CN106971292A CN201710139024.9A CN201710139024A CN106971292A CN 106971292 A CN106971292 A CN 106971292A CN 201710139024 A CN201710139024 A CN 201710139024A CN 106971292 A CN106971292 A CN 106971292A
Authority
CN
China
Prior art keywords
project
module
time
setting
director
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710139024.9A
Other languages
Chinese (zh)
Inventor
陈朝阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG ZONETOWN ENGINEERING MANAGEMENT Co Ltd
Original Assignee
ZHEJIANG ZONETOWN ENGINEERING MANAGEMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG ZONETOWN ENGINEERING MANAGEMENT Co Ltd filed Critical ZHEJIANG ZONETOWN ENGINEERING MANAGEMENT Co Ltd
Priority to CN201710139024.9A priority Critical patent/CN106971292A/en
Publication of CN106971292A publication Critical patent/CN106971292A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of project tracking system and method, it is desirable to provide one kind provides the PROJECT TIME that can follow up in time, carries out the project tracking system and method for PROJECT TIME early warning, its drip irrigation device is project tracking system, including:Project management system client, countdown is carried out to project Step Time according to the time data being previously set, carried out retrieving to obtain its telephone number project step director according to the duration stage of countdown, project step director is called by communications network system or warning message is sent to project step director.

Description

Project tracking system and method
Technical field
The present invention relates to project tracking system and method.
Background technology
At present, the progress of a project is roughly divided into following steps:Project is registered, project is distributed, task is divided Solution, task tracking, project achievement registration, project message in-coming, project dispatch, project filing, project urge money.The problem of existing be when pair The link of some in project then easily causes the delay of project operation without corresponding director is notified in time.
Computerized information development in science and technology in recent years is rapid, and especially internet is prevailing even more in the ascendant, it is this become Under gesture, government bodies or each company's line number all turn to target with computerization, network.And for many years, engineering management is always The problem of many government bodies and construction project dealer quite have a headache.Because engineering management is often related to a large amount of complicated data and phase The personnel of pass, therefore, timely, effective percentage simultaneously grasp and control the construction of engineering to be often not easy to methodically.
The content of the invention
In view of the deficienciess of the prior art, an object of the present invention is to provide the PROJECT TIME that can follow up in time, enter The project tracking system of row PROJECT TIME early warning.
The present invention above-mentioned technical purpose technical scheme is that:A kind of project tracking system System, including:
Project management system client, countdown is carried out according to the time data being previously set to project Step Time, according to The duration stage of countdown project step director is retrieved to obtain its telephone number, passes through communications network system Calling project step director sends warning message to project step director.
Further, the project management system client is before phone is put through, with graphical menu mode to user Available project step is shown, the project step menu setecting that user is shown by client needs to carry out the item of prompting tracking Mesh step;
The project step that user selects is registered in server by client, then initiates to call to third party call central platform, Third party call central platform arrives first whether server lookup is initiated by this client after receiving calling, and by the clothes of the system Project step announcement information on business device is sent to Call Center Platform.
Further, the project step distributes module, Task-decomposing module, task including project Registration Module, project Tracking module, project achievement Registration Module, project message in-coming module, project dispatch module, project profiling module, project urge money mould Block.
Further, project Registration Module obtains the very first time of setting, when project distributes the second of module acquisition setting Between, Task-decomposing module obtains the 3rd time of setting, and task tracking module obtains the 4th time of setting, project achievement registration Module obtains the 5th time of setting, and project message in-coming module obtains the 6th time of setting, and project dispatch module obtains setting 7th time, project profiling module obtains the 8th time of setting, and project urges money module to obtain the 9th time set.
Further, graphical menu mode includes:Shown with list or arborescence frame mode or organizational structure form.
Further, the project management system client also includes grading module, and institute's scoring module is used to entry The alarm times of mesh step director carry out accumulative storage, and the alarm times aggregate-value of project step director is entered on earth by height Row sequence is registered with completing deduction of points.
It is a further object of the present invention to provide the PROJECT TIME that can follow up in time, the project tracking of PROJECT TIME early warning is carried out Management method.
The present invention above-mentioned technical purpose technical scheme is that:
A kind of project tracking method, by project management system client, the time data being previously set is walked to project The rapid time carries out countdown, is carried out retrieving project step director to obtain its phone according to the duration stage of countdown Number, calls project step director by communications network system or sends warning message to project step director.
Further, before phone is put through, available project step is shown to user with graphical menu mode, used The project step menu setecting that family is shown by client needs to carry out the project step of prompting tracking;
The project step that user selects is registered in by project management system client by server, then into third party call Heart platform initiates calling, and third party call central platform arrives first whether server lookup is sent out by this client after receiving calling Rise, and the project step announcement information on the server of the system is sent to Call Center Platform.
Further, the project step distributes module, Task-decomposing module, task including project Registration Module, project Tracking module, project achievement Registration Module, project message in-coming module, project dispatch module, project profiling module, project urge money mould Block;
Project Registration Module obtains the very first time of setting, and project distributes the second time that module obtains setting, Task-decomposing mould Block obtains the 3rd time of setting, and task tracking module obtains the 4th time of setting, and project achievement Registration Module obtains setting The 5th time, project message in-coming module obtain setting the 6th time, project dispatch module obtain setting the 7th time, project Profiling module obtains the 8th time of setting, and project urges money module to obtain the 9th time set.
Further, last, accumulative storage is carried out come the alarm times of record entry step director by grading module Deposit, the alarm times aggregate-value of project step director is ranked up on earth by height to complete deduction of points registration.
In summary, the invention has the advantages that:User can carry out selection in its client needs warning Project step, project situation can be checked,, can be with when countdown terminates so as to improve the convenient degree of project tracking Director is directly notified by way of short message or dialing, the supervision to engineering is completed, and with scoring, can be more Intuitively director is evaluated, the operation enthusiasm to director is improved.
Brief description of the drawings
Fig. 1 is the visualization interface figure between the project management of the present embodiment each step;
Fig. 2 is the logic chart of the transmission alarm request of the present embodiment;
Fig. 3 is the system block diagram of the present embodiment;
Fig. 4 is the step flow chart of the present embodiment.
1, server in figure;2nd, client;3rd, third party call central platform;4th, mobile phone.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.
Embodiment:
As shown in figure 1, a kind of project tracking system, including:Project management system client 2.Below can be to project pipe Manage the abbreviation client 2 of system client 2.
Graphical menu mode includes:Shown with list or arborescence frame mode or organizational structure form.Client 2 with Graphical menu mode shows available project step to user, as shown in figure 1, the project step, which includes project, registers mould Block, project distribute module, Task-decomposing module, task tracking module, project achievement Registration Module, project message in-coming module, project Dispatch module, project profiling module, project urge money module.Project Registration Module obtains the very first time of setting, and project distributes mould Block obtains the second time of setting, and Task-decomposing module obtains the 3rd time of setting, and task tracking module obtains the of setting Four times, project achievement Registration Module obtains the 5th time of setting, and project message in-coming module obtains the 6th time of setting, project Module of sending the documents obtains the 7th time of setting, and project profiling module obtains the 8th time of setting, and project is urged money module to obtain and set The 9th fixed time.After time is previously set, user selection project Registration Module, now its very first time start to count When.As shown in Fig. 2 client 2 carries out countdown according to the time data being previously set to project Step Time, according to meter When the duration stage carry out project step director is retrieved to obtain its telephone number, called by communications network system Project step director sends warning message to project step director.The duration stage of countdown refers to:Countdown distance The remaining time length of terminal, this length is it is also assumed that set.Project step director refers to, for each project Step, projects module in Fig. 1 is all registered with corresponding director, and this registration is also in advance just in server 1 On leave archive.And the telephone number for the correspondence director that is also stored with server 1.
The project step menu setecting that user is shown by client 2 needs to carry out the project step of prompting tracking.
The project step that user selects is registered in server 1 by client 2, is then sent out to third party call central platform 3 Calling is played, third party call central platform 3 is received to arrive first server 1 after calling and inquire about and whether initiated by this client 2, and will Project step announcement information on the server 1 of the system is sent to Call Center Platform.
As shown in figure 3, the system includes server 1, client 2, third party call central platform 3, mobile phone 4, wherein taking Business device 1 is used for the project information for receiving and storing enterprise's offer, there is director, telephone number, project duration.Server 1 can be sent out This type of information is sent to client 2, and registration, the storage carried out to the project Step Information that client 2 is chosen.
Client 2 is used to receive, store, show project Step Information;Send user selection project Step Information to Server 1;And it can realize that hot line is dialed.
Third party call central platform 3 refer to enterprise at present existing Call Center Platform, this platform not with it is above-mentioned Server 1 is only before docking provides conventional information transmission with corpse;After being achieved a butt joint with above-mentioned server 1, call center is put down Platform after call request is received, first to the Check of server 1 ask active calls whether just (as in 1 minute) needs Project Step Information has been sent to system (illustrating that this calling is that the project step initiated by client 2 selects request), if it is, Then Call Center Platform phones the director of corresponding telephone number.
Project management system client 2 also includes grading module, and institute's scoring module is used to record entry step director Alarm times carry out accumulative storage, the alarm times aggregate-value of project step director is ranked up on earth by height to complete Deduction of points registration.
Real-time example 2:
A kind of project tracking method, with reference to shown in Fig. 4, before phone is put through, with graphical menu mode to user's exhibition Show available project step, the project step menu setecting that user is shown by client 2 needs to carry out the item of prompting tracking Mesh step.
Project step includes project Registration Module, project and distributes module, Task-decomposing module, task tracking module, project Achievement Registration Module, project message in-coming module, project dispatch module, project profiling module, project urge money module;
Project Registration Module obtains the very first time of setting, and project distributes the second time that module obtains setting, Task-decomposing mould Block obtains the 3rd time of setting, and task tracking module obtains the 4th time of setting, and project achievement Registration Module obtains setting The 5th time, project message in-coming module obtain setting the 6th time, project dispatch module obtain setting the 7th time, project Profiling module obtains the 8th time of setting, and project urges money module to obtain the 9th time set.
The project step that user selects is registered in by project management system client 2 by server 1, then to third party Call Center Platform 3 initiate calling, third party call central platform 3 receive calling after arrive first server 1 inquire about whether by this Client 2 is initiated, and the project step announcement information on the server 1 of the system is sent into Call Center Platform.
By project management system client 2, the time data being previously set carries out falling to count to project Step Time When, carried out retrieving to obtain its telephone number project step director according to the duration stage of countdown, pass through communication Network system calls project step director or sends warning message to project step director.
Last, accumulative storage is carried out come the alarm times of record entry step director by grading module, by project The alarm times aggregate-value of step director is ranked up to complete deduction of points registration on earth by height.
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, people in the art Member can make the modification without creative contribution to the present embodiment as needed after this specification is read, but as long as at this All protected in the right of invention by Patent Law.

Claims (10)

1. a kind of project tracking system, it is characterised in that including:
Project management system client (2), countdown, root are carried out according to the time data being previously set to project Step Time According to the duration stage of countdown retrieve to obtain its telephone number project step director, pass through communication network system System calling project step director sends warning message to project step director.
2. project tracking system according to claim 1, it is characterised in that:The project management system client (2) before phone is put through, available project step is shown to user with graphical menu mode, user passes through client (2) the project step menu setecting of displaying needs to carry out the project step of prompting tracking;
The project step that user selects is registered in server (1) by project management system client (2), then to third party call Central platform (3) initiate calling, third party call central platform (3) receive calling after arrive first server (1) inquiry whether by This client (2) is initiated, and the project step announcement information on the server (1) of the system is sent into Call Center Platform.
3. project tracking system according to claim 2, it is characterised in that:The project step is registered including project Module, project distribute module, Task-decomposing module, task tracking module, project achievement Registration Module, project message in-coming module, item Mesh dispatch module, project profiling module, project urge money module.
4. project tracking system according to claim 3, it is characterised in that:Project Registration Module obtains the of setting One time, project distributes the second time that module obtains setting, and Task-decomposing module obtains the 3rd time of setting, task tracking Module obtains the 4th time of setting, and project achievement Registration Module obtains the 5th time of setting, and project message in-coming module is obtained and set The 6th fixed time, project dispatch module obtains the 7th time of setting, and project profiling module obtains the 8th time of setting, item Mesh urges money module to obtain the 9th time set.
5. project tracking system according to claim 4, it is characterised in that:Graphical menu mode includes:To arrange Table or arborescence frame mode or organizational structure form are shown.
6. project tracking system according to claim 4, it is characterised in that:The project management system client (2) grading module is also included, institute's scoring module carries out accumulative storage to the alarm times of record entry step director, will The alarm times aggregate-value of project step director is ranked up to complete deduction of points registration on earth by height.
7. a kind of project tracking method, it is characterised in that:By project management system client (2), it has been previously set Time data, countdown is carried out to project Step Time, according to the duration stage of countdown enter project step director Row retrieval calls project step director by communications network system or sends warning message to project to obtain its telephone number Step director.
8. project tracking method according to claim 7, it is characterised in that:Before phone is put through, with graphical Menu mode shows available project step to user, and the project step menu setecting that user is shown by client (2) is needed Point out the project step of tracking;
The project step that user selects is registered in by project management system client (2) by server (1), then to third party Call Center Platform (3) initiates calling, and third party call central platform (3), which receives to arrive first server (1) after calling and inquire about, is It is no by this client (2) initiate, and by the project step announcement information on the server (1) of the system be sent to call center put down Platform.
9. project tracking method according to claim 8, it is characterised in that:The project step is registered including project Module, project distribute module, Task-decomposing module, task tracking module, project achievement Registration Module, project message in-coming module, item Mesh dispatch module, project profiling module, project urge money module;
Project Registration Module obtains the very first time of setting, and project distributes the second time that module obtains setting, Task-decomposing mould Block obtains the 3rd time of setting, and task tracking module obtains the 4th time of setting, and project achievement Registration Module obtains setting The 5th time, project message in-coming module obtain setting the 6th time, project dispatch module obtain setting the 7th time, project Profiling module obtains the 8th time of setting, and project urges money module to obtain the 9th time set.
10. project tracking method according to claim 9, it is characterised in that:Last, remembered by grading module The alarm times of record project step director carry out accumulative storage, by the alarm times aggregate-value of project step director by height to Bottom is ranked up to complete deduction of points registration.
CN201710139024.9A 2017-03-09 2017-03-09 Project tracking system and method Pending CN106971292A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710139024.9A CN106971292A (en) 2017-03-09 2017-03-09 Project tracking system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710139024.9A CN106971292A (en) 2017-03-09 2017-03-09 Project tracking system and method

Publications (1)

Publication Number Publication Date
CN106971292A true CN106971292A (en) 2017-07-21

Family

ID=59329973

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710139024.9A Pending CN106971292A (en) 2017-03-09 2017-03-09 Project tracking system and method

Country Status (1)

Country Link
CN (1) CN106971292A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107705027A (en) * 2017-10-17 2018-02-16 通辽霍林河坑口发电有限责任公司 Information cuing method and device
CN108364169A (en) * 2018-03-21 2018-08-03 浙江省工程咨询有限公司 A kind of engineering project management system for tracking and method
CN112465457A (en) * 2020-11-27 2021-03-09 重庆康盛监理咨询有限公司 Supervision project management method, system, device and computer storage medium
CN112734368A (en) * 2020-12-31 2021-04-30 大为国际工程咨询有限公司 Engineering cost progress management method, system and storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102663582A (en) * 2011-07-21 2012-09-12 上海互联网软件有限公司 Electronic government document handling system
CN103236001A (en) * 2013-05-13 2013-08-07 济南政和科技有限公司 Automatic reminding method for key process and step in item management system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102663582A (en) * 2011-07-21 2012-09-12 上海互联网软件有限公司 Electronic government document handling system
CN103236001A (en) * 2013-05-13 2013-08-07 济南政和科技有限公司 Automatic reminding method for key process and step in item management system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107705027A (en) * 2017-10-17 2018-02-16 通辽霍林河坑口发电有限责任公司 Information cuing method and device
CN108364169A (en) * 2018-03-21 2018-08-03 浙江省工程咨询有限公司 A kind of engineering project management system for tracking and method
CN112465457A (en) * 2020-11-27 2021-03-09 重庆康盛监理咨询有限公司 Supervision project management method, system, device and computer storage medium
CN112465457B (en) * 2020-11-27 2024-05-24 重庆康盛监理咨询有限公司 Method, system, device and computer storage medium for managing supervision project
CN112734368A (en) * 2020-12-31 2021-04-30 大为国际工程咨询有限公司 Engineering cost progress management method, system and storage medium

Similar Documents

Publication Publication Date Title
CN106971292A (en) Project tracking system and method
US20080152097A1 (en) Methods and systems for personalized content delivery to telecommunications devices
CN107527143A (en) Job site data-pushing, management method and management system based on BIM models
CN106131807A (en) The outer paging system of intelligence of call center
EP1564979A1 (en) Provision of voice mail messaging indicator and voice mail access services via common instant communications clients
US20110038470A1 (en) Centrally Located Server Delivery Of Personalized Content To Telecommunications Devices
CN106156228A (en) Resource delivery system, resource payment method and resource get method
US20160119471A1 (en) Methods and apparatus for transmitting data
CN102904928B (en) The high in the clouds retrieval of service calls and automatic dial method, system and device
CN103634444B (en) The method and system of number information are provided
CN102870440B (en) Method, apparatus and system for call forwarding
CN105872833A (en) Video communication method and device, and smart television
CN103312590A (en) Method, device, receiving terminal, transmitting terminal and equipment for group communication
US20130041995A1 (en) Method and System for Managing Service Group
CN105657681A (en) Call service processing method, call service processing system and call platform
US8942670B1 (en) Carrier network determination for providing real-time customer feedback of call information
CN103916444A (en) Method for displaying number information through cloud model
KR102214177B1 (en) System for managing electric business card and method therefor
CN103548368A (en) System for providing data interconnected with ARS by using ring data and method for same
CN101645059A (en) Travel establishing method and mobile terminal
CN106888241A (en) Data processing method and device based on cloud number
US20130084839A1 (en) System and method for delivering caller name information to mobile devices
CN102546984A (en) Method, device and system for realizing customer service telephone real names
CN104869537B (en) A kind of method for locking bicycle code table
CN106559589B (en) Information in conversation display methods and device

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170721