CN106952024A - It is a kind of to strengthen the workflow engine method and system of net O&M scenarios suitable for ground - Google Patents
It is a kind of to strengthen the workflow engine method and system of net O&M scenarios suitable for ground Download PDFInfo
- Publication number
- CN106952024A CN106952024A CN201710118911.8A CN201710118911A CN106952024A CN 106952024 A CN106952024 A CN 106952024A CN 201710118911 A CN201710118911 A CN 201710118911A CN 106952024 A CN106952024 A CN 106952024A
- Authority
- CN
- China
- Prior art keywords
- node
- workflow
- attribute
- field information
- instance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Data Mining & Analysis (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Strengthen the workflow engine method and system of net O&M scenarios, including workflow template, workflow instance, interface layer, attribute widget library suitable for ground the present invention relates to a kind of.A workflow instance is initiated, workflow nodes field information copies to workflow instance node, and workflow nodes attribute field information copies to instant node attribute;Interface layer obtains workflow instance Node field information and instant node attribute field information;The node tasks page obtains workflow instance Node field information and instant node attribute field information from interface layer;Corresponding control is transferred in node tasks page dependence widget library, control dynamically renders the node tasks page.The task form page of front end can be dynamically rendered, exploitation is customized without needing front end developer again to the task page of each node, saves the substantial amounts of time;The example of workflow engine is operationally separated with the definition of workflow, separate.
Description
Technical field
The present invention relates to a kind of workflow processing system, more particularly to a kind of work suitable for ground enhancing net O&M scenarios
Make stream engine method and system.
Background technology
Ground enhancing net is that big-dipper satellite alignment system provides stable position service essential infrastructure, by the whole world
The various ground base stations composition that various regions are dispersed with, is characterized in that distribution is wide, substantial amounts, maintenance cost is high, O&M is difficult
Degree is big, when scale reaches to a certain degree, just as throwing the net one.
Workflow is the abstract of the business rule between each operating procedure to business in enterprise and is broadly described.Detailed
Thin some workflow is then by the logical sum rule of the operating procedure in workflow, in a computer with appropriate model
Express, and for a set of software systems or solution that associate uses.The workflow subject matter to be solved is:For
Some business objective or business scenario are realized, certain is pressed between multiple participants (the relevant personnel i.e. with business) using computer
Plant pre-defined rule and transmit document, information or task automatically, it is efficient to reach the standardization of business, and can reviewing.
And workflow engine is responsible for defining the node in workflow, and flow instance establishment, and realize task
Executor is distributed to, and the task of next step is determined according to the returning result of tasks carrying, controls and coordinates various complex works
The execution of flow, realizes the control to operation flow whole service life cycle.Workflow engine is that Workflow system is most crucial
Module, it redirects the node for the laminar sublayer that works, and distributes the service logic of the logical AND the superiors such as task processing and realizes point
From.
Workflow nodes are each operating procedure or link to each business scenario in workflow, such as in maintenance base station
Operation maintenance personnel will first fill in the Trouble ticket of base station first in the workflow of flow, be then forwarded to whether leading body at a higher level's examination & approval can be tieed up
Repair, if examination & approval pass through if if notify person skilled carry out maintenance work, maintenance people repair after notify operation maintenance personnel
This base station can be used, and workflow nodes at this time have four:
Operation maintenance personnel fill in maintenance it is single->Leading body at a higher level's examination & approval->Notification technique person's progress maintenance work->Notify O&M people
Member base station can use
As the distribution of the earth enhancing net base station is more and more wider, quantity is also increasing, and the complexity of O&M business will
More and more higher, at this moment must just use Workflow system efficiently, the business demand produced in orderly processing O&M.But it is actual
In but there is such a problem, it is different that O&M business has n kinds at different time points for different regions or scene
Workflow (several work can be corresponded in three months by being responsible for the operation maintenance personnel in two regions (or province) than one if possible
Stream, these three months crossed after be transferred to other region, the demand of different business is at this time had again), but lead in enterprise
The speed for crossing existing most of Developing Workflow Engine workflow is but very slow, and result in many business scenarios can only use
Excel, writes mail or artificial formal layout business.The workflow engine of current main flow, its shortcoming is as follows:
1st, main flow workflow engine learning cost is larger, and configuration item is more, and is limited by the limitation of certain platform, substantially
Needing the progress secondary development on the platform of its limitation could use.
2nd, the front-end task page corresponding to each node of each flow, which remains unchanged, needs developer to start from scratch exploitation,
Development time is very very long.
3rd, the substantial amounts of workflow demand that extensive base station operation maintenance personnel is proposed at any time can not be met.
4th, extensive operation maintenance personnel mobility is larger, and a flow made by existing procedure engine can not be timely
Tasks carrying people corresponding to more new node.
The content of the invention
Regarding to the issue above, the present invention proposes a kind of workflow engine system suitable for ground enhancing net O&M scenarios,
Including workflow template, workflow instance, interface layer, attribute widget library;Workflow template can to workflow, workflow nodes with
And workflow nodes attribute is defined, information can be copied to workflow instance by workflow template;Workflow instance includes work
Make stream instant node and workflow instance nodal community;Interface layer is used to obtain workflow instance Node field information and example section
Point attribute field information;Attribute widget library is used for storage control, and control is used for dynamic rendering node task page.
Workflow nodes include more than one workflow nodes attribute, and workflow instance node includes more than one workflow
Instant node attribute;Workflow template provides visualization interface editor by display device and input equipment;Workflow template can
To be stored in workflow template database;Workflow instance can be stored in workflow instance database.
The field information of workflow nodes include a upper node, next node, whether present node, whether start node,
Whether end node, processing people.The field information of workflow nodes attribute is included apart from browser left side distance, apart from browser
Top distance, control height, control money list, control name;Control name and control in attribute widget library are uniquely corresponding.
It is a kind of to strengthen the workflow engine method of net O&M scenarios suitable for ground:Initiate a workflow instance;Work
Stream Node field information copies to workflow instance node, and workflow nodes attribute field information copies to instant node attribute;
Interface layer obtains workflow instance Node field information and instant node attribute field information;The node tasks page is obtained from interface layer
Take workflow instance Node field information and instant node attribute field information;Transferred in node tasks page dependence widget library
Corresponding control, control dynamically renders the node tasks page;
" agreement " operation of the node tasks page, if work at present stream instant node has next node, then Xia Yijie
Point will be set to present node, while giving processing people's distribution according to the processing people field information of workflow instance node next node
Next node is not present in one task, present node, and workflow instance terminates;
The node tasks page " refusal " operation is clicked on, if work at present stream instant node has a upper node and is not starting
Node a, then node will be set to present node on workflow instance node, and to a node on workflow instance node
Handle people and distribute a task, if a upper node for affiliated work at present stream instant node node is start node, flow quilt
Reject to workflow instance section applicant's node.
Workflow engine has function of endorsing, and refers to increase a section between the next node of present node and present node
The operation of point, and the operation of unlimited increase node can be realized.
The beneficial effect that technical solution of the present invention is realized:
This workflow engine can dynamically render the task form page of front end, without needing front end developer again
Task page to each node is customized exploitation, saves the substantial amounts of time;Because the speed for formulating flow is very fast,
The exploitation demand for the extensive work flow that extensive base station operation maintenance personnel is proposed at any time can be met, therefore is highly suitable on a large scale
Used in base enhancing net O&M scenarios;Example is operationally separated with the definition of workflow, separate, even if workflow management person
The operating of example is not interfered with during modification template yet.
Brief description of the drawings
Fig. 1 is a kind of schematic diagram for the workflow engine for strengthening net O&M scenarios suitable for ground of the present invention.
Fig. 2 is the graph of a relation of workflow template intermodule of the present invention.
Fig. 3 is the graph of a relation of workflow instance intermodule of the present invention.
Fig. 4 is that the present invention endorses functional schematic.
Embodiment
Below in conjunction with the accompanying drawings and specific embodiment, the present invention is expanded on further, the embodiment of the present invention is only to illustrate this hair
The protection domain that bright technical scheme is not intended to limit the present invention.
As shown in Figure 1, Figure 2, Figure 3 shows, the present invention proposes a kind of workflow engine suitable for ground enhancing net O&M scenarios
System, including workflow template, workflow instance, interface layer, attribute widget library;Workflow template can be to workflow, workflow
Node and workflow nodes attribute are defined, and information can be copied to workflow instance by workflow template;Workflow instance
Including workflow instance node and workflow instance nodal community;Interface layer be used for obtain workflow instance Node field information and
Instant node attribute field information;Attribute widget library is used for storage control, and control is used for dynamic rendering node task page.
Workflow nodes include more than one workflow nodes attribute, and workflow instance node includes more than one workflow
Instant node attribute;Workflow template provides visualization interface editor by display device and input equipment;Workflow template can
To be stored in workflow template database;Workflow instance can be stored in workflow instance database.
The field information of workflow nodes include a upper node, next node, whether present node, whether start node,
Whether end node, processing people.The field information of workflow nodes attribute is included apart from browser left side distance, apart from browser
Top distance, control height, control money list, control name;Control name and control in attribute widget library are uniquely corresponding.
It is a kind of to strengthen the workflow engine method of net O&M scenarios suitable for ground:Initiate a workflow instance;Work
Stream Node field information copies to workflow instance node, and workflow nodes attribute field information copies to instant node attribute;
Interface layer obtains workflow instance Node field information and instant node attribute field information;The node tasks page is obtained from interface layer
Take workflow instance Node field information and instant node attribute field information;Transferred in node tasks page dependence widget library
Corresponding control, control dynamically renders the node tasks page;
" agreement " operation of the node tasks page, if work at present stream instant node has next node, then Xia Yijie
Point will be set to present node, while giving processing people's distribution according to the processing people field information of workflow instance node next node
Next node is not present in one task, present node, and workflow instance terminates;
The node tasks page " refusal " operation is clicked on, if work at present stream instant node has a upper node and is not starting
Node a, then node will be set to present node on workflow instance node, and to a node on workflow instance node
Handle people and distribute a task, if a upper node for affiliated work at present stream instant node node is start node, flow quilt
Reject to workflow instance section applicant's node.
Workflow engine has function of endorsing, and refers to increase a section between the next node of present node and present node
The operation of point, and the operation of unlimited increase node can be realized, as shown in Figure 4.Concrete operations are as follows:One is generated according to present node
Individual new node, then the node attribute information of present node is also copied in newly-generated node.Then by present node
The field of " the upper node " of next node points to new node, then " next node " of present node is pointed into new node.
When initiating example, according to selected workflow template, it will workflow template node and workflow nodes
The data duplications such as attribute are among workflow instance.Among the design of this engine, the field in " workflow nodes definition " table
There can be " a upper node ", " next node ", " whether present node ", " whether start node ", whether " end node " " is located
Manage people " these fields, so, when visual edit workflow, the logic that redirects of flow is defined in workflow nodes
In have been realized in.When handling people's click " agreement " operation, if there is next node in present node, then next node will be set to
For present node, meanwhile, give processing people to distribute a task according to " processing people " field of next node, if present node is not
There is next node, the flow instance terminates.Processing people click " refusal " operate when, if present node exist a upper node and
It is not start node, then a upper node will be set to present node, and distribute a task to the processing people of a upper node.If
A upper node for present node is start node, then flow is rejected to applicant's node.
The field of workflow nodes attribute has left (apart from browser left side distance), and top is (apart from browser top margin
From), height (control is highly), width (control money list), widget (control name), these fields are that generation front end node is appointed
It is engaged in the critical field of the page, principle is that to render region be absolute fix for the attribute of front end page, and front end page is according to task id
The node attribute information of the present node of correspondence workflow instance is obtained from rear end, preceding end instruction dynamically renders these attributes
The position of corresponding control in a browser, length and width, it is noted that widget control fields are merely representative of
It is that input frame is exactly in the unique name of control in attribute widget library, such as attribute widget library in html language<input>Mark
Label, then the value of the rear end field is exactly " input ", that is to say, that the control field of rear end record owns with attribute widget library
Control be one-to-one, and not only deposited in attribute widget library is conventional bookmark name in html, can also
It is the unique name for the independent control that other modular front end frames are developed, other fields are then described
The x in screen of this control, y values (left fields and top fields i.e. in control) and length and width high level.Opened in front end page
Only need to write the interface of a unified acquisition input value when hair according to these controls, you can by these when submitting
Value acquisition comes into back-end data base and preserved.
Node definition and nodal community in workflow template is defined to the instant node copied in workflow instance
With instance properties node, effect has two:
One, because for the operation maintenance personnel of the earth enhancing net, among the operation process of actual flow, it may occur that permitted
Industry of the processor that many emergency situations, such as operation maintenance personnel are just gone on business in other regions or list to this block region
Business, which is unfamiliar with, needs other people to solve, and at this moment flow engine should provide a kind of mechanism, allows the task of present node to handle people
A node can be increased temporarily in the centre of next node, then this list is given to the processor of this newly-increased node,
Herein, we are defined as this process " endorsing ".
Two, if flow instance reference is flow template node definition information, then after present node is endorsed, then stream
The definition information of journey every template node will be changed, and spend a period of time, and next flow promoter initiates this list again
When, the processing people of flow nodes has but no longer been the processing people that original flow nodes are specified.This is apparently not us
Desired result, the result that we want is only that a node (endorsing) is further added by between present node and next node,
Be only for this workflow instance, so when start flow example, by the every template node of flow template with
And the most information of the field value in every template node attribute all copies in flow instance corresponding instant node and reality
In example nodal community.
Claims (7)
1. a kind of strengthen the workflow engine system of net O&M scenarios suitable for ground, it is characterised in that:
Including workflow template, workflow instance, interface layer, attribute widget library;
The workflow template can be defined to workflow, workflow nodes and workflow nodes attribute, the workflow
Information can be copied to the workflow instance by template;
The workflow instance includes workflow instance node and workflow instance nodal community;
The interface layer is used to obtain the workflow instance Node field information and the instant node attribute field information;
The attribute widget library is used for storage control, and the control is used for dynamic rendering node task page.
2. according to claim 1 strengthen the workflow engine of net O&M scenarios suitable for ground, it is characterised in that described
Workflow nodes include more than one described workflow nodes attribute;The workflow instance node includes more than one described work
Make stream instant node attribute.
3. according to claim 1 strengthen the workflow engine of net O&M scenarios suitable for ground, it is characterised in that described
Workflow template provides visualization interface editor by display device and input equipment;The workflow template can be stored in work
Make flow template database;The workflow instance can be stored in workflow instance database.
4. according to claim 1 strengthen the workflow engine of net O&M scenarios suitable for ground, it is characterised in that described
The field information of workflow nodes include a upper node, next node, whether present node, whether start node, whether terminate
Node, processing people.
5. according to claim 1 strengthen the workflow engine of net O&M scenarios suitable for ground, it is characterised in that described
The field information of workflow nodes attribute is included apart from browser left side distance, apart from browser top distance, control height, control
Part money list, control name;The control name and control in the attribute widget library are uniquely corresponding.
6. a kind of strengthen the workflow engine method of net O&M scenarios suitable for ground, it is characterised in that:
Initiate a workflow instance;
Workflow nodes field information copies to workflow instance node, and workflow nodes attribute field information copies to example section
Point attribute;
Interface layer obtains the workflow instance Node field information and the instant node attribute field information;
The node tasks page obtains the workflow instance Node field information and the instant node attribute from the interface layer
Field information;
Corresponding control is transferred in the node tasks page dependence widget library, the control dynamically renders the node
Task page;
" agreement " operation of the node tasks page is clicked on, if work at present stream instant node has next node, then under
One node will be set to present node, while according to the processing people field information of the workflow instance node next node to institute
State processing people and distribute a task, if next node is not present in present node, the workflow instance terminates;
The node tasks page " refusal " operation is clicked on, if work at present stream instant node has a upper node and is not starting
Node a, then node will be set to present node on the workflow instance node, and on the workflow instance node
The processing people of one node distributes a task, if a upper node for affiliated work at present stream instant node node is start node,
Then flow is rejected to workflow instance section applicant's node.
7. according to claim 6 strengthen the workflow engine method of net O&M scenarios suitable for ground, it is characterised in that
The workflow engine has function of endorsing, and refers to one node of increase between the next node of present node and present node
Operation, and the operation of unlimited increase node can be realized.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710118911.8A CN106952024A (en) | 2017-03-01 | 2017-03-01 | It is a kind of to strengthen the workflow engine method and system of net O&M scenarios suitable for ground |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710118911.8A CN106952024A (en) | 2017-03-01 | 2017-03-01 | It is a kind of to strengthen the workflow engine method and system of net O&M scenarios suitable for ground |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106952024A true CN106952024A (en) | 2017-07-14 |
Family
ID=59466677
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710118911.8A Pending CN106952024A (en) | 2017-03-01 | 2017-03-01 | It is a kind of to strengthen the workflow engine method and system of net O&M scenarios suitable for ground |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106952024A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109101191A (en) * | 2018-06-21 | 2018-12-28 | 东软集团股份有限公司 | Date storage method, device and storage medium and electronic equipment |
CN111144837A (en) * | 2019-12-13 | 2020-05-12 | 东软集团股份有限公司 | Flow arrangement method and device, storage medium and electronic equipment |
CN111782248A (en) * | 2020-07-10 | 2020-10-16 | 上海淇毓信息科技有限公司 | Terminal application updating method and device and electronic equipment |
CN113641405A (en) * | 2021-08-31 | 2021-11-12 | 重庆允成互联网科技有限公司 | Workflow rapid configuration method, device, equipment and storage medium |
CN114546731A (en) * | 2022-03-09 | 2022-05-27 | 北京有生博大软件股份有限公司 | Workflow data recovery method and data recovery system |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103164774A (en) * | 2013-03-11 | 2013-06-19 | 苏州市奥杰汽车技术有限公司 | Automobile complete vehicle development system based on workflow |
CN105808244A (en) * | 2016-03-01 | 2016-07-27 | 杭州师范大学 | Dynamic data visualized analysis tool based on workflows |
-
2017
- 2017-03-01 CN CN201710118911.8A patent/CN106952024A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103164774A (en) * | 2013-03-11 | 2013-06-19 | 苏州市奥杰汽车技术有限公司 | Automobile complete vehicle development system based on workflow |
CN105808244A (en) * | 2016-03-01 | 2016-07-27 | 杭州师范大学 | Dynamic data visualized analysis tool based on workflows |
Non-Patent Citations (2)
Title |
---|
何嘉: "可视化业务流程定制、流转和管理的研究与应用", 《万方数据知识服务平台学位论文》 * |
郭玉彬 等: "轻量级动态工作引擎的设计与实现", 《计算机工程与设计》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109101191A (en) * | 2018-06-21 | 2018-12-28 | 东软集团股份有限公司 | Date storage method, device and storage medium and electronic equipment |
CN109101191B (en) * | 2018-06-21 | 2021-07-16 | 东软集团股份有限公司 | Data storage method, data storage device, storage medium and electronic equipment |
CN111144837A (en) * | 2019-12-13 | 2020-05-12 | 东软集团股份有限公司 | Flow arrangement method and device, storage medium and electronic equipment |
CN111782248A (en) * | 2020-07-10 | 2020-10-16 | 上海淇毓信息科技有限公司 | Terminal application updating method and device and electronic equipment |
CN111782248B (en) * | 2020-07-10 | 2023-09-19 | 上海淇毓信息科技有限公司 | Updating method and device of terminal application and electronic equipment |
CN113641405A (en) * | 2021-08-31 | 2021-11-12 | 重庆允成互联网科技有限公司 | Workflow rapid configuration method, device, equipment and storage medium |
CN114546731A (en) * | 2022-03-09 | 2022-05-27 | 北京有生博大软件股份有限公司 | Workflow data recovery method and data recovery system |
CN114546731B (en) * | 2022-03-09 | 2024-04-05 | 北京有生博大软件股份有限公司 | Workflow data recovery method and data recovery system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106952024A (en) | It is a kind of to strengthen the workflow engine method and system of net O&M scenarios suitable for ground | |
Lian et al. | Analysing the effects of Lean manufacturing using a value stream mapping-based simulation generator | |
US8302096B2 (en) | Methods and systems to perform individual tasks as a composite task | |
Babulak et al. | Discrete event simulation | |
US20110225484A1 (en) | Cloud based modeling for enhancing spreadsheets | |
CN106897806A (en) | Workflow creation method and system, operation system | |
JPH06214865A (en) | Object base data processor | |
Wu et al. | Integrated application of BIM and eXtended reality technology: a review, classification and outlook | |
CN106548429A (en) | Education Administration Information System based on cloud platform | |
CN103793226A (en) | Pervasive application code framework fast-generating method and prototype system | |
JPH043247A (en) | Enterprise information flow defining method | |
Vasilecas et al. | Analysis of using resources in business process modeling and simulation | |
Park et al. | Towards reliable business process simulation: A framework to integrate erp systems | |
CN104346154B (en) | Service-oriented model building method on basis of scenes | |
Dechamma et al. | A review on robotic process automation | |
US11741496B2 (en) | Solution graph for managing content in a multi-stage project | |
Vispi et al. | Simulation on RFID interactive tabletop of working conditions in industry 4.0 | |
Robertson et al. | Feasibility for automatic data collection | |
Andrews | GIS and BIM Integration Leads to Smart Communities | |
Al-Fedaghi et al. | Business process mapping: a case study | |
CN114707429B (en) | EAR-based executable modeling method, apparatus, computer device and medium | |
Whitman et al. | A living enterprise model | |
Bider | Towards process improvement for case management: an outline based on viable system model and an example of organizing scientific events | |
US8311862B2 (en) | Organizational design approach to transition cost assessment for business transformation | |
Berlin et al. | Change agent infrastructure (CHAI)—a stakeholder analysis tool for ergonomics-and work environment-related change projects |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170714 |
|
RJ01 | Rejection of invention patent application after publication |