CN106975787B - A kind of bridge construction steel pipe cutting device that stability is good - Google Patents

A kind of bridge construction steel pipe cutting device that stability is good Download PDF

Info

Publication number
CN106975787B
CN106975787B CN201710348853.8A CN201710348853A CN106975787B CN 106975787 B CN106975787 B CN 106975787B CN 201710348853 A CN201710348853 A CN 201710348853A CN 106975787 B CN106975787 B CN 106975787B
Authority
CN
China
Prior art keywords
shell
steel pipe
cutting device
bridge construction
pipe cutting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710348853.8A
Other languages
Chinese (zh)
Other versions
CN106975787A (en
Inventor
单士睿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuchang Vocational and Technical College
Original Assignee
Xuchang Vocational and Technical College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuchang Vocational and Technical College filed Critical Xuchang Vocational and Technical College
Priority to CN201710348853.8A priority Critical patent/CN106975787B/en
Publication of CN106975787A publication Critical patent/CN106975787A/en
Application granted granted Critical
Publication of CN106975787B publication Critical patent/CN106975787B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23DPLANING; SLOTTING; SHEARING; BROACHING; SAWING; FILING; SCRAPING; LIKE OPERATIONS FOR WORKING METAL BY REMOVING MATERIAL, NOT OTHERWISE PROVIDED FOR
    • B23D21/00Machines or devices for shearing or cutting tubes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Road Repair (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The present invention provides a kind of bridge construction steel pipe cutting device that stability is good, is related to bridge field.The good bridge construction steel pipe cutting device of the stability, including shell, the both sides of the case top are installed with the first sliding rail, slide bar is slidably connected in the sliding slot of first sliding rail, the one end of the slide bar far from the first sliding rail is connected with axle bed, the top of the shell and intert between two the first sliding rails and be provided with inserted link, the inserted link through the top of shell and extends to the inside of shell close to one end of shell.The good bridge construction steel pipe cutting device of the stability, pass through the setting to inserted link, slide plate, fixed block, elastic rod, idler wheel, resetting spring, the second sliding rail, movable plate, the body of rod and damping spring, achieve the effect that convenience to bridge construction steel pipe cutting device into row buffering, to the use for the person of being convenient to use, also increase the stability of frame bridge construction steel pipe cutting device with this.

Description

A kind of bridge construction steel pipe cutting device that stability is good
Technical field
The present invention relates to bridge technology field, the good bridge construction steel pipe cutting device of specially a kind of stability.
Background technology
Bridge refers to and is erected in rivers,lakes and seas, the building for making traffic etc. that can smoothly pass through, referred to as bridge, bridge one As be made of superstructure, substructure, bearing and attached structure, superstructure is also known as bridge span structure, is across obstacle Primary structure, substructure include abutment, bridge pier and basis, and bearing is that bridge span structure is arranged with the bearing place of bridge pier or abutment Load transfer device, attached structure then refers to transition slab at bridge head, truncated cone banking, shore protection, training works etc., and bridge is actually just only divided into Three categories, beam bridge, arch bridge and suspension bridge, stayed-cable bridge, it is very big that beam bridge generally build span in, the shallower place in waters, by bridge column and bridge plate Composition, weight of object are transmitted to bridge column from bridge plate, and arch bridge is generally built on the smaller waters of span, and the body of a bridge overarches, generally all Have several bridge openings, play the function of flood discharge, the weight among bridge is transmitted to bridge both ends, and both ends are then transmitted to centre, hanging bridge be as A kind of modern most practical bridge, bridge can build that span is big, place of the depth of water in, be made of bridge column, cable and bridge floor, the hanging bridge of early stage Just it can will not be broken, present suspension bridge can substantially steadfastly stand on one's ground in storm through living to expose to wind and rain.
When being related to bridge, relate to use bridge construction with steel pipe cutting device, but currently on the market Bridge construction steel pipe cutting device be not easy to delay bridge construction with steel pipe cutting device during use Punching also reduces bridge construction steel pipe cutting dress to reduce the stability of bridge construction steel pipe cutting device with this The working efficiency set.
Invention content
(One)The technical issues of solution
In view of the deficiencies of the prior art, the present invention provides a kind of good bridge construction steel pipe cutting device of stability, Solve the problems, such as that bridge construction steel pipe cutting device stability is bad.
(Two)Technical solution
In order to achieve the above object, the present invention is achieved by the following technical programs:A kind of bridge construction that stability is good It is installed with the first sliding rail with the both sides of steel pipe cutting device, including shell, the case top, first sliding rail Slide bar is slidably connected in sliding slot, the one end of the slide bar far from the first sliding rail is connected with axle bed, the top of the shell And intert between two the first sliding rails and be provided with inserted link, the inserted link through the top of shell and prolongs close to one end of shell The inside of shell is extended to, the one end of the inserted link far from shell is installed with plate body, and the one end of the plate body far from inserted link is solid Dingan County is equipped with cutting machine, and the bottom of the plate body is fixedly connected with the one end of axle bed far from slide bar, and the slide bar is close to inserted link Side is installed with spring, and the one end of the spring far from slide bar is fixedly connected with the side of inserted link.
The shell is internally provided with slide plate, and top and the inserted link of the slide plate are located at one end fixation company of enclosure interior It connects, the bottom of the slide plate is installed with fixed block, and the both sides of the fixed block are installed with elastic rod, the elasticity The one end of bar far from fixed block is flexibly connected idler wheel by shaft, and the bottom of the fixed block is installed with resetting spring, institute The bottom for stating resetting spring is fixedly connected with the bottom of housing cavity, and there are two second for the bottom fixed installation of the housing cavity Sliding rail slidably connects movable plate in the sliding slot of second sliding rail, interts on the movable plate and be provided with the body of rod, the body of rod Be fixedly connected with the inner wall of shell far from one end of fixed block, the surface of the body of rod and inner wall and movable plate positioned at shell it Between be surrounded with damping spring, the controller of the cutting machine and peripheral hardware is electrically connected.
Preferably, the axle bed is located at the both sides of inserted link.
Preferably, the bottom of the shell is installed with fixed plate, and mounting hole is offered in the fixed plate.
Preferably, the quantity of the fixed plate is four, and four fixed plates are distributed in the quadrangle of housing bottom.
Preferably, the both sides of the slide plate are contacted with the inner wall of shell.
Preferably, a side contacts of the idler wheel and movable plate.
(Three)Advantageous effect
The present invention provides a kind of good bridge construction steel pipe cutting devices of stability.Has following advantageous effect:
1, the good bridge construction steel pipe cutting device of the stability, by inserted link, slide plate, fixed block, elastic rod, rolling The setting of wheel, resetting spring, the second sliding rail, movable plate, the body of rod and damping spring has reached convenience and has been cut with steel pipe to bridge construction The effect for cutting device into row buffering is also increased frame bridge construction with this and cuts dress with steel pipe to the use for the person of being convenient to use The stability set.
2, the good bridge construction steel pipe cutting device of the stability is reached by the setting to fixed plate and mounting hole Installation is fixed with steel pipe cutting device to bridge construction in convenience, to facilitating to bridge construction steel pipe cutting device Fixation, the working efficiency of bridge construction steel pipe cutting device is also improved with this.
3, the good bridge construction steel pipe cutting device of the stability, by the first sliding rail, slide bar, axle bed and spring Setting, has achieved the effect that be supported plate body, to the use for the person of being convenient to use, also improves bridge construction with this and uses The stability of steel pipe cutting device.
4, the good bridge construction steel pipe cutting device of the stability, by the setting to slide plate, reached to inside into The effect of row limit also improves the work of bridge construction steel pipe cutting device with this to facilitate the normal work of device Make efficiency.
5, the good bridge construction steel pipe cutting device of the stability is reached by the setting to elastic rod and idler wheel The convenient effect limited to fixed block also improves bridge construction steel to be also convenient for the use of user with this The normal use of pipe cutter device.
Description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the internal structure schematic diagram of inventive shell.
In figure:1 shell, 2 first sliding rails, 3 slide bars, 4 mounting holes, 5 axle beds, 6 inserted links, 7 plate bodys, 8 springs, 9 slide plates, 10 are consolidated Determine block, 11 elastic rods, 12 idler wheels, 13 resetting springs, 14 second sliding rails, 15 movable plates, 16 bodies of rod, 17 damping springs, 18 fixations Plate, 19 cutting machines.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The embodiment of the present invention provides a kind of bridge construction steel pipe cutting device that stability is good, as shown in Figs. 1-2, including Shell(1), shell(1)Bottom be installed with fixed plate(18), fixed plate(18)On offer mounting hole(4), fixed plate (18)Quantity be four, and four fixed plates(18)It is distributed in shell(1)The quadrangle of bottom, shell(1)The both sides at top are equal It is installed with the first sliding rail(2), the first sliding rail(2)Sliding slot in slidably connect slide bar(3), slide bar(3)It is slided far from first Rail(2)One end be connected with axle bed(5), axle bed(5)Positioned at inserted link(6)Both sides, shell(1)Top and be located at two First sliding rail(2)Between intert be provided with inserted link(6), inserted link(6)Close to shell(1)One end run through shell(1)Top simultaneously Extend to shell(1)Inside, inserted link(6)Far from shell(1)One end be installed with plate body(7), plate body(7)Far from inserted link (6)One end be installed with cutting machine(19), plate body(7)Bottom and axle bed(5)Far from slide bar(3)One end fix connect It connects, slide bar(3)Close to inserted link(6)Side be installed with spring(8), spring(8)Far from slide bar(3)One end and inserted link (6)Side be fixedly connected.
Shell(1)Be internally provided with slide plate(9), slide plate(9)Both sides and shell(1)Inner wall contact, slide plate(9) Top and inserted link(6)Positioned at shell(1)Internal one end is fixedly connected, slide plate(9)Bottom be installed with fixed block (10), fixed block(10)Both sides be installed with elastic rod(11), elastic rod(11)Far from fixed block(10)One end it is logical Cross shaft flexible connection idler wheel(12), idler wheel(12)With movable plate(15)A side contacts, fixed block(10)Bottom fix peace Equipped with resetting spring(13), resetting spring(13)Bottom and shell(1)The bottom of inner cavity is fixedly connected, shell(1)Inner cavity There are two the second sliding rails for bottom fixed installation(14), the second sliding rail(14)Sliding slot in slidably connect movable plate(15), mobile Plate(15)It is above interspersed to be provided with the body of rod(16), the body of rod(16)Far from fixed block(10)One end and shell(1)Inner wall fix connect It connects, the body of rod(16)Surface and be located at shell(1)Inner wall and movable plate(15)Between be surrounded with damping spring(17), cut Cutting mill(19)It is electrically connected with the controller of peripheral hardware, the model MAM-200 of peripheral control unit.
Operation principle:In use, the controller of operation peripheral hardware, controls cutting machine(19)Work, to make cutting machine(19) Work.
In conclusion the bridge construction steel pipe cutting device that the stability is good, by inserted link(6), slide plate(7), it is solid Determine block(10), elastic rod(11), idler wheel(12), resetting spring()31, the second sliding rail(14), movable plate(15), the body of rod(16)With Damping spring(17)Setting, achieved the effect that convenience to bridge construction steel pipe cutting device into row buffering, to convenient The use of user, also increases the stability of frame bridge construction steel pipe cutting device with this.
Also, by fixed plate(18)And mounting hole(4)Setting, reached convenience and bridge construction cut with steel pipe Installation is fixed in device, to facilitate the fixation to bridge construction steel pipe cutting device, also improves bridge with this and builds Build the working efficiency with steel pipe cutting device.
Also, by the first sliding rail(2), slide bar(3), axle bed(5)And spring(8)Setting, reached to plate body(7) The effect being supported also improves the steady of bridge construction steel pipe cutting device to the use for the person of being convenient to use with this It is qualitative.
Also, by slide plate(9)Setting, achieved the effect that inside limit, to facilitate device Normal work, the working efficiency of bridge construction steel pipe cutting device is also improved with this.
Also, by elastic rod(11)With the setting of idler wheel, convenience is reached to fixed block(10)The effect limited Fruit also improves the normal use of bridge construction steel pipe cutting device with this to be also convenient for the use of user.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, by sentence " including one ... the element limited, it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (6)

1. a kind of good bridge construction steel pipe cutting device of stability, including shell (1), it is characterised in that:The shell (1) The both sides at top are installed with the first sliding rail (2), and slide bar (3), institute are slidably connected in the sliding slot of first sliding rail (2) It states the one end of slide bar (3) far from the first sliding rail (2) and is connected with axle bed (5), the top of the shell (1) and positioned at two the Intert between one sliding rail (2) and be provided with inserted link (6), the inserted link (6) runs through the top of shell (1) close to one end of shell (1) And the inside of shell (1) is extended to, the one end of the inserted link (6) far from shell (1) is installed with plate body (7), the plate body (7) one end far from inserted link (6) is installed with cutting machine (19), bottom and the separate slide bar of axle bed (5) of the plate body (7) (3) one end is fixedly connected, and the slide bar (3) is installed with spring (8) close to the side of inserted link (6), and the spring (8) is remote One end from slide bar (3) is fixedly connected with the side of inserted link (6);The shell (1) is internally provided with slide plate (9), the cunning The top of plate (9) is located at the internal one end of shell (1) with inserted link (6) and is fixedly connected, and the bottom of the slide plate (9) is installed with The both sides of fixed block (10), the fixed block (10) are installed with elastic rod (11), and the elastic rod (11) is far from fixed One end of block (10) is flexibly connected idler wheel (12) by shaft, and the bottom of the fixed block (10) is installed with resetting spring (13), the bottom of the resetting spring (13) is fixedly connected with the bottom of shell (1) inner cavity, the bottom of shell (1) inner cavity It is fixedly mounted there are two the second sliding rail (14), movable plate (15) is slidably connected in the sliding slot of second sliding rail (14), it is described Intert on movable plate (15) and be provided with the body of rod (16), the one end of the body of rod (16) far from fixed block (10) is interior with shell (1) Wall is fixedly connected, and the surface of the body of rod (16) and is surrounded with and is subtracted between the inner wall and movable plate (15) of shell (1) Spring (17) is shaken, the cutting machine (19) and the controller of peripheral hardware are electrically connected.
2. a kind of good bridge construction steel pipe cutting device of stability according to claim 1, it is characterised in that:It is described Axle bed (5) is located at the both sides of inserted link (6).
3. a kind of good bridge construction steel pipe cutting device of stability according to claim 1, it is characterised in that:It is described The bottom of shell (1) is installed with fixed plate (18), and mounting hole (4) is offered on the fixed plate (18).
4. a kind of good bridge construction steel pipe cutting device of stability according to claim 3, it is characterised in that:It is described The quantity of fixed plate (18) is four, and four fixed plates (18) are distributed in the quadrangle of shell (1) bottom.
5. a kind of good bridge construction steel pipe cutting device of stability according to claim 1, it is characterised in that:It is described The both sides of slide plate (9) are contacted with the inner wall of shell (1).
6. a kind of good bridge construction steel pipe cutting device of stability according to claim 1, it is characterised in that:It is described One side contacts of idler wheel (12) and movable plate (15).
CN201710348853.8A 2017-05-17 2017-05-17 A kind of bridge construction steel pipe cutting device that stability is good Active CN106975787B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710348853.8A CN106975787B (en) 2017-05-17 2017-05-17 A kind of bridge construction steel pipe cutting device that stability is good

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710348853.8A CN106975787B (en) 2017-05-17 2017-05-17 A kind of bridge construction steel pipe cutting device that stability is good

Publications (2)

Publication Number Publication Date
CN106975787A CN106975787A (en) 2017-07-25
CN106975787B true CN106975787B (en) 2018-09-14

Family

ID=59342834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710348853.8A Active CN106975787B (en) 2017-05-17 2017-05-17 A kind of bridge construction steel pipe cutting device that stability is good

Country Status (1)

Country Link
CN (1) CN106975787B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107457636A (en) * 2017-10-12 2017-12-12 安吉晶圣光伏发电有限公司 A kind of terrace sanding machine of convenient use

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002113610A (en) * 2000-10-10 2002-04-16 Sekisui House Ltd Direct cutting device for square steel pipe
CN2508937Y (en) * 2001-12-13 2002-09-04 张堂 Water groove cutting machine
JP2005238363A (en) * 2004-02-25 2005-09-08 Calsonic Kansei Corp Metallic pipe cutting device and cutting method
FR2911805A1 (en) * 2007-01-25 2008-08-01 Lionel Zanon Portable and dismountable self centering orbital pipe cutter for e.g. nuclear industry, has saddle including gauges arranged in contact with internal or external surface of pipe and assuring concentric positioning between cutter and pipe
CN204036669U (en) * 2014-09-09 2014-12-24 桂阳磊腾新材料科技有限公司 For the trimming machine for stones that artificial stone produces
CN205614113U (en) * 2016-03-24 2016-10-05 张淑珍 Quick cutting device of aluminum pipe

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002113610A (en) * 2000-10-10 2002-04-16 Sekisui House Ltd Direct cutting device for square steel pipe
CN2508937Y (en) * 2001-12-13 2002-09-04 张堂 Water groove cutting machine
JP2005238363A (en) * 2004-02-25 2005-09-08 Calsonic Kansei Corp Metallic pipe cutting device and cutting method
FR2911805A1 (en) * 2007-01-25 2008-08-01 Lionel Zanon Portable and dismountable self centering orbital pipe cutter for e.g. nuclear industry, has saddle including gauges arranged in contact with internal or external surface of pipe and assuring concentric positioning between cutter and pipe
CN204036669U (en) * 2014-09-09 2014-12-24 桂阳磊腾新材料科技有限公司 For the trimming machine for stones that artificial stone produces
CN205614113U (en) * 2016-03-24 2016-10-05 张淑珍 Quick cutting device of aluminum pipe

Also Published As

Publication number Publication date
CN106975787A (en) 2017-07-25

Similar Documents

Publication Publication Date Title
CN107574756A (en) A kind of good bridge construction support meanss of stability
CN108468269A (en) A kind of bridge antidetonation pedestal and its anti-shock methods
CN207537954U (en) A kind of novel bulwark
CN106964834B (en) A kind of Steel Tubes For Bridge Application cutter device of the bridge construction convenient for adjusting
CN207904758U (en) A kind of bridge shockproof bearing
CN108457176A (en) A kind of the bridge pedestal and its anti-shock methods of antidetonation
CN107675611A (en) A kind of bridge with shock-absorbing function support pedestal
CN108487292B (en) A kind of bridge girder anti-seismic bearing
CN106975787B (en) A kind of bridge construction steel pipe cutting device that stability is good
CN212248064U (en) Protector for hydraulic engineering
CN203791196U (en) Special gravel screening equipment for construction sites
CN107190640A (en) A kind of bridge buffers pedestal
CN107245941B (en) A kind of bridge beam slab support device convenient for adjusting
CN218175834U (en) A fixed auxiliary device for building pile among engineering building
CN109137822A (en) One kind being based on the novel sea wall of the anti-wave of reclamation
CN206581143U (en) A kind of municipal bridge-collision-avoidance wall
CN107675807B (en) A kind of assembled abnormity Column border node and construction method
CN216109001U (en) Height-adjustable assembly type building base
CN108358080A (en) A kind of windproof fixed mechanism of tower crane for building
CN211007762U (en) Steel structure engineering support
CN206254214U (en) A kind of convenient and practical moon cake cutter sweep
CN201428275Y (en) Steel protective mesh
CN107447653A (en) A kind of bridge buffers pedestal
CN221837501U (en) High-stability slope protection water conservancy net
CN219910313U (en) Building construction guardrail reinforcing apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Dan Shirui

Inventor before: Dan Shirui

Inventor before: Li Ming

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20180806

Address after: 461000 Xuchang Vocational Technical College, 4336 new East Road, Wei Du District, Xuchang, Henan

Applicant after: XUCHANG VOCATIONAL AND TECHNICAL COLLEGE

Address before: 461000 No. 16 Dongcheng District new industrial park, Xuchang Vocational Technical College, 4336 Dongcheng District Xinxing Road, Xuchang, Henan

Applicant before: Xuchang Confucian scientific and Technological Information Consulting Co., Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant