CN106990219B - A kind of coal spontaneous combustion tester - Google Patents

A kind of coal spontaneous combustion tester Download PDF

Info

Publication number
CN106990219B
CN106990219B CN201710257953.XA CN201710257953A CN106990219B CN 106990219 B CN106990219 B CN 106990219B CN 201710257953 A CN201710257953 A CN 201710257953A CN 106990219 B CN106990219 B CN 106990219B
Authority
CN
China
Prior art keywords
coal
coal sample
oil
oil sump
sample tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710257953.XA
Other languages
Chinese (zh)
Other versions
CN106990219A (en
Inventor
刘长春
雷昌奎
马砺
邓军
张志鹏
尹岚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Science and Technology
Original Assignee
Xian University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Science and Technology filed Critical Xian University of Science and Technology
Priority to CN201710257953.XA priority Critical patent/CN106990219B/en
Publication of CN106990219A publication Critical patent/CN106990219A/en
Application granted granted Critical
Publication of CN106990219B publication Critical patent/CN106990219B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/22Fuels; Explosives
    • G01N33/222Solid fuels, e.g. coal

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Food Science & Technology (AREA)
  • Medicinal Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Investigating Or Analyzing Materials Using Thermal Means (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The problem of the present invention relates to a kind of coal spontaneous combustion testers, and big with oil mass in the prior art to solve, heating speed is slow, and temperature is not easy to control, coal sample uneven heating.Coal sample tank upper and lower end portion is respectively arranged with coal-in port and coal outlet;Oil piping system includes oil sump, oil pump and the oil circuit for constituting closed loop, and oil sump is coated on coal sample tank periphery, is connected respectively with coal sample pot sidewall at the top and bottom of oil sump;Temperature control system includes temp probe, temperature controller, electrically heated rod, temperature acquisition template, computer, temp probe is set to inside surveyed coal sample and connect with temperature controller, temperature controller is connect with electrically heated rod, electrically heated rod is located in oil sump, temp probe is also connect with temperature acquisition template, and temperature acquisition template is connect with computer;Air-channel system includes gas cylinder, gas cylinder and coal sample tank by gas preheating pipeline connection, and gas preheating pipeline is located in oil sump, and coal sample tank is also connected to gas chromatograph, and gas chromatograph passes through computer and controls.

Description

A kind of coal spontaneous combustion tester
Technical field
The invention belongs to coal performance test fields, and in particular to a kind of coal spontaneous combustion tester.
Background technique
Coal sample needed for the existing oil-bath type temperature programming experimental provision for coal spontaneous combustion performance test is more, and is by coal Sample tank is placed among oil sump and is heated, therefore it is big with oil mass, and heating speed is slow, this also results in its conduction oil and coal sample temperature Degree is not easy to control, and coal sample uneven heating, simultaneously because coal sample tank is placed within oil sump and conduction oil is not easily taken out, dress takes coal Complex steps are time-consuming during sample, and coal sample cooling rate is slow.
Summary of the invention
The object of the present invention is to provide a kind of coal spontaneous combustion testers, big with oil mass in the prior art to solve, heating The problem of speed is slow, and temperature is not easy to control, coal sample uneven heating.
In order to solve the above technical problems, the technical solution adopted by the present invention is that:
A kind of coal spontaneous combustion tester, is characterized in that including coal sample tank, oil piping system, temperature control system and gas circuit System, the coal sample tank upper and lower end portion are respectively arranged with coal-in port and coal outlet, coal lid, coal outlet are set on coal-in port It is upper that lid of producing coal is set;The oil piping system includes oil sump, oil pump and the oil circuit for constituting closed loop, the oil sump cladding In coal sample tank periphery, it is connected respectively with coal sample pot sidewall at the top and bottom of oil sump;The temperature control system includes temp probe, temperature control Instrument, electrically heated rod, temperature acquisition template, computer, the temp probe are set to inside surveyed coal sample and connect with temperature controller, The temperature controller is connect with electrically heated rod, and electrically heated rod is located in oil sump, and the temp probe is also connect with temperature acquisition template, Temperature acquisition template is connect with computer;The air-channel system includes that gas cylinder, gas cylinder and the coal sample tank pass through gas economizer bank Road connection, the gas preheating pipeline are located in oil sump, and the coal sample tank is also connected to gas chromatograph, and gas chromatograph passes through The computer control.
It further, further include cooling system, the cooling system includes cooling tube, and cooling tube is arranged in the oil circuit On.
It further, further include emission-control equipment, the coal sample tank is also connected to the emission-control equipment, at exhaust gas Reason device is controlled by the computer.
Further, it is arranged between the gas cylinder and coal sample tank by pressure reducing valve and flowmeter.
Further, the coal outlet, which covers, is provided with support coal pedestal.
Further, blender is provided on the oil sump, the blender protrudes into oil sump.
Further, the oil sump side wall is provided with liquid level tube.
The beneficial effect of the present invention compared with the existing technology is:
Coal sample tank and oil sump are used whole design by the present invention, not only reduce coal sample dosage and conduction oil dosage, are improved Heating speed, is uniformly heated coal sample, and coal sample tank coal-in port and coal outlet are designed at except oil sump, simplifies Dress takes the operating process of coal sample, cooling rate is improved by increasing cooling system, while by optimization temperature control system, using line Property heating method solve existing apparatus temperature disadvantage not easy to control.
Detailed description of the invention
Fig. 1 is example structure schematic diagram;
Fig. 2 is distribution box side view in embodiment;
Fig. 3 is experimental box and distribution box main view in experimental example;
Fig. 4 is blender position view in embodiment.
In figure: 1- coal sample tank, 2- coal-in port lid, 3- oil sump, 4- oil sump lid, 5- flange, 6- conduction oil, 7- coal sample, 8- enter Coal mouth, 9- coal sample tank gas outlet, 10- experiment chamber door, 11- gas cylinder, 12- pressure reducing valve, 13- flowmeter, 14- enters gas cutting ferrule, 15- enters Port, 16- gas preheating pipeline, 17- coal sample tank air intake, 18- support coal pedestal, 19- produce coal lid, 20- distribution box door, 21- Threeway, 22- gas-chromatography cutting ferrule, 23- solenoid valve one, 24- gas chromatograph, 25- outlet cutting ferrule, 26- solenoid valve two, 27- are useless Flash Gas Compression Skid System, 28- computer, 29- temp probe, 30- temperature controller, 31- relay, 32- electrically heated rod, 33- temperature acquisition Template, 34- be spaced apart, 35- switch one, 36- switch two, 37- switch three, 38- switch four, 39- switch five, 40- switch six, 41- Micro machine, 42- oil pump, 43- water pump, 44- oil sump valve, 45- Cistern valve, 46- oil leaking hole, 47- oil pipe, 48- oil filler, 49- water tank, 50- water outlet of water tank, 51- cooling tube water inlet, 52- cooling tube, 53- cooling tube water outlet, 54- water tank enter water Mouth, 55- touching display screen, 56- liquid level tube, 57- agitating shaft, 58- stirring blade, 59- fan, 60- coal sample case.
Specific embodiment
The present invention is described in detail in the following with reference to the drawings and specific embodiments.
As Figure 1-Figure 4, embodiment provides a kind of coal spontaneous combustion tester, including coal sample tank 1, oil piping system, temperature control System, air-channel system and cooling system.1 upper and lower end portion of coal sample tank is respectively arranged with coal-in port 8 and coal outlet, sets on coal-in port 8 It is placed in coal lid 2, lid 19 of producing coal is set on coal outlet;Oil piping system include constitute the oil sump 3 of closed loop, oil circuit and Oil pump 42, oil sump 3 are coated on 1 periphery of coal sample tank, and 3 top and bottom of oil sump are connected with 1 side wall of coal sample tank respectively;Temperature control system packet Temp probe 29, temperature controller 30, electrically heated rod 32, temperature acquisition template 33, computer 28 are included, temp probe 29, which is set to, to be surveyed It is connect inside coal sample and with temperature controller 30, temperature controller 30 is connect with electrically heated rod 32, and electrically heated rod 32 is located in oil sump 3, temperature Probe 29 is also connect with temperature acquisition template 33, and temperature acquisition template 33 is connect with computer 28;Air-channel system include gas cylinder 11, Gas cylinder 11 and coal sample tank 1 preheat pipeline 16 by gas and be connected tos, and gas preheats pipeline 16 and is located in oil sump 3, coal sample tank 1 also with gas Chromatograph 24 is connected to, and gas chromatograph 24 is controlled by computer 28;Cooling system includes water tank 49, cooling tube 52 and water pump 43, cooling tube 52 is arranged on oil piping system.It further include emission-control equipment 27, coal sample tank 1 also connects with emission-control equipment 27 Logical, emission-control equipment 27 is controlled by computer 28.Pressure reducing valve 12 and flowmeter 13 are provided between gas cylinder 11 and coal sample tank 1. Support coal pedestal 18 is provided with above lid of producing coal 19.Blender is provided on oil sump 3, blender includes micro machine 41, agitating shaft 57 and stirring blade 58, agitating shaft 57 protrude into oil sump, micro machine 41 by agitating shaft 57 drive stirring blade 58 be stirred. 3 side wall of oil sump is provided with liquid level tube 56.Oil sump 3 is fixed in experimental box, and the coal-in port 8 and coal outlet of coal sample tank 1 stretch out respectively Experiment chamber door 10 is provided with outside experimental box, on experimental box, fan 59, temperature controller 30 and temperature acquisition template 33 are arranged in distribution box Interior, temperature controller 30 controls the switch of electrically heated rod 32 by controlling the on-off of relay 31, and temp probe 29 can also be by temperature Signal is transmitted to temperature acquisition template 33, and temperature signal is transmitted to computer 28 by temperature acquisition template 33, is set on distribution box It is equipped with distribution box door 20, gas, through pressure reducing valve 12 and flowmeter 13, then is entered gas cutting ferrule 14, air intake 15, gas by gas cylinder 11 It preheats pipeline 16 and coal sample tank air intake 17 enters 1 bottom of coal sample tank.Gas is reached after coal sample 7 by coal sample tank gas outlet 9 Threeway 21, wherein reaching solenoid valve 1 by gas-chromatography cutting ferrule 22 all the way, gas enters gas chromatograph 24, and another way is logical It crosses outlet cutting ferrule 25 and reaches solenoid valve 2 26, reconnect in emission-control equipment 27.Solenoid valve 1 and solenoid valve 2 26 connect In being additionally provided with touching display screen 55 on computer 28, distribution box, be spaced apart 34, switch 1, switch 2 36, switch 3 37, open 4 38, switch 5 39 and switch 6 40 are closed, temperature controller 30 is connected with touching display screen 55, can adjust temperature by touching display screen 55 Control parameter.Switch 1 is used for control micro electric machine 41 for controlling temperature controller, switch 2 36, and switch 3 37 is used for solenoid valve one 23 and 2 26 power on/off of solenoid valve, switch 4 38 is opened for controlling fan 59, switch 5 39 for control oil pump 42 and water pump 43 6 40 are closed for controlling temperature acquisition template 33.
Experiment starts front opening and tests chamber door 10, opens the coal-in port lid 2 of 1 top of coal sample tank, by connection oil sump 3 and oil sump The flange 5 of lid 4 is opened.Conduction oil 6 is added into oil sump 3, can be shown in oil sump 3 by the liquid level tube 56 connected on oil sump 3 Oil sump lid 4 is then sealed by flange 5 with oil sump 3, coal sample 7, coal is then added into coal sample tank 1 by the liquid level of conduction oil 6 Sample 7 is located on support coal pedestal 18, and the support coal pedestal 18, which is welded in, to produce coal in lid 19.The coal-in port lid 2 is connected to The coal-in port 8 of 1 upper end of coal sample tank, and temp probe 29 is placed at 7 center of coal sample, it is connected above 1 side wall of coal sample tank later Coal sample tank gas outlet 9, close experiment chamber door 10 and distribution box door 20 and check gas circuit airtightness.Opening is spaced apart 34 and switch 3 37, gas is passed through experimental provision in advance, after a period of time, turns on the switch one 35, switch 2 36 and switch 6 40, is started Temperature controller 30, micro machine 41 and temperature acquisition template 33.
Air-channel system in experimentation: gas, through pressure reducing valve 12 and flowmeter 13, then is entered gas cutting ferrule 14, is entered by gas cylinder 11 Port 15, gas preheating pipeline 16 and coal sample tank air intake 17 enter 1 bottom of coal sample tank.Gas is after coal sample 7 by coal sample tank Gas outlet 9 reaches threeway 21, wherein reaching solenoid valve 1 by gas-chromatography cutting ferrule 22 all the way, gas enters gas chromatograph 24, another way reaches solenoid valve 2 26 by outlet cutting ferrule 25, reconnects in emission-control equipment 27.One 23 He of solenoid valve Solenoid valve 2 26 is connected to computer 28, is in closed state, the solenoid valve 2 26 under one 23 normal condition of solenoid valve In the open state under normal condition, gas enters emission-control equipment 27 by solenoid valve 2 26, then is discharged into atmosphere.Work as coal After sample temperature reaches assigned temperature, the solenoid valve 1 is opened, and the solenoid valve 2 26 is closed, and gas passes through solenoid valve 1 Into gas chromatograph 24.After having enough gas injection gas chromatograph 24, the solenoid valve 1 is closed, the solenoid valve 2 26 open, and gas enters emission-control equipment 27 by solenoid valve 2 26.
Temperature control in experimentation: temp probe 29 is located at 7 center of coal sample, and temperature signal is transmitted to temperature controller 30, the temperature controller 30 controls the on-off of relay 31, and relay 31 is connected with electrically heated rod 32, by controlling relay 31 On-off control the switch of electrically heated rod 32, and then control the temperature of conduction oil 6 in oil sump 3, while micro machine 41 is by stirring Mixing axis 57 drives stirring blade 58 to be stirred, and increases the temperature uniformity of conduction oil 6.Temp probe 29 can also be by temperature signal It is transmitted to temperature acquisition template 33, and temperature signal is transmitted to computer 28 by temperature acquisition template 33, when reaching assigned temperature Afterwards, computer 28 is by controlling solenoid valve 1 and solenoid valve 2 26 come automatic collection gas sample, and is passed through in gas chromatograph 24. The temperature controller 30 is connected with touching display screen 55, can adjust temperature-controlled parameter by touching display screen 55.
The cooling of coal sample and thermally conductive oil temperature after heating: turning off the switch 1, stops electrically heated rod 32 to conduction oil 6 Heating, open oil sump valve 44 and Cistern valve 45, then turn on the switch 5 39, start oil pump 42 and water pump 43, conduction oil 6 from The oil leaking hole 46 of 3 bottom of oil sump reaches oil pump 42 through oil sump valve 44 and oil pipe 47, enters oil through oil filler 48 by oil pipe 47 Pond 3, the liquid level of conduction oil 6 in oil sump 3 can be shown by being connected with liquid level tube 56 on the oil sump 3.Water in water tank 49 is from water tank Water outlet of water tank 50 on 49 reaches water pump 43 through Cistern valve 45, then enters in cooling tube 52 through cooling tube water inlet 51, it Enter in water tank 49 from cooling tube water outlet 53 through water tank water inlet 54 afterwards.The conduction oil 6 is in oil pipe 47 through cooling tube 52 It cools, so that 6 temperature of conduction oil in oil sump 3 reduces, and the coal sample 7 in coal sample tank 1 is thermally conductive after cooling down It cools in oil 6.Switch 4 38 can be closed, be opened in the conduction oil 6 and coal sample tank 1 that fan 59 is accelerated in oil sump 3 simultaneously Coal sample 3 cooling velocity.After the temperature of coal sample 7 and conduction oil 6 is down to room temperature, four and switch 5 39 are turned off the switch, wind is made Fan 59, oil pump 42 and water pump 43 stop working, and turn off oil sump valve 44 and Cistern valve 45.
After the completion of experiment, pressure reducing valve 12, switch 2 36, switch 3 37 and switch 4 38 are closed, stops gas supply, and stop The work of micro machine 41 and temperature acquisition template 33 closes be spaced apart 34 later.Opening is produced coal lid 19, so that the decentralization of coal sample 7 is extremely In coal sample case 60, and laboratory treatment is transported, clear up coal sample tank 1, close coal-in port lid 2 and lid 19 of producing coal, terminates experiment.

Claims (7)

1. a kind of coal spontaneous combustion tester, it is characterised in that: including coal sample tank, oil piping system, temperature control system and air-channel system, institute It states coal sample tank upper and lower end portion and is respectively arranged with coal-in port and coal outlet, coal lid is set on coal-in port, is provided on coal outlet Coal lid;The oil piping system includes oil sump, oil pump and the oil circuit for constituting closed loop, and the coal sample tank and oil sump use Overall structure, the oil sump are coated on coal sample tank periphery, are connected respectively with coal sample pot sidewall at the top and bottom of oil sump;The coal sample Tank coal-in port and coal outlet are located at except oil sump;The temperature control system includes that temp probe, temperature controller, electrically heated rod, temperature are adopted Collect template, computer, the temp probe is set to inside surveyed coal sample and connect with temperature controller, the temperature controller and electric heating Stick connection, electrically heated rod are located in oil sump, and the temp probe is also connect with temperature acquisition template, temperature acquisition template and calculating Machine connection;The air-channel system includes that gas cylinder, gas cylinder and the coal sample tank pass through gas preheating pipeline connection, the gas preheating Pipeline is located in oil sump, and the coal sample tank is also connected to gas chromatograph, and gas chromatograph is controlled by the computer.
2. a kind of coal spontaneous combustion tester according to claim 1, it is characterised in that: it further include cooling system, the cooling System includes cooling tube, and cooling tube is arranged on the oil circuit.
3. a kind of coal spontaneous combustion tester according to claim 2, it is characterised in that: it further include emission-control equipment, it is described Coal sample tank is also connected to the emission-control equipment, and emission-control equipment is controlled by the computer.
4. a kind of coal spontaneous combustion tester according to claim 3, it is characterised in that: be arranged between the gas cylinder and coal sample tank There are pressure reducing valve and flowmeter.
5. a kind of coal spontaneous combustion tester according to claim 4, it is characterised in that: the coal outlet, which covers, is provided with support coal Pedestal.
6. a kind of coal spontaneous combustion tester according to claim 5, it is characterised in that: it is provided with blender on the oil sump, The blender protrudes into oil sump.
7. a kind of coal spontaneous combustion tester according to claim 6, it is characterised in that: the oil sump side wall is provided with liquid level Pipe.
CN201710257953.XA 2017-04-19 2017-04-19 A kind of coal spontaneous combustion tester Expired - Fee Related CN106990219B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710257953.XA CN106990219B (en) 2017-04-19 2017-04-19 A kind of coal spontaneous combustion tester

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710257953.XA CN106990219B (en) 2017-04-19 2017-04-19 A kind of coal spontaneous combustion tester

Publications (2)

Publication Number Publication Date
CN106990219A CN106990219A (en) 2017-07-28
CN106990219B true CN106990219B (en) 2019-12-03

Family

ID=59416391

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710257953.XA Expired - Fee Related CN106990219B (en) 2017-04-19 2017-04-19 A kind of coal spontaneous combustion tester

Country Status (1)

Country Link
CN (1) CN106990219B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108896611A (en) * 2018-08-23 2018-11-27 中原工学院 Determining coal ignitability device and measuring method
CN114397323B (en) * 2021-12-14 2023-09-12 中煤科工集团沈阳研究院有限公司 Device and method for measuring shortest natural ignition period of coal

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103954647A (en) * 2014-05-05 2014-07-30 西安科技大学 Performance test device of fire preventing and extinguishing hot rod for coal spontaneous combustion
CN205643334U (en) * 2016-05-20 2016-10-12 河南理工大学 Coal ignition quality survey device based on heat is heavy

Also Published As

Publication number Publication date
CN106990219A (en) 2017-07-28

Similar Documents

Publication Publication Date Title
CN106990219B (en) A kind of coal spontaneous combustion tester
CN205269503U (en) Nanometer diamond compounding device
CN103505902B (en) Multi-pipe type Large Copacity microwave abstracting machine and microwave assisted extraction methods thereof
CN103506249B (en) A kind of junction box glue-pouring machine
CN108031411A (en) A kind of hydronic reaction kettle
CN103202359B (en) Full-automatic black tea fermentation device
CN108176341A (en) A kind of reaction kettle for batch mixing
CN208959706U (en) A kind of Yoghourt emulsifier unit
CN208897746U (en) Vacuum chamber assembly
CN105780635A (en) Energy-saving efficient heat-circulation joint sealing machine
CN202837058U (en) Fluid preheating and stirring and injecting device for petroleum reservoir physical simulation experiment
CN211206387U (en) Classification device for narrow distribution of gradient elution method
CN211734193U (en) Inorganic fire prevention liquid production filling system
CN209722242U (en) A kind of rare earth extraction separation control device
CN220443761U (en) Device for automatically controlling water quantity and water temperature of mixer
CN209438579U (en) A kind of horizontal degassing reaction kettle
CN208121032U (en) The real-time monitoring system of heat scission reaction
CN208684887U (en) A kind of wine production automatic control device
CN208356166U (en) A kind of intelligent Chinese Traditional Medicine extraction element
CN208213107U (en) A kind of Novel high-temperature high-pressure reactor
CN109011666A (en) A kind of application method of the cold concentration systems of automatic cycle
CN206740748U (en) Instrument for medicament analysis
CN201783308U (en) Machine for automatically preparing zinc chloride liquid
CN208912117U (en) Chemical experiment water bath heating device
CN218969232U (en) Sterile culture medium preparation equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191203

CF01 Termination of patent right due to non-payment of annual fee