CN106965439B - The welding method of hydrocone type storm-water system HDPE horizontal pipe welding support - Google Patents

The welding method of hydrocone type storm-water system HDPE horizontal pipe welding support Download PDF

Info

Publication number
CN106965439B
CN106965439B CN201710188520.3A CN201710188520A CN106965439B CN 106965439 B CN106965439 B CN 106965439B CN 201710188520 A CN201710188520 A CN 201710188520A CN 106965439 B CN106965439 B CN 106965439B
Authority
CN
China
Prior art keywords
support
welding
frame
hdpe
portal frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710188520.3A
Other languages
Chinese (zh)
Other versions
CN106965439A (en
Inventor
文磊
张胜
陈然
陈振国
周文海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Construction First Construction Engineering Co Ltd
Original Assignee
Chengdu Construction First Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Construction First Construction Engineering Co Ltd filed Critical Chengdu Construction First Construction Engineering Co Ltd
Priority to CN201710188520.3A priority Critical patent/CN106965439B/en
Publication of CN106965439A publication Critical patent/CN106965439A/en
Application granted granted Critical
Publication of CN106965439B publication Critical patent/CN106965439B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C65/00Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor
    • B29C65/02Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor by heating, with or without pressure

Abstract

The invention discloses a kind of hydrocone type storm-water system HDPE horizontal pipe welding support and welding methods, are related to hydrocone type storm-water system technical field of construction, provide a kind of welding support for facilitating hydrocone type storm-water system HDPE horizontal pipe to weld.The welding support includes installation part, portal frame, welding platform and pipeline support frame;Mounting groove and two portal frame slots are provided on installation part;Portal frame quantity is two, and portal frame top is hung on mountings, and two portal frames are located in two portal frame slots, and there are two connecting screws for each portal frame lower part setting;Four connecting screws are each passed through the quadrangle of welding platform, and holding nut, holding nut supporting welding platform are connected on connecting screw;Pipeline support frame quantity is two, and two pipeline support frames are arranged at intervals in welding platform, and pipeline support top of the trellis is the tube support of V-arrangement, and pipeline support frame height is adjustable.The present invention can either support HDPE to manage and to welding machine, and can facilitate two HDPE pipe faces.

Description

The welding method of hydrocone type storm-water system HDPE horizontal pipe welding support
Technical field
The present invention relates to hydrocone type storm-water system technical field of construction more particularly to a kind of hydrocone type storm-water system HDPE water The welding method of flat pipeline welding support.
Background technique
Inhaling storm-water system is current relatively advanced roof rain discharging system in the world, earliest originating from Europe, China's beginning of the nineties introduces, and by largely testing and in-depth study, China has successfully developed hydrocone type rain water on roof row Place system is simultaneously widely used in that the spans such as large-sized workshop, exhibition center, airport, sports ground, high-rise podium are big, complicated room Face.
The pipeline of siphon type rainwater discharging system generally uses high density polyethylene (HDPE) (HDPE) to manage, and horizontal pipe is usually outstanding It hangs in position higher in building, pipeline connection type is broadly divided into the melting welding of pipe fitting socket joint and connects two kinds with butt welding.Pipe fitting is held It inserts melting welding mode and there is the disadvantages of difficulty of construction is big, melting welding pipe fitting is at high cost, melting welding connection reliability is poor.Butt welding connection then can be with Save the cost, the reliability for reducing difficulty of construction, guaranteeing pipeline connection;But the corollary equipment connected due to lacking butt welding at present, Operator's lift is needed to shoulder heavy HDPE pipe and to welding machine, that there are operation numbers is more, operation difficulty is larger, matches to operator It closes and requires height, HDPE pipe is to unfavorable conditions such as positive difficulties.
Summary of the invention
The technical problem to be solved by the present invention is provide it is a kind of facilitate hydrocone type storm-water system HDPE horizontal pipe weld Welding support.
In order to solve the above problem the technical solution adopted is that: hydrocone type storm-water system HDPE horizontal pipe welding support includes Installation part, portal frame, welding platform and pipeline support frame;Mounting groove and two portal frame slots, mounting groove are provided on installation part Along the setting of installation part length direction and Open Side Down, and two portal frame slots are located at installation part both ends and opening upwards;Door shape Frame quantity is two, and portal frame top is hung on mountings, and two portal frames are located in two portal frame slots, each shape There are two connecting screws for the setting of frame lower part;Four connecting screws are each passed through the quadrangle of welding platform, are connected on connecting screw Holding nut, holding nut supporting welding platform;Pipeline support frame quantity is two, and two pipeline support frames are arranged at intervals at weldering It connects on platform, pipeline support top of the trellis is the tube support of V-arrangement, and pipeline support frame height is adjustable.
Further, installation part includes channel steel and four L shaped plates, the slot of channel steel is mounting groove, and L shaped plate and channel steel weld It connects, forms portal frame slot between two L shaped plates.
Further, pipeline support frame includes chassis, upper frame, adjusting rod, two shafts, two first support bars and two A second support bar;Chassis is connect with welding platform, and upper frame is located at the surface of chassis;Two first support bars and chassis are hinged In the different location in same horizontal line, two second support bars and upper frame are articulated with the different location in same horizontal line, the One support rod and second support bar are hinged by shaft, and two first support bars and two second support bars form diamond structure; Adjusting rod connects two shafts and can adjust the distance of two shafts;Tube support is connect with upper frame.
Another technical problem to be solved by the present invention is that: provide it is a kind of facilitate hydrocone type storm-water system HDPE horizontal pipe weld The welding method connect.
In order to solve the above problem the technical solution adopted is that: hydrocone type storm-water system HDPE horizontal pipe welding method includes Following steps:
A, for each component and HDPE pipe for preparing welding support to welding machine, welding support is hydrocone type storm-water system HDPE horizontal Pipeline welding support;
B, mounting groove is anchored on rectangular steel conduit, so that installation part is installed on rectangular steel conduit;
C, portal frame is suspended on installation part, two portal frames are located in two portal frame slots;
D, pipeline support frame is installed in welding platform, and welding platform is connect with connecting screw and guarantees that welding is flat Platform is horizontal;
E, HDPE pipe is put into welding platform welding machine, and make HDPE pipe butt welding machine be located at two pipeline support frames it Between;
F, the end of two HDPE pipes to be welded is put into respectively on two tube supports, adjusts pipeline support frame Highly, make two HDPE pipes to be welded horizontal and face;
G, welding machine is welded two HDPE pipes to be welded using HDPE pipe.
The beneficial effects of the present invention are: two pipeline support frames support two HDPE to be welded to manage respectively, pass through adjusting Pipeline support frame height can make two HDPE pipe faces, and welding platform can place welding machine.Therefore the present invention does not need operator Member's lift shoulders heavy HDPE pipe and to welding machine, and can facilitate two HDPE pipe faces, can reduce that operation number is more, reduces and grasps Make difficulty, improves the safety of high altitude operation.
Detailed description of the invention
Fig. 1 is hydrocone type storm-water system HDPE horizontal pipe welding support side structure schematic diagram;
Fig. 2 is hydrocone type storm-water system HDPE horizontal pipe welding support end structure illustration;
Fig. 3 is installation part side structure schematic diagram;
Fig. 4 is installation part end structure illustration;
Fig. 5 is pipeline support frame structural schematic diagram;
In the figure, it is marked as installation part 1, channel steel 1-1, L shaped plate 1-2, portal frame slot 1-3, mounting groove 1-4, portal frame 2, company Connect screw rod 3, holding nut 4, welding platform 5, pipeline support frame 6, tube support 6-1, upper frame 6-2, second support bar 6-3, Shaft 6-4, first support bar 6-5, chassis 6-6, adjusting rod 6-7, HDPE pipe are to welding machine 7, HDPE pipe 8, rectangular steel conduit 9.
Specific embodiment
The present invention is further described with reference to the accompanying drawings and detailed description.
In order to provide a kind of welding support for facilitating hydrocone type storm-water system HDPE horizontal pipe to weld, such as Fig. 1 and Fig. 2 institute Show: hydrocone type storm-water system HDPE horizontal pipe welding support includes installation part 1, portal frame 2, welding platform 5 and pipeline support Frame 6;Mounting groove 1-4 and two portal frames slot 1-3, mounting groove 1-4 are provided on installation part 1 to be arranged along 1 length direction of installation part And Open Side Down, two portal frame slot 1-3 are located at 1 both ends of installation part and opening upwards;2 quantity of portal frame is two, door 2 top of shape frame is hung on installation part 1, and two portal frames 2 are located in two portal frame slot 1-3, and each 2 lower part of portal frame is set Connecting screw 3 there are two setting;Four connecting screws 3 are each passed through the quadrangle of welding platform 5, and support is connected on connecting screw 3 Nut 4,4 supporting welding platform 5 of holding nut;6 quantity of pipeline support frame is two, and two pipeline support frames 6 are arranged at intervals at It is the tube support 6-1 of V-arrangement in welding platform 5, at the top of pipeline support frame 6,6 height of pipeline support frame is adjustable.
The side of HDPE horizontal pipe welding is carried out using the welding support of hydrocone type storm-water system HDPE horizontal pipe welding Method includes the following steps: A, each component for preparing hydrocone type storm-water system HDPE horizontal pipe welding support and HDPE pipe to welding machine 7;B, mounting groove 1-4 is anchored on rectangular steel conduit 9, so that installation part 1 is installed on rectangular steel conduit 9;C, portal frame 2 is hung Onto installation part 1, two portal frames 2 are located in two portal frame slot 1-3;D, pipeline support frame 6 welding is installed to put down On platform 5, and welding platform 5 is connect with connecting screw 3 and guarantees that welding platform 5 is horizontal;E, HDPE pipe is put into weldering to welding machine 7 It connects on platform 5, and is located at HDPE pipe between two pipeline support frames 6 to welding machine 7;F, by two HDPE pipes 8 to be welded End is put into respectively on two tube support 6-1, is adjusted the height of pipeline support frame 6, is made two 8 water of HDPE pipe to be welded Flat and face;G, welding machine 7 is welded two HDPE pipes 8 to be welded using HDPE pipe.
Rectangular steel conduit 9 has been set before welding for hanging HDPE pipe 8.Two HDPE pipes 8 are out of portal frame 2 It passes through and is individually placed on two tube support 6-1, guarantee the location accuracy of two pipeline support frames 6, and adjust pipeline The height of support frame 6 can make two 8 faces of HDPE pipe.The present invention had not only supported HDPE pipe and to welding machine, but also facilitated two HDPE pipe face.Therefore can reduce operation number it is more, reduction operation difficulty, improve the safety of high altitude operation.Operator It can stand and hydrocone type storm-water system HDPE horizontal pipe welding support and HDPE pipe operate welding machine 7 in other plateau.
The specific structure of installation part 1 can there are many, such as shown in Figure 3 and Figure 4: installation part 1 includes channel steel 1-1 and four The slot of a L shaped plate 1-2, channel steel 1-1 are mounting groove 1-4, L shaped plate 1-2 and channel steel 1-1 welding, are formed between two L shaped plate 1-2 Portal frame slot 1-3.
The specific structure of pipeline support frame 6 can there are many, such as shown in Figure 5: pipeline support frame 6 include chassis 6-6, Upper frame 6-2, adjusting rod 6-7, two shaft 6-4, two first support bar 6-5 and two second support bar 6-3;Chassis 6-6 with Welding platform 5 connects, and upper frame 6-2 is located at the surface of chassis 6-6;Two first support bar 6-5 and chassis 6-6 is articulated with same Different location on horizontal line, two second support bar 6-3 and upper frame 6-2 are articulated with the different location in same horizontal line, the One support rod 6-5 and second support bar 6-3 is hinged by shaft 6-4, two first support bar 6-5 and two second support bar 6- 3 form diamond structure;Two shaft 6-4 of adjusting rod 6-7 connection and the distance that two shaft 6-4 can be adjusted;Tube support 6-1 is connect with upper frame 6-2.Adjusting rod 6-7 is adjusted, the distance i.e. adjustable bottom bracket 6-6 and upper frame 6-2 of two shaft 6-4 are changed Distance, also just have adjusted the height of support frame 6.

Claims (2)

1. the welding method of hydrocone type storm-water system HDPE horizontal pipe welding support, it is characterised in that: the welding support Including installation part (1), portal frame (2), welding platform (5) and pipeline support frame (6);
Mounting groove (1-4) and two portal frame slots (1-3) are provided on installation part (1), mounting groove (1-4) is long along installation part (1) It spends direction setting and Open Side Down, two portal frame slots (1-3) are located at installation part (1) both ends and opening upwards;Installation part It (1) include channel steel (1-1) and four L shaped plates (1-2), the slot of channel steel (1-1) is mounting groove (1-4), L shaped plate (1-2) and channel steel (1-1) is welded, and forms portal frame slot (1-3) between two L shaped plates (1-2);
Portal frame (2) quantity is two, and portal frame (2) top is hung on installation part (1), and two portal frames (2) are located at two In a portal frame slot (1-3), there are two connecting screw (3) for each portal frame (2) lower part setting;Four connecting screws (3) are respectively It across the quadrangle of welding platform (5), is connected on connecting screw (3) holding nut (4), holding nut (4) supporting welding platform (5);
Pipeline support frame (6) quantity is two, and two pipeline support frames (6) are arranged at intervals on welding platform (5), pipeline support It is the tube support (6-1) of V-arrangement at the top of frame (6), pipeline support frame (6) height is adjustable;
The welding method includes the following steps:
A, each component and HDPE pipe for preparing welding support are to welding machine (7);
B, mounting groove (1-4) is anchored to the rectangular steel conduit (9) for hanging HDPE pipe, so that installation part (1) side of being installed to On shape steel conduit (9);
C, portal frame (2) is suspended on installation part (1), two portal frames (2) are located in two portal frame slots (1-3);
D, pipeline support frame (6) is installed on welding platform (5), and welding platform (5) is connect and protected with connecting screw (3) It is horizontal to demonstrate,prove welding platform (5);
E, HDPE pipe is put on welding platform (5) welding machine (7), and HDPE pipe is made to be located at two pipeline supports to welding machine (7) Between frame (6);
F, the end of two HDPE pipe (8) to be welded is put into respectively on two tube supports (6-1), adjusts pipeline support The height of frame (6) makes two HDPE to be welded manage (8) level and face;
G, welding machine (7) is welded two HDPE pipe (8) to be welded using HDPE pipe.
2. the welding method of hydrocone type storm-water system HDPE horizontal pipe welding support according to claim 1, feature Be: pipeline support frame (6) includes chassis (6-6), upper frame (6-2), adjusting rod (6-7), two shafts (6-4), two first Support rod (6-5) and two second support bars (6-3);Chassis (6-6) is connect with welding platform (5), and upper frame (6-2) is located at chassis The surface of (6-6);Two first support bars (6-5) and chassis (6-6) are articulated with the different location in same horizontal line, and two Second support bar (6-3) and upper frame (6-2) are articulated with the different location in same horizontal line, first support bar (6-5) and second Hingedly by shaft (6-4), two first support bars (6-5) and two second support bars (6-3) form diamond shape to support rod (6-3) Structure;Adjusting rod (6-7) connects two shafts (6-4) and can adjust the distance of two shafts (6-4);Tube support (6- 1) it is connect with upper frame (6-2).
CN201710188520.3A 2017-03-27 2017-03-27 The welding method of hydrocone type storm-water system HDPE horizontal pipe welding support Active CN106965439B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710188520.3A CN106965439B (en) 2017-03-27 2017-03-27 The welding method of hydrocone type storm-water system HDPE horizontal pipe welding support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710188520.3A CN106965439B (en) 2017-03-27 2017-03-27 The welding method of hydrocone type storm-water system HDPE horizontal pipe welding support

Publications (2)

Publication Number Publication Date
CN106965439A CN106965439A (en) 2017-07-21
CN106965439B true CN106965439B (en) 2019-07-19

Family

ID=59335450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710188520.3A Active CN106965439B (en) 2017-03-27 2017-03-27 The welding method of hydrocone type storm-water system HDPE horizontal pipe welding support

Country Status (1)

Country Link
CN (1) CN106965439B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202199990U (en) * 2011-08-08 2012-04-25 河南送变电建设公司 Support platform for welding tubular bus-bars
CN103586618A (en) * 2013-09-11 2014-02-19 郑军林 Large pipe welding platform
CN203437842U (en) * 2013-07-26 2014-02-19 陈燕 Pipeline welding platform
CN203592268U (en) * 2013-09-11 2014-05-14 郑军林 Large pipe welding platform
CN204621439U (en) * 2015-04-16 2015-09-09 山东易林机器人技术有限公司 Building hoist chip standard section welding fixture fixture

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202199990U (en) * 2011-08-08 2012-04-25 河南送变电建设公司 Support platform for welding tubular bus-bars
CN203437842U (en) * 2013-07-26 2014-02-19 陈燕 Pipeline welding platform
CN103586618A (en) * 2013-09-11 2014-02-19 郑军林 Large pipe welding platform
CN203592268U (en) * 2013-09-11 2014-05-14 郑军林 Large pipe welding platform
CN204621439U (en) * 2015-04-16 2015-09-09 山东易林机器人技术有限公司 Building hoist chip standard section welding fixture fixture

Also Published As

Publication number Publication date
CN106965439A (en) 2017-07-21

Similar Documents

Publication Publication Date Title
CN205871785U (en) Subway rigid suspension contact net bearing structure
CN205967986U (en) Device is used in adjustable straightness's of hanging down corundum wear -resistant pipeline flange welding
CN209011579U (en) A kind of adjustable vertical pump line support frame
CN106965439B (en) The welding method of hydrocone type storm-water system HDPE horizontal pipe welding support
CN208310244U (en) A kind of device for control panel surface evenness
CN108915250A (en) A kind of cantilever form
CN109132843A (en) The installation method of super-section metal bellows in a kind of vertical shaft
CN208830712U (en) A kind of cantilever form
CN208369083U (en) A kind of communication pipe support device
CN206636168U (en) A kind of overhanging scaffold system
CN104628055A (en) Submersible water impeller system and mounting method thereof
CN207194427U (en) A kind of fixed structure of scaffold for building
CN210053104U (en) Power transformation support for power transmission and transformation engineering
CN208055873U (en) The self-traveling module inner platform system of suspended pouring of box beam Hanging Basket
CN209524163U (en) A kind of heavy fixed framework construction of pipeline beam column combination of horizontal Tile laying
CN209742967U (en) Adjustable tunnel equipment mounting structure
CN110847966B (en) Lower support-free adjustable suspended formwork construction method
CN113309256A (en) Construction device and construction method for prefabricated shear wall with post-pouring section
CN205492087U (en) Lamb device of suckleing
CN220201124U (en) Semi-self-propelled daylighting roof glass hoisting equipment
CN215670469U (en) Adjustable ceiling connecting device
CN204754225U (en) Can have enough to meet need a support
CN203911413U (en) Adjustable supporting type tubular busbar support
CN209742912U (en) Template support is pour to tunnel medial side escape canal
CN210475933U (en) Tool for mounting cable bridge bracket arm

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 610000 No. 123 Yusha Road, Qingyang District, Chengdu City, Sichuan Province

Applicant after: Chengdu Construction First Construction Engineering Co., Ltd.

Address before: 610017 No. 123 Yusha Road, Qingyang District, Chengdu City, Sichuan Province

Applicant before: CHENGDU NO.1 CONSTRUCTION CORPORATION

GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Cao Qian

Inventor after: Li Yang

Inventor after: Hu Shenlin

Inventor after: Wen Lei

Inventor after: Zhang Sheng

Inventor after: Chen Ran

Inventor after: Chen Zhenguo

Inventor after: Zhou Wenhai

Inventor before: Wen Lei

Inventor before: Zhang Sheng

Inventor before: Chen Ran

Inventor before: Chen Zhenguo

Inventor before: Zhou Wenhai