CN106978580A CN201710279192.8A CN201710279192A CN106978580A CN 106978580 A CN106978580 A CN 106978580A CN 201710279192 A CN201710279192 A CN 201710279192A CN 106978580 A CN106978580 A CN 106978580A
Authority
CN
China
Prior art keywords
bull stick
support bar
frame
bearing seat
fixture block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710279192.8A
Other languages
Chinese (zh)
Other versions
CN106978580B (en
Inventor
冯全义
王旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunshan hongdeda Precision Industry Co., Ltd
Original Assignee
冯全义
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 冯全义 filed Critical 冯全义
Priority to CN201710279192.8A priority Critical patent/CN106978580B/en
Publication of CN106978580A publication Critical patent/CN106978580A/en
Application granted granted Critical
Publication of CN106978580B publication Critical patent/CN106978580B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/26After-treatment
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/04Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor characterised by the coating material
    • C23C2/06Zinc or cadmium or alloys based thereon
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/34Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor characterised by the shape of the material to be treated
    • C23C2/36Elongated material
    • C23C2/38Wires; Tubes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B11/00Machines or apparatus for drying solid materials or objects with movement which is non-progressive
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B21/00Arrangements or duct systems, e.g. in combination with pallet boxes, for supplying and controlling air or gases for drying solid materials or objects
    • F26B21/004Nozzle assemblies; Air knives; Air distributors; Blow boxes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F26DRYING
    • F26BDRYING SOLID MATERIALS OR OBJECTS BY REMOVING LIQUID THEREFROM
    • F26B25/00Details of general application not covered by group F26B21/00 or F26B23/00
    • F26B25/06Chambers, containers, or receptacles
    • F26B25/14Chambers, containers, receptacles of simple construction
    • F26B25/18Chambers, containers, receptacles of simple construction mainly open, e.g. dish, tray, pan, rack

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Drying Of Solid Materials (AREA)

Abstract

The present invention relates to a kind of drying plant, more particularly to a kind of hardware galvanized pipe hot-air drying plant.The technical problem to be solved in the present invention is to provide a kind of hardware galvanized pipe hot-air drying plant dried by hot-air.In order to solve the above-mentioned technical problem, the invention provides such a hardware galvanized pipe hot-air drying plant, including organic frame, left support bar, first bearing seat, the first bull stick, first bevel gear, right support bar, second bearing seat, the second bull stick, the 3rd bull stick, the first belt pulley etc.;Left upper portion is connected with L-shaped pole in frame, and L-shaped pole inner top is connected with the 3rd bull stick with being respectively connected with the left of frame inner bottom part on 3rd bearing seat, 3rd bearing seat, and the 3rd bull stick top is connected with the first belt pulley.The present invention is provided with the cause of clamping device, can realize the purpose that zinc-plated tube body is fixed, and can allow zinc-plated tube body by the first bull stick constantly along inverse alternate rotation.

Description

A kind of hardware galvanized pipe hot-air drying plant
Technical field
The present invention relates to a kind of drying plant, more particularly to a kind of hardware galvanized pipe hot-air drying plant.
Background technology
Hardware:Traditional hardware, also referred to as " hardware ".Refer to gold, silver, copper, iron, five kinds of metals of tin.Through artificial The arts work such as knife, sword or metal device can be made.The hardware of modern society is more extensive, for example hardware & tools, hardware zero Part, haberdashery and hardware, architectural hardware and security protection articles for use etc..Hardware product is not mostly final consumption product.
Galvanized pipe, also known as coating steel pipe, are divided to two kinds of galvanizing and electrogalvanizing, and galvanizing thickness is uniform with coating, attachment Power is strong, the advantages of service life is long.Electrogalvanizing cost is low, and surface is not very smooth, and the corrosion resistance of itself compares hot dip galvanizing pipe It is far short of what is expected.
Due to it is existing in hardware galvanized pipe manufacturing process, it is necessary to which the hardware galvanized pipe completed to pickling dries It is dry, and the relatively simple property of mode dried to hardware galvanized pipe.
Therefore a kind of hardware galvanized pipe hot-air drying plant dried by hot-air of research and development is needed badly, to overcome The shortcoming that can not be dried in the prior art by hot-air.
The content of the invention
(1) technical problem to be solved
The present invention in order to overcome the shortcoming that can not be dried in the prior art by hot-air, the invention solves the problems that Technical problem is to provide a kind of hardware galvanized pipe hot-air drying plant dried by hot-air.
(2) technical scheme
In order to solve the above-mentioned technical problem, the invention provides such a hardware galvanized pipe hot-air drying plant, bag Include organic frame, left support bar, first bearing seat, the first bull stick, first bevel gear, right support bar, second bearing seat, second turn Bar, the 3rd bull stick, the first belt pulley, 3rd bearing seat, flat belt, motor, L-shaped pole, the second belt pulley, the 4th bull stick, leaf Left upper portion is connected with L-shaped pole, L-shaped pole inner top and frame inner bottom part in piece, installing frame, air-heater and jet pipe, frame Left side is respectively connected with 3rd bearing seat, 3rd bearing seat and is connected with the 3rd bull stick, and the 3rd bull stick top is connected with the first belt Wheel, the 3rd bull stick bottom, which is connected with the left of second bevel gear, frame inner bottom part, is connected with left support bar, and left support bar is located at the 3rd On the right side of bearing block, the left upper portion of left support bar, which is connected with the middle part of first bearing seat, left support bar, is provided with through hole, first bearing seat On be connected with the first bull stick, the first bull stick passes through first bearing seat and through hole, and the left end of the first bull stick is connected with first bevel gear, First bevel gear is engaged with second bevel gear, and right support bar is connected with the right side of frame inner bottom part, and the left upper portion of right support bar connects It is connected in second bearing seat, second bearing seat and is connected with the second bull stick, galvanized pipe sheet is cased between the second bull stick and the first bull stick It is respectively connected with body, and the second bull stick and the first bull stick on the right side of clamping device, L-shaped pole inner top and motor, motor is installed Output shaft on be connected with the 4th bull stick, the 4th bull stick top is connected with the second belt pulley, the second belt pulley and the first belt pulley Between be wound with flat belt, the right side bottom of L-shaped pole, which is connected with the middle part of installing frame, the roof of installing frame, is provided with aperture, the 4th turn Bar passes through aperture, and the 4th bull stick bottom is symmetrically connected with blade, and blade is located in installing frame, right in the middle part of the left and right sides in installing frame Title is connected with air-heater, and installing frame bottom wall is uniformly connected with jet pipe.
Preferably, clamping device includes lower fixture block, upper fixture block, inserted link, the first spring, screw rod, nut and the second cone tooth Wheel, is respectively connected with lower fixture block, lower fixture block top left side is symmetrically connected with inserted link, lower fixture block between the first bull stick and the second bull stick Top right side is respectively connected with the first spring, and the top of the first spring is respectively connected with fixture block, and upper fixture block left part is symmetrical to be opened There is bar hole, bar hole coordinates with inserted link, upper fixture block right part, which is provided with screwed hole, screwed hole, is provided with screw rod, the outer surface of screw rod Be provided with the external screw thread coordinated with screwed hole, and the mode that is connected through a screw thread of screw rod top is connected with nut, nut be provided with The internal thread that external screw thread coordinates.
Preferably, also include to be connected with the right side of in slide rail, sliding block and second spring, bottom of the frame on slide rail, slide rail and slide Dynamic formula is connected with sliding block, and sliding block and slide rail coordinate, and is connected with second spring, slider top and the right side in slide rail between right side and sliding block Support bar bottom is connected.
Preferably, frame material is stainless steel.
Preferably, L-shaped pole is high-quality steel, surface covering zinc layers.
Preferably, installing frame is Q235 steel.
Operation principle:During using the present apparatus, zinc-plated tube body is fixed on the first bull stick by workman by clamping device first On the second bull stick, then while controlling the air-heater to be powered, controlled motor is along inverse alternate rotation, and motor drives the 4th bull stick along inverse Alternate rotation, and then the 4th bull stick drives blade along inverse alternate rotation so that the hot-air in installing frame sprays to plating by jet pipe Zinc pipe body, to carry out hot-air drying.At the same time the 4th bull stick drives the second belt pulley along inverse alternate rotation, the second belt Wheel drives the first belt pulley by flat belt along inverse alternate rotation, so that the first belt pulley drives the 3rd bull stick to turn along inverse alternating Dynamic, the 3rd bull stick drives second bevel gear along inverse alternate rotation, when second bevel gear is rotated clockwise, and second bevel gear drives First bevel gear is rotated clockwise, and first bevel gear drives the first bull stick to rotate clockwise therewith, and the first bull stick is filled by clamping Put the zinc-plated tube body of drive and the second bull stick is rotated clockwise, when second bevel gear is rotated counterclockwise, second bevel gear drives First bevel gear is rotated counterclockwise, and first bevel gear drives the first bull stick to rotate counterclockwise therewith, and the first bull stick is filled by clamping Put the zinc-plated tube body of drive and the second bull stick is rotated counterclockwise, so repeatedly, zinc-plated tube body constantly along inverse alternate rotation, makes Obtain zinc-plated tube body heated air uniform, thoroughly purpose is dried so as to reach, after completion is dried, control is hot Hair-dryer and motor are stopped.
Because clamping device includes lower fixture block, upper fixture block, inserted link, the first spring, screw rod, nut and second bevel gear, Lower fixture block is respectively connected between first bull stick and the second bull stick, lower fixture block top left side is symmetrically connected with inserted link, lower fixture block top The first spring is respectively connected with the right side of portion, the top of the first spring is respectively connected with fixture block, and upper fixture block left part is symmetrical to be provided with Bar hole, bar hole coordinates with inserted link, and upper fixture block right part, which is provided with screwed hole, screwed hole, is provided with screw rod, and the outer surface of screw rod is opened Have an external screw thread coordinated with screwed hole, and the mode that is connected through a screw thread of screw rod top is connected with nut, nut be provided with outside The internal thread that screw thread coordinates, when needing to be fixed on zinc-plated tube body on the first bull stick and the second bull stick, first by galvanized pipe The two ends of body are placed between the lower fixture block and upper fixture block of the left and right sides respectively, then turn nut, and upper fixture block is pressed down, the One spring is compressed so that the inserted link on lower fixture block is inserted into bar hole, reaches the mesh that zinc-plated tube body is fixed , when drying complete, it is necessary to take zinc-plated tube body when, screw out nut, upper fixture block returns in the presence of the first spring force Original position, can so take out zinc-plated tube body.
Because also including slide rail, sliding block and second spring, right side is connected with slidingtype on slide rail, slide rail in bottom of the frame Sliding block is connected with, sliding block coordinates with slide rail, and second spring, slider top and right support are connected between right side and sliding block in slide rail Bar bottom is connected, when needing zinc-plated tube body being enclosed on the first bull stick and the second bull stick to be fixed, and promotes right support Bar is moved right by sliding block, and second spring is compressed, and is enclosed on to enter to be about to galvanized pipe body on the first bull stick and the second bull stick To be fixed, right support bar is loosened, right support bar and sliding block return to original position in the presence of second spring elastic force, when needs are taken It is same to allow right support bar side-to-side movement by sliding block when taking zinc-plated tube body, in this way, can more facilitate workman to take plating Zinc pipe body.
Because frame material is stainless steel, stainless steel corrosion resistance and acid resistance are strong, make the service life of device longer.
Because L-shaped pole is high-quality steel, surface covering zinc layers so that the present apparatus is not perishable, improves service life.
Because installing frame is Q235 steel, Q235 steel hardness is high and does not allow yielding, makes the service life of device longer.
(3) beneficial effect
The present invention is provided with the cause of clamping device, can realize the purpose that zinc-plated tube body is fixed, and Zinc-plated tube body can be allowed by the first bull stick constantly along inverse alternate rotation so that zinc-plated tube body heated air is uniform, from And can reach and be dried thoroughly purpose, and it is provided with slide rail, sliding block and second spring, you can more facilitate workman to take Zinc-plated tube body is taken, the stability and practicality of this equipment is improved.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the invention.
Fig. 2 is the main structure diagram of clamping device of the present invention.
Fig. 3 is second of main structure diagram of the invention.
Mark in accompanying drawing for:1- frames, 2- left support bars, 3- first bearing seats, the bull sticks of 4- first, the cone teeth of 5- first Wheel, the zinc-plated tube bodies of 6-, 7- right support bars, 8- second bearing seats, the bull sticks of 9- second, 10- clamping devices, 11- second bevel gears, The bull sticks of 12- the 3rd, the belt pulleys of 13- first, 14- 3rd bearings seat, 15- flat belts, 16- motors, 17-L shape poles, 18- second Fixture block under belt pulley, the bull sticks of 19- the 4th, 20- apertures, 21- blades, 22- installing frames, 23- air-heaters, 24- jet pipes, 101-, The upper fixture blocks of 102-, 103- bar holes, 104- inserted links, 105- screwed holes, the springs of 106- first, 107- screw rods, 108- nuts, 25- Slide rail, 26- sliding blocks, 27- second springs.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of hardware galvanized pipe hot-air drying plant, as Figure 1-3, including organic frame 1, left support bar 2, first axle Bearing 3, the first bull stick 4, first bevel gear 5, right support bar 7, second bearing seat 8, the second bull stick 9, the 3rd bull stick 12, the first skin Belt wheel 13,3rd bearing seat 14, flat belt 15, motor 16, L-shaped pole 17, the second belt pulley 18, the 4th bull stick 19, blade 21, Left upper portion is connected with L-shaped pole 17, the inner top of L-shaped pole 17 and machine in installing frame 22, air-heater 23 and jet pipe 24, frame 1 It is respectively connected with 3rd bearing seat 14,3rd bearing seat 14 and is connected with the 3rd bull stick 12, the 3rd bull stick 12 on the left of the inner bottom part of frame 1 Portion is connected with the first belt pulley 13, and the bottom of the 3rd bull stick 12 is connected with the left of second bevel gear 11, the inner bottom part of frame 1 and is connected with a left side Support bar 2, left support bar 2 is located at the right side of 3rd bearing seat 14, and the left upper portion of left support bar 2 is connected with first bearing seat 3, left The middle part of support bar 2, which is provided with through hole, first bearing seat 3, is connected with the first bull stick 4, and the first bull stick 4 is through first bearing seat 3 and leads to Hole, the left end of the first bull stick 4 is connected with first bevel gear 5, and first bevel gear 5 is engaged with second bevel gear 11, the inner bottom part of frame 1 Right side is connected with right support bar 7, and the left upper portion of right support bar 7, which is connected with second bearing seat 8, second bearing seat 8, to be connected with Second bull stick 9, is cased between the second bull stick 9 and the first bull stick 4 on zinc-plated tube body 6, and the second bull stick 9 and the first bull stick 4 It is respectively connected with to be provided with motor 16, the output shaft of motor 16 on the right side of clamping device 10, the inner top of L-shaped pole 17 and is connected with the 4th Bull stick 19, the top of the 4th bull stick 19 is connected with the second belt pulley 18, is wound between the second belt pulley 18 and the first belt pulley 13 flat Belt 15, the right side bottom of L-shaped pole 17, which is connected with the middle part of installing frame 22, the roof of installing frame 22, is provided with aperture 20, the 4th turn Bar 19 passes through aperture 20, and the bottom of the 4th bull stick 19 is symmetrically connected with blade 21, and blade 21 is located in installing frame 22, in installing frame 22 Air-heater 23 is symmetrically connected with the middle part of the left and right sides, the bottom wall of installing frame 22 is uniformly connected with jet pipe 24.
Embodiment 2
A kind of hardware galvanized pipe hot-air drying plant, as Figure 1-3, including organic frame 1, left support bar 2, first axle Bearing 3, the first bull stick 4, first bevel gear 5, right support bar 7, second bearing seat 8, the second bull stick 9, the 3rd bull stick 12, the first skin Belt wheel 13,3rd bearing seat 14, flat belt 15, motor 16, L-shaped pole 17, the second belt pulley 18, the 4th bull stick 19, blade 21, Left upper portion is connected with L-shaped pole 17, the inner top of L-shaped pole 17 and machine in installing frame 22, air-heater 23 and jet pipe 24, frame 1 It is respectively connected with 3rd bearing seat 14,3rd bearing seat 14 and is connected with the 3rd bull stick 12, the 3rd bull stick 12 on the left of the inner bottom part of frame 1 Portion is connected with the first belt pulley 13, and the bottom of the 3rd bull stick 12 is connected with the left of second bevel gear 11, the inner bottom part of frame 1 and is connected with a left side Support bar 2, left support bar 2 is located at the right side of 3rd bearing seat 14, and the left upper portion of left support bar 2 is connected with first bearing seat 3, left The middle part of support bar 2, which is provided with through hole, first bearing seat 3, is connected with the first bull stick 4, and the first bull stick 4 is through first bearing seat 3 and leads to Hole, the left end of the first bull stick 4 is connected with first bevel gear 5, and first bevel gear 5 is engaged with second bevel gear 11, the inner bottom part of frame 1 Right side is connected with right support bar 7, and the left upper portion of right support bar 7, which is connected with second bearing seat 8, second bearing seat 8, to be connected with Second bull stick 9, is cased between the second bull stick 9 and the first bull stick 4 on zinc-plated tube body 6, and the second bull stick 9 and the first bull stick 4 It is respectively connected with to be provided with motor 16, the output shaft of motor 16 on the right side of clamping device 10, the inner top of L-shaped pole 17 and is connected with the 4th Bull stick 19, the top of the 4th bull stick 19 is connected with the second belt pulley 18, is wound between the second belt pulley 18 and the first belt pulley 13 flat Belt 15, the right side bottom of L-shaped pole 17, which is connected with the middle part of installing frame 22, the roof of installing frame 22, is provided with aperture 20, the 4th turn Bar 19 passes through aperture 20, and the bottom of the 4th bull stick 19 is symmetrically connected with blade 21, and blade 21 is located in installing frame 22, in installing frame 22 Air-heater 23 is symmetrically connected with the middle part of the left and right sides, the bottom wall of installing frame 22 is uniformly connected with jet pipe 24.
Clamping device 10 includes lower fixture block 101, upper fixture block 102, inserted link 104, the first spring 106, screw rod 107, nut 108 and second bevel gear 11, lower fixture block 101, the lower top left side of fixture block 101 are respectively connected between the first bull stick 4 and the second bull stick 9 Inserted link 104 is symmetrically connected with, the lower top right side of fixture block 101 is respectively connected with the first spring 106, and the top of the first spring 106 is equal Fixture block 102 is connected with, the upper left part of fixture block 102 is symmetrical to be provided with bar hole 103, and bar hole 103 coordinates with inserted link 104, The upper right part of fixture block 102, which is provided with screwed hole 105, screwed hole 105, is provided with screw rod 107, and the outer surface of screw rod 107 is provided with and screwed hole 105 external screw threads coordinated, and the mode that is connected through a screw thread of the top of screw rod 107 is connected with nut 108, nut 108 be provided with The internal thread that external screw thread coordinates.
Embodiment 3
A kind of hardware galvanized pipe hot-air drying plant, as Figure 1-3, including organic frame 1, left support bar 2, first axle Bearing 3, the first bull stick 4, first bevel gear 5, right support bar 7, second bearing seat 8, the second bull stick 9, the 3rd bull stick 12, the first skin Belt wheel 13,3rd bearing seat 14, flat belt 15, motor 16, L-shaped pole 17, the second belt pulley 18, the 4th bull stick 19, blade 21, Left upper portion is connected with L-shaped pole 17, the inner top of L-shaped pole 17 and machine in installing frame 22, air-heater 23 and jet pipe 24, frame 1 It is respectively connected with 3rd bearing seat 14,3rd bearing seat 14 and is connected with the 3rd bull stick 12, the 3rd bull stick 12 on the left of the inner bottom part of frame 1 Portion is connected with the first belt pulley 13, and the bottom of the 3rd bull stick 12 is connected with the left of second bevel gear 11, the inner bottom part of frame 1 and is connected with a left side Support bar 2, left support bar 2 is located at the right side of 3rd bearing seat 14, and the left upper portion of left support bar 2 is connected with first bearing seat 3, left The middle part of support bar 2, which is provided with through hole, first bearing seat 3, is connected with the first bull stick 4, and the first bull stick 4 is through first bearing seat 3 and leads to Hole, the left end of the first bull stick 4 is connected with first bevel gear 5, and first bevel gear 5 is engaged with second bevel gear 11, the inner bottom part of frame 1 Right side is connected with right support bar 7, and the left upper portion of right support bar 7, which is connected with second bearing seat 8, second bearing seat 8, to be connected with Second bull stick 9, is cased between the second bull stick 9 and the first bull stick 4 on zinc-plated tube body 6, and the second bull stick 9 and the first bull stick 4 It is respectively connected with to be provided with motor 16, the output shaft of motor 16 on the right side of clamping device 10, the inner top of L-shaped pole 17 and is connected with the 4th Bull stick 19, the top of the 4th bull stick 19 is connected with the second belt pulley 18, is wound between the second belt pulley 18 and the first belt pulley 13 flat Belt 15, the right side bottom of L-shaped pole 17, which is connected with the middle part of installing frame 22, the roof of installing frame 22, is provided with aperture 20, the 4th turn Bar 19 passes through aperture 20, and the bottom of the 4th bull stick 19 is symmetrically connected with blade 21, and blade 21 is located in installing frame 22, in installing frame 22 Air-heater 23 is symmetrically connected with the middle part of the left and right sides, the bottom wall of installing frame 22 is uniformly connected with jet pipe 24.
Clamping device 10 includes lower fixture block 101, upper fixture block 102, inserted link 104, the first spring 106, screw rod 107, nut 108 and second bevel gear 11, lower fixture block 101, the lower top left side of fixture block 101 are respectively connected between the first bull stick 4 and the second bull stick 9 Inserted link 104 is symmetrically connected with, the lower top right side of fixture block 101 is respectively connected with the first spring 106, and the top of the first spring 106 is equal Fixture block 102 is connected with, the upper left part of fixture block 102 is symmetrical to be provided with bar hole 103, and bar hole 103 coordinates with inserted link 104, The upper right part of fixture block 102, which is provided with screwed hole 105, screwed hole 105, is provided with screw rod 107, and the outer surface of screw rod 107 is provided with and screwed hole 105 external screw threads coordinated, and the mode that is connected through a screw thread of the top of screw rod 107 is connected with nut 108, nut 108 be provided with The internal thread that external screw thread coordinates.
Also include right side in slide rail 25, sliding block 26 and second spring 27, the bottom of frame 1 and be connected with slide rail 25, slide rail 25 Upper slidingtype is connected with sliding block 26, and sliding block 26 coordinates with slide rail 25, and the second bullet is connected between right side and sliding block 26 in slide rail 25 Spring 27, the top of sliding block 26 is connected with the bottom of right support bar 7.
Embodiment 4
A kind of hardware galvanized pipe hot-air drying plant, as Figure 1-3, including organic frame 1, left support bar 2, first axle Bearing 3, the first bull stick 4, first bevel gear 5, right support bar 7, second bearing seat 8, the second bull stick 9, the 3rd bull stick 12, the first skin Belt wheel 13,3rd bearing seat 14, flat belt 15, motor 16, L-shaped pole 17, the second belt pulley 18, the 4th bull stick 19, blade 21, Left upper portion is connected with L-shaped pole 17, the inner top of L-shaped pole 17 and machine in installing frame 22, air-heater 23 and jet pipe 24, frame 1 It is respectively connected with 3rd bearing seat 14,3rd bearing seat 14 and is connected with the 3rd bull stick 12, the 3rd bull stick 12 on the left of the inner bottom part of frame 1 Portion is connected with the first belt pulley 13, and the bottom of the 3rd bull stick 12 is connected with the left of second bevel gear 11, the inner bottom part of frame 1 and is connected with a left side Support bar 2, left support bar 2 is located at the right side of 3rd bearing seat 14, and the left upper portion of left support bar 2 is connected with first bearing seat 3, left The middle part of support bar 2, which is provided with through hole, first bearing seat 3, is connected with the first bull stick 4, and the first bull stick 4 is through first bearing seat 3 and leads to Hole, the left end of the first bull stick 4 is connected with first bevel gear 5, and first bevel gear 5 is engaged with second bevel gear 11, the inner bottom part of frame 1 Right side is connected with right support bar 7, and the left upper portion of right support bar 7, which is connected with second bearing seat 8, second bearing seat 8, to be connected with Second bull stick 9, is cased between the second bull stick 9 and the first bull stick 4 on zinc-plated tube body 6, and the second bull stick 9 and the first bull stick 4 It is respectively connected with to be provided with motor 16, the output shaft of motor 16 on the right side of clamping device 10, the inner top of L-shaped pole 17 and is connected with the 4th Bull stick 19, the top of the 4th bull stick 19 is connected with the second belt pulley 18, is wound between the second belt pulley 18 and the first belt pulley 13 flat Belt 15, the right side bottom of L-shaped pole 17, which is connected with the middle part of installing frame 22, the roof of installing frame 22, is provided with aperture 20, the 4th turn Bar 19 passes through aperture 20, and the bottom of the 4th bull stick 19 is symmetrically connected with blade 21, and blade 21 is located in installing frame 22, in installing frame 22 Air-heater 23 is symmetrically connected with the middle part of the left and right sides, the bottom wall of installing frame 22 is uniformly connected with jet pipe 24.
Clamping device 10 includes lower fixture block 101, upper fixture block 102, inserted link 104, the first spring 106, screw rod 107, nut 108 and second bevel gear 11, lower fixture block 101, the lower top left side of fixture block 101 are respectively connected between the first bull stick 4 and the second bull stick 9 Inserted link 104 is symmetrically connected with, the lower top right side of fixture block 101 is respectively connected with the first spring 106, and the top of the first spring 106 is equal Fixture block 102 is connected with, the upper left part of fixture block 102 is symmetrical to be provided with bar hole 103, and bar hole 103 coordinates with inserted link 104, The upper right part of fixture block 102, which is provided with screwed hole 105, screwed hole 105, is provided with screw rod 107, and the outer surface of screw rod 107 is provided with and screwed hole 105 external screw threads coordinated, and the mode that is connected through a screw thread of the top of screw rod 107 is connected with nut 108, nut 108 be provided with The internal thread that external screw thread coordinates.
Also include right side in slide rail 25, sliding block 26 and second spring 27, the bottom of frame 1 and be connected with slide rail 25, slide rail 25 Upper slidingtype is connected with sliding block 26, and sliding block 26 coordinates with slide rail 25, and the second bullet is connected between right side and sliding block 26 in slide rail 25 Spring 27, the top of sliding block 26 is connected with the bottom of right support bar 7.
The material of frame 1 is stainless steel.
L-shaped pole 17 is high-quality steel, surface covering zinc layers.
Installing frame 22 is Q235 steel.
Operation principle:During using the present apparatus, zinc-plated tube body 6 is fixed on first turn by workman by clamping device 10 first On the bull stick 9 of bar 4 and second, then while controlling the air-heater 23 to be powered, controlled motor 16 is along inverse alternate rotation, and motor 16 drives the Four bull sticks 19 are along inverse alternate rotation, and then the 4th bull stick 19 drives blade 21 along inverse alternate rotation so that the heat in installing frame 22 Air sprays to zinc-plated tube body 6 by jet pipe 24, to carry out hot-air drying.At the same time the 4th bull stick 19 drives the second belt Wheel 18 is along inverse alternate rotation, and the second belt pulley 18 drives the first belt pulley 13 by flat belt 15 along inverse alternate rotation, so that First belt pulley 13 drives the 3rd bull stick 12 along inverse alternate rotation, and the 3rd bull stick 12 drives second bevel gear 11 to turn along inverse alternating Dynamic, when second bevel gear 11 is rotated clockwise, second bevel gear 11 drives first bevel gear 5 to rotate clockwise, and therewith first Bevel gear 5 drives the first bull stick 4 to rotate clockwise, and the first bull stick 4 drives zinc-plated tube body 6 and second turn by clamping device 10 Bar 9 is rotated clockwise, when second bevel gear 11 is rotated counterclockwise, and second bevel gear 11 drives first bevel gear 5 to turn counterclockwise Dynamic, first bevel gear 5 drives the first bull stick 4 to rotate counterclockwise therewith, and the first bull stick 4 drives galvanized pipe sheet by clamping device 10 The bull stick 9 of body 6 and second is rotated counterclockwise, so repeatedly, and zinc-plated tube body 6 is constantly along inverse alternate rotation so that galvanized pipe sheet The heated air of body 6 is uniform, and thoroughly purpose is dried so as to reach, when dry complete after, control hot hair dryer and Motor 16 is stopped.
Because clamping device 10 include lower fixture block 101, upper fixture block 102, inserted link 104, the first spring 106, screw rod 107, Nut 108 and second bevel gear 11, are respectively connected with lower fixture block 101, the lower top of fixture block 101 between the first bull stick 4 and the second bull stick 9 Left side is symmetrically connected with inserted link 104, and the lower top right side of fixture block 101 is respectively connected with the first spring 106, the top of the first spring 106 End is respectively connected with fixture block 102, and the upper left part of fixture block 102 is symmetrical to be provided with bar hole 103, and bar hole 103 is matched somebody with somebody with inserted link 104 Close, the upper right part of fixture block 102, which is provided with screwed hole 105, screwed hole 105, is provided with screw rod 107, and the outer surface of screw rod 107 is provided with and spiral shell The external screw thread that pit 105 coordinates, and the mode that the top of screw rod 107 is connected through a screw thread is connected with nut 108, and nut 108 is opened There is the internal thread coordinated with external screw thread, when needing zinc-plated tube body 6 to be fixed on first bull stick 4 and the second bull stick 9, first The two ends of zinc-plated tube body 6 are placed between the lower fixture block 101 and upper fixture block 102 of the left and right sides respectively, then turn nut 108, upper fixture block 102 is pressed down, the first spring 106 is compressed so that the inserted link 104 on lower fixture block 101 is inserted into bar hole In 103, reach the purpose that zinc-plated tube body 6 is fixed, when drying complete, it is necessary to take zinc-plated tube body 6 when, screw out Nut 108, upper fixture block 102 returns to original position in the presence of the elastic force of the first spring 106, can so take out zinc-plated tube body 6.
Because also including slide rail 25, sliding block 26 and second spring 27, right side is connected with slide rail 25 in the bottom of frame 1, sliding Slidingtype is connected with sliding block 26 on rail 25, and sliding block 26 coordinates with slide rail 25, is connected with the in slide rail 25 between right side and sliding block 26 Two springs 27, the top of sliding block 26 is connected with the bottom of right support bar 7, when needing zinc-plated tube body 6 being enclosed on the first bull stick 4 and second When on bull stick 9 to be fixed, right support bar 7 is promoted to be moved right by sliding block 26, second spring 27 is compressed, to enter to be about to Zinc-plated tube body 6 is enclosed on the first bull stick 4 and the second bull stick 9 to be fixed, and loosens right support bar 7, right support bar 7 and sliding block 26 return to original position in the presence of the elastic force of second spring 27, when need to take zinc-plated tube body 6 when, it is same by sliding block 26 come The side-to-side movement of right support bar 7 is allowed, in this way, can more facilitate workman to take zinc-plated tube body 6.
Because the material of frame 1 is stainless steel, stainless steel corrosion resistance and acid resistance are strong, make the service life of device longer.
Because L-shaped pole 17 is high-quality steel, surface covering zinc layers so that the present apparatus is not perishable, improves service life.
Because installing frame 22 is Q235 steel, Q235 steel hardness is high and does not allow yielding, makes the service life of device longer.
Embodiment described above only expresses the preferred embodiment of the present invention, and it describes more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (6)

1. a kind of hardware galvanized pipe hot-air drying plant, it is characterised in that including organic frame (1), left support bar (2), first Bearing block (3), the first bull stick (4), first bevel gear (5), right support bar (7), second bearing seat (8), the second bull stick (9), Three bull sticks (12), the first belt pulley (13), 3rd bearing seat (14), flat belt (15), motor (16), L-shaped pole (17), second It is left in belt pulley (18), the 4th bull stick (19), blade (21), installing frame (22), air-heater (23) and jet pipe (24), frame (1) Upper lateral part is connected with L-shaped pole (17), and L-shaped pole (17) inner top on the left of frame (1) inner bottom part with being respectively connected with 3rd bearing The 3rd bull stick (12) is connected with seat (14), 3rd bearing seat (14), the 3rd bull stick (12) top is connected with the first belt pulley (13), the 3rd bull stick (12) bottom is connected with the left of second bevel gear (11), frame (1) inner bottom part and is connected with left support bar (2), Left support bar (2) is located on the right side of 3rd bearing seat (14), and the left upper portion of left support bar (2) is connected with first bearing seat (3), left It is provided with the middle part of support bar (2) in through hole, first bearing seat (3) and is connected with the first bull stick (4), the first bull stick (4) passes through first axle Bearing (3) and through hole, the left end of the first bull stick (4) are connected with first bevel gear (5), first bevel gear (5) and second bevel gear (11) engage, be connected with right support bar (7) on the right side of frame (1) inner bottom part, the left upper portion of right support bar (7) is connected with the second axle The second bull stick (9) is connected with bearing (8), second bearing seat (8), is cased between the second bull stick (9) and the first bull stick (4) zinc-plated Tube body (6), and the second bull stick (9) is with being respectively connected with top in clamping device (10), L-shaped pole (17) on the first bull stick (4) It is provided with the right side of portion on motor (16), the output shaft of motor (16) and is connected with the 4th bull stick (19), the 4th bull stick (19) top connects The second belt pulley (18) is connected to, flat belt (15), L-shaped pole are wound between the second belt pulley (18) and the first belt pulley (13) (17) right side bottom is connected with the middle part of installing frame (22), the roof of installing frame (22) and is provided with aperture (20), the 4th bull stick (19) Through aperture (20), the 4th bull stick (19) bottom is symmetrically connected with blade (21), and blade (21) is located in installing frame (22), installs Frame (22) is symmetrically connected with air-heater (23) in the middle part of the interior left and right sides, and installing frame (22) bottom wall is uniformly connected with jet pipe (24).
2. a kind of hardware galvanized pipe hot-air drying plant according to claim 1, it is characterised in that clamping device (10) Include lower fixture block (101), upper fixture block (102), inserted link (104), the first spring (106), screw rod (107), nut (108) and Two bevel gears (11), are respectively connected between the first bull stick (4) and the second bull stick (9) at the top of lower fixture block (101), lower fixture block (101) Left side is symmetrically connected with inserted link (104), and lower fixture block (101) top right side is respectively connected with the first spring (106), the first spring (106) top is respectively connected with fixture block (102), and upper fixture block (102) left part is symmetrical to be provided with bar hole (103), bar shaped Hole (103) coordinates with inserted link (104), and upper fixture block (102) right part, which is provided with screwed hole (105), screwed hole (105), is provided with screw rod (107), the outer surface of screw rod (107) is provided with the external screw thread coordinated with screwed hole (105), and screw rod (107) top passes through spiral shell The mode of line connection is connected with nut (108), and nut (108) is provided with the internal thread coordinated with external screw thread.
3. a kind of hardware galvanized pipe hot-air drying plant according to claim 2, it is characterised in that also include slide rail (25) right side is connected with slidingtype on slide rail (25), slide rail (25) in, sliding block (26) and second spring (27), frame (1) bottom Sliding block (26) is connected with, sliding block (26) coordinates with slide rail (25), and second is connected between right side and sliding block (26) in slide rail (25) It is connected at the top of spring (27), sliding block (26) with right support bar (7) bottom.
4. a kind of hardware galvanized pipe hot-air drying plant according to claim 3, it is characterised in that frame (1) material For stainless steel.
5. a kind of hardware galvanized pipe hot-air drying plant according to claim 4, it is characterised in that L-shaped pole (17) For high-quality steel, surface covering zinc layers.
6. a kind of hardware galvanized pipe hot-air drying plant according to claim 5, it is characterised in that installing frame (22) is Q235 steel.
CN201710279192.8A 2017-04-25 2017-04-25 A kind of hardware galvanized pipe hot-air drying equipment Active CN106978580B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710279192.8A CN106978580B (en) 2017-04-25 2017-04-25 A kind of hardware galvanized pipe hot-air drying equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710279192.8A CN106978580B (en) 2017-04-25 2017-04-25 A kind of hardware galvanized pipe hot-air drying equipment

Publications (2)

Publication Number Publication Date
CN106978580A true CN106978580A (en) 2017-07-25
CN106978580B CN106978580B (en) 2018-12-07

Family

ID=59344691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710279192.8A Active CN106978580B (en) 2017-04-25 2017-04-25 A kind of hardware galvanized pipe hot-air drying equipment

Country Status (1)

Country Link
CN (1) CN106978580B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107287961A (en) * 2017-08-21 2017-10-24 曹鹏飞 A kind of uniform dilution device of paper grade (stock) paper making additive
CN107696713A (en) * 2017-10-19 2018-02-16 太原双鼎科技有限公司 A kind of electric printing equipment
CN107952639A (en) * 2017-11-14 2018-04-24 邓海运 A kind of environment-friendly spray coating aids in drying equipment after being sprayed with coating
CN109355609A (en) * 2018-12-26 2019-02-19 重庆佰鸿机械设备有限公司 A kind of steel plate galvanizing rig
CN109576625B (en) * 2019-01-30 2021-01-15 天津邦特磁性材料有限公司 A galvanizing rig for neodymium iron boron magnetism iron

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5893862A (en) * 1981-11-28 1983-06-03 Sumitomo Metal Ind Ltd Removing method for oxidized film on non-plated surface of galvanized steel plate alloyed on one side
US20060021250A1 (en) * 2004-02-27 2006-02-02 Lg Electronics Inc. Apparatus for supplying hot air in drum type washer with dry function
CN201313931Y (en) * 2008-12-19 2009-09-23 成都电子机械高等专科学校 Drying device of hot dipped tinned wire
CN102052824A (en) * 2009-10-29 2011-05-11 天津市白塘口电镀有限公司 Galvanized workpiece drying oven
CN102052825A (en) * 2009-10-29 2011-05-11 天津市白塘口电镀有限公司 Galvanized part drying bed
CN206104436U (en) * 2016-08-30 2017-04-19 嘉善北方机械制造有限公司 High -efficient cleaning and drying device of high -end agricultural machine spare part

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5893862A (en) * 1981-11-28 1983-06-03 Sumitomo Metal Ind Ltd Removing method for oxidized film on non-plated surface of galvanized steel plate alloyed on one side
US20060021250A1 (en) * 2004-02-27 2006-02-02 Lg Electronics Inc. Apparatus for supplying hot air in drum type washer with dry function
CN201313931Y (en) * 2008-12-19 2009-09-23 成都电子机械高等专科学校 Drying device of hot dipped tinned wire
CN102052824A (en) * 2009-10-29 2011-05-11 天津市白塘口电镀有限公司 Galvanized workpiece drying oven
CN102052825A (en) * 2009-10-29 2011-05-11 天津市白塘口电镀有限公司 Galvanized part drying bed
CN206104436U (en) * 2016-08-30 2017-04-19 嘉善北方机械制造有限公司 High -efficient cleaning and drying device of high -end agricultural machine spare part

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107287961A (en) * 2017-08-21 2017-10-24 曹鹏飞 A kind of uniform dilution device of paper grade (stock) paper making additive
CN107287961B (en) * 2017-08-21 2019-02-01 于都县正亿纸品纸业有限公司 A kind of uniform dilution device of paper grade (stock) paper making additive
CN107696713A (en) * 2017-10-19 2018-02-16 太原双鼎科技有限公司 A kind of electric printing equipment
CN107952639A (en) * 2017-11-14 2018-04-24 邓海运 A kind of environment-friendly spray coating aids in drying equipment after being sprayed with coating
CN107952639B (en) * 2017-11-14 2021-01-12 南通格瑞福染整有限公司 Paint spraying and post-auxiliary drying equipment for environment-friendly spraying
CN109355609A (en) * 2018-12-26 2019-02-19 重庆佰鸿机械设备有限公司 A kind of steel plate galvanizing rig
CN109576625B (en) * 2019-01-30 2021-01-15 天津邦特磁性材料有限公司 A galvanizing rig for neodymium iron boron magnetism iron

Also Published As

Publication number Publication date
CN106978580B (en) 2018-12-07

Similar Documents

Publication Publication Date Title
CN106978580A (en) A kind of hardware galvanized pipe hot-air drying plant
CN106140518B (en) A kind of quick spray-painting plant of hardware plate surface
CN106835176B (en) A kind of hardware galvanized pipe lift pickler
CN204589286U (en) A kind of vacuum coating film equipment
CN107444976A (en) A kind of Phase of Electric Power Projects cable coiling device
CN206276541U (en) A kind of steel pipe high-efficency spraying device
CN207430584U (en) A kind of curtain wall rock cotton board spray-painting plant
CN205550673U (en) Pipeline preserved handle device
CN106863674B (en) It is a kind of to remove burr machine automatically
CN108212601A (en) A kind of timber floor paint spraying apparatus
CN107779935A (en) A kind of metalwork electrophoresis painting method and apparatus
CN209227042U (en) A kind of steel tube hot galvanizing device
CN208878849U (en) A kind of machinery cylinder iron manages uniform paint spraying apparatus
CN215484435U (en) Interior wall whitewashes device for building engineering construction
CN208512853U (en) A kind of timber floor paint spraying apparatus
CN207667879U (en) A kind of novel spray-painting plant
CN210289020U (en) Coating device for wall surface
CN210304343U (en) Glue coating device for inner and outer liners of sphere
CN208960508U (en) A kind of full-automatic three slots n-Propyl Bromide cleaning machine
CN209663563U (en) A kind of paint spraying tooling of novel high-speed rail door and window
CN207839255U (en) A kind of two-sided spray-painting plant
CN208146354U (en) A kind of office furniture drying unit
CN207238358U (en) Batten device for painting
CN109329484A (en) Device is rubbed in a kind of answering for dark green tea processing
CN213515118U (en) Waste heat recovery processing device of large-scale processing furnace

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20181026

Address after: 317200 No. 5, Shan Zhu Zhu, Xia Zhu Village, Chicheng street, Tiantai County, Taizhou, Zhejiang

Applicant after: Zhu Youfu

Address before: 310018 Hangzhou Dianzi University, Hangzhou Hangzhou Economic Development Zone, 2 Avenue 1158, Hangzhou Dianzi University

Applicant before: Feng Quanyi

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191125

Address after: 215300 room 6, 269 Dingjing Road, Chengbei, Yushan Town, Kunshan City, Suzhou City, Jiangsu Province

Patentee after: Kunshan hongdeda Precision Industry Co., Ltd

Address before: 317 200 No. 5, Shantou Zhu Group, Xiazhu Village, Chicheng Street, Tiantai County, Taizhou City, Zhejiang Province

Patentee before: Zhu Youfu

TR01 Transfer of patent right