CN106953956A CN201710166026.7A CN201710166026A CN106953956A CN 106953956 A CN106953956 A CN 106953956A CN 201710166026 A CN201710166026 A CN 201710166026A CN 106953956 A CN106953956 A CN 106953956A
Authority
CN
China
Prior art keywords
test
continuation
journey
terminal
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710166026.7A
Other languages
Chinese (zh)
Inventor
陈萌萌
陈玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Yude Technology Co Ltd
Original Assignee
Shanghai Yude Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Yude Technology Co Ltd filed Critical Shanghai Yude Technology Co Ltd
Priority to CN201710166026.7A priority Critical patent/CN106953956A/en
Publication of CN106953956A publication Critical patent/CN106953956A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04MTELEPHONIC COMMUNICATION
    • H04M1/00Substation equipment, e.g. for use by subscribers
    • H04M1/24Arrangements for testing

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The present invention relates to communication technical field, a kind of continuation of the journey test system and method are disclosed.Continuation of the journey test system includes:Test configurations module, for pre-setting at least one special project test, wherein, each power consumption of special project test only to the One function of terminal is tested;When carrying out continuation of the journey test, only start a special test every time;When carrying out each special project test, all upper layer applications being had been switched in closing a terminal close the bottom application unrelated with special test, only start bottom application corresponding with special test;Monitoring module is used in continuation of the journey test process is carried out, and the operational factor to terminal is detected automatically, and synchronously preserves test data;Report output module is used for when stopping continuation of the journey test, the Test data generation test report preserved according to monitoring module.Continuation of the journey test system and method provided in an embodiment of the present invention, more accurate and visual can measure the battery drain situation of terminal, so as to draw specific terminal cruising time.

Description

Test system of continuing a journey and method
Technical field
The present invention relates to communication technical field, more particularly to a kind of continuation of the journey test system and method.
Background technology
With the development of mobile communication technology, the mobile terminal such as mobile phone, panel computer, wearable device turns into people A pith in daily life, the life given people, office bring huge convenience.But it is at the same time, mobile whole Some problems at end also become increasingly conspicuous, wherein, the problem of continuation of the journey duration is relatively short is one that mobile terminal user is generally reflected Individual concentration problem.In order to meet the use demand of user, increasing manufacturer is being absorbed in mobile terminal and application both at home and abroad While research and development, substantial amounts of manpower is also put into and the situation of mobile terminal continuation of the journey duration has been tested with material resources.
At present, frequently with manual test method, or automatic retest method moves terminal continuation of the journey test.But During the present invention is realized, inventor has found that prior art at least has problems with:Carried out using manual test method Mobile terminal continuation of the journey test, although the test for situation of being continued a journey to mobile terminal can be reached, but be due to that manual test has necessarily Limitation, it is impossible to ensure to repeat the uniformity of frequency, and be not easy to check and record electricity in time in test process Expenditure Levels, thus the accuracy of test result can not be ensured;Operated using mobile terminal analog subscriber itself, it is automatic to repeat Perform test, although efficiently solve the time length tested in test process, repeat operation, test intensity it is larger, test As a result the problems such as can not automatically recording, can-not be automatically generated form, but be due to that test process is by calling third-party application Realize, and call third-party application to there are many uncontrollable factors in simulation application, therefore test result and forbidden Really.
The content of the invention
The purpose of embodiment of the present invention is to provide a kind of continuation of the journey test system and method, can be more accurate and visual The battery drain situation of terminal is measured, so as to draw specific terminal cruising time.
Include in order to solve the above technical problems, embodiments of the present invention provide a kind of continuation of the journey test system:Test is matched somebody with somebody Put module, monitoring module and report output module;Test configurations module, for pre-setting at least one special project test, wherein, Each power consumption of special project test only to the One function of terminal is tested;When carrying out continuation of the journey test, only start one every time Individual special test;When carrying out each special project test, all upper layer applications being had been switched in closing a terminal are closed and special The unrelated bottom application of test, only starts bottom application corresponding with special test;Monitoring module is used to carry out continuation of the journey test During, the operational factor to terminal is detected automatically, and synchronously preserves test data;Report output module is used to stop During continuation of the journey test, the Test data generation test report preserved according to monitoring module.
Embodiments of the present invention, which additionally provide a kind of continuation of the journey method of testing, to be included:The present invention is installed in the terminal in advance to appoint Continuation of the journey test system in embodiment of anticipating;When needing to carry out continuation of the journey test, start the continuation of the journey test system of terminal;In terminal The special test of selection one in the test configurations module for test system of continuing a journey, the special test to selection is configured, and is started Test.
Embodiment of the present invention in terms of existing technologies, continuation of the journey test is carried out using the continuation of the journey test system, can be with Ensure to be not in while open multiple applications, so as to be interfered between avoiding different application in continuation of the journey test process Problem, improves the accuracy of continuation of the journey test result;And can monitor in real time preservation test process in terminal in different operations The test data produced under parameter, facilitates tester to test carrying out continuation of the journey the monitoring of terminal, can root when stopping test Research staff's progress subsequent analysis is surveyed according to the corresponding test report of the Test data generation of preservation is convenient, is accurately positioned in terminal Power consuming device.
In addition, continuation of the journey test system also includes ambient As module, ambient As module is used to carry out continuation of the journey test It is preceding that precondition is configured;Wherein, precondition at least include it is following any one:Close Wireless Fidelity WIFI, close Global position system GPS, the brightness for adjusting display screen.Before continuation of the journey test is carried out, pass through the environment in test system of continuing a journey Setup module is configured to precondition, so as to exclude the interference of other external factors, is further ensured that the standard of test result True property.
In addition, the special test that test configurations module is set includes radio frequency test;Radio frequency testing specifically includes online and surveyed Examination and speaking test;Wherein, test configurations module configures IP address when setting online test;Test configurations module is setting logical Dialing numbers are configured during words test.Using radio frequency test as a specific special test, and surveyed by test of surfing the Net, call Two kinds of specific test modes are tried, radio frequency testing is realized.In continuation of the journey test, specific test mode in radio frequency testing in being elected to Afterwards, directly according to the test information configured, all upper layer applications being had been switched in closing a terminal, and with the test mode without The bottom application of pass, only starts bottom application corresponding with the test mode and is tested, and solves different in test process answer The problem of with interfering, it is ensured that the accuracy of continuation of the journey test result.
In addition, the special test that test configurations module is set includes video-stream processor GPU tests;GPU tests are specifically included Video measurement and three-dimensional animation test;Wherein, test configurations module configures the sheet played in testing when setting video measurement Ground video;Test configurations module configures the self-defined three-dimensional animation played in testing when setting animation to test.At display Device GPU tests are managed as a specific special test, and two kinds of specific test sides are tested by video measurement, three-dimensional animation Formula, realizes that GPU is tested.In continuation of the journey test, in being elected in GPU tests after specific test mode, directly according to having configured Information, all upper layer applications being had been switched in closing a terminal, and the bottom application unrelated with the test mode are tested, is only started Bottom application corresponding with the test mode is tested, and solves the problem of different application is interfered in test process, is protected The accuracy of continuation of the journey test result is demonstrate,proved.
In addition, test configurations module is additionally operable to set the condition for stopping continuation of the journey test.Utilize the survey in test system of continuing a journey Configuration module is tried, the corresponding condition for stopping continuation of the journey test is arranged as required to, surveyed so as to more convenient control continuation of the journey The stop and start of examination.
In addition, continuation of the journey method of testing also includes:Installed in contrast machine and terminal identical continuation of the journey test system;Wherein, Contrast machine is identical with terminal configuration;In the continuation of the journey test system installed in starting terminal, also start the continuation of the journey of contrast machine simultaneously Test system;The special test of selection one in the test configurations module of the continuation of the journey test system of contrast machine, to the special project of selection Test is configured, and starts test;Wherein, contrast machine is identical with the special project test that terminal is selected;Stopping continuation of the journey test Afterwards, contrasted according to the test report of terminal and contrast machine, determine continuation of the journey situation of the terminal relative to contrast machine.By using When the continuation of the journey test system installed in the terminal carries out continuation of the journey test to terminal, identical continuation of the journey test system is installed while starting Contrast machine carry out identical special project test, so as to after continuation of the journey test is stopped, being distinguished by contrasting terminal and contrast machine The test report of generation, determines continuation of the journey situation of the terminal relative to contrast machine.
In addition, after the continuation of the journey test system of contrast machine is started, before test is started, continuation of the journey method of testing is also wrapped Include:Precondition is configured in the ambient As module of the continuation of the journey test system of contrast machine;Wherein, contrast machine and terminal The precondition of setting is identical.It is identical with the precondition of contrast machine by limiting terminal in embodiment of the present invention, so as to protect Demonstrate,prove the accuracy of comparing result.
In addition, after the continuation of the journey test system of contrast machine is started, before test is started, continuation of the journey method of testing is also wrapped Include:The condition for stopping continuation of the journey test is configured in the test configurations module of the continuation of the journey test system of contrast machine;Wherein, it is right The condition of the stopping continuation of the journey test set than machine and terminal is identical.In embodiment of the present invention, by limiting terminal and contrast machine Stopping test condition it is identical, so as to ensure the accuracy of comparing result.
Brief description of the drawings
One or more embodiments are illustrative by the picture in corresponding accompanying drawing, these exemplary theorys The element with same reference numbers label is expressed as similar element in the bright restriction not constituted to embodiment, accompanying drawing, removes Composition is not limited the non-figure having in special statement, accompanying drawing.
Fig. 1 is the structural representation of the continuation of the journey test system of first embodiment of the invention;
Fig. 2 is the structural representation of the continuation of the journey test system of second embodiment of the invention;
Fig. 3 is the flow chart of the continuation of the journey method of testing of third embodiment of the invention;
Fig. 4 is the flow chart of the continuation of the journey method of testing of four embodiment of the invention;
Fig. 5 is the flow chart of the continuation of the journey method of testing of fifth embodiment of the invention.
Embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with each reality of the accompanying drawing to the present invention The mode of applying is explained in detail.However, it will be understood by those skilled in the art that in each embodiment of the invention, In order that reader more fully understands the application and proposes many ins and outs.But, even if without these ins and outs and base Many variations and modification in following embodiment, can also realize the application technical scheme claimed.
The first embodiment of the present invention is related to a kind of continuation of the journey test system, and the continuation of the journey test system includes test configurations mould Annexation between block 101, monitoring module 102 and report output module 103, each module is specifically as shown in Figure 1.
Test configurations module 101, for pre-setting at least one special project test.
Specifically, the special test that test configurations module 101 is set can include radio frequency test, video-stream processor GPU is tested and central processor CPU test.
Wherein, radio frequency testing specifically includes online test and speaking test.
Test configurations module 101 needs to configure IP address, i.e. Internet protocol address when setting online test (Internet Protocol Address, internet protocol address is translated into again).IP address is a kind of unification that IP agreement is provided Address format, it is one logical address of each network and each host assignment on internet, and physics is shielded with this The difference of address, therefore be radio frequency testing in the special test of selection, and when selecting to be tested using the method for online test, The survey to network function can be realized in the way of ping bags (a kind of communication protocol mode) directly by the IP address configured Examination, utilizes " ping " order to check whether network connects, and us can be helped to analyze and judge network failure well, and And need not start the browser of terminal, therefore also without any network data is loaded, also in the absence of with each browser server Data interaction, so as to avoid the interference of these external factors.Specifically, it is using form:Ping spaces IP address, should Order can also add many parameters and use, and it is it can be seen that detailed description, is repeated no more here by carriage return specifically to key in Ping.
Test configurations module 101 needs to configure dialing numbers when setting speaking test, so as in the special project of selection Test is radio frequency testing, and when selecting to be tested using the method for speaking test, can directly dial pre-configured want The telephone number dialed, by auxiliary machine auto-pickup, realizes speaking test, and if line interrupted occurs in midway, may be used also To dial the telephone number of configuration again automatically, continue to test, untill stopping test.
Wherein, GPU tests specifically include video measurement and three-dimensional animation test.
Test configurations module 101 needs to configure the local video played in testing when setting video measurement.So as to It is GPU tests with the special test in selection, and when selecting to be tested using the method for video measurement, directly initiates in terminal The multimedia player carried opens full screen display or partial display mode, the local video that loop play has been configured, Zhi Daoting Untill only testing.
Test configurations module 101 needs to configure the self-defined three-dimensional animation played in testing when setting animation to test. It is GPU tests so as to the special test in selection, and when selecting to be tested using the method that animation is tested, directly initiates The multimedia player unlatching full-screen display mode carried in terminal, the self-defined three-dimensional animation that loop play has been configured, until Untill stopping test.
Wherein, cpu test directly can close all upper layer applications having been switched on and all by testing terminal Bottom application, and in the specific power consumption condition gone out when shielding holding state, it is used as final continuation of the journey test result.
It should be noted that in actual applications, can be selected when continuation of the journey test is carried out to terminal using continuation of the journey test system The special test selected is not limited to above-mentioned several, and tester can set in test configurations module 101 and accord with as needed The test mode of conjunction demand is tested as special project, and, it is necessary to open, which application, tool closed during default startup special project test The implementation of body, those skilled in the art can be set according to prior art, not illustrated here.
In addition, it is necessary to which explanation, special test is pre-set in test configurations module 101, is specifically defined each Power consumption of the individual special test only to the One function of terminal is tested.Meanwhile, when carrying out continuation of the journey test, restriction is only opened every time A dynamic special test, and when carrying out each special project test, all upper layer applications being had been switched in closing a terminal are closed The bottom application unrelated with special test is closed, only starts bottom application corresponding with special test.
Monitoring module 102 is used in continuation of the journey test process is carried out, and the operational factor to terminal is detected automatically, and together Step preserves test data.
Specifically, in embodiment of the present invention, test system of continuing a journey is being started, during carrying out continuation of the journey test, prison Control the automatic operational factor to terminal of the meeting of module 102 to detect, such as mobile phone electricity, screen luminance of terminal, signal intensity, and Test data under each operational factor detected is saved under the path specified in terminal, correspondence in such as continuation of the journey test system Under the path of special project test.
It should be noted that monitoring module 102 is detected in the operational factor to terminal, and synchronously preserve test data Process, the AM automatic monitoring mainly carried out according to terminal inner curent change in test process obtains.Its test preserved Data form can be with as shown in the table:
Special project test Time Battery electric quantity Screen intensity Signal intensity ···
Online test 10:00 100% 70% By force ···
··· ··· ··· ··· ··· ···
Online test 12:00 50% 70% By force ···
It is noted that in actual applications, the test data form of preservation and the operation for monitoring the detection of module 102 Parameter is not limited thereto, and tester and research staff can be as needed, is made an appointment and is set in continuation of the journey test system The operational factor that form and needs are detected that preserves for monitoring the test data that module 102 is detected is put, is now repeated no more.
Report output module 103 is used for when stopping continuation of the journey test, the Test data generation preserved according to monitoring module 102 Test report.
Specifically, according to from test is started to the test data that produces in test this period is terminated, according to default Form generates test report, and total power consumption and cost time are all generated in test report, so as to facilitate tester The power consuming device in terminal is accurately determined with research staff.
In addition, it is noted that the condition for being used to stop continuation of the journey test in embodiment of the present invention can be matched somebody with somebody by test Put what module 101 was configured.
Such as, the condition setting that will stop continuation of the journey test in test configurations module 101 is remaining for terminal battery electricity quantity 5%, during continuation of the journey test is carried out, when the battery electric quantity residue 5% of terminal, continuation of the journey test is just automatically stopped, then The Test data generation test report preserved by report output module 103 according to monitoring module 102, thus can be in terminal electricity Before pond electricity is depleted completely, the work of generation test report is completed, it is to avoid in the case where terminal battery electricity quantity is depleted When terminating test, generating the need of work of test report could be carried out after terminal changes battery or charging start.
Also such as, can be set in the arbitrary interface of continuation of the journey system or terminal one be used for control continue a journey test stop Entrance only, when the entrance is triggered, is automatically stopped continuation of the journey test, generates test report, so as to facilitate tester to continuous The control of aerial survey examination.
But in actual applications, stop the condition of continuation of the journey test and be not limited to above two, and remained using battery When remaining electricity is as continuation of the journey test condition is stopped, electricity is also than being confined to 5%, and tester can be arranged as required to accordingly Stop continuation of the journey test condition, here is omitted.
Compared with prior art, continuation of the journey test is carried out using the continuation of the journey test system, it is ensured that in continuation of the journey test process In be not in while open multiple applications, so that the problem of being interfered between avoiding different application, improves continuation of the journey and survey The accuracy of test result;And the test number for preserving that terminal is produced under different operational factors in test process can be monitored in real time According to, facilitate tester to carry out continuation of the journey test terminal monitoring, stop test when can be given birth to according to the test data of preservation Research staff's progress subsequent analysis is surveyed into corresponding test report is convenient, the power consuming device in terminal is accurately positioned.
It is noted that each module involved in present embodiment is logic module, in actual applications, one Individual logic unit can be a part for a physical location or a physical location, can also be with multiple physics lists The combination of member is realized.In addition, will not be with solving institute of the present invention in the innovative part in order to protrude the present invention, present embodiment The technical problem relation of proposition less close unit is introduced, but this be not intended that in present embodiment be not present it is other single Member.
Second embodiment of the present invention is related to a kind of continuation of the journey test system.Base of the present embodiment in first embodiment Further improvement is done on plinth, specific improvements are:After the continuation of the journey test system of terminal is started, starting test Before, precondition can be configured in the ambient As module of the continuation of the journey test system of terminal, it is specific as shown in Figure 2.
As shown in Fig. 2 the continuation of the journey test system in embodiment of the present invention is in addition to including the module shown in Fig. 1, Also include ambient As module 104.Ambient As module 104 is used to set precondition before continuation of the journey test is carried out Put.
Wherein, the precondition being configured by ambient As module 104 at least includes closing Wireless Fidelity WIFI, closed Close global position system GPS, adjust display screen brightness any one.
Specifically, because different special tests needs the bottom application started to differ, and the end that needs are related to End bottom function is also differed, such as when carrying out online test, and terminal needs to open Wireless Fidelity WIFI, or mobile network (2G/3G/4G) can just carry out online test, and because online test is what is carried out by way of ping bags, in test During need not use global position system GPS, it is and relatively low to the brightness requirement of terminal display screen, therefore carrying out Need to close global position system GPS when online test, and minimum brightness is transferred in terminal display screen brightness, so as to avoid Influence of these factors to test result, is further ensured that the accuracy of test result.On other specific test modes, The specific precondition for needing to open and close, is no longer repeated one by one here in test process, as long as ensureing in continuation of the journey test, The precondition of unlatching is all necessary, and the Close All unrelated with currently testing.
Compared with prior art, it is right by the ambient As module in test system of continuing a journey before continuation of the journey test is started Precondition is configured, and excludes the interference of other external factors, further ensures the accuracy of test result.
Third embodiment of the present invention is related to a kind of continuation of the journey method of testing, based on continuous in any embodiment in the present invention Aerial survey test system, idiographic flow is as shown in Figure 3.
Continuation of the journey method of testing shown in Fig. 3 can be used in the user terminal, and wherein the user terminal can be such as intelligence Energy mobile phone, panel computer, personal digital assistant, wearable electronic equipment etc..Specifically, the continuation of the journey test that Fig. 3 is related to The flow of method can include:
In step 301, continuation of the journey test system is installed in the terminal in advance.
Specifically, in the terminal for needing to carry out continuation of the journey test, install what is provided in any embodiment of the present invention in advance Continuation of the journey test system.
In step 302, the continuation of the journey test system of terminal is started.
Specifically, when needing to carry out continuation of the journey test, the continuation of the journey test system installed in the terminal is started.
In step 303, a special test is selected.
Specifically, start after the continuation of the journey test system of terminal, tester needs the continuation of the journey in terminal to test A special test, such as radio frequency testing are selected in the test configurations module of system.
Because each power consumption of special project test only to the One function of terminal is tested, and carrying out continuation of the journey test When, a special test can only be started every time.
In addition, when carrying out each special project test, the test configurations module in continuation of the journey test system can be closed end automatically All upper layer applications being had been switched in end, and the bottom application unrelated with special test, only start corresponding with special test Bottom application so that ensure continuation of the journey test in be not in application between interfering, improve the accurate of test result Property.
In step 304, the special test to selection is configured.
Specifically, due to the test configurations module in the continuation of the journey test system that uses, to pre-set at least one special Test can be specifically radio frequency test, video-stream processor GPU is tested, central processor CPU is tested etc., and radio frequency testing Again can be by test and the speaking test realization of surfing the Net, GPU tests can be realized by video measurement and three-dimensional animation test again.
Such as, when the special test of selection is radio frequency testing, it is necessary to be two specific test sides in radio frequency testing Formula is configured respectively, specifically:
Tester's needs are test mode configuration IP address of surfing the Net in test configurations module, such as www.baidu.com, only Network access can be carried out by ensureing the IP address of configuration;Dialing numbers are configured for speaking test mode, can be one Phone number or fixed line number, are not limited here, can normally be answered as long as ensureing the dialing numbers of configuration Number.
Also such as, when the special test of selection is GPU tests, it is necessary to two specific test sides in being GPU tests Formula is configured respectively, specifically:
Tester's needs configure the local video played in testing, tool in test configurations module for video measurement mode Body can be obtained by data connecting line or radio transmission apparatus from other equipment, can also shift to an earlier date and test is downloaded to from network In terminal, it is not limited here;Configure the self-defined three-dimensional animation played in testing for three-dimensional animation test mode, for The self-defined three-dimensional animation played in test can be equally taken from other equipment or Network Capture to test terminal, can also Test terminal system is carried, and is not limited here, as long as ensureing to be stored in for carrying out the multimedia file of GPU tests In terminal.
Also such as, when the special test of selection is cpu test, it is necessary to all upper layer applications that terminal is currently opened and Bottom application is turned off.
It should be noted that in actual applications due in test configurations module default special test it is different, therefore The configuration that special test to selection is carried out is not particularly limited, related personnel is matched somebody with somebody as needed herein there is also difference Put.
In step 305, test is started.
Specifically, the special test to selection carries out, with postponing, starting test, and terminal enters automatic test phase.
Within step 306, judge whether to meet the condition for stopping continuation of the journey test.
Specifically, if meeting the condition for stopping continuation of the journey test, 307 are done into step;Otherwise continue to test, and in fact When monitor whether to meet the condition for stopping continuation of the journey test, untill entering step 307.
It should be noted that be configured in advance by test configurations module for the condition for stopping continuation of the journey test, Can be specifically terminal battery electricity quantity residue 5% by the condition setting for stopping continuation of the journey test, during continuation of the journey test is carried out, When the battery electric quantity residue 5% of terminal, continuation of the journey test is just automatically stopped, is then deposited by report output module according to monitoring module Test data generation test report, thus can before terminal battery electricity quantity is depleted completely, complete generation test report Work, it is to avoid when just terminating test in the case that terminal battery electricity quantity is depleted, the need of work of generation test report exists Terminal could be carried out after changing battery or charging start.
Can also be set in the arbitrary interface of continuation of the journey system or terminal one be used for control continuation of the journey test stopping entering Mouthful, when the entrance is triggered, continuation of the journey test is automatically stopped, test report is generated, so as to facilitate tester to test continuation of the journey Control.
But in actual applications, stop the condition of continuation of the journey test and be not limited to above two, and remained using battery When remaining electricity is as continuation of the journey test condition is stopped, electricity is also than being confined to 5%, and tester can be arranged as required to accordingly Stop continuation of the journey test condition, here is omitted.
In step 307, test is stopped.
Specifically, during continuation of the journey test is carried out, when judging currently to meet the condition for stopping continuation of the journey test, continue Aerial survey test system is automatically stopped the continuation of the journey test to terminal.
In step 308, test report is generated.
Specifically, when stopping continuation of the journey test, the report output module in continuation of the journey test system can be according to monitoring module It is embodied not only in the Test data generation test report of preservation, the test report in progress continuation of the journey test process, monitoring module The automatic operational factor to terminal carries out detecting obtained test data, also including the total power consumption in whole continuation of the journey test process And from test is started to terminating the contents such as time for spending altogether of test, and can be generated according to default form.
Compared with prior art, continuation of the journey test is carried out using the continuation of the journey test system, it is ensured that in continuation of the journey test process In be not in while open multiple applications, so that the problem of being interfered between avoiding different application, improves continuation of the journey and survey The accuracy of test result;And the test number for preserving that terminal is produced under different operational factors in test process can be monitored in real time According to, facilitate tester to carry out continuation of the journey test terminal monitoring, stop test when can be given birth to according to the test data of preservation Research staff's progress subsequent analysis is surveyed into corresponding test report is convenient, the power consuming device in terminal is accurately positioned.
It is seen that, present embodiment is the embodiment of the method corresponding with first embodiment, and present embodiment can be with First embodiment is worked in coordination implementation.The relevant technical details mentioned in first embodiment still have in the present embodiment Effect, in order to reduce repetition, is repeated no more here.Correspondingly, the relevant technical details mentioned in present embodiment are also applicable in In first embodiment.
The 4th embodiment of the present invention is related to a kind of continuation of the journey method of testing, based on continuous in any embodiment in the present invention Aerial survey test system.Present embodiment has done further improvement on the basis of the 3rd embodiment, and specific improvements are:Opening When the dynamic terminal for being provided with continuation of the journey test system carries out continuation of the journey test, while starting the contrast for being provided with identical continuation of the journey test system Machine carries out continuation of the journey test, and idiographic flow is as shown in Figure 4.
In step 401, installed in contrast machine and terminal identical continuation of the journey test system.
Specifically, select roughly the same with being currently needed for carrying out the continuation of the journey terminal price of test, function, configure also identical Other brands or with brand terminal machine as a comparison, and install in contrast machine and to be continued a journey test system with terminal identical.
It should be noted that in order to ensure that test report has comparability, it is necessary to ensure contrast before continuation of the journey test is started Machine possesses identical electricity with terminal.
In step 402, in the continuation of the journey test system installed in starting terminal, the continuation of the journey for also starting contrast machine simultaneously is surveyed Test system.
It should be noted that identical with the stopping test condition of contrast machine in order to limit terminal, it is ensured that the standard of comparing result True property, after continuation of the journey test system of the terminal with contrast machine is started, before test is started, in terminal and can contrast machine The condition for stopping continuation of the journey test is configured in the test configurations module for test system of continuing a journey, and ensures contrast machine and terminal The condition of the stopping continuation of the journey test of setting is identical.
In step 403, the special test of selection one in the test configurations module of the continuation of the journey test system of contrast machine, it is right The special test of selection is configured, and starts test.
Specifically, it is identical with the special test selected in the continuation of the journey test system of each self installation in terminal in contrast machine Special test, and carry out identical configuration, then start test.
In step 404, after continuation of the journey test is stopped, being contrasted according to the test report of terminal and contrast machine, really Determine continuation of the journey situation of the terminal relative to contrast machine.
Compared with prior art, when carrying out continuation of the journey test to terminal, identical continuation of the journey is provided with by startup simultaneously and tested System, machine is contrasted with terminal configuration identical, and selects identical special project test to carry out continuation of the journey test, so as to according to terminal Test report and the test report of contrast machine determine the actual continuation of the journey situation of terminal.
The 5th embodiment of the present invention is related to a kind of continuation of the journey method of testing, based on continuous in any embodiment in the present invention Aerial survey test system.Present embodiment has done further improvement on the basis of the 3rd embodiment, and specific improvements are:Opening After the continuation of the journey test system of dynamic terminal, before test is started, ambient As module of the meeting in the continuation of the journey test system of terminal In precondition is configured, idiographic flow is as shown in Figure 5.
In step 501, continuation of the journey test system is installed in the terminal in advance.
In step 502, the continuation of the journey test system of terminal is started.
In step 503, a special test is selected.
In step 504, the special test to selection is configured.
Because step 501 to step 504 is roughly the same to step 304 with the step 301 in the 3rd embodiment, it is intended to: Continuation of the journey test system is installed in the terminal in advance, when needing to carry out continuation of the journey test, starts the continuation of the journey test system of terminal, at end A special test is selected in the test configurations module of the continuation of the journey test system at end, and the special test of selection is configured, Here is omitted.
In step 505, precondition is configured.
Specifically, after the continuation of the journey test system of terminal is started, before test is started, in addition it is also necessary in the continuous of terminal Precondition is configured in the ambient As module of aerial survey test system.Specifically, the precondition set needs at least to wrap Include it is following any one:Close Wireless Fidelity WIFI, the brightness closed global position system GPS, adjust display screen.
It should be noted that due in embodiment of the present invention, starting continuation of the journey test system to terminal progress continuation of the journey survey While examination, it can also start and identical continuation of the journey test system is installed, and have selected identical special project test and carry out continuation of the journey survey The contrast machine of examination, therefore in order to ensure to stop after test, the test data preserved according to terminal and contrast machine in test process The accuracy of the test report of generation, and comparability, to preposition in the ambient As module of the continuation of the journey test system of terminal After condition is configured, it is necessary to right in the ambient As module of the continuation of the journey test system of contrast machine before starting continuation of the journey test Precondition is configured, and it is identical with the precondition that terminal is set to contrast machine.
In addition, it is noted that setting to precondition, can be after the continuation of the journey test system of terminal be started, choosing Just it is configured before selecting special test, special project can also be being selected to test and progress is being tested with postponing for the special of selection, entered The setting of row precondition, as long as ensureing after the continuation of the journey test system of terminal is started, completes preposition before test is started The operation of condition setting, specific setting steps are not limited.
In step 506, test is started.
In step 507, judge whether to meet the condition for stopping continuation of the journey test, if meeting the bar for stopping continuation of the journey test Part, then into step 508;Otherwise continue to test, and monitor whether to meet the condition for stopping continuation of the journey test in real time, until entering step Untill rapid 508.
In step 508, test is stopped.
In step 509, test report is generated.
Because step 506 to step 509 is roughly the same to step 308 with the step 305 in the 3rd embodiment, it is intended to: The special test of selection is carried out with postponing startup test, and during test of continuing a journey, judgement meets stopping continuation of the journey test Condition when, stop test, then generate test report, here is omitted.
Compared with prior art, it is right by the ambient As module in test system of continuing a journey before continuation of the journey test is started Precondition is configured, and excludes the interference of other external factors, further ensures the accuracy of test result.
Because second embodiment is mutually corresponding with present embodiment, therefore present embodiment can be mutual with second embodiment It is engaged implementation.The relevant technical details mentioned in second embodiment are still effective in the present embodiment, implement second The technique effect that can be reached in mode can similarly be realized in the present embodiment, in order to reduce repetition, no longer be gone to live in the household of one's in-laws on getting married here State.Correspondingly, the relevant technical details mentioned in present embodiment are also applicable in second embodiment.
The step of various methods are divided above, be intended merely to description it is clear, can be merged into when realizing a step or Some steps are split, multiple steps are decomposed into, as long as including identical logical relation, all protection domain in this patent It is interior;To adding inessential modification in algorithm or in flow or introducing inessential design, but its algorithm is not changed Core design with flow is all in the protection domain of the patent.
It will be understood by those skilled in the art that the respective embodiments described above are to realize the specific embodiment of the present invention, And in actual applications, can to it, various changes can be made in the form and details, without departing from the spirit and scope of the present invention.

Claims (10)

1. one kind continuation of the journey test system, it is characterised in that the continuation of the journey test system includes:Test configurations module, monitoring module With report output module;
The test configurations module, for pre-setting at least one special project test, wherein, each special project test is only to terminal The power consumption of One function tested;When carrying out continuation of the journey test, only start a special test every time;Carrying out each During special project test, all upper layer applications being had been switched in the terminal are closed, the bottom unrelated with the special test is closed Using only startup bottom application corresponding with the special project test;
The monitoring module is used in continuation of the journey test process is carried out, and the operational factor to the terminal is detected automatically, and It is synchronous to preserve test data;
The report output module is used for when stopping the continuation of the journey test, the test number preserved according to the monitoring module According to generation test report.
2. continuation of the journey test system according to claim 1, it is characterised in that the continuation of the journey test system is also set including environment Module is put, and the ambient As module is used to precondition is configured before continuation of the journey test is carried out;Wherein, it is described preposition Condition at least include it is following any one:Wireless Fidelity WIFI is closed, global position system GPS is closed, adjusts the bright of display screen Degree.
3. continuation of the journey test system according to claim 1, it is characterised in that the special survey that the test configurations module is set Examination includes radio frequency test;
The radio frequency testing specifically includes online test and speaking test;
Wherein, the test configurations module configures IP address when setting online test;The test configurations module is setting logical Dialing numbers are configured during words test.
4. continuation of the journey test system according to claim 1, it is characterised in that the special survey that the test configurations module is set Examination includes video-stream processor GPU tests;
The GPU tests specifically include video measurement and three-dimensional animation test;
Wherein, the test configurations module configures the local video played in testing when setting video measurement;The test Configuration module configures the self-defined three-dimensional animation played in testing when setting animation to test.
5. continuation of the journey test system according to claim 1, it is characterised in that the test configurations module is additionally operable to setting and stopped The condition that only continuation of the journey is tested.
6. one kind continuation of the journey method of testing, it is characterised in that including:
Continuation of the journey test system as described in claim 1 to 5 any one is installed in the terminal in advance;
When needing to carry out continuation of the journey test, start the continuation of the journey test system of the terminal;
A special test is selected in the test configurations module of the continuation of the journey test system of the terminal, to the special project of selection Test is configured, and starts test.
7. continuation of the journey method of testing according to claim 6, it is characterised in that starting the continuation of the journey test system of the terminal Afterwards, before test is started, the continuation of the journey method of testing also includes:
Precondition is configured in the ambient As module of the continuation of the journey test system of the terminal;Wherein, it is described preposition Condition at least include it is following any one:Wireless Fidelity WIFI is closed, global position system GPS is closed, adjusts the bright of display screen Degree.
8. continuation of the journey method of testing according to claim 6, it is characterised in that the continuation of the journey method of testing also includes:
Installed in contrast machine and test system of being continued a journey described in the terminal identical;Wherein, the contrast machine and the terminal Configuration is identical;
In the continuation of the journey test system installed in starting the terminal, also start the continuation of the journey test system of the contrast machine simultaneously System;
A special test is selected in the test configurations module of the continuation of the journey test system of the contrast machine, to the described special of selection Item test is configured, and starts test;Wherein, the contrast machine is identical with the special project test that the terminal is selected;
After continuation of the journey test is stopped, being contrasted according to the test report of the terminal and the contrast machine, determine the end Hold the continuation of the journey situation relative to the contrast machine.
9. continuation of the journey method of testing according to claim 8, it is characterised in that test system in the continuation of the journey for starting the contrast machine After system, before test is started, the continuation of the journey method of testing also includes:
Precondition is configured in the ambient As module of the continuation of the journey test system of the contrast machine;Wherein, it is described right It is more identical with the precondition that the terminal is set than machine.
10. continuation of the journey method of testing according to claim 8, it is characterised in that starting the continuation of the journey test of the contrast machine After system, before test is started, the continuation of the journey method of testing also includes:
The condition for stopping continuation of the journey test is configured in the test configurations module of the continuation of the journey test system of the contrast machine;Its In, the contrast machine is identical with the condition for the stopping continuation of the journey test that the terminal is set.
CN201710166026.7A 2017-03-20 2017-03-20 Test system of continuing a journey and method Pending CN106953956A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710166026.7A CN106953956A (en) 2017-03-20 2017-03-20 Test system of continuing a journey and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710166026.7A CN106953956A (en) 2017-03-20 2017-03-20 Test system of continuing a journey and method

Publications (1)

Publication Number Publication Date
CN106953956A true CN106953956A (en) 2017-07-14

Family

ID=59473709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710166026.7A Pending CN106953956A (en) 2017-03-20 2017-03-20 Test system of continuing a journey and method

Country Status (1)

Country Link
CN (1) CN106953956A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108235760A (en) * 2017-12-27 2018-06-29 深圳前海达闼云端智能科技有限公司 Power consumption antihunt means, its device and the electronic equipment of intelligent terminal
CN109274804A (en) * 2018-09-27 2019-01-25 英望科技(深圳)有限公司 A kind of mobile telephone power consumption analysis system and method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102752429A (en) * 2012-06-30 2012-10-24 成都西可科技有限公司 Automatic mobile phone battery endurance test method based on Android system
US8650552B1 (en) * 2012-06-22 2014-02-11 Google Inc. Methods and systems for simulation of energy consumption in mobile operating system emulators
CN104077211A (en) * 2013-03-25 2014-10-01 腾讯科技(深圳)有限公司 Test method and test system for mobile terminal software
CN104092804A (en) * 2014-07-17 2014-10-08 广东欧珀移动通信有限公司 Mobile terminal power consumption test method and system
CN105025141A (en) * 2015-07-29 2015-11-04 上海斐讯数据通信技术有限公司 Method and device for testing electricity consumption of terminal
CN105611019A (en) * 2016-01-18 2016-05-25 广东欧珀移动通信有限公司 Power consumption testing method of mobile terminal and power consumption testing system of mobile terminal

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8650552B1 (en) * 2012-06-22 2014-02-11 Google Inc. Methods and systems for simulation of energy consumption in mobile operating system emulators
CN102752429A (en) * 2012-06-30 2012-10-24 成都西可科技有限公司 Automatic mobile phone battery endurance test method based on Android system
CN104077211A (en) * 2013-03-25 2014-10-01 腾讯科技(深圳)有限公司 Test method and test system for mobile terminal software
CN104092804A (en) * 2014-07-17 2014-10-08 广东欧珀移动通信有限公司 Mobile terminal power consumption test method and system
CN105025141A (en) * 2015-07-29 2015-11-04 上海斐讯数据通信技术有限公司 Method and device for testing electricity consumption of terminal
CN105611019A (en) * 2016-01-18 2016-05-25 广东欧珀移动通信有限公司 Power consumption testing method of mobile terminal and power consumption testing system of mobile terminal

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108235760A (en) * 2017-12-27 2018-06-29 深圳前海达闼云端智能科技有限公司 Power consumption antihunt means, its device and the electronic equipment of intelligent terminal
WO2019127081A1 (en) * 2017-12-27 2019-07-04 深圳前海达闼云端智能科技有限公司 Power consumption stabilization method and apparatus for intelligent terminal, and electronic device
CN109274804A (en) * 2018-09-27 2019-01-25 英望科技(深圳)有限公司 A kind of mobile telephone power consumption analysis system and method
CN109274804B (en) * 2018-09-27 2021-09-14 英望科技(深圳)有限公司 System and method for analyzing power consumption of mobile phone

Similar Documents

Publication Publication Date Title
CN109660502A (en) Detection method, device, equipment and the storage medium of abnormal behaviour
CN102801688B (en) The terminal of a kind of method of data access, device and supported data access
CN106383786A (en) Interface pressure performance testing method and device and electronic equipment
CN105787364B (en) Automatic testing method, device and system for tasks
CN107154976A (en) Website testing method, device and system
CN104834601B (en) The automated testing method of intelligent terminal RAM leakage based on android system
CN104317648B (en) A kind of method and apparatus of monitoring advertisement
CN108664372A (en) Monitoring device, method and the computer readable storage medium of test process
CN105187608B (en) The method and apparatus of application program power consumption on a kind of acquisition mobile terminal
CN104021218A (en) Information display method and device
CN107509110A (en) A kind of loop play method and device of video file
CN106953956A (en) Test system of continuing a journey and method
CN107133162A (en) A kind of method of testing and device
CN109753425A (en) Pop-up processing method and processing device
CN110119354A (en) Method for testing software, device and electronic equipment based on Test cases technology
CN107450029A (en) Battery status method of calibration and device, computer equipment, computer-readable recording medium
CN105447383B (en) Browser execution environment detection method, client, server and system
CN108959064A (en) The pop-up processing method and processing device of automatic test
CN106776301A (en) Daughter element method of testing and device
CN106682513A (en) Detection method for target sample file and device
CN108958890A (en) Container microscope testing method, apparatus and electronic equipment
CN105162664A (en) Automatic platform testing method and system developed based on intermediate layers of instruments
CN107918509A (en) Software shortcut prompting method to set up, device and readable storage medium storing program for executing
CN107608707A (en) Application detection method, terminal and readable storage medium storing program for executing with hot repair function
CN101634601B (en) Method and device for testing mechanical reliability of mobile phones

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20170714

WD01 Invention patent application deemed withdrawn after publication