CN107012777A - Track traffic uprises continuous U beams - Google Patents

Track traffic uprises continuous U beams Download PDF

Info

Publication number
CN107012777A
CN107012777A CN201710326545.5A CN201710326545A CN107012777A CN 107012777 A CN107012777 A CN 107012777A CN 201710326545 A CN201710326545 A CN 201710326545A CN 107012777 A CN107012777 A CN 107012777A
Authority
CN
China
Prior art keywords
bottom plate
continuous
beams
section
track traffic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710326545.5A
Other languages
Chinese (zh)
Inventor
岳迎九
徐永利
张蕾
康炜
吴文华
乔雷涛
方桂芬
文强
周友权
冯亚成
房帅平
张鹏
张鹏举
卢皓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN201710326545.5A priority Critical patent/CN107012777A/en
Publication of CN107012777A publication Critical patent/CN107012777A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

Continuous U beams are uprised the present invention relates to a kind of track traffic.To make full bridge structure stress more reasonable, steel beam utilization rate improve, it is necessary at a kind of new fulcrum cross-sectional configuration continuous U girder constructions.The present invention includes the web that both sides and center above uiform section thickness and bottom plate in wave shape, bottom plate set longitudinal direction;It is pouring concrete section after being set above the bottom plate in the range of central bearing point, central bearing point both sides 30m at bottom plate trough.Compared to traditional continuous U section forms of beam, stress of the present invention is more reasonable, longitudinal steel beam effective rate of utilization lifting, using new type of continuous U section forms of beam, can meet in terms of spanning has necessary rigidity, economic technology and more save.

Description

Track traffic uprises continuous U beams
Technical field
The invention belongs to bridge structure technical field of buildings, and in particular to a kind of track traffic uprises continuous U beams.
Background technology
Prestressed concrete U beams are a kind of bottom-road bridge girder construction forms, and bottom plate is used as carriageway plate, girder web plate conduct Main bearing member, compared with car for deck bridge, can substantially reduce the height from bridge floor to beam bottom, when under-clearance by limited time, The elevation of structure circuit can be effectively reduced.With the increase of span, continuous U beams are to ensure that beam body has certain rigidity, Ying Jia Heavy in section size or the ratio of reinforcement, to ensure that beam body has certain rigidity and elastic carrying capacity.Due to evacuation platform and other are attached The limitation of structure, deck-molding in a disguised form can only increase downwards, by suitably increasing base plate thickness to improve structure tension performance.
For traditional continuous U beams, due to the limitation of evacuation platform and other accessory structures, the routine of depth of section is adjusted Way is:On the premise of keeping web height constant, increase base plate thickness downwards, while bottom plate transverse width is reduced, so as to change Kind structure tension performance.
If simply increasing base plate thickness, beam section increase certainly will be caused at fulcrum and structural type is moved in the heart, substantially reduced Section stress at fulcrum.In order to there is sufficient stress deposit, it is necessary to increase the quantity of roof and floor steel beam.Ultimately cause full-bridge steel Beam consumption increases, and strength assurance coefficient is higher, and full-bridge construction costs is also higher.Therefore, in order that full bridge structure stress is more closed Reason, steel beam utilization rate is improved, it is necessary to study a kind of continuous U girder constructions of cross-sectional configuration at new fulcrum to solve the problem.
The content of the invention
Continuous U beams are uprised it is an object of the invention to provide a kind of track traffic, uniform thickness bottom plate section form U beam knots are taken Structure, effectively reduces fulcrum area of section, improves full-bridge longitudinal normal stress and vertical deformation, the conventional section form of optimization.
The technical solution adopted in the present invention is:
Track traffic uprises continuous U beams, it is characterised in that:
Including uiform section thickness and bottom plate in wave shape, both sides and center set the web of longitudinal direction above bottom plate;
It is pouring concrete section after being set above the bottom plate in the range of central bearing point, central bearing point both sides 30m at bottom plate trough.
Pouring concrete section and is flushed top surface level with bottom plate crest afterwards.
Pouring concrete section is longitudinally continuous the horizontal breaking joint of setting multiple tracks after-pouring concrete segment afterwards.
The web of bottom plate top center is vertical;
The oblique outside in web lower end of both sides above bottom plate, upper end is vertical.
The present invention has advantages below:
Compared to traditional continuous U section forms of beam, stress of the present invention is more reasonable, longitudinal steel beam effective rate of utilization lifting.Using new The continuous U section forms of beam of type, can meet in terms of spanning has necessary rigidity, economic technology and more save.
Brief description of the drawings
The continuous U beams elevation of Fig. 1.
Beam body cross section at Fig. 2 span centres.
Beam body cross section at Fig. 3 central bearing points.
In figure, 1, bottom plate, 2, rear pouring concrete section, 3, web, 4, the horizontal breaking joint of after-pouring concrete segment.
Embodiment
With reference to embodiment, the present invention will be described in detail.
A kind of track traffic of the present invention uprises continuous U beams, and girder construction outer contour keeps one with conventional design Cause, continuous U beam sections base plate thickness keeps constant, and Bottom Board Steel beam erects bent line and is consistent with board structure line style.In middle branch Pouring concrete section, longitudinally disposed breaking joint after being set in the range of point both sides 30m.
Concrete structure includes uiform section thickness and bottom plate 1 in wave shape, and the top both sides of bottom plate 1 and center set the abdomen of longitudinal direction Plate 3.The web 3 of the top center of bottom plate 1 is vertical;The oblique outside in the lower end of web 3 of the top both sides of bottom plate 1, upper end is vertical.Bottom plate 1 It is pouring concrete section 2 after the top of bottom plate 1 setting in the range of central bearing point, central bearing point both sides 30m at trough.Afterwards pouring concrete section 2 Top surface level is simultaneously flushed with the crest of bottom plate 1.Pouring concrete section 2 is longitudinally continuous the horizontal breaking joint of setting multiple tracks after-pouring concrete segment afterwards 4。
Present disclosure is not limited to cited by embodiment, and those of ordinary skill in the art are by reading description of the invention And any equivalent conversion taken technical solution of the present invention, it is that claim of the invention is covered.

Claims (4)

1. track traffic uprises continuous U beams, it is characterised in that:
Including uiform section thickness and bottom plate in wave shape(1), bottom plate(1)Top both sides and center set the web of longitudinal direction(3);
Bottom plate(1)It is the bottom plate in the range of central bearing point, central bearing point both sides 30m at trough(1)Pouring concrete section after top is set (2).
2. track traffic according to claim 1 uprises continuous U beams, it is characterised in that:
Afterwards pouring concrete section(2)Top surface level and and bottom plate(1)Crest is flushed.
3. track traffic according to claim 1 uprises continuous U beams, it is characterised in that:
Afterwards pouring concrete section(2)It is longitudinally continuous the horizontal breaking joint of setting multiple tracks after-pouring concrete segment(4).
4. track traffic according to claim 1 uprises continuous U beams, it is characterised in that:
Bottom plate(1)The web of top center(3)Vertically;
Bottom plate(1)The web of top both sides(3)The oblique outside in lower end, upper end is vertical.
CN201710326545.5A 2017-05-10 2017-05-10 Track traffic uprises continuous U beams Pending CN107012777A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710326545.5A CN107012777A (en) 2017-05-10 2017-05-10 Track traffic uprises continuous U beams

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710326545.5A CN107012777A (en) 2017-05-10 2017-05-10 Track traffic uprises continuous U beams

Publications (1)

Publication Number Publication Date
CN107012777A true CN107012777A (en) 2017-08-04

Family

ID=59450480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710326545.5A Pending CN107012777A (en) 2017-05-10 2017-05-10 Track traffic uprises continuous U beams

Country Status (1)

Country Link
CN (1) CN107012777A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4142468A (en) * 1976-04-20 1979-03-06 Charles Birnstiel Elevated rail transit guideway with noise attenuators
CN101638882A (en) * 2009-08-20 2010-02-03 上海市城市建设设计研究院 Prestressed concrete three-web trough girder
CN202401383U (en) * 2011-08-30 2012-08-29 北京城建设计研究总院有限责任公司 A W-shaped beam for an urban rail transit three-rail power supply mode
CN202401382U (en) * 2011-08-30 2012-08-29 重庆市轨道交通(集团)有限公司 A W-shaped beam for an urban rail transit overhead line system power supply mode
CN103321137A (en) * 2013-06-19 2013-09-25 江苏科技大学 Groove-shaped bridge beam
CN105317002A (en) * 2015-05-08 2016-02-10 贵州省水利水电勘测设计研究院 Continuous rigid frame aqueduct variable box variable cross section transition beam section structure and design method
CN105317001A (en) * 2015-05-08 2016-02-10 贵州省水利水电勘测设计研究院 Variable box variable cross section continuous rigid frame aqueduct single-box single-chamber box girder and design method thereof
CN105696455A (en) * 2015-12-30 2016-06-22 中铁第四勘察设计院集团有限公司 Box type web simply supported U-shaped girder of double-track railway
CN206800162U (en) * 2017-05-10 2017-12-26 中铁第一勘察设计院集团有限公司 A kind of track traffic uprises continuous U beams

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4142468A (en) * 1976-04-20 1979-03-06 Charles Birnstiel Elevated rail transit guideway with noise attenuators
CN101638882A (en) * 2009-08-20 2010-02-03 上海市城市建设设计研究院 Prestressed concrete three-web trough girder
CN202401383U (en) * 2011-08-30 2012-08-29 北京城建设计研究总院有限责任公司 A W-shaped beam for an urban rail transit three-rail power supply mode
CN202401382U (en) * 2011-08-30 2012-08-29 重庆市轨道交通(集团)有限公司 A W-shaped beam for an urban rail transit overhead line system power supply mode
CN103321137A (en) * 2013-06-19 2013-09-25 江苏科技大学 Groove-shaped bridge beam
CN105317002A (en) * 2015-05-08 2016-02-10 贵州省水利水电勘测设计研究院 Continuous rigid frame aqueduct variable box variable cross section transition beam section structure and design method
CN105317001A (en) * 2015-05-08 2016-02-10 贵州省水利水电勘测设计研究院 Variable box variable cross section continuous rigid frame aqueduct single-box single-chamber box girder and design method thereof
CN105696455A (en) * 2015-12-30 2016-06-22 中铁第四勘察设计院集团有限公司 Box type web simply supported U-shaped girder of double-track railway
CN206800162U (en) * 2017-05-10 2017-12-26 中铁第一勘察设计院集团有限公司 A kind of track traffic uprises continuous U beams

Similar Documents

Publication Publication Date Title
CN205443907U (en) Double track railway box web letter branching groove ellbeam
CN206680884U (en) A kind of high pier cast-in-site box girder with large span formwork-support
CN206800162U (en) A kind of track traffic uprises continuous U beams
CN203559341U (en) Longitudinal and transverse beam system channel beam of railway longitudinal beam type box beam
CN205775786U (en) A kind of novel railway curve Cable-stayed Bridge with Slanted Pylon
CN110512774A (en) A kind of the ALC stripe board internal partition wall and its construction method of super-high
CN207878254U (en) A kind of assembled light combination beam freely-supported structure changes continuous structure
CN206800165U (en) A kind of highway bridge
CN205999769U (en) A kind of high-speed railway steel reinforced concrete combines only tower section cable-stayed bridge
CN106638261A (en) Railway bridge separated dual-box pre-stressed concrete main girder structure
CN108342980B (en) Railway suspension bridge upper bearing type steel truss bridge deck structure
CN204849559U (en) Double -deck bridge floor box girder bridge of prestressed concrete
CN107012777A (en) Track traffic uprises continuous U beams
CN105696455A (en) Box type web simply supported U-shaped girder of double-track railway
CN206205236U (en) A kind of deformed bar truss hollow superimposed sheet
CN208009170U (en) Plate-type ballastless track on a kind of steel truss girder bridge
CN103321137B (en) Groove-shaped bridge beam
CN206693030U (en) A kind of compound section steel box girder for high-speed railway
CN208201613U (en) A kind of asymmetric main push-towing rope railway Suspension bridge structure
CN203890865U (en) Stabilizing beam structure of horizontally-pulling rope bridge
CN203295955U (en) Composite bridge for railway
CN205223823U (en) Highway with stride a formula single track and build bilateral case section structure of bridge jointly
CN207944318U (en) A kind of railway simple supported box beam
CN202530365U (en) Half-through type opening box-shaped section steel-concrete composite beam
CN109024267B (en) Steel truss girder structure of curved bridge floor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170804