the movable pulley and described two horizontal pulleys, described two horizontal cunnings Another horizontal pulley in wheel is arranged in a horizontal pulley and the described two fixed pulleys in described two horizontal pulleys A fixed pulley between.
In another implementation of the embodiment of the present invention, the pulley gear includes two fixed pulleys and one horizontal Pulley;The horizontal pulley is removably set on the first position and the second place of experiment ground, the first position, second Put and be located along the same line with the bottom leading block, in described two fixed pulleys a fixed pulley is located at the movable pulley Between the first position, another fixed pulley in described two fixed pulleys is located at second mounting seat and the second place Between;The towing winch pilot system is also included on the slide rail base for the spill being fixed on experiment ground, the slide rail base Offer and U-shaped slide rail is provided with U-shaped groove, the U-shaped groove, the bottom of the horizontal pulley is provided with and the U-shaped slide rail The chute of matching, the U-shaped groove is located at the width and horizontal pulley of two parts protruded of the slide rail base of the spill The width of bottom is identical, and two parts protruded of the slide rail base of the spill correspond to first position and the second place, institute respectively State the width that U-shaped groove is more than the bottom of horizontal pulley positioned at the width of the main part of the slide rail base of the spill.
In another implementation of the embodiment of the present invention, the pulley gear includes a fixed pulley and one horizontal Pulley;The horizontal pulley is removably set on the first position and the second place of experiment ground, and the fixed pulley is removable to be set Put in the 3rd position and the 4th position of experiment ground;The first position, the second place and the bottom leading block are located at On same straight line, the 3rd position is located between the movable pulley and the first position, and the 4th position is located at described Between second mounting seat and the second place;The towing winch pilot system also includes the slide rail for the spill being fixed on experiment ground Offered on base, the slide rail base of the spill and U-shaped slide rail, the horizontal cunning are provided with U-shaped groove, the U-shaped groove Wheel bottom is provided with the chute matched with the U-shaped slide rail, and the U-shaped groove is located at two protrusions of the slide rail base of the spill Partial width is identical with the width of the bottom of horizontal pulley, and two parts protruded of the slide rail base of the spill are corresponded to respectively First position and the second place, the U-shaped groove are located at the width of the main part of the slide rail base of the spill more than horizontal The width of the bottom of pulley;The towing winch pilot system also includes the slide rail base for the bar shaped being fixed on experiment ground, institute State and strip groove is offered on the slide rail base of bar shaped, the strip groove length direction is parallel to first position and the second place Line, linear pattern slide rail is provided with the strip groove, the bottom of the fixed pulley is provided with and the linear pattern slide rail The chute matched somebody with somebody, the width of the strip groove is identical with the width of the bottom of fixed pulley, the two ends difference position of the strip groove In the 3rd position and the 4th position.
In another implementation of the embodiment of the present invention, the first end of second steel wire rope is in each horizontal pulley Rope stretching point and second steel wire rope first end it is identical in the height for entering rope point of the bottom leading block.
In another implementation of the embodiment of the present invention, the first end of second steel wire rope is in each fixed pulley The height of rope stretching point is identical in the height for entering rope point of each horizontal pulley with the first end of second steel wire rope.
In another implementation of the embodiment of the present invention, the maximum load capacity of second steel wire rope is more than described The weight of balancing weight, the maximum load capacity of first steel wire rope is more than the weight of twice of the balancing weight.
In another implementation of the embodiment of the present invention, the second end of first steel wire rope and second steel wire Shackle is respectively equipped with second end of rope.
In another implementation of the embodiment of the present invention, each fixed pulley, the movable pulley and described horizontal The guard pin for preventing the steel wire rope from departing from from the pulley is equipped with pulley.
In another implementation of the embodiment of the present invention, in first mounting seat and second mounting seat respectively Provided with the tool base plate for fixing towing winch.
The beneficial effect that technical scheme provided in an embodiment of the present invention is brought is:Experiment ground, which is provided with, to be used to install towing cable The first mounting seat and the second mounting seat of machine, two mounting seats are used to set towing winch to be tested, and the roller of tractor passes through First steel wire rope is connected to pulley gear, and pulley gear connects balancing weight by the second steel wire rope after pylon again.Carrying out During the load test of towing winch, if the first end of the first steel wire rope is fixed on the towing winch for being arranged at first mounting seat Reel on, then the second end of the first steel wire rope is fixed on the movable pulley, and second steel wire rope one end is fixed on the heaving pile In stake, the other end bypasses movable pulley, fixed pulley, horizontal pulley, bottom leading block and top guide pulley connection balancing weight, by It is twice loaded on the second steel wire rope in the load in the effect of movable pulley component, the first steel wire rope, so as to load Higher towing winch is tested;If the first end of the first steel wire rope is fixed on the towing cable for being arranged at second mounting seat On the reel of machine, then the second end of the first steel wire rope is connected with one end of second steel wire rope, the other end of the second steel wire rope Fixed pulley, at least one horizontal pulley, bottom leading block and top guide pulley connection balancing weight are bypassed, so as to realize and match somebody with somebody The towing winch experiment of the suitable tonnage of block is put, a set of towing winch pilot system of the present invention is gone for different rated loads The load test of towing winch, and one tonnage of experiment is when being two towing winches of 2 times of another tonnage, without changing counterweight, examination Proved recipe is just.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, makes required in being described below to embodiment Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only one embodiment of the present of invention, for For those of ordinary skill in the art, on the premise of not paying creative work, other can also be obtained according to these accompanying drawings Accompanying drawing.
Figure 1A and Figure 1B are a kind of structural representations of towing winch pilot system provided in an embodiment of the present invention;
Fig. 2A and Fig. 2 B are the structural representations of another towing winch pilot system provided in an embodiment of the present invention;
Fig. 3 is the structural representation of experiment pylon provided in an embodiment of the present invention;
Fig. 4 is the structural representation of fixed pulley provided in an embodiment of the present invention;
Fig. 5 A and Fig. 5 B are the structural representations of two kinds of horizontal pulleys provided in an embodiment of the present invention.
Embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with accompanying drawing to embodiment party of the present invention Formula is described in further detail.
The embodiments of the invention provide a kind of towing winch pilot system, referring to Figure 1A-Fig. 2 B, the towing winch pilot system bag The installation pedestal 1 being arranged on experiment ground, pulley gear 2 and experiment pylon 3 are included, installation pedestal 1 includes being used to place to wait to try The first mounting seat and the second mounting seat for the towing winch tested, the bottom and top for testing pylon 3 are respectively equipped with bottom leading block 31 (may refer to Fig. 3) and top guide pulley 32.
Towing winch pilot system also includes the first steel wire rope 100 and the second steel wire rope 200, the first of the first steel wire rope 100 End, which is fixed on, to be arranged on the reel of the towing winch of the first mounting seat or the second mounting seat, the first end of the second steel wire rope 200 Bypass successively after pulley gear 2, bottom leading block 31 and top guide pulley 32 straight down, and the second steel wire rope 200 Balancing weight 33 is connected with first end.
Pulley gear 2 includes some fixed pulleys 21, some horizontal pulleys 22, a movable pulley being arranged on experiment ground 23 and be fixed on experiment ground on bollard 24.
Referring to Figure 1A or Fig. 2A, the towing winch of the first mounting seat is arranged at when the first end of the first steel wire rope 100 is fixed on Reel on when, the second end of the first steel wire rope 100 is fixed on movable pulley 23, and the second end of the second steel wire rope 200 is fixed on In bollard 24, the first end of the second steel wire rope 200 bypass after movable pulley 23, a fixed pulley 21 and a horizontal pulley 22 around Cross bottom leading block 31, the projection of the Part I of the second steel wire rope 200 with Part II on experiment ground is parallel, second Projection of the Part II of steel wire rope 200 on experiment ground is vertical with Part III, and Part I is 200, the second steel wire rope Part between bollard 24 and movable pulley 23, Part II is that the second steel wire rope 200 is located at movable pulley 23 and horizontal pulley Part between 22, Part III is the part that the second steel wire rope 200 is located between horizontal pulley 22 and bottom leading block 31; Or,
Referring to Figure 1B or Fig. 2 B, the towing winch of the second mounting seat is arranged at when the first end of the first steel wire rope 100 is fixed on Reel on when, the second end of the first steel wire rope 100 is connected with the second end of the second steel wire rope 200, the of the second steel wire rope 200 One end bypasses bottom leading block 31 after bypassing a fixed pulley 21 and at least one horizontal pulley 22, the second steel wire rope 200 Projection of the Part III with Part IV on experiment ground is vertical, and Part III is that the second steel wire rope 200 is located at fixed pulley 21 Part between first horizontal pulley 22, Part IV be the second steel wire rope 200 be located at last horizontal pulley 22 with Part between bottom leading block 31.Wherein, first horizontal pulley 22 refers to what the first end of the second steel wire rope 200 was bypassed First horizontal pulley (the horizontal pulley 22 of top in such as Figure 1B), last horizontal pulley 22 refers to the second steel wire rope 200 Last horizontal pulley (the horizontal pulley 22 of lower section in such as Figure 1B) for bypassing of first end.When the of the second steel wire rope 200 When a horizontal pulley 22 is only passed through in one end, first horizontal pulley 22 and last horizontal pulley 22 are same horizontal cunning Wheel 22.
The beneficial effect that technical scheme provided in an embodiment of the present invention is brought is:Experiment ground, which is provided with, to be used to install towing cable The first mounting seat and the second mounting seat of machine, two mounting seats are used to set towing winch to be tested, and the roller of tractor passes through First steel wire rope is connected to pulley gear, and pulley gear connects balancing weight by the second steel wire rope after pylon again.Carrying out During the load test of towing winch, if the first end of the first steel wire rope is fixed on the reel for the towing winch for being arranged at the first mounting seat On, then the second end of the first steel wire rope is fixed on movable pulley, and second steel wire rope one end is fixed in bollard, and the other end is bypassed Movable pulley, fixed pulley, horizontal pulley, bottom leading block and top guide pulley connection balancing weight, due to movable pulley component Load on effect, the first steel wire rope is twice loaded on the second steel wire rope, is entered so as to the towing winch higher to load Row experiment;And if the first end of the first steel wire rope is fixed on and is arranged on the reel of the towing winch of the second mounting seat, the first steel Second end of cord is connected with one end of the second steel wire rope, and the other end of the second steel wire rope bypasses fixed pulley, at least one is horizontal Pulley, bottom leading block and top guide pulley connection balancing weight, so as to realize the towing winch examination of tonnage suitable with configuration block Test, a set of towing winch pilot system of the invention is gone for the load test of the towing winch of different rated loads, and examination When testing two towing winches (such as the 300T towing winches and 600T towing winches) that a tonnage is 2 times of another tonnage, without changing Counterweight, experiment is convenient.
Referring to Figure 1A and Figure 1B, in the first implementation of the embodiment of the present invention, pulley gear 2 includes two and slided calmly Wheel 21 and two horizontal pulleys 22;A fixed pulley 21 in two fixed pulleys 21 just (is installed to the second mounting seat on the right side of Figure 1A Seat) set, another fixed pulley 21 in two fixed pulleys 21 is arranged on one in movable pulley 23 and two horizontal pulleys 22 Between horizontal pulley 22, another horizontal pulley 22 is arranged on a horizontal pulley 22 in two horizontal pulleys 22 and two fixed Between a fixed pulley 21 in pulley 21.
Referring to Fig. 2A and Fig. 2 B, in second of implementation of the embodiment of the present invention, pulley gear 2 includes two and slided calmly Wheel 21 and a horizontal pulley 22;Horizontal pulley 22 is removably set on first position (the horizontal pulley in Fig. 2A of experiment ground 22 locations) and the second place (the location of horizontal pulley 22 in Fig. 2 B), first position, the second place and bottom are led Be located along the same line to pulley 32, a fixed pulley 21 in two fixed pulleys 21 be located at movable pulley 23 and first position it Between, another fixed pulley 21 in two fixed pulleys 21 is located between the second mounting seat and the second place.Towing winch pilot system Also include offering U-shaped groove, U-shaped groove on the slide rail base 220 of spill being fixed on experiment ground, slide rail base 200 U-shaped slide rail 222 is inside provided with, the horizontal bottom of pulley 22 is provided with the chute matched with U-shaped slide rail 222, and U-shaped groove is located at spill The width of 220 liang of prominent parts of slide rail base is identical with the width of the bottom of horizontal pulley 22,220 liang of the slide rail base of spill Prominent part corresponds to first position and the second place respectively, and U-shaped groove is located at the width of the main part of slide rail base 220 of spill Width of the degree more than the bottom of horizontal pulley 22.Referring to Fig. 2A and Fig. 2 B, when being worked due to horizontal pulley 22, by two 90 degree Power, direction points to towing winch, and another points to balancing weight, therefore during using this slide rail base 200, horizontal pulley 22 by It is transferred to power on two side walls of slide rail base 200 (being respectively towards towing winch and two side walls of balancing weight), thus it is horizontal Pulley 22 itself will not be moved, without being locked.
In the third implementation of the embodiment of the present invention, pulley gear 2 includes a fixed pulley 21 and one horizontal Pulley 22;Horizontal pulley 22 is removably set on the first position and the second place of experiment ground, namely horizontal pulley is according to figure 2A and Fig. 2 B mode is set, and fixed pulley 21 is removably set on the 3rd position and the 4th position of experiment ground.First position, The second place and bottom leading block 32 are located along the same line, and the 3rd position is located between movable pulley 23 and first position, the Four positions are located between the second mounting seat and the second place.Towing winch pilot system also includes the spill being fixed on experiment ground Slide rail base 220, offer on the slide rail base 200 of spill and U-shaped slide rail 222 be provided with U-shaped groove, U-shaped groove, it is horizontal The bottom of pulley 22 is provided with the chute matched with U-shaped slide rail 222, and U-shaped groove is located at 220 liang of prominent parts of slide rail base of spill Width it is identical with the width of the bottom of horizontal pulley 22,220 liang of prominent parts of slide rail base of spill correspond to first respectively Position and the second place, U-shaped groove are located at bottom of the width more than horizontal pulley 22 of the main part of slide rail base 220 of spill Width.Referring to Fig. 2A and Fig. 2 B, when being worked due to horizontal pulley 22, by two 90 degree of power, towing cable is pointed in a direction Machine, another points to balancing weight, therefore when using the slide rail base 200 of this spill, horizontal pulley 22 is transferred to spill by power Slide rail base 200 two side walls (be respectively towards towing winch and two side walls of balancing weight) on, thus 22, horizontal pulley Body will not be moved, without being locked.Towing winch pilot system also includes the slide rail base for the bar shaped being fixed on experiment ground, Strip groove, company of the strip groove length direction parallel to first position and the second place are offered on the slide rail base of bar shaped Linear pattern slide rail is provided with line, strip groove, the bottom of fixed pulley 21 is provided with the chute matched with linear pattern slide rail, strip groove Width it is identical with the width of the bottom of fixed pulley 21, the two ends of strip groove are located at the 3rd position and the 4th position respectively.By When fixed pulley 21 works, the power being subject to is perpendicular to strip groove length direction, therefore using the slide rail base of this bar shaped When, two side walls that fixed pulley 21 is transferred to the slide rail base of bar shaped by power (are respectively two towards towing winch and horizontal pulley Individual side wall) on, thus fixed pulley 21 itself will not move, without being locked.
In embodiments of the present invention, the sidewall thickness of slide rail base (the slide rail base of spill and the slide rail base of bar shaped) is equal Design thicker (such as 1m to 2m), to guarantee to bear enough pulling force.But in order to ensure steel wire rope normally through one Plant in implementation, height of the height less than the center of the horizontal race of pulley 22 of the side wall of the slide rail base of spill, bar shaped The height of the side wall of slide rail base is less than the pulley overhead height of fixed pulley 21.In a kind of another implementation, spill The height of the side wall of slide rail base, which is higher than to offer on the height of horizontal pulley 22, the side wall of the slide rail base of spill, supplies steel wire rope The through hole passed through, the height of the side wall of the slide rail base of bar shaped is higher than the height of fixed pulley 21, the side wall of the slide rail base of bar shaped On offer through hole for steel wire penetrating, so both can guarantee that side wall stress, and do not influence steel wire penetrating.
Certainly, in order to further fix horizontal pulley 22 and fixed pulley 21, jack and latch can also be set in groove, So that horizontal pulley 22 and fixed pulley 21 are when reaching setting position (position of first position-the four), surrounding positioning is carried out.
In above-mentioned three kinds of implementations, in addition to the quantity, fixed form and position of pulley set and there is difference, other All same is set, is specifically such as hereinafter described.
In above-mentioned three kinds of implementations, the first end of the second steel wire rope 200 each horizontal pulley 22 rope stretching point with The first end of second steel wire rope 200 is identical in the height for entering rope point of bottom leading block 31.The transition of such second steel wire rope Than shallower, it can prevent that the second steel wire rope comes off from horizontal pulley in process of the test.
The first end of second steel wire rope 200 the rope stretching point of each fixed pulley 21 height and the second steel wire rope 200 the One end is identical in the height for entering rope point of each horizontal pulley 22.
In addition, when the horizontal pulley 22 of the towing winch pilot system is more than one, it is as shown in figures 1A or ib, all horizontal The rope stretching point height of pulley 22, i.e., the height of all race neutral surfaces of horizontal pulley 22 is identical.The neutral surface of race is race The plane perpendicular to wheel shaft where center.Ensure that steel wire rope will not twist after turning to.
In embodiments of the present invention, the maximum load capacity of the second steel wire rope 200 is more than the weight of balancing weight 33, the first steel The maximum load capacity of cord 100 is more than the weight of twice of balancing weight 33.Wherein, balancing weight 33 is load, can be according to not Towing winch with tonnage configures corresponding weight.
In embodiments of the present invention, set respectively on the second end of the first steel wire rope 100 and the second end of the second steel wire rope 200 There is shackle.So as to facilitate steel wire rope after the towing winch being connected in the first mounting seat, dragging in the second mounting seat is connected to Cable machine;Or, facilitate steel wire rope after the towing winch being connected in the second mounting seat, be connected to the towing cable in the first mounting seat Machine.
In the embodiment of the present invention, it is equipped with each fixed pulley 21, movable pulley 23 and horizontal pulley 22 for preventing The guard pin that steel wire rope departs from from pulley.
In the embodiment of the present invention, the work of fixed towing winch is respectively provided with the first mounting seat and the second mounting seat Fill bottom plate.The screwed hole of fixed towing winch can be provided for installing in tool base plate, towing winch can also be weldingly fixed on In tool base plate.
In the embodiment of the present invention, the first steel wire rope 100 can be set in the range of certain angle, such as Fig. 2A and 2B institutes Show, the direction of the first steel wire rope 100 has an angle, or the first steel wire with the line direction of the mounting seat of movable pulley 23 and first There is an angle in the direction of rope 100, the angle is less than or equal to 6 ° with the line direction of the mounting seat of fixed pulley 21 and second, so that Ensure the accuracy of test.
Fig. 3 is the structural representation of experiment pylon provided in an embodiment of the present invention, referring to Fig. 4, and experiment pylon 3 bottom is provided with Bottom leading block 31, the second steel wire rope 200 sequentially passes through bottom leading block 31 after being passed from pulley gear 2, passes through bottom Leading block 31 make the second steel wire rope 200 be transitioned into experiment pylon 3 lower section and rope outlet direction straight up.Test under pylon 3 The top of side sequentially passes through two provided with two top guide pulleys 32, the second steel wire rope 200 after being passed from bottom leading block 31 Individual top guide pulley 32, the side for making the second steel wire rope 200 from experiment pylon 3 by two top guide pulleys 32 is transitioned into Test pylon 3 opposite side and rope outlet direction straight down, so as to connect balancing weight 33.
Fig. 4 is the first implementation provided in an embodiment of the present invention and the structure of the fixed pulley in second of implementation Schematic diagram (direction B sectional view in Figure 1A and Fig. 2A), referring to Fig. 4, fixed pulley 21 includes base 210, wheel shaft 211 and pulley 212, base 210 is fixedly installed on experiment ground, and pulley 211 is arranged in the rotating shaft 211 on base 210.Base 210 can be with It is fixedly installed on by modes such as welding, bolts on experiment ground.
Fig. 5 A are that the structural representation of horizontal pulley in the first implementation provided in an embodiment of the present invention is (square in Figure 1A To C sectional view), referring to Fig. 5 A, horizontal pulley 22 includes base 220, wheel shaft 221, pulley 222 and protection component 223, protects The top of the connection wheel shaft 221 of protecting assembly 223 and experiment ground, it is to avoid the horizontal stress of pulley 22 is excessive to cause wheel shaft 221 to damage.
Fig. 5 B are the knots of horizontal pulley in second of implementation provided in an embodiment of the present invention and the third implementation Structure schematic diagram (direction C sectional view in Fig. 2A), referring to Fig. 5 B, horizontal pulley 22 includes base 220, wheel shaft 221, pulley 222 And protection component 223, the lower section of wheel shaft 221 is provided with arc groove 224, and arc groove 224 is used to realize that horizontal pulley 22 exists Movement on slide rail, top, base and the experiment ground of the protection connection wheel shaft 221 of component 223, it is to avoid the horizontal stress mistake of pulley 22 Wheel shaft 221 is caused to damage greatly, while protecting component 223 and the one side design of chute joint thicker, more preferably to bear pulling force. The width of horizontal pulley 22 is as shown in label a in figure in second of implementation and the third implementation.
It is readily apparent that, in the third implementation, fixed pulley 21 is referred to Fig. 5 B horizontal roller design, i.e., fixed Arc groove is opened up below the wheel shaft of pulley 21.
The foregoing is only presently preferred embodiments of the present invention, be not intended to limit the invention, it is all the present invention spirit and Within principle, any modification, equivalent substitution and improvements made etc. should be included in the scope of the protection.

Claims (10)

1. a kind of towing winch pilot system, it is characterised in that the towing winch pilot system includes being arranged on experiment ground Installation pedestal, pulley gear and experiment pylon, the installation pedestal include being used for the first installation for placing towing winch to be tested Seat and the second mounting seat, the bottom and top of the experiment pylon are respectively equipped with bottom leading block and top guide pulley;
The towing winch pilot system also includes the first steel wire rope and the second steel wire rope, and the first end of first steel wire rope is fixed On the reel of the towing winch for being arranged at first mounting seat or second mounting seat, second steel wire rope First end is bypassed after the pulley gear, the bottom leading block and the top guide pulley straight down successively, and institute Balancing weight is connected with the first end for stating the second steel wire rope;
The pulley gear includes some fixed pulleys, some horizontal pulleys, a movable pulley being arranged on the experiment ground With the bollard being fixed on the experiment ground;
When the first end of first steel wire rope, which is fixed on, to be arranged on the reel of the towing winch of first mounting seat, Second end of first steel wire rope is fixed on the movable pulley, and the second end of second steel wire rope is fixed on the heaving pile In stake, the first end of second steel wire rope bypass bypassed after the movable pulley, a fixed pulley and a horizontal pulley it is described Bottom leading block, the projection of the Part I of second steel wire rope with Part II on the experiment ground is parallel, institute The Part II for stating the second steel wire rope is vertical with Part III in the projection tested on ground, and the Part I is described Second steel wire rope is located at the part between the bollard and the movable pulley, and the Part II is second steel wire rope position Part between the movable pulley and the horizontal pulley, the Part III is second steel wire rope positioned at described horizontal Part between pulley and the bottom leading block;Or,
When the first end of first steel wire rope, which is fixed on, to be arranged on the reel of the towing winch of second mounting seat, Second end of first steel wire rope is connected with the second end of second steel wire rope, and the first end of second steel wire rope is bypassed Bypass the bottom leading block after one fixed pulley and at least one horizontal pulley, the Part III of second steel wire rope with Projection of the Part IV on the experiment ground is vertical, and the Part III is that second steel wire rope is located at fixed pulley and the Part between one horizontal pulley, the Part IV be second steel wire rope be located at last horizontal pulley with it is described Part between the leading block of bottom.
2. towing winch pilot system according to claim 1, it is characterised in that the pulley gear includes two fixed pulleys With two horizontal pulleys;A fixed pulley in described two fixed pulleys is just set to second mounting seat, described two fixed Another fixed pulley in pulley is arranged between a horizontal pulley in the movable pulley and described two horizontal pulleys, institute State a horizontal pulley that another horizontal pulley in two horizontal pulleys is arranged in described two horizontal pulleys and described Between a fixed pulley in two fixed pulleys.
3. towing winch pilot system according to claim 1, it is characterised in that the pulley gear includes two fixed pulleys With a horizontal pulley;The horizontal pulley is removably set on the first position and the second place of experiment ground, described first Position, the second place and the bottom leading block are located along the same line, in described two fixed pulleys fixed pulley position Between the movable pulley and the first position, another fixed pulley in described two fixed pulleys is located at described second and installed Between seat and the second place;The towing winch pilot system also includes the slide rail base for the spill being fixed on experiment ground, institute State and U-shaped groove offered on slide rail base, be provided with U-shaped slide rail in the U-shaped groove, the bottom of the horizontal pulley be provided with The chute of the U-shaped slide rail matching, the U-shaped groove be located at the width of two parts protruded of the slide rail base of the spill with The width of the bottom of horizontal pulley is identical, and two parts protruded of the slide rail base of the spill correspond to first position and the respectively Two positions, the U-shaped groove is located at the width of the main part of the slide rail base of the spill more than the bottom of horizontal pulley Width.
4. towing winch pilot system according to claim 1, it is characterised in that the pulley gear includes a fixed pulley With a horizontal pulley;The horizontal pulley is removably set on the first position and the second place of experiment ground, described to determine cunning Wheel is removably set on the 3rd position and the 4th position of experiment ground;The first position, the second place and the bottom are led It is located along the same line to pulley, the 3rd position is located between the movable pulley and the first position, described 4th Setting between second mounting seat and the second place;The towing winch pilot system also includes being fixed on experiment ground Offered on the slide rail base of spill, the slide rail base of the spill in U-shaped groove, the U-shaped groove and be provided with U-shaped slide rail, The horizontal pulley bottom is provided with the chute matched with the U-shaped slide rail, and the U-shaped groove is located at the slide rail base of the spill Two protrude parts width it is identical with the width of the bottom of horizontal pulley, the slide rail base of the spill two protrusions portions Divide and correspond to first position and the second place respectively, the U-shaped groove is located at the width of the main part of the slide rail base of the spill Width of the degree more than the bottom of horizontal pulley;The towing winch pilot system also includes the cunning for the bar shaped being fixed on experiment ground Strip groove is offered on flange of rail seat, the slide rail base of the bar shaped, the strip groove length direction is parallel to first position With the line of the second place, be provided with linear pattern slide rail in the strip groove, the bottom of the fixed pulley be provided with it is described straight The chute of line style slide rail matching, the width of the strip groove is identical with the width of the bottom of fixed pulley, the strip groove Two ends are located at the 3rd position and the 4th position respectively.
5. the towing winch pilot system according to claim any one of 2-4, it is characterised in that the of second steel wire rope One end enters to restrict a little in the rope stretching point of each horizontal pulley and the first end of second steel wire rope in the bottom leading block Height it is identical.
6. the towing winch pilot system according to claim any one of 2-4, it is characterised in that the of second steel wire rope One end enters to restrict a little in the height of the rope stretching point of each fixed pulley and the first end of second steel wire rope in each horizontal pulley Height it is identical.
7. the towing winch pilot system according to claim any one of 1-6, it is characterised in that second steel wire rope is most Big load capacity is more than the weight of the balancing weight, and the maximum load capacity of first steel wire rope is more than twice of the counterweight The weight of block.
8. the towing winch pilot system according to claim any one of 1-4, it is characterised in that the of first steel wire rope Shackle is respectively equipped with two ends and the second end of second steel wire rope.
9. the towing winch pilot system according to claim any one of 1-4, it is characterised in that each fixed pulley, institute State the guard pin being equipped with movable pulley and the horizontal pulley for preventing the steel wire rope from departing from from the pulley.
10. the towing winch pilot system according to claim any one of 1-4, it is characterised in that first mounting seat and The tool base plate of fixed towing winch is respectively provided with second mounting seat.
CN201710171029.XA 2017-03-21 2017-03-21 A kind of towing winch pilot system Active CN107014596B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710171029.XA CN107014596B (en) 2017-03-21 2017-03-21 A kind of towing winch pilot system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710171029.XA CN107014596B (en) 2017-03-21 2017-03-21 A kind of towing winch pilot system

Publications (2)

Publication Number Publication Date
CN107014596A true CN107014596A (en) 2017-08-04
CN107014596B CN107014596B (en) 2019-10-08

Family

ID=59440768

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710171029.XA Active CN107014596B (en) 2017-03-21 2017-03-21 A kind of towing winch pilot system

Country Status (1)

Country Link
CN (1) CN107014596B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108844759A (en) * 2018-03-02 2018-11-20 武汉船用机械有限责任公司 A kind of experimental rig and test method of the double rope hoist engine of double-rope

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3047613A1 (en) * 1979-12-17 1981-09-24 Marine Technical Associates, 07424 Little Fatls, N.J. Rope winch with brake - has second brake for different type of operation with detector for rope load(NO. 13.7.81)
SU1048348A1 (en) * 1979-03-12 1983-10-15 Горьковский конструкторско-технологический институт автомобильной промышленности Vehicle transmission testing stand
JPH10120377A (en) * 1996-10-25 1998-05-12 Sumitomo Constr Mach Co Ltd Winch control device
CN102221477A (en) * 2011-03-31 2011-10-19 煤炭科学研究总院上海分院 Winch detection equipment used in coal mine
CN202255868U (en) * 2011-10-28 2012-05-30 中联重科股份有限公司 Test equipment for winding mechanism
CN102818712A (en) * 2012-07-31 2012-12-12 武汉船用机械有限责任公司 Testing device and method of winch
CN104729866A (en) * 2015-01-30 2015-06-24 武汉船用机械有限责任公司 Test tool of marine hydraulic capstan
CN105216965A (en) * 2015-06-30 2016-01-06 中船黄埔文冲船舶有限公司 Ship bank towing trial method
CN105712200A (en) * 2016-04-12 2016-06-29 南通润邦重机有限公司 Lifting hook pulley with function of rapidly regulating rope reeling rate

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1048348A1 (en) * 1979-03-12 1983-10-15 Горьковский конструкторско-технологический институт автомобильной промышленности Vehicle transmission testing stand
DE3047613A1 (en) * 1979-12-17 1981-09-24 Marine Technical Associates, 07424 Little Fatls, N.J. Rope winch with brake - has second brake for different type of operation with detector for rope load(NO. 13.7.81)
JPH10120377A (en) * 1996-10-25 1998-05-12 Sumitomo Constr Mach Co Ltd Winch control device
CN102221477A (en) * 2011-03-31 2011-10-19 煤炭科学研究总院上海分院 Winch detection equipment used in coal mine
CN202255868U (en) * 2011-10-28 2012-05-30 中联重科股份有限公司 Test equipment for winding mechanism
CN102818712A (en) * 2012-07-31 2012-12-12 武汉船用机械有限责任公司 Testing device and method of winch
CN104729866A (en) * 2015-01-30 2015-06-24 武汉船用机械有限责任公司 Test tool of marine hydraulic capstan
CN105216965A (en) * 2015-06-30 2016-01-06 中船黄埔文冲船舶有限公司 Ship bank towing trial method
CN105712200A (en) * 2016-04-12 2016-06-29 南通润邦重机有限公司 Lifting hook pulley with function of rapidly regulating rope reeling rate

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108844759A (en) * 2018-03-02 2018-11-20 武汉船用机械有限责任公司 A kind of experimental rig and test method of the double rope hoist engine of double-rope
CN108844759B (en) * 2018-03-02 2020-07-21 武汉船用机械有限责任公司 Testing device and testing method for double-rope-outlet double-row rope winch

Also Published As

Publication number Publication date
CN107014596B (en) 2019-10-08

Similar Documents

Publication Publication Date Title
US11300104B2 (en) Wind turbine blade removal and installation system and method
US9573660B2 (en) Traction system for operating lines of a vessel
KR20140141442A (en) Installing apparatus for marine file
CN112523963B (en) Installation process of offshore wind turbine generator set
CN214668769U (en) Port hoisting equipment wire rope detection device
US7475867B1 (en) Fairleads for building platforms
CN207263351U (en) The experiment detection device of drawworks brake power and winch capacity
CN106441961B (en) Load test system for anchor capstan
CN107014596A (en) A kind of towing winch pilot system
CN103574158A (en) Super-large diameter pressure steel tube inclined shaft three-hanging-point installation method
CN106758578B (en) A kind of mountain area band corner, more fixed pivot formula heavy duty cableway erection methods
CN212475874U (en) Bridge cable crane system
CN111155822A (en) Steel strand installation method for wind driven generator support tower frame prestressed structure
CN202471433U (en) Loading device used for entirely applying simulated load to ocean workover rig
CN114132839A (en) Crane installation method for heavy crane ship
CN114822890A (en) Nuclear power station equipment gate installation method
CN107389366A (en) Big pull test platform
CN112378621A (en) Floating body test system device
CN212007783U (en) Combination of a plurality of cantilever beams of new energy automobile hangs heavy test device
CN111573534B (en) Steel wire rope anti-twisting guide device
CN115071912B (en) Synchronous lifting process of special moon pool buoyancy tank
CN214010716U (en) Floating body test system device
CN114940440B (en) Installation and hoisting method for equipment in ship cabin
CN220336491U (en) Sliding type single-support-arm curtain wall hoisting system
CN114987720B (en) Undocking method of ship structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant