CN106988522A - A kind of high-building cleaning plastering tower crane - Google Patents

A kind of high-building cleaning plastering tower crane Download PDF

Info

Publication number
CN106988522A
CN106988522A CN201710358734.0A CN201710358734A CN106988522A CN 106988522 A CN106988522 A CN 106988522A CN 201710358734 A CN201710358734 A CN 201710358734A CN 106988522 A CN106988522 A CN 106988522A
Authority
CN
China
Prior art keywords
integral type
horizontal
substrate
tower crane
riser
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710358734.0A
Other languages
Chinese (zh)
Inventor
陈嘉木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taizhou Ruixiang Education Technology Co Ltd
Original Assignee
Taizhou Ruixiang Education Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taizhou Ruixiang Education Technology Co Ltd filed Critical Taizhou Ruixiang Education Technology Co Ltd
Priority to CN201710358734.0A priority Critical patent/CN106988522A/en
Publication of CN106988522A publication Critical patent/CN106988522A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/34Mobile scaffolds; Scaffolds with mobile platforms characterised by supporting structures provided on the roofs

Abstract

The invention discloses a kind of high-building cleaning plastering tower crane, longitudinal substrate, horizontal pipeline including horizontal substrate and horizontal substrate integral type and the pipe tunnel with horizontal pipeline integral type, the both sides on the horizontal substrate and longitudinal substrate surface connect a both insertion internal expansion bolts by nut, the bottom of the horizontal pipeline both sides is provided with the fixed plate with its integral type, the inside of the fixed plate connects a both insertion internal expansion bolts by nut, and the upper surface of the horizontal substrate is provided with the root riser of two and its integral type.One end of cotton rope can be effectively fixed on roof by the present invention; reduce cotton rope port due to fasten it is unstable caused by accident occur probability; in addition being arranged on the cotton rope in corner has safeguard measure, can prevent the friction between cotton rope and metope, reduces potential safety hazard.

Description

A kind of high-building cleaning plastering tower crane
Technical field
The present invention relates to field of mechanical technique, specially a kind of high-building cleaning plastering tower crane.
Background technology
At present, in order to ensure the cleannes of high building watch crystal, the effect of high building rendering and cleaning can be periodically being carried out, and When carrying out this work, it is necessary to which one end of cotton rope pair is wound in roof, it is fixed, the other end is hung in high building surface , however, general fastening method is fairly simple, so the potential safety hazard existed is larger, in addition, riding over corner for hanging down Cotton rope can be with surface of wall friction, there is also larger potential safety hazard.
The content of the invention
It is an object of the invention to provide a kind of high-building cleaning plastering tower crane, to solve what is proposed in above-mentioned background technology Problem.
To achieve the above object, the present invention provides following technical scheme:
A kind of high-building cleaning plastering tower crane, including horizontal substrate, the longitudinal substrate with horizontal substrate integral type, horizontal pipeline and With the pipe tunnel of horizontal pipeline integral type, the both sides on horizontal substrate and the longitudinal substrate surface are inserted by nut connection one Enter both internal expansion bolts, the bottom of the horizontal pipeline both sides is provided with the fixed plate with its integral type, described solid The inside of fixed board connects a both insertion internal expansion bolts by nut, and the upper surface of the horizontal substrate is provided with two With the root riser of its integral type, the top riser with its integral type is each provided with the top of the root riser, it is described It is provided with the top of the riser of top between the Circular plate structure with its integral type, Circular plate structure described in two and fixes a central shaft, it is described The axis body of central shaft be socketed with two opposition setting side guard plate, the central shaft between the side guard plate to axis body table The center that face is fixed inside one end of a cotton rope, the horizontal pipeline and the pipe tunnel is provided with hollow structure, and institute The hollow structure inside horizontal pipeline and the pipe tunnel is stated to handle by chamfering structure in intersection, the cotton rope it is another End is inserted into the inside of hollow structure.
Preferably, the longitudinal substrate is arranged on the top of the side of the horizontal substrate.
Preferably, the pipe tunnel is arranged on the bottom of the horizontal pipeline side.
Preferably, root riser described in two is set in opposition.
Preferably, the both sides of the root riser and the both sides of top riser connect for transition type.
Preferably, the axis body end at the two ends of the central shaft is provided with the rotary shaft with its integral type, revolved described in two Rotating shaft is separately fixed at the inside at Circular plate structure center described in two by axle sleeve.
Compared with prior art, the beneficial effects of the invention are as follows:
One end of cotton rope can be effectively fixed on roof by the present invention, and reduce cotton rope port causes due to fastening unstable Accident occur probability, the cotton rope in corner is arranged in addition safeguard measure, can prevent the friction between cotton rope and metope, Reduce potential safety hazard.
Brief description of the drawings
Fig. 1 is a kind of complete section structural representation of high-building cleaning plastering tower crane of the invention;
Fig. 2 is the front view of horizontal pipeline and pipe tunnel in a kind of high-building cleaning plastering tower crane of the invention;
Fig. 3 is the front view of central shaft and side guard plate in a kind of high-building cleaning plastering tower crane of the invention.
In figure:1, horizontal substrate, 2, horizontal pipeline, 3, longitudinal substrate, 4, pipe tunnel, 5, expansion bolt, 6, root are stood Plate, 7, top riser, 8, axle sleeve, 9, Circular plate structure, 10, rotary shaft, 11, central shaft, 12, side guard plate, 13, cotton rope, 14 are hollow Structure, 15, chamfering structure, 16, fixed plate.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Refer to Fig. 1, Fig. 2 and Fig. 3, a kind of embodiment that the present invention is provided:A kind of high-building cleaning plastering tower crane, including Horizontal substrate 1, longitudinal substrate 3, horizontal pipeline 2 and the pipe tunnel with the integral type of horizontal pipeline 2 with the horizontal integral type of substrate 1 4, the both sides on horizontal substrate 1 and longitudinal substrate 3 surface connect a both insertion internal expansion bolts 5 by nut, The bottom of the both sides of horizontal pipeline 2 is provided with the fixed plate 16 with its integral type, and the inside of the fixed plate 16 passes through Both internal expansion bolts 5 of the insertion of nut connection one, the upper surface of the horizontal substrate 1 is provided with the root of two and its integral type Portion's riser 6, the top of each root riser 6 is provided with the top riser 7 with its integral type, the top riser 7 Top, which is provided between the Circular plate structure 9 with its integral type, Circular plate structure 9 described in two, fixes a central shaft 11, the central shaft 11 axis body be socketed with two opposition setting side guard plate 12, the central shaft 11 between the side guard plate 12 to axis body The center that surface is fixed inside one end of a cotton rope 13, the horizontal pipeline 2 and the pipe tunnel 4 is provided with hollow structure Hollow structure 14 inside 14, and the horizontal pipeline 2 and the pipe tunnel 4 is handled in intersection by chamfering structure 15, The other end of the cotton rope 13 is inserted into the inside of hollow structure 14.
The longitudinal substrate 3 is arranged on the top of the side of the horizontal substrate 1;The pipe tunnel 4 is arranged on described The bottom of the side of horizontal pipeline 2;Root riser 6 described in two is set in opposition;The both sides of the root riser 6 and top riser 7 Both sides be transition type connection so that the compactedness of connection;The axis body end at the two ends of the central shaft 11 is provided with and one The rotary shaft 10 of body formula, rotary shaft 10 described in two is separately fixed at the inside at the center of Circular plate structure 9 described in two by axle sleeve 8, real Existing fixed connection.
Specifically used mode:In present invention work, in use, the electric drill effect of burrowing is carried out to roof again, then will laterally Expansion bolt 5 in substrate 1 is held within the hole in roof horizontal plane, then by the He of expansion bolt 5 in longitudinal substrate 3 Hole in roof enclosure wall position is fixed, during then the expansion bolt 5 in fixed plate 16 is fixed at the top of roof enclosure wall Hole in, and cause pipe tunnel 4 be in building body side, then rotate side guard plate 12 so that cotton rope hang down rides over building body Side, you can, staff can install usual method and be operated, after hours, and expanding screw is turned on by bolt Annexation between bolt and all parts, you can.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power Profit is required rather than described above is limited, it is intended that all in the implication and scope of the equivalency of claim by falling Change is included in the present invention.Any reference in claim should not be considered as to the claim involved by limitation.

Claims (6)

1. a kind of high-building cleaning plastering tower crane, including horizontal substrate (1), the longitudinal substrate with horizontal substrate (1) integral type (3), horizontal pipeline (2) and the pipe tunnel (4) with horizontal pipeline (2) integral type, it is characterised in that:The horizontal substrate (1) Both an insertion internal expansion bolts (5), the horizontal pipeline are connected by nut with the both sides on longitudinal substrate (3) surface (2) bottom of both sides is provided with the fixed plate (16) with its integral type, and the inside of the fixed plate (16) is connected by nut The internal expansion bolt of both insertions (5) is connect, the upper surface of the horizontal substrate (1) is provided with the root of two and its integral type The top riser (7) with its integral type, the top riser are provided with the top of riser (6), each root riser (6) (7) it is provided with the top of between the Circular plate structure (9) with its integral type, Circular plate structure described in two (9) and fixes a central shaft (11), The axis body of the central shaft (11) is socketed with the side guard plate (12) of two opposition setting, and the central shaft (11) is positioned at side shield Between plate (12) to axis body surface fix in one end of a cotton rope (13), the horizontal pipeline (2) and the pipe tunnel (4) The center in portion is provided with hollow structure (14), and the horizontal pipeline (2) and the internal hollow structure of the pipe tunnel (4) (14) handled in intersection by chamfering structure (15), the other end of the cotton rope (13) is inserted into the interior of hollow structure (14) Portion.
2. a kind of high-building cleaning plastering tower crane according to claim 1, it is characterised in that:The longitudinal substrate (3) sets Put the top in the side of the horizontal substrate (1).
3. a kind of high-building cleaning plastering tower crane according to claim 2, it is characterised in that:The pipe tunnel (4) sets Put the bottom in the horizontal pipeline (2) side.
4. a kind of high-building cleaning plastering tower crane according to claim 3, it is characterised in that:Root riser (6) described in two Set in opposition.
5. a kind of high-building cleaning plastering tower crane according to claim 4, it is characterised in that:The root riser (6) Both sides and the both sides of top riser (7) connect for transition type.
6. a kind of high-building cleaning plastering tower crane according to claim 5, it is characterised in that:The two of the central shaft (11) The axis body end at end is provided with the rotary shaft (10) with its integral type, and rotary shaft described in two (10) is fixed respectively by axle sleeve (8) Inside at Circular plate structure described in two (9) center.
CN201710358734.0A 2017-05-19 2017-05-19 A kind of high-building cleaning plastering tower crane Pending CN106988522A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710358734.0A CN106988522A (en) 2017-05-19 2017-05-19 A kind of high-building cleaning plastering tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710358734.0A CN106988522A (en) 2017-05-19 2017-05-19 A kind of high-building cleaning plastering tower crane

Publications (1)

Publication Number Publication Date
CN106988522A true CN106988522A (en) 2017-07-28

Family

ID=59421151

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710358734.0A Pending CN106988522A (en) 2017-05-19 2017-05-19 A kind of high-building cleaning plastering tower crane

Country Status (1)

Country Link
CN (1) CN106988522A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201160829Y (en) * 2008-01-06 2008-12-10 李国起 Machine for cleaning external wall of high building
CN203113755U (en) * 2013-03-23 2013-08-07 张光裕 Maintenance machine outside building
CN103850424A (en) * 2013-12-24 2014-06-11 中建八局第一建设有限公司 Anti-wearing device of lifting rope
CN205242982U (en) * 2015-12-10 2016-05-18 中国三冶集团有限公司 Platform is used in construction of building outer wall
CN205330136U (en) * 2016-01-25 2016-06-22 谷锋 Building outer wall construction hanging flower basket
CN105781094A (en) * 2016-04-15 2016-07-20 安徽机电职业技术学院 Electric hanger for construction
US9505590B2 (en) * 2012-09-06 2016-11-29 Shun-Yuan CHEN Wall cleaner hanging structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201160829Y (en) * 2008-01-06 2008-12-10 李国起 Machine for cleaning external wall of high building
US9505590B2 (en) * 2012-09-06 2016-11-29 Shun-Yuan CHEN Wall cleaner hanging structure
CN203113755U (en) * 2013-03-23 2013-08-07 张光裕 Maintenance machine outside building
CN103850424A (en) * 2013-12-24 2014-06-11 中建八局第一建设有限公司 Anti-wearing device of lifting rope
CN205242982U (en) * 2015-12-10 2016-05-18 中国三冶集团有限公司 Platform is used in construction of building outer wall
CN205330136U (en) * 2016-01-25 2016-06-22 谷锋 Building outer wall construction hanging flower basket
CN105781094A (en) * 2016-04-15 2016-07-20 安徽机电职业技术学院 Electric hanger for construction

Similar Documents

Publication Publication Date Title
CN105805112B (en) A kind of universal joint assembly for the connection of rod piece space structure
CN106988522A (en) A kind of high-building cleaning plastering tower crane
CN103290963B (en) Modularized combination type heat insulating curtain wall panel
CN203207958U (en) Window-cleaning machine platform
CN208039545U (en) A kind of energy saving connection structure with glass curtain wall framework
CN106436640A (en) Easy-assembly flood control baffle plate for water conservancy and hydropower
CN207469718U (en) A kind of exterior wall scaffold drawknot device being used in turn
CN205000514U (en) Stand loss prevention structure
CN205617778U (en) Outer wall scaffold frame is wall structure even
CN206784901U (en) One kind can have enough to meet the need outrigger wall-connecting piece
CN205134635U (en) Permanent stone that is full of fire prevention heat insulation structure
CN205348698U (en) Plasterboard suspended ceiling prevents access hole that ftractures
CN208279232U (en) A kind of derrick crane safety device being easily installed
CN209855215U (en) Safe type combination formula scaffold frame
CN203987851U (en) A kind of track locking device
CN205348484U (en) Glass curtain wall corner grid
CN205663176U (en) Shaped steel for building that runs through outer wall scaffold frame of encorbelmenting
CN205000502U (en) Prevent wind structure
CN206352399U (en) One kind lengthens L-type back cord
CN205189134U (en) Pre -buried spout carrier assembly
CN219887628U (en) Detachable protective structure for elevator shaft mouth
CN204357146U (en) Safety net is chosen outside integrally detachable
CN204040329U (en) A kind of glass sunlight house
CN203398635U (en) Bracing frame for replacing vibration damper
CN214541213U (en) Digital building principle ware teaching aid

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170728

RJ01 Rejection of invention patent application after publication