CN107012279A - Molten iron slagging-off method for horizontal blowing slag removal - Google Patents

Molten iron slagging-off method for horizontal blowing slag removal Download PDF

Info

Publication number
CN107012279A
CN107012279A CN201610059453.0A CN201610059453A CN107012279A CN 107012279 A CN107012279 A CN 107012279A CN 201610059453 A CN201610059453 A CN 201610059453A CN 107012279 A CN107012279 A CN 107012279A
Authority
CN
China
Prior art keywords
slag
gun
molten iron
air
jet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610059453.0A
Other languages
Chinese (zh)
Inventor
刘文飞
赵自鑫
金百刚
李海峰
牛兴明
马宁
费鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Steel Co Ltd
Original Assignee
Angang Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Steel Co Ltd filed Critical Angang Steel Co Ltd
Priority to CN201610059453.0A priority Critical patent/CN107012279A/en
Publication of CN107012279A publication Critical patent/CN107012279A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • C21C7/0087Treatment of slags covering the steel bath, e.g. for separating slag from the molten metal
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D43/00Mechanical cleaning, e.g. skimming of molten metals
    • B22D43/005Removing slag from a molten metal surface
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C1/00Refining of pig-iron; Cast iron
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C7/00Treating molten ferrous alloys, e.g. steel, not covered by groups C21C1/00 - C21C5/00
    • C21C7/04Removing impurities by adding a treating agent
    • C21C7/072Treatment with gases

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Analytical Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • Refinement Of Pig-Iron, Manufacture Of Cast Iron, And Steel Manufacture Other Than In Revolving Furnaces (AREA)

Abstract

The invention provides a molten iron slagging-off method for flat blowing slag removal, which is characterized in that an air gun consisting of a gun body and a gun head is manufactured, the gun head and the gun body are connected through a screw port, and the front end of an air blowing pipe of the gun head is provided with a linear or cross air blowing hole. When the hot-metal ladle is tilted to a slag skimming position, vertically inserting 1 air lance from the top of the hot-metal ladle, wherein the insertion depth of the air lance is that an air hole of an air blowing pipe is positioned on the surface of molten iron or is slightly lower than the surface of the molten iron; when the air gun descends, air starts to be supplied, the air supply intensity is not less than 1.5 NL/(min.t), and the pressure is more than 0.5 MPa; adjusting the flow according to the condition of the slag, and stabilizing the gas flow and starting to slag off when the gas flow can smoothly blow open top slag and the exposed molten iron area is not less than 2/3; and after slagging off is finished, lifting the air gun and then stopping the gas. The invention has the advantages of simple structure, convenient construction, high operation efficiency and low failure rate. The slag skimming time can be shortened, the slag skimming effect is improved, and the iron loss and the converter sulfur return amount during desulfurization and slag skimming are greatly reduced.

Description

It is a kind of to equal the molten iron drossing method blown and catch up with slag
Technical field
The invention belongs to hot metal pretreatment technology field, the clinker after more particularly to a kind of dephosphorization, desiliconization and desophorization for hot metal or single desulfurization removes method.
Background technology
After molten iron pretreatment, to prevent later process " returning sulphur ", " rephosphorization ", increase metallurgy lime consumes and causes quality accident Etc. reason, it is necessary to which top slag of the molten iron after de- is removed.For top slag is smoothly removed, current Normal practice is input Slag conglomeration agent, The top slag of good fluidity is become sticky, recycles manipulator to concentrate and removes, the requirement because of indivedual steel grades to sulfur content is tight sometimes Lattice, particularly with pure magnesium powder sulfur removal technology is blown, the dilute amount of slag is small, generally requires repeatedly to put into Slag conglomeration agent.So, not only increase Slag conglomeration agent is consumed, and can be increased molten iron and taken off damage.
Application number 200710015162.2 provides a kind of molten iron pot narrow gap gas-blowing slag-removing device and operating procedure, and its narrow slit is blown and removed The mechanical arm that slag device is made up of first, second hydraulic cylinder, first, second ultrasonic transformer and turning joint, mechanical arm, which is provided with, to be blown Pipe, blowpipe is provided with gas connection pipe and narrow slit shape nozzle, and its operating procedure is:A. first by gas connection pipe connected nitrogen tube or Air compressor;B. after hot-metal bottle being tilted into certain angle in position of skimming, narrow slit shape nozzle and iron are adjusted by amplitude-variable mechanical arm The top of the slag distance of water pot, is then driven to hot-metal bottle to top of the slag nitrogen-blow or compressed air by narrow slit shape nozzle by liquid slag Outside mouthful.Narrow slit that this method is used is blown it is difficult to ensure that difficulty is built in service life, increase tank lining cutting, and due to some air blowing, Top slag can only be blown out " falcate ", bent moon two ends top slag, which is removed, still to acquire a certain degree of difficulty.
Application number 201010272903.7 discloses a kind of blowing slag-removing equipment for molten iron pretreatment, including guide rail, pivoting support, can Adjust bearing, guide roller, jockey sprocket, lifting drive, lift cart, inflatable bar and refractory segment.Guide rail is inclined at Above hot-metal bottle, lift cart is arranged on guide rail, and lifting drive is driven lift cart along above and below guide rail by jockey sprocket Motion.Pivoting support is connected in the middle part of guide upper, adjustable seats connection guide rail, and guide roller is arranged on guide rail bottom, pivoting support And adjustable seats are each attached to and skimmed on machine platform.Inflatable bar is arranged on lift cart, and refractory segment is connected to inflatable bar bottom. When Cinder Machine works, inflatable bar is inserted into nitrogen blowing in ladle.With the progress for the process of skimming, the quantity of slag is constantly reduced, iron Water exposed surface constantly expands, until slag is almost removed completely.Because jet gun is tilting insertion molten iron, in spite of guide rail and The effect of bearing, certain amount of deflection will be unavoidably produced under natural gravity effect, and refractory material only possesses insulation energy Power, jet gun upper epidermis refractory material easily produces micro-crack under a stretching force, can accelerate molten iron erosive velocity, and jet gun is inserted Entering the service life of part can greatly shorten.
The content of the invention
It is contemplated that overcome the defect of prior art, and then offer one kind can reduce residue and iron loss, effectively shorten slag-removing time Flat blow the molten iron drossing method for catching up with slag.
For up to this purpose, this invention takes following technical solution:
A kind of to equal the molten iron drossing method blown and catch up with slag, its concrete operation step is:
(1) jet gun is made:Jet gun includes the permanent gun body in top and bottom jet pipette tips, and jet pipette tips are 1~1.2 meter long Resistance to material, pipette tips and gun body are connected by screw socket, and gun body 1 is provided with gas blow pipe 3, the gas blow pipe front end band of pipette tips with the center of pipette tips 2 There are in-line or cross gas hole;
(2) set two sets by control button and control hand valve group into control operation disk:One is sheathed on the lower rifle position on operating platform Put, it is another to be set on forklift for slag or interior of skimming;
(3) rifle is operated under:Taken off after sulphur, when hot-metal bottle tipping is to when skimming, from hot-metal bottle at the top of be inserted perpendicularly into molten iron face 1 jet gun, 0.8~1.2 meter away from tank skin of jet gun insertion position, insertion depth is located at molten iron surface for the gas hole of gas blow pipe Or slightly less than molten iron surface;
(4) jet is operated:Jet gun starts supply when declining, air supply intensity is not less than 1.5NL/ (mint), and pressure is more than 0.5MPa;Flow is adjusted according to clinker situation, when gas flow can smoothly blow top slag open, exposed molten iron area is not less than 2/3 When, stabilizing gas flux, and start to skim;
(5) skim after end, first carry jet gun and close down gas again.
Beneficial effects of the present invention are:
1. method of the present invention by being inserted perpendicularly into jet gun, solves the problems, such as the amount of deflection of spear, makes mechanical structure simpler.
2. the present invention only needs a jet gun, easy construction, operating efficiency is high, and fault rate is relatively fewer.
3. the method that the present invention blows slag by horizontal top layer, residue is effectively assembled, be conducive to skimming more thoroughly, greatly subtract Sulfur content is returned in converter when light iron loss and desulphurization and slag skimming.
Brief description of the drawings
Fig. 1 is air gun structure schematic diagram.
In figure:Gun body 1, screw socket 2, gas blow pipe 3, pipette tips 4, gas hole 5.
Embodiment
Make jet gun:Jet gun includes the permanent gun body 1 in top and bottom jet pipette tips 2, and jet pipette tips 2 are 1 meter long resistance to material, Pipette tips 2 and gun body 1 are connected by screw socket, and gun body 1 is provided with gas blow pipe 3, the gas blow pipe 3 in pipette tips 4 with the center of pipette tips 2 Front end carries in-line or cross gas hole 5, realizes the air blowing of multiple directions.
Set two sets by control button and control hand valve group into control operation disk:The one lower rifle position being sheathed on operating platform is put, It is another to be set on forklift for slag or interior of skimming.
Flat blow of 3 stoves is carried out with reference to desulfurizing iron and catches up with slag molten iron drossing embodiment, and the invention will be further described.
Embodiment 1:
Hot-metal bottle charge weight is 260 tons, 1400 DEG C of molten iron temperature.The normal quantity of slag of taking off is 5 tons/tank.
The gas hole 5 of jet gun is set for in-line, a diameter of 11mm of gas hole 5.Jet gun gun body 1 passes through spiral shell with pipette tips 4 Mouth 2 is connected, and coupling part is in order to prevent top slag splash to interface, to be unfavorable for pipette tips 4 and change, and in joint, parcel asbestos are resistance to Material, and fixed tightly with iron wire.The asbestos that only need to dismantle when changing pipette tips 4 just can very easily change pipette tips 4.
Take off after sulphur, hot-metal bottle tipping to position of skimming.Then start to fall jet gun, when jet gun drops to gas hole 5 just Stop during into molten iron, work of skimming manually adjusts jet gun air supply intensity to 2.5NL/ (mint), at this moment jet gun can have Top slag is blown to skimming gate by effect.Start to skim, process of skimming is according to top slag aggregation extent fine setting jet gun flow.Skim after end, Rifle is carried, and continues to supply 1min.Iron loss 4.2t/ tanks.
Embodiment 2:
Hot-metal bottle charge weight is 265 tons, 1350 DEG C of molten iron temperature.The normal quantity of slag of taking off is 5.1 tons/tank.
The gas hole 5 of jet gun is in-line, a diameter of 12mm of gas hole 5.
Take off after sulphur, hot-metal bottle tipping to position of skimming.Then start to fall jet gun, when jet gun drops to gas hole 5 just Stop during into molten iron, work of skimming manually adjusts jet gun air supply intensity to 2.8NL/ (mint), at this moment jet gun can have Top slag is blown to skimming gate by effect.Start to skim, process of skimming is according to top slag aggregation extent fine setting jet gun flow.Skim after end, Rifle is carried, and continues to supply 1min.Iron loss 4.1t/ tanks.
Embodiment 3:
Hot-metal bottle charge weight is 270 tons, 1380 DEG C of molten iron temperature.The normal quantity of slag of taking off is 5.2 tons/tank.
The gas hole 5 of jet gun is cross, a diameter of 11mm of gas hole 5.
Take off after sulphur, hot-metal bottle tipping to position of skimming.Then start to fall jet gun, when jet gun drops to gas hole 5 just Stop during into molten iron, work of skimming manually adjusts jet gun air supply intensity to 2.6NL/ (mint), at this moment jet gun can have Top slag is blown to skimming gate by effect.Start to skim, process of skimming is according to top slag aggregation extent fine setting jet gun flow.Skim after end, Rifle is carried, and continues to supply 1min.Iron loss 4.4t/ tanks.

Claims (1)

1. flat the molten iron drossing method for catching up with slag is blown a kind of, it is characterised in that concrete operation step is:
(1) jet gun is made:Jet gun includes the permanent gun body in top and bottom jet pipette tips, and jet pipette tips are 1~1.2 meter long resistance to material, pipette tips and gun body are connected by screw socket, and gun body is provided with gas blow pipe, rifle with pipette tips center The gas blow pipe front end of head carries in-line or cross gas hole;
(2) set two sets by control button and control hand valve group into control operation disk:One, which is sheathed on operation, puts down Lower rifle position on platform is put, another to be set on forklift for slag or interior of skimming;
(3) rifle is operated under:Taken off after sulphur, when hot-metal bottle tipping is to when skimming, from hot-metal bottle at the top of and iron The water surface is inserted perpendicularly into 1 jet gun, 0.8~1.2 meter away from tank skin of jet gun insertion position, and insertion depth is to blow The gas hole of tracheae is located at molten iron surface or slightly less than molten iron surface;
(4) jet is operated:Jet gun starts supply when declining, air supply intensity is not less than 1.5NL/ (mint), Pressure is more than 0.5MPa;Flow is adjusted according to clinker situation, when gas flow can smoothly blow top slag open, made When exposed molten iron area is not less than 2/3, stabilizing gas flux, and start to skim;
(5) skim after end, first carry jet gun and close down gas again.
CN201610059453.0A 2016-01-27 2016-01-27 Molten iron slagging-off method for horizontal blowing slag removal Pending CN107012279A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610059453.0A CN107012279A (en) 2016-01-27 2016-01-27 Molten iron slagging-off method for horizontal blowing slag removal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610059453.0A CN107012279A (en) 2016-01-27 2016-01-27 Molten iron slagging-off method for horizontal blowing slag removal

Publications (1)

Publication Number Publication Date
CN107012279A true CN107012279A (en) 2017-08-04

Family

ID=59438698

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610059453.0A Pending CN107012279A (en) 2016-01-27 2016-01-27 Molten iron slagging-off method for horizontal blowing slag removal

Country Status (1)

Country Link
CN (1) CN107012279A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107779554A (en) * 2017-10-31 2018-03-09 攀钢集团攀枝花钢铁研究院有限公司 Desulfurizing iron blowing slag-removing device
CN113337674A (en) * 2021-05-31 2021-09-03 攀钢集团攀枝花钢钒有限公司 Air blowing slag removing gun and slag removing method
CN114737018A (en) * 2022-05-07 2022-07-12 湖南华菱涟源钢铁有限公司 Consumable air gun for slagging off molten iron and use method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201331268Y (en) * 2008-12-30 2009-10-21 中钢设备有限公司 Air assist slagging-off device
CN201778055U (en) * 2010-06-25 2011-03-30 上海梅山钢铁股份有限公司 Air blow gun for blowing air and removing slag
CN102031339A (en) * 2009-09-30 2011-04-27 鞍钢股份有限公司 Molten iron slagging-off method
CN203972854U (en) * 2014-07-10 2014-12-03 鞍钢民企机电检修公司 Spring up the micro-damage system of the skimming cross jet gun of formula molten iron
CN204401043U (en) * 2014-12-10 2015-06-17 马钢(集团)控股有限公司 A kind of molten iron drossing device
CN104759613A (en) * 2015-04-15 2015-07-08 中冶南方工程技术有限公司 Molten iron tank slag removal system and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201331268Y (en) * 2008-12-30 2009-10-21 中钢设备有限公司 Air assist slagging-off device
CN102031339A (en) * 2009-09-30 2011-04-27 鞍钢股份有限公司 Molten iron slagging-off method
CN201778055U (en) * 2010-06-25 2011-03-30 上海梅山钢铁股份有限公司 Air blow gun for blowing air and removing slag
CN203972854U (en) * 2014-07-10 2014-12-03 鞍钢民企机电检修公司 Spring up the micro-damage system of the skimming cross jet gun of formula molten iron
CN204401043U (en) * 2014-12-10 2015-06-17 马钢(集团)控股有限公司 A kind of molten iron drossing device
CN104759613A (en) * 2015-04-15 2015-07-08 中冶南方工程技术有限公司 Molten iron tank slag removal system and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107779554A (en) * 2017-10-31 2018-03-09 攀钢集团攀枝花钢铁研究院有限公司 Desulfurizing iron blowing slag-removing device
CN113337674A (en) * 2021-05-31 2021-09-03 攀钢集团攀枝花钢钒有限公司 Air blowing slag removing gun and slag removing method
CN114737018A (en) * 2022-05-07 2022-07-12 湖南华菱涟源钢铁有限公司 Consumable air gun for slagging off molten iron and use method

Similar Documents

Publication Publication Date Title
JP5894937B2 (en) Copper anode refining system and method
CN103114177B (en) Gas-blowing and slag-gathering spray gun for assisting slag-off of molten iron and using method of spray gun
CN111635977B (en) Full-continuous ultrashort electric arc furnace steelmaking flow production equipment and process
CN107012279A (en) Molten iron slagging-off method for horizontal blowing slag removal
CN112029956B (en) Oxygen supply method for electric arc furnace steelmaking
CN101550468A (en) Metal smelting device driven by gravitational potential energy and method thereof
JP7024600B2 (en) Refining lance, refining lance equipment, RH type refining equipment, and method for manufacturing ultra-low sulfur molten steel
CN104711395B (en) High-performance spray gun for molten iron injection pretreatment
CN210486515U (en) Throat brick for smelting furnace or heat preservation furnace
CN204111803U (en) There is the hot metal pretreatment spray gun of diversion trench spout structure
CN112111625A (en) RH vacuum powder injection refining device and powder injection method thereof
CN204311083U (en) Combined air gun for slagging-off of molten iron
CN203602649U (en) Bottom blowing structure for small-sized smelting container
CN105296709B (en) Surging molten iron slag-removing method
CN113502367A (en) Molten iron desulphurization pretreatment process and method
CN112404373B (en) System and method for stream inoculation at ladle nozzle
CN206359555U (en) The vertical blow desulphurization spray gun of rotation
CN202155526U (en) Slag removing gun
CN117845011B (en) Converter tapping slag blocking device and method
CN103849708A (en) Converter slagging device and method for controlling converter slagging
CN219064129U (en) Siphon slag discharging device of nickel top-blown furnace
CN206438158U (en) A kind of two step lead smelting process devices
CN104894325A (en) Compound jetting and step-by-step jetting desulfurization spray gun for molten iron mixed jetting or online mixing
CN2639312Y (en) Slag device for steelmaking
KR100913920B1 (en) Ladle slag sampler apparatus and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170804

WD01 Invention patent application deemed withdrawn after publication