CN106968227A - 高拱坝导流洞永久堵头的检修布置结构 - Google Patents
高拱坝导流洞永久堵头的检修布置结构 Download PDFInfo
- Publication number
- CN106968227A CN106968227A CN201710343564.9A CN201710343564A CN106968227A CN 106968227 A CN106968227 A CN 106968227A CN 201710343564 A CN201710343564 A CN 201710343564A CN 106968227 A CN106968227 A CN 106968227A
- Authority
- CN
- China
- Prior art keywords
- maintenance
- diversion tunnel
- permanent plug
- draining
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B8/00—Details of barrages or weirs ; Energy dissipating devices carried by lock or dry-dock gates
- E02B8/06—Spillways; Devices for dissipation of energy, e.g. for reducing eddies also for lock or dry-dock gates
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Abstract
本发明涉及一种高拱坝导流洞永久堵头的检修布置结构,相应地,同时涉及一种高拱坝导流洞永久堵头的检修方法,属于水利水电工程中导截流施工技术领域。本发明的检修布置结构包括可排水封堵结构和检修封堵结构,可排水封堵结构布置于导流洞出口处,包括廊道、竖井平台、排水竖井和集水井,检修封堵结构布置于施工支洞内,包括检修通道和检修挡水闸门。检修方法为先通过设置的排水竖井将导流洞内水流抽干,再通过检修通道开启检修闸门进入导流洞,最终实现对永久堵头的监测和检修。本发明提供了一种既方便导流洞永久堵头监测检修、又不影响水垫塘排水廊道的安全运行的布置结构,结构简单可靠,安全性高,节省投资、且施工方便。
Description
技术领域
本发明涉及一种高拱坝导流洞永久堵头的检修布置结构,相应地,同时涉及一种高拱坝导流洞永久堵头的检修方法,属于水利水电工程中导截流施工技术领域。
背景技术
在深山峡谷地区的高拱坝建设过程中,围堰全年断流,通过导流洞泄流的施工导流方式应用最多,这些大型导流洞在完成使命后,均需在水库蓄水前采用混凝土永久堵头结构对其进行封堵。封堵完成后,导流洞永久堵头与大坝防渗帷幕形成整体起到坝体防渗作用,其级别与永久挡水建筑物级别一致,安全性和稳定性显得极为重要。因此,导流洞永久堵头需要进行运行监测和检修。同时,高拱坝坝后往往需要设置水垫塘以满足泄洪消能的需要,而水垫塘底板设置有排水廊道,其运行安全和排水效能会受到下游洪水位和导流洞堵头或衬砌漏水的影响。
目前,工程人员利用导流洞施工支洞通道作为永久检修通道,并在下游导流洞出口设置岸塔闸室,当需要检修时,通过导流洞出口闸门下闸抽水后检修,然而该布置结构存在以下不足:
(1)导流洞出口设置岸塔式闸室,工程规模大、投资很高、维护费用高;
(2)导流洞出口闸室经泥沙长年累月的淤积(已有工程出现此情况),下闸难度大,而且闸门长期置于水下,可能出现损坏漏水现象;
(3)导流洞施工支洞通道往往与水垫塘排水廊道通道相接,为避免导流洞堵头或导流洞衬砌渗水对其影响,确保水垫塘排水廊道正常运行和安全,需要定期抽水,极为繁琐。
发明内容
本发明的目的是针对上述现有背景技术中存在的不足之处,提供一种高拱坝导流洞永久堵头的检修布置结构,该布置结构简单,运行安全,施工方便、节省投资、且检修方便。
本发明解决其技术问题所采用的技术方案是:高拱坝导流洞永久堵头的检修布置结构,包括导流洞,导流洞中设置有永久堵头,永久堵头与防渗帷幕相接,导流洞在永久堵头的下游一侧连通施工支洞,导流洞出口处布置有可排水封堵结构,可排水封堵结构包括混凝土封堵体A,混凝土封堵体A的迎水端设置有用于排水和灌浆的廊道,廊道的顶板布置有连通外界的排水竖井,排水竖井的外端布置有竖井平台;施工支洞内布置有检修封堵结构,检修封堵结构包括混凝土封堵体B,混凝土封堵体B与防渗帷幕相接,混凝土封堵体B具有贯穿其本体的检修通道,检修通道内设置有检修挡水闸门。实施时,混凝土封堵体A的长度、竖井平台的高程可按照能抵挡下游100年一遇洪水位计算得到。
进一步的是:竖井平台由山体岩体开挖形成。
进一步的是:廊道的底板布置有集水井,集水井与排水竖井在竖直方向对齐设置。
进一步的是:集水井断面与排水竖井断面均为圆形,集水井直径与排水竖井直径相同。
进一步的是:集水井的底板高程与混凝土封堵体A的底板高程间距为2m~3m。
进一步的是:检修挡水闸门安装于距检修通道迎水端5m~10m处。
另外,本发明还提供一种利用上述高拱坝导流洞永久堵头检修布置结构进行永久堵头检修的方法,检修一般在枯水期进行,检修步骤为:
一、沿排水竖井将水泵抽水管下放至廊道,将导流洞内水流抽干;
二、从施工支洞进入检修封堵结构内的检修通道,打开检修挡水闸门进入导流洞,对导流洞中的永久堵头进行运行监测和检修。
本发明的有益效果是:①非检修期的汛期,在导流洞出口处,依靠可排水封堵结构阻挡下游水位灌入,同时可保证遭遇100年一遇洪水时,可排水封堵结构能够稳定运行,不会滑动,结构安全可靠;竖井平台高程满足高于100年一遇洪水位的要求,可保证遭遇100年一遇洪水时,不会倒灌进入导流洞而影响其他附属建筑物;②非检修期或汛期,检修封堵结构中的检修挡水闸门关闭,这样可以保证上游的导流洞堵头或导流洞衬砌渗水不会进入水垫塘排水廊道而影响其运行。③通过巧妙的结构布置和设计,实现了对高拱坝永久堵头进行定期的监测和检修,布置结构简单可靠,安全性高,节省投资、且施工方便。
附图说明
图1为本发明的导流洞出口处可排水封堵结构布置纵剖面;
图2为可排水封堵结构堵头断面示意图;
图3为排水竖井断面示意图;
图4为检修封堵结构布置平面示意图;
图5为检修封堵结构堵头断面图;
图6为检修封堵结构平面详图。
图中标记为:1-可排水封堵结构、2-检修封堵结构、3-导流洞出口处、4-施工支洞、5-防渗帷幕、11-廊道、12-竖井平台、13-排水竖井、14-集水井、15-混凝土封堵体A、21-检修通道、22-检修挡水闸门、23-混凝土封堵体B、6-永久堵头、7-水平施工缝、8-原衬砌。
具体实施方式
下面结合附图及实施例对本发明作进一步说明。
如图1~图6所示,高拱坝导流洞永久堵头的检修布置结构,包括导流洞,导流洞中设置有永久堵头6,永久堵头6与防渗帷幕5相接,导流洞在永久堵头2的下游一侧连通施工支洞4,导流洞出口处3布置有可排水封堵结构1,可排水封堵结构1包括混凝土封堵体A15,混凝土封堵体A15的迎水端设置有用于排水和灌浆的廊道11,廊道11的顶板布置有连通外界的排水竖井13,排水竖井13的外端布置有竖井平台12;施工支洞4内布置有检修封堵结构2,检修封堵结构2包括混凝土封堵体B23,混凝土封堵体B23与防渗帷幕5相接,混凝土封堵体B23具有贯穿其本体的检修通道21,检修通道21内设置有检修挡水闸门22。
优选地,竖井平台12由山体岩体开挖形成;廊道11的底板布置有集水井14,集水井14与排水竖井13在竖直方向对齐设置。集水井14断面与排水竖井13断面均为圆形,集水井14直径与排水竖井13直径相同。集水井14的底板高程与混凝土封堵体A15的底板高程间距为2m~3m。检修挡水闸门22安装于距检修通道21迎水端5m~10m处。
以西南地区某世界级高拱坝工程为例,混凝土封堵体A15的设计长度按照能抵挡下游100年一遇洪水位计算得到,根据相关规程规范计算得长度为15m;可排水封堵结构1内设排水和灌浆的廊道11,尺寸为3m×4m(宽×高);可排水封堵结构1上方设置的竖井平台12由山体岩体开挖形成,竖井平台12高程为410m,满足高于100年一遇洪水位407m的要求,从竖井平台12往下开挖贯通廊道11至离可排水封堵结构1底板2m的距离形成排水竖井13和集水井14;排水竖井13和集水井14为圆形,直径均为2m。检修通道21内距检修通道迎水端5m处安装检修挡水闸门22,尺寸为3m×4m(宽×高)。
另外,本发明还提供一种利用上述高拱坝导流洞永久堵头检修布置结构进行永久堵头检修的方法,检修一般在枯水期进行,检修步骤为:
一、由于导流洞出口高程较低,导流洞堵头内或导流洞衬砌渗水会流入下游导流洞出口处,此时沿排水竖井13将水泵抽水管下放至廊道11,将导流洞内水流抽干以方便检修;
二、从施工支洞4进入检修封堵结构2内的检修通道21,打开检修挡水闸门22进入导流洞,对导流洞中的永久堵头6进行运行监测和检修。
Claims (8)
1.高拱坝导流洞永久堵头的检修布置结构,包括导流洞,导流洞中设置有永久堵头(6),永久堵头(6)与防渗帷幕(5)相接,导流洞在永久堵头(2)的下游一侧连通施工支洞(4),其特征在于:导流洞出口处(3)布置有可排水封堵结构(1),可排水封堵结构(1)包括混凝土封堵体A(15),混凝土封堵体A(15)的迎水端设置有用于排水和灌浆的廊道(11),廊道(11)的顶板布置有连通外界的排水竖井(13),排水竖井(13)的外端布置有竖井平台(12);施工支洞(4)内布置有检修封堵结构(2),检修封堵结构(2)包括混凝土封堵体B(23),混凝土封堵体B(23)与防渗帷幕(5)相接,混凝土封堵体B(23)具有贯穿其本体的检修通道(21),检修通道(21)内设置有检修挡水闸门(22)。
2.如权利要求1所述的高拱坝导流洞永久堵头的检修布置结构,其特征在于:竖井平台(12)由山体岩体开挖形成。
3.如权利要求1所述的高拱坝导流洞永久堵头的检修布置结构,其特征在于:廊道(11)的底板布置有集水井(14),集水井(14)与排水竖井(13)在竖直方向对齐设置。
4.如权利要求3所述的高拱坝导流洞永久堵头的检修布置结构,其特征在于:集水井(14)断面与排水竖井(13)断面均为圆形,集水井(14)直径与排水竖井(13)直径相同。
5.如权利要求3所述的高拱坝导流洞永久堵头的检修布置结构,其特征在于:集水井(14)的底板高程与混凝土封堵体A(15)的底板高程间距为2m~3m。
6.如权利要求1所述的高拱坝导流洞永久堵头的检修布置结构,其特征在于:检修挡水闸门(22)安装于距检修通道(21)迎水端5m~10m处。
7.高拱坝导流洞永久堵头的检修方法,其特征在于,采用如权利要求1至6中任意一项所述的高拱坝导流洞永久堵头的检修布置结构,检修步骤为:
一、沿排水竖井(13)将水泵抽水管下放至廊道(11),将导流洞内水流抽干;
二、从施工支洞(4)进入检修封堵结构(2)内的检修通道(21),打开检修挡水闸门(22)进入导流洞,对导流洞中的永久堵头(6)进行运行监测和检修。
8.如权利要求7所述的高拱坝导流洞永久堵头的检修方法,其特征在于:检修在枯水期进行。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710343564.9A CN106968227B (zh) | 2017-05-16 | 2017-05-16 | 高拱坝导流洞永久堵头的检修布置结构及检修方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710343564.9A CN106968227B (zh) | 2017-05-16 | 2017-05-16 | 高拱坝导流洞永久堵头的检修布置结构及检修方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106968227A true CN106968227A (zh) | 2017-07-21 |
CN106968227B CN106968227B (zh) | 2023-07-25 |
Family
ID=59330758
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710343564.9A Active CN106968227B (zh) | 2017-05-16 | 2017-05-16 | 高拱坝导流洞永久堵头的检修布置结构及检修方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106968227B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109555087A (zh) * | 2019-01-04 | 2019-04-02 | 长江勘测规划设计研究有限责任公司 | 运行期不抽排检修期临时抽排的二道坝结构及其运用方法 |
CN109853495A (zh) * | 2019-03-15 | 2019-06-07 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种临时封堵导流洞洞身闸门井筒的方法及装置 |
CN114960483A (zh) * | 2022-04-22 | 2022-08-30 | 浙江华东工程建设管理有限公司 | 一种导流尾水洞改建堵头上游永久排水结构及排水方法 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW200912121A (en) * | 2007-09-14 | 2009-03-16 | Chung Tai Resourse Technology Corp | Seawater intake system |
JP2011032785A (ja) * | 2009-08-04 | 2011-02-17 | Hazama Corp | 水中仮締切り設備の水密構造 |
CN102162230A (zh) * | 2011-03-02 | 2011-08-24 | 中国水电顾问集团西北勘测设计研究院 | 一种由导流洞采用“龙翘尾”型式改建成泄洪洞的设计方法 |
CN203049554U (zh) * | 2013-02-01 | 2013-07-10 | 中国水电顾问集团贵阳勘测设计研究院 | 用于导流洞下闸的结构 |
CN103526732A (zh) * | 2013-10-28 | 2014-01-22 | 中国水电顾问集团中南勘测设计研究院有限公司 | 一种大坝泄水结构 |
CN104018474A (zh) * | 2014-06-23 | 2014-09-03 | 黄河勘测规划设计有限公司 | 施工支洞回填改建检修支洞的方法 |
CN105735215A (zh) * | 2016-04-12 | 2016-07-06 | 中国电建集团成都勘测设计研究院有限公司 | 可进行隧洞闸室段检修的导流洞结构 |
CN105951689A (zh) * | 2016-06-30 | 2016-09-21 | 中国电建集团中南勘测设计研究院有限公司 | 一种水库预泄兼生态流量下泄结构 |
CN106284240A (zh) * | 2016-08-29 | 2017-01-04 | 中国电建集团西北勘测设计研究院有限公司 | 一种水电站在施工期向下游临时供水结构和方法 |
-
2017
- 2017-05-16 CN CN201710343564.9A patent/CN106968227B/zh active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW200912121A (en) * | 2007-09-14 | 2009-03-16 | Chung Tai Resourse Technology Corp | Seawater intake system |
JP2011032785A (ja) * | 2009-08-04 | 2011-02-17 | Hazama Corp | 水中仮締切り設備の水密構造 |
CN102162230A (zh) * | 2011-03-02 | 2011-08-24 | 中国水电顾问集团西北勘测设计研究院 | 一种由导流洞采用“龙翘尾”型式改建成泄洪洞的设计方法 |
CN203049554U (zh) * | 2013-02-01 | 2013-07-10 | 中国水电顾问集团贵阳勘测设计研究院 | 用于导流洞下闸的结构 |
CN103526732A (zh) * | 2013-10-28 | 2014-01-22 | 中国水电顾问集团中南勘测设计研究院有限公司 | 一种大坝泄水结构 |
CN104018474A (zh) * | 2014-06-23 | 2014-09-03 | 黄河勘测规划设计有限公司 | 施工支洞回填改建检修支洞的方法 |
CN105735215A (zh) * | 2016-04-12 | 2016-07-06 | 中国电建集团成都勘测设计研究院有限公司 | 可进行隧洞闸室段检修的导流洞结构 |
CN105951689A (zh) * | 2016-06-30 | 2016-09-21 | 中国电建集团中南勘测设计研究院有限公司 | 一种水库预泄兼生态流量下泄结构 |
CN106284240A (zh) * | 2016-08-29 | 2017-01-04 | 中国电建集团西北勘测设计研究院有限公司 | 一种水电站在施工期向下游临时供水结构和方法 |
Non-Patent Citations (5)
Title |
---|
刘佳;常俊杰;郑宇;冯向珍;: "向阳桥水库工程导流洞与放空洞结合方案设计探讨" * |
刘佳;常俊杰;郑宇;冯向珍;: "向阳桥水库工程导流洞与放空洞结合方案设计探讨", 陕西水利, no. 05, pages 469 - 470 * |
刘庆亮,陈军芳,赵武生: "小浪底工程孔板塔后施工竖井对导流洞结构影响分析", 红水河, no. 04 * |
姚敏杰;高雅芬;: "水电站放空洞混凝土和钢管联合封堵系统设计", 人民长江, no. 17 * |
武夏宁;侯晓暾;江燕;: "巴贡水电站1#导流洞下闸封堵施工方法与应急措施", 科技传播, no. 05 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109555087A (zh) * | 2019-01-04 | 2019-04-02 | 长江勘测规划设计研究有限责任公司 | 运行期不抽排检修期临时抽排的二道坝结构及其运用方法 |
CN109555087B (zh) * | 2019-01-04 | 2024-04-12 | 长江勘测规划设计研究有限责任公司 | 运行期不抽排检修期临时抽排的二道坝结构及其运用方法 |
CN109853495A (zh) * | 2019-03-15 | 2019-06-07 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种临时封堵导流洞洞身闸门井筒的方法及装置 |
CN109853495B (zh) * | 2019-03-15 | 2024-03-01 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种临时封堵导流洞洞身闸门井筒的方法及装置 |
CN114960483A (zh) * | 2022-04-22 | 2022-08-30 | 浙江华东工程建设管理有限公司 | 一种导流尾水洞改建堵头上游永久排水结构及排水方法 |
CN114960483B (zh) * | 2022-04-22 | 2024-01-12 | 浙江华东工程建设管理有限公司 | 一种导流尾水洞改建堵头上游永久排水结构及排水方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106968227B (zh) | 2023-07-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201874614U (zh) | 引水隧洞放空检修排水结构 | |
CN204174574U (zh) | 用于泥石流防护的挡排结构 | |
CN105369784B (zh) | 沟水处理排水洞结构和沟水处理排水方法 | |
CN104631475A (zh) | 一种下穿河流浅埋暗挖隧道的安全快速施工方法 | |
CN103939109B (zh) | 与隧道隔离的永久封堵斜井结构 | |
CN207131448U (zh) | 隧道快速反坡施工富水段新型羽状截排水构造 | |
CN106968227A (zh) | 高拱坝导流洞永久堵头的检修布置结构 | |
CN206928255U (zh) | 高拱坝导流洞永久堵头的检修布置结构 | |
CN206448286U (zh) | 一种用于降低灰场坝体浸润线的辐射井系统 | |
CN104389634B (zh) | 一种矿山立井筛井井壁结构及其可控疏水方法 | |
CN205259201U (zh) | 一种隧洞地下水控排装置 | |
CN207211100U (zh) | 竖井式水电站厂房结构 | |
CN117272455A (zh) | 穿越大型活动性断裂的抽水蓄能电站尾水布置方法 | |
CN204676504U (zh) | 一种无自流引排条件的长尾水隧洞群的放空检修结构 | |
CN203768881U (zh) | 一种山体、坝体廊道渗水排水装置 | |
CN217839924U (zh) | 一种导流尾水洞改建堵头上游永久排水结构 | |
CN108677894A (zh) | 一种利用管道型岩溶地下水发电系统及设计方法 | |
CN110185051A (zh) | 深窄基坑开挖施工排水方法 | |
CN107386222A (zh) | 竖井式水电站厂房结构 | |
CN203796274U (zh) | 一种与隧道隔离的永久封堵斜井结构 | |
CN212336278U (zh) | 一种结合边坡竖井的大型地下式水电站厂房渗漏排水系统 | |
CN208563277U (zh) | 一种利用管道型岩溶地下水发电系统 | |
CN104088664B (zh) | 一种向上填充采矿的矿井废水处理方法及系统 | |
CN106088122A (zh) | 露天矿端帮渗水梯级截排的综合治理方法 | |
CN206928262U (zh) | 坝后式或河床式水力发电厂房集水井结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |