CN106971292A - Project tracking system and method - Google Patents
Project tracking system and method Download PDFInfo
- Publication number
- CN106971292A CN106971292A CN201710139024.9A CN201710139024A CN106971292A CN 106971292 A CN106971292 A CN 106971292A CN 201710139024 A CN201710139024 A CN 201710139024A CN 106971292 A CN106971292 A CN 106971292A
- Authority
- CN
- China
- Prior art keywords
- project
- module
- time
- setting
- director
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- Development Economics (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Educational Administration (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Game Theory and Decision Science (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of project tracking system and method, it is desirable to provide one kind provides the PROJECT TIME that can follow up in time, carries out the project tracking system and method for PROJECT TIME early warning, its drip irrigation device is project tracking system, including:Project management system client, countdown is carried out to project Step Time according to the time data being previously set, carried out retrieving to obtain its telephone number project step director according to the duration stage of countdown, project step director is called by communications network system or warning message is sent to project step director.
Description
Technical field
The present invention relates to project tracking system and method.
Background technology
At present, the progress of a project is roughly divided into following steps:Project is registered, project is distributed, task is divided
Solution, task tracking, project achievement registration, project message in-coming, project dispatch, project filing, project urge money.The problem of existing be when pair
The link of some in project then easily causes the delay of project operation without corresponding director is notified in time.
Computerized information development in science and technology in recent years is rapid, and especially internet is prevailing even more in the ascendant, it is this become
Under gesture, government bodies or each company's line number all turn to target with computerization, network.And for many years, engineering management is always
The problem of many government bodies and construction project dealer quite have a headache.Because engineering management is often related to a large amount of complicated data and phase
The personnel of pass, therefore, timely, effective percentage simultaneously grasp and control the construction of engineering to be often not easy to methodically.
The content of the invention
In view of the deficienciess of the prior art, an object of the present invention is to provide the PROJECT TIME that can follow up in time, enter
The project tracking system of row PROJECT TIME early warning.
The present invention above-mentioned technical purpose technical scheme is that:A kind of project tracking system
System, including:
Project management system client, countdown is carried out according to the time data being previously set to project Step Time, according to
The duration stage of countdown project step director is retrieved to obtain its telephone number, passes through communications network system
Calling project step director sends warning message to project step director.
Further, the project management system client is before phone is put through, with graphical menu mode to user
Available project step is shown, the project step menu setecting that user is shown by client needs to carry out the item of prompting tracking
Mesh step;
The project step that user selects is registered in server by client, then initiates to call to third party call central platform,
Third party call central platform arrives first whether server lookup is initiated by this client after receiving calling, and by the clothes of the system
Project step announcement information on business device is sent to Call Center Platform.
Further, the project step distributes module, Task-decomposing module, task including project Registration Module, project
Tracking module, project achievement Registration Module, project message in-coming module, project dispatch module, project profiling module, project urge money mould
Block.
Further, project Registration Module obtains the very first time of setting, when project distributes the second of module acquisition setting
Between, Task-decomposing module obtains the 3rd time of setting, and task tracking module obtains the 4th time of setting, project achievement registration
Module obtains the 5th time of setting, and project message in-coming module obtains the 6th time of setting, and project dispatch module obtains setting
7th time, project profiling module obtains the 8th time of setting, and project urges money module to obtain the 9th time set.
Further, graphical menu mode includes:Shown with list or arborescence frame mode or organizational structure form.
Further, the project management system client also includes grading module, and institute's scoring module is used to entry
The alarm times of mesh step director carry out accumulative storage, and the alarm times aggregate-value of project step director is entered on earth by height
Row sequence is registered with completing deduction of points.
It is a further object of the present invention to provide the PROJECT TIME that can follow up in time, the project tracking of PROJECT TIME early warning is carried out
Management method.
The present invention above-mentioned technical purpose technical scheme is that:
A kind of project tracking method, by project management system client, the time data being previously set is walked to project
The rapid time carries out countdown, is carried out retrieving project step director to obtain its phone according to the duration stage of countdown
Number, calls project step director by communications network system or sends warning message to project step director.
Further, before phone is put through, available project step is shown to user with graphical menu mode, used
The project step menu setecting that family is shown by client needs to carry out the project step of prompting tracking;
The project step that user selects is registered in by project management system client by server, then into third party call
Heart platform initiates calling, and third party call central platform arrives first whether server lookup is sent out by this client after receiving calling
Rise, and the project step announcement information on the server of the system is sent to Call Center Platform.
Further, the project step distributes module, Task-decomposing module, task including project Registration Module, project
Tracking module, project achievement Registration Module, project message in-coming module, project dispatch module, project profiling module, project urge money mould
Block;
Project Registration Module obtains the very first time of setting, and project distributes the second time that module obtains setting, Task-decomposing mould
Block obtains the 3rd time of setting, and task tracking module obtains the 4th time of setting, and project achievement Registration Module obtains setting
The 5th time, project message in-coming module obtain setting the 6th time, project dispatch module obtain setting the 7th time, project
Profiling module obtains the 8th time of setting, and project urges money module to obtain the 9th time set.
Further, last, accumulative storage is carried out come the alarm times of record entry step director by grading module
Deposit, the alarm times aggregate-value of project step director is ranked up on earth by height to complete deduction of points registration.
In summary, the invention has the advantages that:User can carry out selection in its client needs warning
Project step, project situation can be checked,, can be with when countdown terminates so as to improve the convenient degree of project tracking
Director is directly notified by way of short message or dialing, the supervision to engineering is completed, and with scoring, can be more
Intuitively director is evaluated, the operation enthusiasm to director is improved.
Brief description of the drawings
Fig. 1 is the visualization interface figure between the project management of the present embodiment each step;
Fig. 2 is the logic chart of the transmission alarm request of the present embodiment;
Fig. 3 is the system block diagram of the present embodiment;
Fig. 4 is the step flow chart of the present embodiment.
1, server in figure;2nd, client;3rd, third party call central platform;4th, mobile phone.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.
Embodiment:
As shown in figure 1, a kind of project tracking system, including:Project management system client 2.Below can be to project pipe
Manage the abbreviation client 2 of system client 2.
Graphical menu mode includes:Shown with list or arborescence frame mode or organizational structure form.Client 2 with
Graphical menu mode shows available project step to user, as shown in figure 1, the project step, which includes project, registers mould
Block, project distribute module, Task-decomposing module, task tracking module, project achievement Registration Module, project message in-coming module, project
Dispatch module, project profiling module, project urge money module.Project Registration Module obtains the very first time of setting, and project distributes mould
Block obtains the second time of setting, and Task-decomposing module obtains the 3rd time of setting, and task tracking module obtains the of setting
Four times, project achievement Registration Module obtains the 5th time of setting, and project message in-coming module obtains the 6th time of setting, project
Module of sending the documents obtains the 7th time of setting, and project profiling module obtains the 8th time of setting, and project is urged money module to obtain and set
The 9th fixed time.After time is previously set, user selection project Registration Module, now its very first time start to count
When.As shown in Fig. 2 client 2 carries out countdown according to the time data being previously set to project Step Time, according to meter
When the duration stage carry out project step director is retrieved to obtain its telephone number, called by communications network system
Project step director sends warning message to project step director.The duration stage of countdown refers to:Countdown distance
The remaining time length of terminal, this length is it is also assumed that set.Project step director refers to, for each project
Step, projects module in Fig. 1 is all registered with corresponding director, and this registration is also in advance just in server 1
On leave archive.And the telephone number for the correspondence director that is also stored with server 1.
The project step menu setecting that user is shown by client 2 needs to carry out the project step of prompting tracking.
The project step that user selects is registered in server 1 by client 2, is then sent out to third party call central platform 3
Calling is played, third party call central platform 3 is received to arrive first server 1 after calling and inquire about and whether initiated by this client 2, and will
Project step announcement information on the server 1 of the system is sent to Call Center Platform.
As shown in figure 3, the system includes server 1, client 2, third party call central platform 3, mobile phone 4, wherein taking
Business device 1 is used for the project information for receiving and storing enterprise's offer, there is director, telephone number, project duration.Server 1 can be sent out
This type of information is sent to client 2, and registration, the storage carried out to the project Step Information that client 2 is chosen.
Client 2 is used to receive, store, show project Step Information;Send user selection project Step Information to
Server 1;And it can realize that hot line is dialed.
Third party call central platform 3 refer to enterprise at present existing Call Center Platform, this platform not with it is above-mentioned
Server 1 is only before docking provides conventional information transmission with corpse;After being achieved a butt joint with above-mentioned server 1, call center is put down
Platform after call request is received, first to the Check of server 1 ask active calls whether just (as in 1 minute) needs
Project Step Information has been sent to system (illustrating that this calling is that the project step initiated by client 2 selects request), if it is,
Then Call Center Platform phones the director of corresponding telephone number.
Project management system client 2 also includes grading module, and institute's scoring module is used to record entry step director
Alarm times carry out accumulative storage, the alarm times aggregate-value of project step director is ranked up on earth by height to complete
Deduction of points registration.
Real-time example 2:
A kind of project tracking method, with reference to shown in Fig. 4, before phone is put through, with graphical menu mode to user's exhibition
Show available project step, the project step menu setecting that user is shown by client 2 needs to carry out the item of prompting tracking
Mesh step.
Project step includes project Registration Module, project and distributes module, Task-decomposing module, task tracking module, project
Achievement Registration Module, project message in-coming module, project dispatch module, project profiling module, project urge money module;
Project Registration Module obtains the very first time of setting, and project distributes the second time that module obtains setting, Task-decomposing mould
Block obtains the 3rd time of setting, and task tracking module obtains the 4th time of setting, and project achievement Registration Module obtains setting
The 5th time, project message in-coming module obtain setting the 6th time, project dispatch module obtain setting the 7th time, project
Profiling module obtains the 8th time of setting, and project urges money module to obtain the 9th time set.
The project step that user selects is registered in by project management system client 2 by server 1, then to third party
Call Center Platform 3 initiate calling, third party call central platform 3 receive calling after arrive first server 1 inquire about whether by this
Client 2 is initiated, and the project step announcement information on the server 1 of the system is sent into Call Center Platform.
By project management system client 2, the time data being previously set carries out falling to count to project Step Time
When, carried out retrieving to obtain its telephone number project step director according to the duration stage of countdown, pass through communication
Network system calls project step director or sends warning message to project step director.
Last, accumulative storage is carried out come the alarm times of record entry step director by grading module, by project
The alarm times aggregate-value of step director is ranked up to complete deduction of points registration on earth by height.
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art
Member can make the modification without creative contribution to the present embodiment as needed after this specification is read, but as long as at this
All protected in the right of invention by Patent Law.
Claims (10)
1. a kind of project tracking system, it is characterised in that including:
Project management system client (2), countdown, root are carried out according to the time data being previously set to project Step Time
According to the duration stage of countdown retrieve to obtain its telephone number project step director, pass through communication network system
System calling project step director sends warning message to project step director.
2. project tracking system according to claim 1, it is characterised in that:The project management system client
(2) before phone is put through, available project step is shown to user with graphical menu mode, user passes through client
(2) the project step menu setecting of displaying needs to carry out the project step of prompting tracking;
The project step that user selects is registered in server (1) by project management system client (2), then to third party call
Central platform (3) initiate calling, third party call central platform (3) receive calling after arrive first server (1) inquiry whether by
This client (2) is initiated, and the project step announcement information on the server (1) of the system is sent into Call Center Platform.
3. project tracking system according to claim 2, it is characterised in that:The project step is registered including project
Module, project distribute module, Task-decomposing module, task tracking module, project achievement Registration Module, project message in-coming module, item
Mesh dispatch module, project profiling module, project urge money module.
4. project tracking system according to claim 3, it is characterised in that:Project Registration Module obtains the of setting
One time, project distributes the second time that module obtains setting, and Task-decomposing module obtains the 3rd time of setting, task tracking
Module obtains the 4th time of setting, and project achievement Registration Module obtains the 5th time of setting, and project message in-coming module is obtained and set
The 6th fixed time, project dispatch module obtains the 7th time of setting, and project profiling module obtains the 8th time of setting, item
Mesh urges money module to obtain the 9th time set.
5. project tracking system according to claim 4, it is characterised in that:Graphical menu mode includes:To arrange
Table or arborescence frame mode or organizational structure form are shown.
6. project tracking system according to claim 4, it is characterised in that:The project management system client
(2) grading module is also included, institute's scoring module carries out accumulative storage to the alarm times of record entry step director, will
The alarm times aggregate-value of project step director is ranked up to complete deduction of points registration on earth by height.
7. a kind of project tracking method, it is characterised in that:By project management system client (2), it has been previously set
Time data, countdown is carried out to project Step Time, according to the duration stage of countdown enter project step director
Row retrieval calls project step director by communications network system or sends warning message to project to obtain its telephone number
Step director.
8. project tracking method according to claim 7, it is characterised in that:Before phone is put through, with graphical
Menu mode shows available project step to user, and the project step menu setecting that user is shown by client (2) is needed
Point out the project step of tracking;
The project step that user selects is registered in by project management system client (2) by server (1), then to third party
Call Center Platform (3) initiates calling, and third party call central platform (3), which receives to arrive first server (1) after calling and inquire about, is
It is no by this client (2) initiate, and by the project step announcement information on the server (1) of the system be sent to call center put down
Platform.
9. project tracking method according to claim 8, it is characterised in that:The project step is registered including project
Module, project distribute module, Task-decomposing module, task tracking module, project achievement Registration Module, project message in-coming module, item
Mesh dispatch module, project profiling module, project urge money module;
Project Registration Module obtains the very first time of setting, and project distributes the second time that module obtains setting, Task-decomposing mould
Block obtains the 3rd time of setting, and task tracking module obtains the 4th time of setting, and project achievement Registration Module obtains setting
The 5th time, project message in-coming module obtain setting the 6th time, project dispatch module obtain setting the 7th time, project
Profiling module obtains the 8th time of setting, and project urges money module to obtain the 9th time set.
10. project tracking method according to claim 9, it is characterised in that:Last, remembered by grading module
The alarm times of record project step director carry out accumulative storage, by the alarm times aggregate-value of project step director by height to
Bottom is ranked up to complete deduction of points registration.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710139024.9A CN106971292A (en) | 2017-03-09 | 2017-03-09 | Project tracking system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710139024.9A CN106971292A (en) | 2017-03-09 | 2017-03-09 | Project tracking system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106971292A true CN106971292A (en) | 2017-07-21 |
Family
ID=59329973
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710139024.9A Pending CN106971292A (en) | 2017-03-09 | 2017-03-09 | Project tracking system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106971292A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107705027A (en) * | 2017-10-17 | 2018-02-16 | 通辽霍林河坑口发电有限责任公司 | Information cuing method and device |
CN108364169A (en) * | 2018-03-21 | 2018-08-03 | 浙江省工程咨询有限公司 | A kind of engineering project management system for tracking and method |
CN112465457A (en) * | 2020-11-27 | 2021-03-09 | 重庆康盛监理咨询有限公司 | Supervision project management method, system, device and computer storage medium |
CN112734368A (en) * | 2020-12-31 | 2021-04-30 | 大为国际工程咨询有限公司 | Engineering cost progress management method, system and storage medium |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102663582A (en) * | 2011-07-21 | 2012-09-12 | 上海互联网软件有限公司 | Electronic government document handling system |
CN103236001A (en) * | 2013-05-13 | 2013-08-07 | 济南政和科技有限公司 | Automatic reminding method for key process and step in item management system |
-
2017
- 2017-03-09 CN CN201710139024.9A patent/CN106971292A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102663582A (en) * | 2011-07-21 | 2012-09-12 | 上海互联网软件有限公司 | Electronic government document handling system |
CN103236001A (en) * | 2013-05-13 | 2013-08-07 | 济南政和科技有限公司 | Automatic reminding method for key process and step in item management system |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107705027A (en) * | 2017-10-17 | 2018-02-16 | 通辽霍林河坑口发电有限责任公司 | Information cuing method and device |
CN108364169A (en) * | 2018-03-21 | 2018-08-03 | 浙江省工程咨询有限公司 | A kind of engineering project management system for tracking and method |
CN112465457A (en) * | 2020-11-27 | 2021-03-09 | 重庆康盛监理咨询有限公司 | Supervision project management method, system, device and computer storage medium |
CN112465457B (en) * | 2020-11-27 | 2024-05-24 | 重庆康盛监理咨询有限公司 | Method, system, device and computer storage medium for managing supervision project |
CN112734368A (en) * | 2020-12-31 | 2021-04-30 | 大为国际工程咨询有限公司 | Engineering cost progress management method, system and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106971292A (en) | Project tracking system and method | |
US20080152097A1 (en) | Methods and systems for personalized content delivery to telecommunications devices | |
CN107527143A (en) | Job site data-pushing, management method and management system based on BIM models | |
CN106131807A (en) | The outer paging system of intelligence of call center | |
EP1564979A1 (en) | Provision of voice mail messaging indicator and voice mail access services via common instant communications clients | |
US20110038470A1 (en) | Centrally Located Server Delivery Of Personalized Content To Telecommunications Devices | |
CN106156228A (en) | Resource delivery system, resource payment method and resource get method | |
US20160119471A1 (en) | Methods and apparatus for transmitting data | |
CN102904928B (en) | The high in the clouds retrieval of service calls and automatic dial method, system and device | |
CN103634444B (en) | The method and system of number information are provided | |
CN102870440B (en) | Method, apparatus and system for call forwarding | |
CN105872833A (en) | Video communication method and device, and smart television | |
CN103312590A (en) | Method, device, receiving terminal, transmitting terminal and equipment for group communication | |
US20130041995A1 (en) | Method and System for Managing Service Group | |
CN105657681A (en) | Call service processing method, call service processing system and call platform | |
US8942670B1 (en) | Carrier network determination for providing real-time customer feedback of call information | |
CN103916444A (en) | Method for displaying number information through cloud model | |
KR102214177B1 (en) | System for managing electric business card and method therefor | |
CN103548368A (en) | System for providing data interconnected with ARS by using ring data and method for same | |
CN101645059A (en) | Travel establishing method and mobile terminal | |
CN106888241A (en) | Data processing method and device based on cloud number | |
US20130084839A1 (en) | System and method for delivering caller name information to mobile devices | |
CN102546984A (en) | Method, device and system for realizing customer service telephone real names | |
CN104869537B (en) | A kind of method for locking bicycle code table | |
CN106559589B (en) | Information in conversation display methods and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170721 |