CN106971263A - Consider the photovoltaic plant electricity price Cost Analysis Method of the time value of money - Google Patents
Consider the photovoltaic plant electricity price Cost Analysis Method of the time value of money Download PDFInfo
- Publication number
- CN106971263A CN106971263A CN201710156568.6A CN201710156568A CN106971263A CN 106971263 A CN106971263 A CN 106971263A CN 201710156568 A CN201710156568 A CN 201710156568A CN 106971263 A CN106971263 A CN 106971263A
- Authority
- CN
- China
- Prior art keywords
- photovoltaic plant
- electricity price
- year
- formula
- photovoltaic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000005611 electricity Effects 0.000 title claims abstract description 52
- 238000007728 cost analysis Methods 0.000 title claims abstract description 16
- 238000000034 method Methods 0.000 title claims abstract description 11
- 238000009434 installation Methods 0.000 claims abstract description 16
- 238000012423 maintenance Methods 0.000 claims abstract description 13
- 238000013461 design Methods 0.000 claims abstract description 5
- 238000013178 mathematical model Methods 0.000 claims abstract description 4
- 238000007726 management method Methods 0.000 claims description 17
- PEDCQBHIVMGVHV-UHFFFAOYSA-N Glycerine Chemical group OCC(O)CO PEDCQBHIVMGVHV-UHFFFAOYSA-N 0.000 claims description 3
- 238000004458 analytical method Methods 0.000 abstract description 6
- 238000010248 power generation Methods 0.000 abstract description 3
- 238000011161 development Methods 0.000 description 3
- 230000003068 static effect Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 230000007423 decrease Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 235000013399 edible fruits Nutrition 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000010348 incorporation Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 230000001131 transforming effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/02—Marketing; Price estimation or determination; Fundraising
- G06Q30/0201—Market modelling; Market analysis; Collecting market data
- G06Q30/0206—Price or cost determination based on market factors
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/90—Financial instruments for climate change mitigation, e.g. environmental taxes, subsidies or financing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S50/00—Market activities related to the operation of systems integrating technologies related to power network operation or related to communication or information technologies
- Y04S50/14—Marketing, i.e. market research and analysis, surveying, promotions, advertising, buyer profiling, customer management or rewards
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Development Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Finance (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- Accounting & Taxation (AREA)
- General Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Educational Administration (AREA)
- Tourism & Hospitality (AREA)
- Game Theory and Decision Science (AREA)
- Data Mining & Analysis (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of photovoltaic plant electricity price Cost Analysis Method for considering the time value of money, following steps are specifically included:1) photovoltaic plant electricity price cost analysis relevant rudimentary data, are extracted, basic data includes that installed capacity of power station, design life, the electric subsidy of degree that initially installation cost, one's own reserves and bank loan ratio, loan rate, repayment period, photovoltaic plant year operation maintenance rate, government are given, project base earnings ratio, photovoltaic plant be year equivalent at full capacity, photovoltaic module year attenuation rate;2), founding mathematical models:Calculate photovoltaic plant electricity price cost.The present invention is with dynamic viewpoint analysis electricity price cost, time value on assets, photovoltaic power station power generation ability is considered the factor such as over time progressively to decay, the dynamic model and algorithm for the photovoltaic plant cost electricity price derived, make the estimation of electricity price cost more accurate, so as to be that project investment and government decision are referred to.
Description
Technical field
The present invention relates to photovoltaic plant electricity price Cost Analysis Method technical field, specifically a kind of consideration fund time
The photovoltaic plant electricity price Cost Analysis Method of value.
Background technology
Compared with conventional energy resource generates electricity, photovoltaic generation still belongs to " intermittent energy " at present, and big, Modulatory character is impacted to power network
Difference;Cost remains unchanged higher, it is necessary to could develop by government subsidy.But under the overall background of Developing low-carbon economy, due to
The progress of science and technology and the support of government policy, photovoltaic generation industry are currently under great change and fast-developing period.
Nearly ten years, domestic photovoltaic plant project development is swift and violent, by the end of the year 2015, domestic photovoltaic generation total installation of generating capacity
43.18GW is reached, and 635 times were increased compared with 2005,90% is grown beyond every year.With increasing sharply for installed capacity,
National Development and Reform Committee issues in December, 2015《On improve land wind-powered electricity generation, photovoltaic generation online stake electrovalence policy it is logical
Know》,《Notify》Explicitly point out, photovoltaic plant online stake electrovalence will be progressively lowered, so as to realize《Energy development strategic action meter
Draw (2014~the year two thousand twenty)》The target suitable with sales rate of electricity supplied to consumers on photovoltaic plant rate for incorporation into the power network proposed.This
Under background, the electricity price cost of photovoltaic generation needs more careful progress to estimate, so as to make to join for project investment and government decision
Examine.
The mathematical modeling of existing photovoltaic plant electricity price cost is primarily present problems with:
1) time value on assets, is not accounted for, the fund value-added form of expression over time is not accounted for, and only
With static viewpoint analysis electricity price cost.
2) the problem of, progressively decaying over time without the generating capacity for embodying photovoltaic plant.
3), consider that government subsidy uses construction subsidy patterns, and the Government Compensation mould of actually current photovoltaic plant
The formula overwhelming majority is electricity price subsidy patterns.Before this, central and local government implement " plan of solar photoelectric Application in Building " and
" golden sun demonstration project " uses construction subsidy patterns, and the current pattern is cancelled substantially.
The content of the invention
It is an object of the invention to provide a kind of photovoltaic plant electricity price Cost Analysis Method for considering the time value of money, use
The problem of above-mentioned be previously mentioned is solved.
The technical scheme adopted by the invention to solve the technical problem is that:Consider the photovoltaic plant electricity price of the time value of money
Cost Analysis Method, it is characterized in that, specifically include following steps:
1) photovoltaic plant electricity price cost analysis relevant rudimentary data, are extracted, basic data includes installed capacity of power station, design
Service life, initially installation cost, one's own reserves and bank loan ratio, loan rate, repayment period, photovoltaic plant year operation
Safeguard that the electric subsidy of degree, project base earnings ratio, photovoltaic plant year that rate, government are given are equivalent at full capacity, decline in photovoltaic module year
Lapse rate;
2), founding mathematical models:
Calculate photovoltaic plant electricity price cost;
In formula, A is the one's own reserves in photovoltaic plant installation cost;B is the annual operation maintenance expense of photovoltaic plant;C is
Photovoltaic plant is repaid capital with interest the amount of money every year;D is year power selling income;E is government's year subsidy;N is photovoltaic plant life cycle management
Year;iCFor project base earnings ratio.
Further, in formula 1,
A=Civs×(1-Rloan);
B=Cop=Civs×Rop;
D=P × Ci×Hfp×(1-iat)n-1×1000;
E=isub×Ci×Hfp×(1-iat)n-1×1000;
Wherein, CivsFor the installation cost of photovoltaic plant;RloanProvided a loan for photovoltaic plant and account for the ratio of gross investment;CopFor light
The year operation maintenance expense of overhead utility;RopFor operation maintenance rate;CyFor the annual principal and interest amount of money for needing to refund;imonthFor loan
Rate per month;M is moon number that need to refund;CiFor photovoltaic plant installed capacity;HfpFor the equivalent hourage at full capacity of photovoltaic plant year;P is
Photovoltaic plant electricity price cost;iatFor photovoltaic module year attenuation rate;N is operation year;CtotalIt is total for photovoltaic plant life cycle management
Input;EtotalFor the gross generation of photovoltaic plant life cycle management;isubFor the degree electricity subsidy acquired in photovoltaic plant.
Further, the circular of formula 1 is:
21) electricity price x1, is selected, formula 1 is substituted into;
If 22), calculating value on the left of formula, just, to select a value x2 for being less than x1, is substituted into formula 1, such as
Now left side is still just, then to be recalculated again after the value for reducing x2 on the left of formula to fruit, for untill bearing on the left of formula;
23) if it is negative, the value x3 that selection one is more than x1, to calculate value on the left of formula, formula 1 is substituted into, such as
Really now left side is still negative, then is recalculated again after the value for increasing x3 on the left of formula, untill formula left side is just.
The beneficial effects of the invention are as follows:
1), consideration fund of the present invention value-added effect over time, that is, consider time value on assets.
2), the generating capacity that photovoltaic plant is considered in the mathematical modeling designed by the present invention progressively decays over time
The problem of.
3), the present invention considers actual government subsidy pattern, i.e. electricity price subsidy patterns.
The present invention is with dynamic viewpoint analysis electricity price cost, it is contemplated that time value on assets, photovoltaic power station power generation ability
Over time progressively decay etc. factor, the dynamic model and algorithm of the photovoltaic plant cost electricity price derived make electricity price cost
Estimation it is more accurate, so as to be referred to for project investment and government decision.
Brief description of the drawings
Fig. 1 is photovoltaic plant life cycle cash flow diagram of the present invention;
In figure, A is the one's own reserves in photovoltaic plant installation cost;B is the annual operation maintenance expense of photovoltaic plant;C is
Photovoltaic plant is repaid capital with interest the amount of money every year;D is year power selling income (electricity price at cost);E is government's year subsidy;N is photovoltaic electric
Stand life cycle management year (unit:a).
Embodiment
Current photovoltaic plant electricity price cost conventional analysis is as follows:
Photovoltaic plant overall cost of ownership includes project's earlier stage expense, cost of project implementation, project operation expense etc..Project is built
If expense accounts for the major part of power station total investment expenses, mainly include power station hardware input and software input.Hardware facility has:Soil
Ground requisition, public utility, solar module, inverter, support, power transmission and transforming equipment, data acquisition, cable and wire and lightning protection
The projects such as ground connection;Software facility has:Engineering design, transport and storage, rigging up and debugging, acceptance of work etc..
In order to analyze electricity price cost, existing electricity price cost analysis is static analysis, is specially:
The static electricity price cost of photovoltaic plant can be obtained with the total input and gross generation of photovoltaic plant life cycle management, be pressed
Calculated according to following formula:
In formula:P is photovoltaic plant electricity price cost;Ctotal is that photovoltaic plant life cycle management is always put into;Etotal is light
The gross generation of overhead utility life cycle management.
For some photovoltaic plant, the gross investment of its life cycle management can be calculated as follows:
Ctotal=Civs+Cfn+Cop-Isub
In formula:Isub is total subsidy acquired in photovoltaic plant.
For some photovoltaic plant, its life cycle management total electricity Etotal is:
Etotal=Ci×Hfp×N×1000
In formula:Ci is photovoltaic plant installed capacity (unit:MW);Hfp is that the equivalent hourage at full capacity of photovoltaic plant year is (single
Position:h);N is photovoltaic plant life cycle management year (unit:a).
In general, installation cost is directly proportional to installed capacity, then unit installation cost Cp is
Meanwhile, also there is proportional relation in the subsidy revenue of photovoltaic plant, can be according to the following formula cost with installed capacity
Certain proportion:
Isub=Civs×Rsub
In formula:Isub is the subsidy revenue of photovoltaic plant;Rsub is the ratio that subsidy revenue accounts for installation cost.
Summary, it is considered to the unit cost of photovoltaic plant and unit installation cost, financial expenses, operation maintenance expense,
Every year equivalent hourage at full capacity, life cycle management and government subsidy, then the mathematical modeling of photovoltaic plant electricity price cost see below formula:
But existing electricity price analysis does not account for time value on assets, photovoltaic power station power generation ability over time
The progressively factor such as decay so that the result estimated is inaccurate, it is impossible to make effective reference.Therefore examined the invention provides one kind
Consider the photovoltaic plant electricity price Cost Analysis Method of the time value of money, specifically include:
1) photovoltaic plant electricity price cost analysis relevant rudimentary data, are extracted, basic data includes installed capacity of power station, design
Service life, initially installation cost, one's own reserves and bank loan ratio, loan rate, repayment period, photovoltaic plant year operation
Safeguard that the electric subsidy of degree, project base earnings ratio, photovoltaic plant year that rate, government are given are equivalent at full capacity, decline in photovoltaic module year
Lapse rate;
2), according to photovoltaic plant life cycle cash flow diagram as shown in Figure 1, founding mathematical models:
Calculate photovoltaic plant electricity price cost;
In formula, A is the one's own reserves in photovoltaic plant installation cost;B is the annual operation maintenance expense of photovoltaic plant;C is
Photovoltaic plant is repaid capital with interest the amount of money every year;D is year power selling income (electricity price at cost);E is government's year subsidy;N is photovoltaic electric
Stand life cycle management year;iCFor project base earnings ratio.
In formula 1,
A=Civs×(1-Rloan);
B=Cop=Civs×Rop;
D=P × Ci×Hfp×(1-iat)n-1×1000;
E=isub×Ci×Hfp×(1-iat)n-1×1000;
Wherein, CivsFor the installation cost of photovoltaic plant;RloanProvided a loan for photovoltaic plant and account for the ratio of gross investment;CopFor light
The year operation maintenance expense of overhead utility;RopFor operation maintenance rate;CyFor the annual principal and interest amount of money (unit for needing to refund:Member);
imonthFor loan rate per month;M is moon number (unit that need to refund:Month);CiFor photovoltaic plant installed capacity (unit:MW);Hfp is light
Equivalent hourage (the unit at full capacity of overhead utility year:h);P is photovoltaic plant electricity price cost;iatFor photovoltaic module year attenuation rate;N is
Operation year (unit:a);CtotalAlways put into for photovoltaic plant life cycle management;EtotalFor the total of photovoltaic plant life cycle management
Generated energy;isubFor the degree electricity subsidy (unit acquired in photovoltaic plant:Member/kWh).
The circular of formula 1 is:
21) electricity price x1, is selected, formula 1 is substituted into;
If 22), calculating value on the left of formula, just, to select a value x2 for being less than x1, is substituted into formula 1, such as
Now left side is still just, then to be recalculated again after the value for reducing x2 on the left of formula to fruit, for untill bearing on the left of formula;
23) if it is negative, the value x3 that selection one is more than x1, to calculate value on the left of formula, formula 1 is substituted into, such as
Really now left side is still negative, then is recalculated again after the value for increasing x3 on the left of formula, untill formula left side is just.
Although above-mentioned the embodiment of the present invention is described with reference to accompanying drawing, not to present invention protection model
The limitation enclosed, on the basis of technical scheme, those skilled in the art need not pay creative work and can do
The various modifications or deformation gone out are still within protection scope of the present invention.
Claims (3)
1. consider the photovoltaic plant electricity price Cost Analysis Method of the time value of money, it is characterized in that, specifically include following steps:
1) photovoltaic plant electricity price cost analysis relevant rudimentary data, are extracted, basic data includes installed capacity of power station, design and used
The time limit, initially installation cost, one's own reserves and bank loan ratio, loan rate, repayment period, photovoltaic plant year operation maintenance
The electric subsidy of degree that rate, government are given, project base earnings ratio, photovoltaic plant are year equivalent at full capacity, photovoltaic module year attenuation rate;
2), founding mathematical models:
Calculate photovoltaic plant electricity price cost;
In formula, A is the one's own reserves in photovoltaic plant installation cost;B is the annual operation maintenance expense of photovoltaic plant;C is photovoltaic
Power station is repaid capital with interest the amount of money every year;D is year power selling income;E is government's year subsidy;N is photovoltaic plant life cycle management year;
iCFor project base earnings ratio.
2. the photovoltaic plant electricity price Cost Analysis Method according to claim 1 for considering the time value of money, it is characterized in that,
In formula 1,
A=Civs×(1-Rloan);
B=Cop=Civs×Rop;
D=P × Ci×Hfp×(1-iat)n-1×1000;
E=isub×Ci×Hfp×(1-iat)n-1×1000;
Wherein, CivsFor the installation cost of photovoltaic plant;RloanProvided a loan for photovoltaic plant and account for the ratio of gross investment;CopFor photovoltaic electric
The year operation maintenance expense stood;RopFor operation maintenance rate;CyFor the annual principal and interest amount of money for needing to refund;imonthFor loan monthly interest
Rate;M is moon number that need to refund;CiFor photovoltaic plant installed capacity;HfpFor the equivalent hourage at full capacity of photovoltaic plant year;P is photovoltaic
Power station electricity price cost;iatFor photovoltaic module year attenuation rate;N is operation year;CtotalAlways thrown for photovoltaic plant life cycle management
Enter;EtotalFor the gross generation of photovoltaic plant life cycle management;isubFor the degree electricity subsidy acquired in photovoltaic plant.
3. the photovoltaic plant electricity price Cost Analysis Method according to claim 2 for considering the time value of money, it is characterized in that,
The circular of formula 1 is:
21) electricity price x1, is selected, formula 1 is substituted into;
If 22), calculating value on the left of formula, just, to select a value x2 for being less than x1, is substituted into formula 1, if this
When left side still for just, then recalculated again after the value for reducing x2 on the left of formula, for untill negative on the left of the formula;
23) if it is negative, the value x3 that selection one is more than x1, to calculate value on the left of formula, formula 1 is substituted into, if this
When left side still be negative, then recalculated again after the value for increasing x3 on the left of formula, untill formula left side is just.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710156568.6A CN106971263A (en) | 2017-03-16 | 2017-03-16 | Consider the photovoltaic plant electricity price Cost Analysis Method of the time value of money |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710156568.6A CN106971263A (en) | 2017-03-16 | 2017-03-16 | Consider the photovoltaic plant electricity price Cost Analysis Method of the time value of money |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106971263A true CN106971263A (en) | 2017-07-21 |
Family
ID=59329706
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710156568.6A Pending CN106971263A (en) | 2017-03-16 | 2017-03-16 | Consider the photovoltaic plant electricity price Cost Analysis Method of the time value of money |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106971263A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109636033A (en) * | 2018-12-11 | 2019-04-16 | 远景能源(南京)软件技术有限公司 | A kind of distributed photovoltaic project is generated power for their own use total rate of electricity prediction technique |
CN109800980A (en) * | 2019-01-11 | 2019-05-24 | 中城科新能源科技(北京)有限公司 | A kind of business model method of family photovoltaic heating project construction |
CN112366695A (en) * | 2020-10-30 | 2021-02-12 | 国网冀北电力有限公司 | Social cost-based new energy optimal proportion determination method and device |
CN114022217A (en) * | 2021-11-16 | 2022-02-08 | 广东电网有限责任公司 | Distributed photovoltaic power generation investment income calculation method, device, equipment and medium |
CN117273669A (en) * | 2023-11-23 | 2023-12-22 | 中交二公局东萌工程有限公司 | Engineering project cost management system |
-
2017
- 2017-03-16 CN CN201710156568.6A patent/CN106971263A/en active Pending
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109636033A (en) * | 2018-12-11 | 2019-04-16 | 远景能源(南京)软件技术有限公司 | A kind of distributed photovoltaic project is generated power for their own use total rate of electricity prediction technique |
CN109636033B (en) * | 2018-12-11 | 2022-05-27 | 远景能源(南京)软件技术有限公司 | Spontaneous self-use comprehensive electricity price prediction method for distributed photovoltaic project |
CN109800980A (en) * | 2019-01-11 | 2019-05-24 | 中城科新能源科技(北京)有限公司 | A kind of business model method of family photovoltaic heating project construction |
CN112366695A (en) * | 2020-10-30 | 2021-02-12 | 国网冀北电力有限公司 | Social cost-based new energy optimal proportion determination method and device |
CN112366695B (en) * | 2020-10-30 | 2023-10-24 | 国网冀北电力有限公司 | Method and device for determining optimal duty ratio of new energy based on social cost |
CN114022217A (en) * | 2021-11-16 | 2022-02-08 | 广东电网有限责任公司 | Distributed photovoltaic power generation investment income calculation method, device, equipment and medium |
CN117273669A (en) * | 2023-11-23 | 2023-12-22 | 中交二公局东萌工程有限公司 | Engineering project cost management system |
CN117273669B (en) * | 2023-11-23 | 2024-02-23 | 中交二公局东萌工程有限公司 | Engineering project cost management system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Johnston et al. | Levelised cost of energy, A challenge for offshore wind | |
Loncar et al. | Compound real options valuation of renewable energy projects: The case of a wind farm in Serbia | |
CN106971263A (en) | Consider the photovoltaic plant electricity price Cost Analysis Method of the time value of money | |
Purohit | Small hydro power projects under clean development mechanism in India: A preliminary assessment | |
Barbour et al. | Projecting battery adoption in the prosumer era | |
Eltamaly | Design and implementation of wind energy system in Saudi Arabia | |
Ouyang et al. | Levelized cost of electricity (LCOE) of renewable energies and required subsidies in China | |
Mishra et al. | Small hydro power in India: Current status and future perspectives | |
Karaveli et al. | Comparison of large scale solar PV (photovoltaic) and nuclear power plant investments in an emerging market | |
Li et al. | Analysis of wind power generation operation management risk in China | |
Li et al. | Comprehensive effectiveness assessment of energy storage incentive mechanisms for PV-ESS projects based on compound real options | |
Huang et al. | Evaluating the productivity and financial feasibility of a vertical-axis micro-hydro energy generation project using operation simulations | |
CN105846464A (en) | Method and system for evaluating influences exerted by distributed power source on power distribution network | |
Loomis et al. | Economic impact potential of solar photovoltaics in Illinois | |
Campisi et al. | Effectiveness of incentives for wind energy: Models and empirical evidences from an Italian case study | |
Boopathi et al. | Economic investigation of repowering of the existing wind farms with hybrid wind and solar power plants: a case study | |
Song et al. | Peer-to-peer trade and the economy of distributed PV in China | |
Yang et al. | Dynamic feed-in tariff pricing model of distributed photovoltaic generation in China | |
Yang et al. | The optimal investment strategy of P2G based on real option theory | |
Nishio et al. | Supply amount and marginal price of renewable electricity under the renewables portfolio standard in Japan | |
He et al. | A cost-based life-cycle pricing model for offshore wind power plants within China’s carbon trading scheme | |
Johnston et al. | Influence of input costs and levelised cost of energy on wind power growth | |
CN110059951A (en) | A kind of feasibility evaluation method suitable for photovoltaic project development | |
Qureshi et al. | Rooftop solar policies feasibility assessment model: Vietnam case study | |
Papadopoulos et al. | Economic viability analysis of planned WEC system installations for electrical power production |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170721 |