CN106981867B - Double-unit power lifting rate optimization method and device for asynchronous networking engineering - Google Patents
Double-unit power lifting rate optimization method and device for asynchronous networking engineering Download PDFInfo
- Publication number
- CN106981867B CN106981867B CN201710397176.9A CN201710397176A CN106981867B CN 106981867 B CN106981867 B CN 106981867B CN 201710397176 A CN201710397176 A CN 201710397176A CN 106981867 B CN106981867 B CN 106981867B
- Authority
- CN
- China
- Prior art keywords
- customary
- power
- units
- unit
- instruction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 67
- 238000005457 optimization Methods 0.000 title claims description 31
- 230000006855 networking Effects 0.000 title abstract description 4
- 230000008569 process Effects 0.000 claims abstract description 23
- 238000001514 detection method Methods 0.000 claims description 20
- 238000004364 calculation method Methods 0.000 claims description 15
- 230000006870 function Effects 0.000 claims description 13
- 230000003028 elevating effect Effects 0.000 claims description 9
- 238000004590 computer program Methods 0.000 claims description 6
- 230000003247 decreasing effect Effects 0.000 claims description 6
- 230000009467 reduction Effects 0.000 claims description 4
- 238000010586 diagram Methods 0.000 description 6
- 238000007726 management method Methods 0.000 description 5
- 230000009194 climbing Effects 0.000 description 3
- 230000009191 jumping Effects 0.000 description 3
- 238000012544 monitoring process Methods 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012913 prioritisation Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 230000009183 running Effects 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J1/00—Circuit arrangements for dc mains or dc distribution networks
- H02J1/10—Parallel operation of dc sources
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The invention relates to a method and a device for optimizing the double-unit power lifting rate of asynchronous networking engineering, wherein the method comprises the following steps: after two conventional direct current units of asynchronous networking engineering enter a power balancing process, carrying out power regulation on the two conventional direct current units at a preset active coordination rate value; if a power lifting instruction is received later, acquiring the time length from the beginning of power regulation of the two conventional direct current units by a preset active coordination rate value to the current time length of receiving the power lifting instruction; if the duration is less than the preset first time threshold and the power values of the two conventional direct current units are not equal, keeping the preset active coordination rate value to carry out power regulation on the two conventional direct current units until the power values of the two conventional direct current units are equal, and controlling the two conventional direct current units to carry out power lifting according to a lifting rate set value in a power lifting instruction after the two conventional direct current units are equal. By adopting the scheme of the invention, the execution deviation of the scheduling power curve can be effectively avoided.
Description
Technical field
The present invention relates to power scheduling technical fields, go up and down more particularly to a kind of double cell powers of Asynchronous Interconnection engineering
Rate optimized method and apparatus.
Background technique
The Asynchronous Interconnection engineering of two customary DC unit paired runnings has two kinds of operation sides of stand-alone mode and coodination modes
Formula.In the independent mode, the power transmission of the respective unit of the unit control system independent control of Unit two independently issues power ginseng
Value and ramp rate are examined, does not influence the operation of another unit.And under coodination modes, the coordination of two customary DC units and match
Function is closed to be realized by direct current station monitoring and control equipment, after direct current station monitoring and control equipment issues value and power reference and ramp rate, two customary DCs
Unit equality power sharing reference value and ramp rate.However, when two customary DC unit emergent powers successively reach target value,
The customary DC unit of arrival power target value climbing speed during power rise will become the half of rate setpoints afterwards,
Second half section power rise rate becomes smaller, and causes schedule power curve implementation deviation.
Summary of the invention
Based on this, it is necessary to for the execution skew problem of schedule power curve, provide a kind of pair of Asynchronous Interconnection engineering
Cell power ramp rate optimization method and device, a kind of computer readable storage medium and a kind of computer equipment.
In a first aspect, providing a kind of double cell power ramp rate optimization methods of Asynchronous Interconnection engineering comprising:
After two customary DC unit ingoing power equilibrium process of Asynchronous Interconnection engineering, to preset active coordination rate
Value carries out power regulation to described two customary DC units;
If receive after power regulation to preset active coordination rate value to described two customary DC units
Power lifting instruction, then obtain and carry out power tune from starting to preset active coordination rate value to described two customary DC units
Save the duration for being currently received power lifting instruction;
If the duration is less than the performance number not yet phase of preset first time threshold and described two customary DC units
Deng then keeping to preset active coordinations rate value to described two customary DC units and carry out power regulation until described two normal
The performance number for advising direct current component is equal, after the performance number of described two customary DC units is equal, is gone up and down according to the power
The described two customary DC units of ramp rate set value calculation in instruction carry out power lifting.
With reference to first aspect, in a kind of possible implementation of first aspect, double lists of above-mentioned Asynchronous Interconnection engineering
First power ramp rate optimization method further include:
If the duration is not less than the first time threshold, set according to the ramp rate in power lifting instruction
The described two customary DC units of setting control carry out power lifting.
With reference to first aspect or above-mentioned certain possible implementations, in a kind of possible implementation of first aspect,
Double cell power ramp rate optimization methods of above-mentioned Asynchronous Interconnection engineering, further includes:
When receiving the unlocking command of any one customary DC unit in described two customary DC units, generate
For prompting dispatcher that cannot issue the prompt information of power lifting instruction in second time threshold, by the prompt information
It is transferred to power-management centre equipment, wherein the second time threshold is greater than the first time threshold.
With reference to first aspect or above-mentioned certain possible implementations, in a kind of possible implementation of first aspect,
Double cell power ramp rate optimization methods of above-mentioned Asynchronous Interconnection engineering, further includes:
When any one customary DC unit steady-state operation in described two customary DC units, if receiving another
The unlock instruction of a customary DC unit then presets the conventional straight of active coordination rate value reduction current steady state operation according to described
The performance number of unit is flowed, unlock is currently received until the power decreasing value of the customary DC unit of current steady state operation reaches and refers to
The customary DC unit of order enters in the performance number for receiving unlock instruction steps and jumping out into described two customary DC units
Power balancing procedure.
Second aspect provides a kind of double cell power ramp rates optimization device of Asynchronous Interconnection engineering comprising balance
Control unit, instruction detection unit, duration acquiring unit and elevating control unit;
The balance control unit is used for two customary DC unit ingoing power equilibrium process in Asynchronous Interconnection engineering
Afterwards, power regulation is carried out to preset active coordination rate value to described two customary DC units;
Described instruction detection unit to preset active coordination rate value to described two customary DC units for carrying out
It detects whether to receive power lifting instruction after power regulation;
The duration acquiring unit is used in the testing result of described instruction detection unit be to preset active coordination speed
When rate value is to power lifting instruction is received after described two customary DC units progress power regulation, obtain from beginning with pre-
Coordinate rate value equipped with function and instruction is gone up and down to power is currently received to described two customary DC units progress power regulation
Duration;
The balance control unit is also used to be less than preset first time threshold and described two routines in the duration
When the performance number of direct current component is not yet equal, holding is carried out with presetting active coordination rate value to described two customary DC units
Power regulation is until the performance number of described two customary DC units is equal;
The elevating control unit is used for after the performance number of described two customary DC units is equal, according to the power
The described two customary DC units of ramp rate set value calculation in lifting instruction carry out power lifting.
In conjunction with second aspect, in a kind of possible implementation of second aspect, above-mentioned elevating control unit is also used to
When the duration is not less than the first time threshold, according to the ramp rate set value calculation institute in power lifting instruction
It states two customary DC units and carries out power liter.
In conjunction with second aspect or above-mentioned certain possible implementations, in a kind of possible implementation of second aspect,
Double cell power ramp rates optimization device of above-mentioned Asynchronous Interconnection engineering further includes prompt unit;
Described instruction detection unit is also used to any one customary DC unit in described two customary DC units
When steady-state operation, the unlock life for receiving any one customary DC unit in described two customary DC units is detected whether
It enables;
The prompt unit is used in the testing result of described instruction detection unit be to receive described two customary DCs
When the unlocking command of any one customary DC unit in unit, generate for prompting dispatcher in second time threshold
The prompt information that power lifting instruction cannot be issued, is transferred to power-management centre equipment for the prompt information, wherein described
Second time threshold is greater than the first time threshold.
In conjunction with second aspect or above-mentioned certain possible implementations, in a kind of possible implementation of second aspect,
Above-mentioned balance control unit is also used in the testing result of described instruction detection unit be to receive described two customary DCs
When the unlocking command of any one customary DC unit in unit, according to it is described preset active coordination rate value reduce it is current steady
The performance number of the customary DC unit of state operation is worked as until the power decreasing value of the customary DC unit of current steady state operation reaches
Before receive the customary DC unit of unlock instruction in the performance number for receiving unlock instruction steps and jumping out, into it is described two often
Advise direct current component ingoing power equilibrium process.
The third aspect provides a kind of computer readable storage medium, is stored thereon with computer program, and the program is processed
The step of double cell power ramp rate optimization methods such as above-mentioned Asynchronous Interconnection engineering are realized when device executes.
Fourth aspect, provides a kind of computer equipment, including memory, processor and storage on a memory and can located
The computer program run on reason device, the processor realize the double of Asynchronous Interconnection engineering as described above when executing described program
The step of cell power ramp rate optimization method.
It is two customary DC unit ingoing powers balance in Asynchronous Interconnection engineering according to the scheme of aforementioned present invention
After process, power regulation is carried out to preset active coordination rate value to described two customary DC units, if receiving after this
It goes up and down and instructs to power, then obtain and carry out power from starting to preset active coordination rate value to described two customary DC units
Adjust the duration for being currently received power lifting instruction;If the duration is less than preset first time threshold and described two
The performance number of customary DC unit is not yet equal, then keeps to preset active coordination rate value to described two customary DC units
Power regulation is carried out until the performance number of described two customary DC units is equal, in the power of described two customary DC units
Be worth it is equal after, carry out function according to the described two customary DC units of ramp rate set value calculation in power lifting instruction
Rate lifting, that is to say, that be to preset active coordination rate value pair after two customary DC unit ingoing power equilibrium process
Described two customary DC units carry out power regulation, even if receiving power within the period for being less than the first time threshold
Lifting instruction, the ramp rate setting value that will not be gone up and down with power in instruction are carried out power lifting and are to continue with active to preset
Coordinate rate value and power regulation is carried out up to the performance number of described two customary DC units to described two customary DC units
Power lifting is carried out after equal again, in this way, it is possible to prevente effectively from causing schedule power curve implementation deviation.
Detailed description of the invention
Fig. 1-1 is power rise process schematic after two standard elements unlock in succession;
Fig. 1-2 is two standard element power balancing procedure schematic diagrames;
Fig. 1-3 is the general power change procedure schematic diagram in two standard element power balancing procedures;
Fig. 1-4 is the realization stream of double cell power ramp rate optimization methods of the Asynchronous Interconnection engineering in one embodiment
Journey schematic diagram;
Fig. 1-5 is the realization of double cell power ramp rate optimization methods of the Asynchronous Interconnection engineering in another embodiment
Flow diagram;
Fig. 2 is that double cell power ramp rates of the Asynchronous Interconnection engineering in one embodiment optimize the composed structure of device
Schematic diagram;
Fig. 3 is that double cell power ramp rates of the Asynchronous Interconnection engineering in another embodiment optimize the composition knot of device
Structure schematic diagram.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention more comprehensible, with reference to the accompanying drawings and embodiments, to this
Invention is described in further detail.It should be appreciated that the specific embodiments described herein are only used to explain the present invention,
And the scope of protection of the present invention is not limited.
Below for promoting the power of two customary DC units, to illustrate problem of the existing technology.Institute as above
It states, under coodination modes, after direct current station monitoring and control equipment issues value and power reference and ramp rate, two customary DC units can be divided equally
Value and power reference and ramp rate.However, being arrived afterwards when two customary DC unit emergent powers successively reach power target value
Up to power target value customary DC unit during power rise climbing speed will become the half of ramp rate, after causing
Half section of power rise rate becomes smaller, and deviates schedule power curve, this is illustrated below.
As Figure 1-1, under coodination modes, value and power reference 2000MW, power ramp rate (refers to power in this example
Climbing speed) it is set as 200MW/min.Customary DC unit one first unlocks, its power rise rate is 200MW/min at this time.
When one power of customary DC unit rises to 500MW, customary DC unit two is unlocked.Subsequent customary DC unit one and customary DC
Two power rise rate of unit all becomes 100MW/min.But after customary DC unit one reaches 1000MW, customary DC list
First two power rise rates are still 100MW/min, fail the 200MW/min for reverting to setting, which will cause schedule power
Curve implementation deviation.
Discovery is researched and analysed, only when two customary DC unit emergent powers are inconsistent, and goes up and down power simultaneously
It will appear the case where power does not reach power target value simultaneously.But according to live actual condition, customary DC unit completes unlock
Afterwards, can't hoisting power immediately, and need to wait two customary DC cell powers balances that (two customary DC units are divided equally
After power) after hoisting power again.
Power balancing procedure is shown in Fig. 1-2 and Fig. 1-3.One customary DC unit (customary DC unit one) steady-state operation,
The unlock of another customary DC unit (customary DC unit two), customary DC unit two unlock moment meeting step and go out 100MW's
Minimum power.In order to eliminate this 100MW overshoot as early as possible, the power of customary DC unit one is reduced with the rate of 300MW/min
20s reduces 100MW, such as the 1. process in Fig. 1-2.This latter two customary DC unit is started with the active coordination rate being arranged
Power is balanced until two cell powers are equal (t3 moment).
It is found according to field operation experiences, above procedure has problems in that t2~t3 process 2. may be very long.For example,
One customary DC unit is run with 1000MW, and the unlock of another customary DC unit, dispatching the power regulation rate assigned is
5MW/min, then 2. process is then up to 80min.If in this process, such as tx moment, power-management centre requirement promotion function
Rate then still will appear the case where two customary DC cell powers successively reach power target value, second half section power rise speed
The problem of rate halves, dispatch curve implementation deviation.
For this purpose, prioritization scheme provided in an embodiment of the present invention is mainly to increase the time of power-balance, to two routines
Power is gone up and down again after the power complete equipilibrium of direct current component, in this way, it is successive to avoid the occurrence of two customary DC cell powers
The case where reaching power target value, the problem of effectively evading dispatch curve implementation deviation.Below to the embodiment of the present invention program
It is illustrated.
It is gone up and down referring to the double cell powers for shown in Fig. 1-4, providing a kind of Asynchronous Interconnection engineering in one of the embodiments,
Rate optimized method.As shown in Figs 1-4, double cell power ramp rate optimization sides packet of the Asynchronous Interconnection engineering in the present embodiment
Include following steps:
Step S101: after two customary DC unit ingoing power equilibrium process of Asynchronous Interconnection engineering, to be preset with
Function coordinates rate value and carries out power regulation to described two customary DC units;
Here, 2. the power balancing procedure of two customary DC units of Asynchronous Interconnection engineering refers to the process of in Fig. 1-2.
Here, the size for presetting active coordination rate value can be set according to actual needs, but generally to choose to the greatest extent
Big value is measured to be preferred, so that the power of two customary DC units reaches balance as early as possible, reach here balance refer to two often
The performance number for advising direct current component is equal.In practical applications, 300MW/min can be selected to preset active coordination rate as this
Value, but preset the active specific value for coordinating rate value and be also not necessarily limited to this.
Step S102: if with preset active coordination rate value to described two customary DC units carry out power regulation it
After receive power lifting instruction, then obtain from start with preset active coordination rate value to described two customary DC units into
Row power regulation goes up and down the duration of instruction to power is currently received;
Specifically, after to preset active coordination rate value to described two customary DC units progress power regulation,
It detects whether to receive power lifting instruction, if testing result is straight to described two routines to preset active coordination rate value
Stream unit carries out receiving power lifting instruction after power regulation, then obtains from starting to preset active coordination rate value to institute
It states two customary DC units and carries out power regulation to the duration for being currently received power lifting instruction.
Step S103: if the duration is less than the power of preset first time threshold and described two customary DC units
Value is not yet equal, then keeps to preset active coordination rate value to described two customary DC units and carry out power regulation until institute
The performance number for stating two customary DC units is equal, after the performance number of described two customary DC units is equal, according to described
The described two customary DC units of ramp rate set value calculation in power lifting instruction carry out power lifting;
Here, the size of the first time threshold can be set according to actual needs, but need to guarantee that two routines are straight
The performance number of stream unit reaches balance enough in first time threshold, i.e., adjusts the power to two customary DC units enough
It is worth equal.
Specifically, two customary DC lists of the size of the duration more described first and preset first time threshold and detection
Whether the performance number of member is equal, if the duration is less than the function of preset first time threshold and described two customary DC units
Rate value is not yet equal, then keep with preset active coordinations rate value to described two customary DC units carry out power regulation up to
The performance number of described two customary DC units is equal, after the performance number of described two customary DC units is equal, according to institute
The described two customary DC units of ramp rate set value calculation stated in power lifting instruction carry out power lifting.
In practical applications, the value of first time threshold is to be greater than each customary DC unit in power balancing procedure
The maximum power value for needing to shift is preferred with the active ratio for coordinating rate value is preset, to guarantee set first time threshold
It is adapted to all power-balance situations.For example, the performance number of one customary DC unit is 0MW in the case of most extreme,
The performance number of another customary DC unit is 1200MW, when balance each customary DC unit 600MW, that is to say, that in power
The performance number for needing to shift in equilibrium process is 600MW, and divided by 300MW/min, the time is 2min, and first time threshold should be big
In 2min, for example, 150s can be taken as, wherein needing the performance number shifted in most extreme situation is to need to shift most
High-power value.
Accordingly, according to the scheme in above-mentioned the present embodiment, be Asynchronous Interconnection engineering two customary DC units into
After entering power balancing procedure, power regulation is carried out to preset active coordination rate value to described two customary DC units, if
Power lifting instruction is received after this, then is obtained from starting to preset active coordination rate value to described two customary DC lists
Member carries out power regulation to the duration for being currently received power lifting instruction;If the duration is less than preset first time threshold
And the performance number of described two customary DC units is not yet equal, then keeps to preset active coordination rate value to described two normal
It advises direct current component and carries out power regulation until the performance number of described two customary DC units is equal, in described two customary DCs
After the performance number of unit is equal, according to the described two customary DCs of ramp rate set value calculation in power lifting instruction
Unit carries out power lifting, that is to say, that in this embodiment scheme after two customary DC unit ingoing power equilibrium process,
It is to be less than the first time threshold to preset active coordination rate value to described two customary DC units and carry out power regulation
Even if receiving power lifting instruction in the period of value, the ramp rate setting value that will not be gone up and down in instruction with power carries out function
Rate goes up and down and is to continue with to preset active coordination rate value to described two customary DC units and carry out power regulation until described
The performance number of two customary DC units is equal to carry out power lifting again, in this way, two customary DC units can be avoided the occurrence of
Power successively reaches the case where power target value, effectively evades schedule power curve implementation deviation problem.
In one of the embodiments, as shown in Figs. 1-5, double cell power lifting speeds of Asynchronous Interconnection engineering of the invention
Rate optimization method can also include:
Step S104: if the duration is not less than the first time threshold, according in power lifting instruction
The described two customary DC units of ramp rate set value calculation carry out power lifting.
In the present embodiment, since the first time threshold is to complete function according to two customary DC units of guarantee enough
The setting of rate equilibrium process, therefore, if (i.e. duration is not less than the first time threshold) receives function after this time
Rate lifting instruction, then can be directly straight according to the described two routines of ramp rate set value calculation in power lifting instruction
It flows unit and carries out power lifting.
Double cell power ramp rate optimization methods of Asynchronous Interconnection engineering of the invention in one of the embodiments,
It can be comprising steps of in the unlocking command for receiving any one customary DC unit in described two customary DC units
When, the prompt information for prompting dispatcher that cannot issue power lifting instruction in second time threshold is generated, it will be described
Prompt information is transferred to power-management centre equipment, wherein the second time threshold is greater than the first time threshold.
The size of second time threshold can be chosen according to actual needs, such as 5 minutes, but be also not necessarily limited to 5 minutes.
In the present embodiment, the second time threshold is greater than the first time threshold, in this way, electricity can be avoided as far as possible
Power control centre equipment issues power lifting instruction in the first time threshold, can further evade schedule power curve and hold
Row offset issue.
Double cell power ramp rate optimization methods of Asynchronous Interconnection engineering of the invention in one of the embodiments,
It can also include the following steps:
When any one customary DC unit steady-state operation in described two customary DC units, if receiving another
The unlock instruction of a customary DC unit then presets the conventional straight of active coordination rate value reduction current steady state operation according to described
The performance number of unit is flowed, unlock is currently received until the power decreasing value of the customary DC unit of current steady state operation reaches and refers to
The customary DC unit of order enters in the performance number for receiving unlock instruction steps and jumping out into described two customary DC units
Power balancing procedure.
Using this embodiment scheme, it can eliminate as early as possible and be currently received the customary DC unit of unlock instruction and receiving
Overshoot caused by the performance number that institute's step goes out when unlock instruction.
Preferably, the above-mentioned active value for coordinating rate value of presetting is 300MW/min, every point of MW/min expression megawatt
Clock, above-mentioned first time threshold take the value greater than 2min, such as 150 seconds as described above.
According to double cell power ramp rate optimization methods of the Asynchronous Interconnection engineering in above-described embodiment, the present invention is also mentioned
Optimize device for a kind of double cell power ramp rates of Asynchronous Interconnection engineering.In one of the embodiments, as shown in Fig. 2,
Double cell power ramp rates optimization device of the Asynchronous Interconnection engineering of the embodiment of the present invention includes balance control unit 201, refers to
Enable detection unit 202, duration acquiring unit 203 and elevating control unit 204;
Control unit 201 is balanced for two customary DC unit ingoing power equilibrium process in Asynchronous Interconnection engineering
Afterwards, power regulation is carried out to preset active coordination rate value to described two customary DC units;
Instruction detection unit 202 is used to carry out function to preset active coordination rate value to described two customary DC units
Rate detects whether to receive power lifting instruction after adjusting;
Duration acquiring unit 203 is used in the testing result of instruction detection unit 202 be to preset active coordination rate
When value is to power lifting instruction is received after described two customary DC units progress power regulation, obtain from beginning with default
It is active coordinate rate value to described two customary DC units carry out power regulation arrive be currently received power lifting instruct when
It is long;
Balance control unit 201 is also used to be less than preset first time threshold in the duration and described two routines are straight
When the performance number of stream unit is not yet equal, keep to preset active coordination rate value to described two customary DC units and carry out function
Rate is adjusted until the performance number of described two customary DC units is equal;
Elevating control unit 204 is used for after the performance number of described two customary DC units is equal, according to the power
The described two customary DC units of ramp rate set value calculation in lifting instruction carry out power lifting.
When elevating control unit 204 can be also used for the duration not less than described first in one of the embodiments,
Between threshold value when, carry out function according to the described two customary DC units of ramp rate set value calculation in power lifting instruction
Rate lifting.
In one of the embodiments, as shown in figure 3, double cell power liters of the Asynchronous Interconnection engineering of the embodiment of the present invention
Dropping rate optimized device can also include prompt unit 301;
Instruction detection unit 202 can be also used for any one customary DC list in described two customary DC units
When meta stable state is run, the unlock for receiving any one customary DC unit in described two customary DC units is detected whether
Order;
Prompt unit 301 is used in the testing result of described instruction detection unit be to receive described two customary DC lists
When the unlocking command of any one customary DC unit in member, generate for prompt dispatcher in second time threshold not
The prompt information that power lifting instruction can be issued, is transferred to power-management centre equipment for the prompt information, wherein described the
Two time thresholds are greater than the first time threshold.
Balance control unit 201 can be also used for the detection in described instruction detection unit in one of the embodiments,
It as a result is when receiving the unlocking command of any one customary DC unit in described two customary DC units, according to described
Presetting active coordination rate value reduces the performance number of customary DC unit of current steady state operation, until current steady state operation is normal
The power decreasing value of rule direct current component reaches the customary DC unit for being currently received unlock instruction when receiving unlock instruction
The performance number that step goes out, into described two customary DC unit ingoing power equilibrium process.
The description of double cell power ramp rates optimization device of Asynchronous Interconnection engineering provided in an embodiment of the present invention, and it is upper
It is similar for stating the description of double cell power ramp rate optimization methods of Asynchronous Interconnection engineering, and has above-mentioned Asynchronous Interconnection
The beneficial effect of double cell power ramp rate optimization methods of engineering repeats no more to save length;Therefore, above to this
Undisclosed technical detail in the double cell power ramp rates optimization device for the Asynchronous Interconnection engineering that inventive embodiments provide, is asked
Referring to the description of double cell power ramp rate optimization methods of the Asynchronous Interconnection engineering of above-mentioned offer.
Based on embodiment as described above, a kind of computer readable storage medium is also provided in one embodiment, is deposited thereon
Computer program is contained, is realized when which is executed by processor as above described asynchronous in any one embodiment
The step of double cell power ramp rate optimization methods of networking project.
Based on embodiment as described above, a kind of computer equipment is also provided in one embodiment, the computer equipment packet
The computer program that includes memory, processor and storage on a memory and can run on a processor, the processor execute
Realize that double cell power ramp rates of the Asynchronous Interconnection engineering in as above any one embodiment are excellent when described program
The step of change method.The computer equipment can be include mobile phone, tablet computer, PDA (PersonalDigital
Assistant, personal digital assistant), POS (Point ofSales, point-of-sale terminal), vehicle-mounted computer, wearable device etc. it is any
Terminal device.
Those of ordinary skill in the art will appreciate that realizing all or part of the process in above-described embodiment method, being can be with
Relevant hardware is instructed to complete by computer program, it is non-volatile computer-readable that the program can be stored in one
It takes in storage medium, in the embodiment of the present invention, which be can be stored in the storage medium of computer system, and by the calculating
At least one processor in machine system executes, and includes the process such as the embodiment of above-mentioned each method with realization.Wherein, described
Storage medium can be magnetic disk, CD, read-only memory (Read-Only Memory, ROM) or random access memory
(Random Access Memory, RAM) etc..
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality
It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously
It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art
It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention
Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.
Claims (10)
1. a kind of double cell power ramp rate optimization methods of Asynchronous Interconnection engineering characterized by comprising
After two customary DC unit ingoing power equilibrium process of Asynchronous Interconnection engineering, to preset active coordination rate value pair
Described two customary DC units carry out power regulation;
If carrying out receiving after power regulation starts to described two customary DC units to preset active coordination rate value
Power lifting instruction, then obtain and carry out power tune from starting to preset active coordination rate value to described two customary DC units
Save the duration for being currently received power lifting instruction;
If the duration is less than preset first time threshold and the performance number of described two customary DC units is not yet equal,
It keeps to preset active coordination rate value to described two customary DC units and carry out power regulation until described two routines are straight
The performance number for flowing unit is equal, after the performance number of described two customary DC units is equal, is gone up and down and is instructed according to the power
In the described two customary DC units of ramp rate set value calculation carry out power liftings.
2. double cell power ramp rate optimization methods of Asynchronous Interconnection engineering according to claim 1, which is characterized in that
Further include:
If the duration is not less than the first time threshold, according to the ramp rate setting value in power lifting instruction
It controls described two customary DC units and carries out power lifting.
3. double cell power ramp rate optimization methods of Asynchronous Interconnection engineering according to claim 1 or 2, feature exist
In, further includes:
When receiving the unlocking command of any one customary DC unit in described two customary DC units, generation is used for
Prompt dispatcher cannot issue the prompt information of power lifting instruction in second time threshold, and the prompt information is transmitted
Give power-management centre equipment, wherein the second time threshold is greater than the first time threshold.
4. double cell power ramp rate optimization methods of Asynchronous Interconnection engineering according to claim 1 or 2, feature exist
In further include:
When any one customary DC unit steady-state operation in described two customary DC units, if receiving another often
The unlock instruction of direct current component is advised, then according to the customary DC list for presetting active coordination rate value reduction current steady state operation
The performance number of member, until the power decreasing value of the customary DC unit of current steady state operation, which reaches, is currently received unlock instruction
Customary DC unit is when receiving the performance number that unlock instruction steps jump out, into the power of described two customary DC units
Equilibrium process.
5. a kind of double cell power ramp rates of Asynchronous Interconnection engineering optimize device, which is characterized in that single including balance control
Member, instruction detection unit, duration acquiring unit and elevating control unit;
The balance control unit is used for after two customary DC unit ingoing power equilibrium process of Asynchronous Interconnection engineering, with
It presets active coordination rate value and power regulation is carried out to described two customary DC units;
Described instruction detection unit is used to carry out power to preset active coordination rate value to described two customary DC units
Adjusting detects whether to receive power lifting instruction after starting;
The duration acquiring unit is used in the testing result of described instruction detection unit be to preset active coordination rate value
When to receiving power lifting instruction after described two customary DC units progress power regulation, obtain from beginning to be preset with
Function coordinates rate value and carries out power regulation to the duration for being currently received power lifting instruction to described two customary DC units;
The balance control unit is also used to be less than preset first time threshold and described two customary DCs in the duration
When the performance number of unit is not yet equal, keep to preset active coordination rate value to described two customary DC units and carry out power
It adjusts until the performance number of described two customary DC units is equal;
The elevating control unit is used for after the performance number of described two customary DC units is equal, is gone up and down according to the power
The described two customary DC units of ramp rate set value calculation in instruction carry out power lifting.
6. double cell power ramp rates of Asynchronous Interconnection engineering according to claim 5 optimize device, it is characterised in that:
When the elevating control unit is also used to the duration not less than the first time threshold, according to the power lifting finger
The described two customary DC units of ramp rate set value calculation in order carry out power lifting.
7. double cell power ramp rates of Asynchronous Interconnection engineering according to claim 5 or 6 optimize device, feature exists
In further including prompt unit;
Described instruction detection unit is also used to any one customary DC unit stable state in described two customary DC units
When operation, the unlocking command for receiving any one customary DC unit in described two customary DC units is detected whether;
The prompt unit is used in the testing result of described instruction detection unit be to receive described two customary DC units
In any one customary DC unit unlocking command when, generate for prompting dispatcher cannot in second time threshold
The prompt information for issuing power lifting instruction, is transferred to power-management centre equipment for the prompt information, wherein described second
Time threshold is greater than the first time threshold.
8. double cell power ramp rates of Asynchronous Interconnection engineering according to claim 7 optimize device, it is characterised in that:
The balance control unit is also used to straight to receive described two routines in the testing result of described instruction detection unit
When flowing the unlocking command of any one customary DC unit in unit, active coordination rate value reduction is preset currently according to described
The performance number of the customary DC unit of steady-state operation, until the power decreasing value of the customary DC unit of current steady state operation reaches
The customary DC unit of unlock instruction is currently received when receiving the performance number that unlock instruction steps jump out, into described two
The power balancing procedure of a customary DC unit.
9. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the program is held by processor
The step of double cell power ramp rate optimization methods of the Asynchronous Interconnection engineering as described in one of claim 1-4 is realized when row
Suddenly.
10. a kind of computer equipment including memory, processor and stores the meter that can be run on a memory and on a processor
Calculation machine program, which is characterized in that the processor is realized asynchronous as described in one of claim 1-4 when executing described program
The step of double cell power ramp rate optimization methods of net engineering.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710397176.9A CN106981867B (en) | 2017-05-27 | 2017-05-27 | Double-unit power lifting rate optimization method and device for asynchronous networking engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710397176.9A CN106981867B (en) | 2017-05-27 | 2017-05-27 | Double-unit power lifting rate optimization method and device for asynchronous networking engineering |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106981867A CN106981867A (en) | 2017-07-25 |
CN106981867B true CN106981867B (en) | 2019-04-23 |
Family
ID=59343098
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710397176.9A Active CN106981867B (en) | 2017-05-27 | 2017-05-27 | Double-unit power lifting rate optimization method and device for asynchronous networking engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106981867B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06245487A (en) * | 1993-02-23 | 1994-09-02 | Fujitsu Denso Ltd | Controlling method for power supply balance |
CN103296673A (en) * | 2013-05-09 | 2013-09-11 | 国家电网公司 | Debugging method for +/- 800 kV ultra-high voltage direct-current transmission project system |
CN205195303U (en) * | 2015-12-22 | 2016-04-27 | 山东华天电气有限公司 | Device can be presented in special filtering of beam -pumping unit |
CN106129999A (en) * | 2016-07-01 | 2016-11-16 | 东南大学 | Based on finite time conforming direct-current grid distributed collaboration control method |
CN106370946A (en) * | 2016-08-24 | 2017-02-01 | 南方电网科学研究院有限责任公司 | Method for testing frequency limit control function of direct current transmission system |
CN106505569A (en) * | 2016-12-28 | 2017-03-15 | 云南电力调度控制中心 | A kind of method that asynchronous sending end provincial power network high-frequency cutting machine strategy is formulated in analysis |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7394674B2 (en) * | 2004-12-28 | 2008-07-01 | Zippy Technology Corp. | Backup power supply with parallel AC power source and DC power source |
-
2017
- 2017-05-27 CN CN201710397176.9A patent/CN106981867B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06245487A (en) * | 1993-02-23 | 1994-09-02 | Fujitsu Denso Ltd | Controlling method for power supply balance |
CN103296673A (en) * | 2013-05-09 | 2013-09-11 | 国家电网公司 | Debugging method for +/- 800 kV ultra-high voltage direct-current transmission project system |
CN205195303U (en) * | 2015-12-22 | 2016-04-27 | 山东华天电气有限公司 | Device can be presented in special filtering of beam -pumping unit |
CN106129999A (en) * | 2016-07-01 | 2016-11-16 | 东南大学 | Based on finite time conforming direct-current grid distributed collaboration control method |
CN106370946A (en) * | 2016-08-24 | 2017-02-01 | 南方电网科学研究院有限责任公司 | Method for testing frequency limit control function of direct current transmission system |
CN106505569A (en) * | 2016-12-28 | 2017-03-15 | 云南电力调度控制中心 | A kind of method that asynchronous sending end provincial power network high-frequency cutting machine strategy is formulated in analysis |
Also Published As
Publication number | Publication date |
---|---|
CN106981867A (en) | 2017-07-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105978043B (en) | Photovoltaic plant multi-inverter active power controller method | |
CN109038614B (en) | Control method and system for photovoltaic power station to participate in system frequency modulation | |
CN105162172B (en) | A kind of grid-connected photovoltaic power generation station power automatic control system | |
CN109390932A (en) | A kind of security constraint Unit Combination calculation method considering DC link power optimization | |
CN108092322B (en) | AGC control method based on frequency modulation market environment | |
CN115498706B (en) | Capacitive energy storage auxiliary grid-related adjusting system and control method | |
JP2013258806A (en) | Frequency control apparatus, power input/output apparatus, frequency control system, frequency control method, and program | |
WO2020107542A1 (en) | Energy control method and system for cascade utilization energy storage battery of energy storage unit | |
CN107508312A (en) | Energy accumulation current converter and off-network mode operation controller and its control method and device | |
CN107203855A (en) | The robust bi-level optimization model and conversion equivalent method of the Real-Time Scheduling containing wind power system | |
CN111049167B (en) | Energy storage system power control method and system | |
CN106981867B (en) | Double-unit power lifting rate optimization method and device for asynchronous networking engineering | |
CN112290888B (en) | IV scanning method and photovoltaic power station | |
CN115603337B (en) | Economic frequency modulation system and method based on super capacitor | |
CN108039717B (en) | Capacity configuration method and device for converter station in multi-terminal flexible direct-current power grid | |
US10666059B2 (en) | Systems, apparatus, and methods for controlling generating assets, flexible loads and/or storage assets to support dynamic regulation | |
CN115912401A (en) | Rapid frequency response method and system for new energy station | |
CN110661252B (en) | Real-time economic dispatching method for providing flexible climbing capacity by considering wind-solar energy storage | |
CN109962492B (en) | Power compensation method and device for converter of wind generating set and converter | |
CN104779618B (en) | Control method for coordinating of the big power supply to each generating set in big load direct-furnish electric system | |
CN114221356B (en) | Hybrid energy storage based frequency disturbance suppression method and system | |
CN115622085B (en) | Economic frequency modulation method, device, equipment and medium based on energy storage capacity of unit | |
CN111082472A (en) | Method and system for controlling regulation of wind turbine generator inverter based on V-f cross | |
CN109524973A (en) | A kind of load active management method and device based on Load Regulation margin index | |
CN113629702B (en) | Evaluation method, system and control diagnosis device for active control of new energy station |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |