CN106988206B CN201710395007.1A CN201710395007A CN106988206B CN 106988206 B CN106988206 B CN 106988206B CN 201710395007 A CN201710395007 A CN 201710395007A CN 106988206 B CN106988206 B CN 106988206B
Authority
CN
China
Prior art keywords
inner tooth
fitting
tooth sleeve
fixed
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710395007.1A
Other languages
Chinese (zh)
Other versions
CN106988206A (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Concrete Pole Building Structure Engineering Co ltd
Original Assignee
Shanghai Concrete Pole Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Concrete Pole Engineering Technology Co Ltd filed Critical Shanghai Concrete Pole Engineering Technology Co Ltd
Priority to CN201710395007.1A priority Critical patent/CN106988206B/en
Publication of CN106988206A publication Critical patent/CN106988206A/en
Application granted granted Critical
Publication of CN106988206B publication Critical patent/CN106988206B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention relates to bridge construction technical field, in particular to a kind of bridge construction bracket structure being fixed on concrete, bracket structure includes fixed plate and force bearing plate;Reinforcing rib is provided between the side wall of fixed plate and the bottom surface of force bearing plate;The edge of force bearing plate is provided with guide groove;The pre-buried inside for being fixed on concrete structure in tension built-in fitting one end;The tension built-in fitting other end reaches the outside of concrete structure;The one end stretched out outside concrete structure on tension built-in fitting is provided with guide pad;Guide pad is inserted into inside guide groove from top to bottom;Inner tooth sleeve one end connect built-in fitting with inner tooth sleeve and is mutually fixedly connected;Inner tooth sleeve other end reaches outside concrete structure;Bolt is mutually threadedly coupled fastening with inner tooth sleeve after passing through through-hole.The structure is safe and reliable in using the present invention, and avoids the risk of overhead welding, and dismounting is simple, improves disassembly efficiency to the utmost, provides convenience for maintenance in the future.

Description

A kind of bridge construction bracket structure being fixed on concrete
Technical field
The present invention relates to bridge construction technical field, in particular to a kind of bridge construction ox being fixed on concrete Leg structure.
Background technique
In field of bridge construction, requirement of the people to Urban Bridge landscape is higher and higher.Calf support structure is extensive Apply in bridge structure, calf support structure used in current bridge construction design mostly uses on concrete structure Pre-buried steel construction piece, and realized in the mode of external welding bracket.But its construction method is related to overhead welding construction operation, Overhead welding then comes risk, unfavorable construction operation to the safety belt of construction personnel;And the welding of bracket is to maintenance in the future Increase difficulty.
Therefore it is necessary to carry out further technological innovation to the existing bridge construction bracket structure being fixed on concrete.
Summary of the invention
In view of the defects and deficiencies of the prior art, the present invention intends to provide a kind of bridge construction oxen easy to use Leg structure.
To achieve the above object, the technical solution adopted by the present invention is that:
A kind of bridge construction bracket structure being fixed on concrete of the present invention, it include concrete structure, Bolt, tension built-in fitting and bracket structure;The bracket structure includes fixed plate and force bearing plate;The top surface of the fixed plate It is mutually fixedly connected with the bottom of force bearing plate;Reinforcing rib is provided between the side wall of the fixed plate and the bottom surface of force bearing plate;Institute The edge for stating force bearing plate is provided with guide groove;The guide groove is arranged along the vertical direction at the top of force bearing plate;The tension The pre-buried inside for being fixed on concrete structure in built-in fitting one end;The tension built-in fitting other end reaches the outside of concrete structure; The one end stretched out outside concrete structure on the tension built-in fitting is provided with guide pad;The guide pad and guide groove phase Match;The guide pad is inserted into inside guide groove from top to bottom;It is pre- that the inside of the concrete structure is embedded with several inner tooth sleeves Embedded component;The inner tooth sleeve fastener inserts connect built-in fitting by inner tooth sleeve and inner tooth sleeve forms;Described inner tooth sleeve one end and interior tooth Set connection built-in fitting is mutually fixedly connected;Inner tooth sleeve other end reaches outside concrete structure;It is set on the surface of the fixed plate It is equipped with several through-holes;The bolt is mutually threadedly coupled fastening with inner tooth sleeve after passing through through-hole.
Further, connecting plate is fixedly installed between two adjacent reinforcing ribs.
Further, the through-hole is waist-shaped hole;The length direction of the waist-shaped hole is horizontally disposed.
After adopting the above structure, the invention has the following beneficial effects: a kind of bridge being fixed on concrete of the present invention Construction bracket structure, bracket structure includes fixed plate and force bearing plate;The top surface of fixed plate and the bottom of force bearing plate are mutually fixed Connection;Reinforcing rib is provided between the side wall of fixed plate and the bottom surface of force bearing plate;The edge of force bearing plate is provided with guide groove; Guide groove is arranged along the vertical direction;Guide groove is arranged in the top vertical direction of force bearing plate;The pre-buried fixation in tension built-in fitting one end In the inside of concrete structure;The tension built-in fitting other end reaches the outside of concrete structure;It is stretched out on tension built-in fitting mixed One end outside Xtah Crude Clay structure is provided with guide pad;Guide pad matches with guide groove;Guide pad is inserted into guide groove from top to bottom It is internal;The inside of concrete structure is embedded with several inner tooth sleeve fastener inserts;Inner tooth sleeve fastener inserts are connected pre- by inner tooth sleeve Embedded part and inner tooth sleeve composition;Inner tooth sleeve one end connect built-in fitting with inner tooth sleeve and is mutually fixedly connected;Inner tooth sleeve other end reaches Outside concrete structure;Several through-holes are provided on the surface of fixed plate;The bolt pass through through-hole after with inner tooth sleeve phase screw thread Connection fastening.In using the present invention, the upper surface of force bearing plate is pressurized, and pressure is each by being transmitted to after reinforcing rib and fixed plate Bolt, the pulling force that tension built-in fitting is mainly generated by load plate benging;The structure is safe and reliable, and avoids high missing solder The risk connect, dismounting is simple, improves disassembly efficiency to the utmost, provides convenience for maintenance in the future.
Detailed description of the invention
Fig. 1 is structure main view sectional view of the invention;
Fig. 2 is structure top view of the invention;
Fig. 3 is structure right view of the invention;
Fig. 4 is the structural schematic diagram of concrete structure and built-in fitting;
Fig. 5 is the top view of force bearing plate;
Description of symbols:
1, concrete structure;2, inner tooth sleeve connects built-in fitting;3, inner tooth sleeve;4, fixed plate;401, through-hole;5, bolt;6, Reinforcing rib;7, connecting plate;8 force bearing plates;801, guide groove;9, tension built-in fitting;901, guide pad.
Specific embodiment
The present invention will be further described below with reference to the drawings.
As shown in Fig. 1 to 5, a kind of bridge construction bracket structure being fixed on concrete of the present invention, it includes There are concrete structure 1, bolt 5, tension built-in fitting 9 and bracket structure;The bracket structure includes fixed plate 4 and force bearing plate 8; The top surface of the fixed plate 4 is mutually fixedly connected with the bottom of force bearing plate 8;The side wall of the fixed plate 4 and the bottom table of force bearing plate 8 Reinforcing rib 6 is provided between face;The edge of the force bearing plate 8 is provided with guide groove 801;The guide groove 801 is in force bearing plate 8 Top be arranged along the vertical direction;The pre-buried inside for being fixed on concrete structure 1 in 9 one end of tension built-in fitting;Tension is pre-buried 9 other end of part reaches the outside of concrete structure 1;The one end stretched out outside concrete structure 1 on the tension built-in fitting 9 is set It is equipped with guide pad 901;The guide pad 901 matches with guide groove 801;The guide pad 901 is inserted into guide groove from top to bottom Inside 801;The inside of the concrete structure 1 is embedded with several inner tooth sleeve fastener inserts;The inner tooth sleeve fastener inserts by Inner tooth sleeve connects built-in fitting 2 and inner tooth sleeve 3 forms;Described 3 one end of inner tooth sleeve connect 2 phase of built-in fitting with inner tooth sleeve and is fixedly connected; 3 other end of inner tooth sleeve reaches outside concrete structure 1;Several through-holes 401 are provided on the surface of the fixed plate 4;Institute It states bolt 5 and is threadedly coupled fastening with 3 phase of inner tooth sleeve after through-hole 401;When the upper surface of force bearing plate 8 is pressurized, pressure passes through Each bolt 5 is transmitted to after reinforcing rib 6 and fixed plate 4, tension built-in fitting 9 is mainly bent by force bearing plate 8 and the pulling force of generation; The structure is safe and reliable, and avoids the risk of overhead welding, and dismounting is simple, improves disassembly efficiency to the utmost, is day Maintenance provides convenience afterwards.
As a kind of preferred embodiment of the invention, connecting plate 7 is fixedly installed between two adjacent reinforcing ribs 6;Even The effect of fishplate bar 7 is to reinforce the globality of each reinforcing rib 6, improves the stability of bracket structure.
As a kind of preferred embodiment of the invention, the through-hole 401 is waist-shaped hole;The length direction of the waist-shaped hole is along water Square to setting;The waist-shaped hole of the setting of through-hole 401 horizontally, makes up the ruler that horizontal direction occurs when pre-buried in inner tooth sleeve 3 Very little deviation reduces the difficulty of construction of bracket structure.
In using the present invention, the upper surface of force bearing plate is pressurized, and pressure is each by being transmitted to after reinforcing rib and fixed plate Bolt, the pulling force that tension built-in fitting is mainly generated by load plate benging;The effect of connecting plate is to reinforce each reinforcing rib Globality improves the stability of bracket structure;The structure is safe and reliable, and avoids the risk of overhead welding, and dismounting is simple, Disassembly efficiency is improved to the utmost, provides convenience for maintenance in the future;The waist-shaped hole of through-hole setting horizontally, makes up There is the dimensional discrepancy of horizontal direction when pre-buried in inner tooth sleeve, reduces the difficulty of construction of bracket structure.
The above description is only a preferred embodiment of the present invention, thus it is all according to the configuration described in the scope of the patent application of the present invention, The equivalent change or modification that feature and principle are done, is included in the scope of the patent application of the present invention.

Claims (3)

1. a kind of bridge construction bracket structure being fixed on concrete, it is characterised in that: it include concrete structure (1), Bolt (5), tension built-in fitting (9) and bracket structure;The bracket structure includes fixed plate (4) and force bearing plate (8);It is described solid The top surface of fixed board (4) is mutually fixedly connected with the bottom of force bearing plate (8);The side wall of the fixed plate (4) and the bottom of force bearing plate (8) Reinforcing rib (6) are provided between surface;The edge of the force bearing plate (8) is provided with guide groove (801);The guide groove (801) it is arranged along the vertical direction at the top of force bearing plate (8);Described tension built-in fitting (9) one end is pre-buried to be fixed on concrete knot The inside of structure (1);Tension built-in fitting (9) other end reaches the outside of concrete structure (1);On the tension built-in fitting (9) It stretches out concrete structure (1) external one end and is provided with guide pad (901);The guide pad (901) and guide groove (801) phase Match;It is internal that the guide pad (901) is inserted into guide groove (801) from top to bottom;The concrete structure (1) if inside be embedded with Dry inner tooth sleeve fastener inserts;The inner tooth sleeve fastener inserts are made of inner tooth sleeve connection built-in fitting (2) and inner tooth sleeve (3);Institute It states inner tooth sleeve (3) one end and connect built-in fitting (2) with inner tooth sleeve and be mutually fixedly connected;Inner tooth sleeve (3) other end reaches concrete Structure (1) is outside;Several through-holes (401) are provided on the surface of the fixed plate (4);The bolt (5) passes through through-hole (401) Fastening is mutually threadedly coupled with inner tooth sleeve (3) afterwards.
2. a kind of bridge construction bracket structure being fixed on concrete according to claim 1, it is characterised in that: adjacent Two reinforcing ribs (6) between be fixedly installed connecting plate (7).
3. a kind of bridge construction bracket structure being fixed on concrete according to claim 1, it is characterised in that: described Through-hole (401) is waist-shaped hole;The length direction of the waist-shaped hole is horizontally disposed.
CN201710395007.1A 2017-05-30 2017-05-30 A kind of bridge construction bracket structure being fixed on concrete Active CN106988206B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710395007.1A CN106988206B (en) 2017-05-30 2017-05-30 A kind of bridge construction bracket structure being fixed on concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710395007.1A CN106988206B (en) 2017-05-30 2017-05-30 A kind of bridge construction bracket structure being fixed on concrete

Publications (2)

Publication Number Publication Date
CN106988206A CN106988206A (en) 2017-07-28
CN106988206B true CN106988206B (en) 2019-03-12

Family

ID=59420912

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710395007.1A Active CN106988206B (en) 2017-05-30 2017-05-30 A kind of bridge construction bracket structure being fixed on concrete

Country Status (1)

Country Link
CN (1) CN106988206B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113187095B (en) * 2021-04-15 2022-05-17 浙江信宇建设集团有限公司 Concrete beam bracket joint connecting structure and construction method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425116B (en) * 2011-12-19 2013-07-31 中煤建安第七工程有限公司 Method for connecting trough-type base of steel trestle with embedded bolt in concrete bracket
CN102758523B (en) * 2012-07-23 2014-10-01 中国核工业华兴建设有限公司 Bracket for floor hoisting die construction and use method thereof
JP6205115B2 (en) * 2012-09-27 2017-09-27 東急建設株式会社 Corbels and buildings
CN104669434A (en) * 2013-11-27 2015-06-03 五冶集团上海有限公司 Construction method of large reinforced concrete prefabricated column and beam lifting auxiliary embedded part
CN105040827B (en) * 2015-08-21 2018-03-06 中建三局集团有限公司 The assembled bracket joint structure that concrete embedded part can be taken off
CN205636474U (en) * 2016-04-29 2016-10-12 贵州桥梁建设集团有限责任公司 Assembled bracket structure

Also Published As

Publication number Publication date
CN106988206A (en) 2017-07-28

Similar Documents

Publication Publication Date Title
CN104153555B (en) The detachable pre-buried fixing device of overhanging type steel beam containing horizontal fixation kit
CN105781100B (en) Template component for subway station side wall
KR101207927B1 (en) Landfill facility for bridge inspection
CN106120571B (en) Arch bridge suspender tensioning equipment
CN106988206B (en) A kind of bridge construction bracket structure being fixed on concrete
CN107313584A (en) The girder of builder's jack and the connection fastener of auxiliary girder
CN105781131A (en) Assembled building wall plate mounting support system and construction method thereof
CN202280256U (en) Lifting tool for unit curtain wall
CN205855702U (en) A kind of Elevator weight sensor block assembly
CN105804417A (en) Sway brace for installation of assembly type building wallboard and using method thereof
CN202469249U (en) Wall mixture vertical conveying pipeline shock absorber
CN205545078U (en) Novel distributed roof photovoltaic support
CN201981728U (en) Stainless steel composite covered column structure
RU147172U1 (en) ADJUSTING GASKET
CN208533805U (en) The connector of curtain wall round bar and main structure
CN208380089U (en) A kind of dedicated locking fixture of steel form
KR101230011B1 (en) Beam molding frame supporter for concrete building
CN208137216U (en) A kind of stone curtain wall is without crossbeam suspension
CN206175001U (en) Embedding slot way for subway tunnel
CN207245139U (en) Boat scaffold mounting structure
CN208430517U (en) Bracing members hanging plate for subway foundation pit construction
CN207749969U (en) the motor mounting plate assembly of automobile glass lifter
CN205530776U (en) Removable formula damping device that trades of rubber support
CN206646805U (en) A kind of attachment means, template and shear wall formwork for being used to connect shear wall formwork
CN205776992U (en) Drawing and pulling type lifting floor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190115

Address after: 201900 Building 616, 180 Changjiang South Road, Baoshan District, Shanghai

Applicant after: Shanghai Concrete Pole Engineering Technology Co.,Ltd.

Address before: 528429 Zhongxing Road, Huangpu town, Zhongshan, Guangdong 32

Applicant before: Lin Zaiyi

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240517

Address after: 200441, Building A, No. 15 Changyi Road, Baoshan District, Shanghai, 809

Patentee after: Shanghai concrete pole Building Structure Engineering Co.,Ltd.

Country or region after: China

Address before: 201900 Building 616, 180 Changjiang South Road, Baoshan District, Shanghai

Patentee before: Shanghai Concrete Pole Engineering Technology Co.,Ltd.

Country or region before: China