CN106952024A - It is a kind of to strengthen the workflow engine method and system of net O&M scenarios suitable for ground - Google Patents

It is a kind of to strengthen the workflow engine method and system of net O&M scenarios suitable for ground Download PDF

Info

Publication number
CN106952024A
CN106952024A CN201710118911.8A CN201710118911A CN106952024A CN 106952024 A CN106952024 A CN 106952024A CN 201710118911 A CN201710118911 A CN 201710118911A CN 106952024 A CN106952024 A CN 106952024A
Authority
CN
China
Prior art keywords
node
workflow
attribute
field information
instance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710118911.8A
Other languages
Chinese (zh)
Inventor
冯汝俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qianxun Position Network Co Ltd
Original Assignee
Qianxun Position Network Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qianxun Position Network Co Ltd filed Critical Qianxun Position Network Co Ltd
Priority to CN201710118911.8A priority Critical patent/CN106952024A/en
Publication of CN106952024A publication Critical patent/CN106952024A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

Strengthen the workflow engine method and system of net O&M scenarios, including workflow template, workflow instance, interface layer, attribute widget library suitable for ground the present invention relates to a kind of.A workflow instance is initiated, workflow nodes field information copies to workflow instance node, and workflow nodes attribute field information copies to instant node attribute;Interface layer obtains workflow instance Node field information and instant node attribute field information;The node tasks page obtains workflow instance Node field information and instant node attribute field information from interface layer;Corresponding control is transferred in node tasks page dependence widget library, control dynamically renders the node tasks page.The task form page of front end can be dynamically rendered, exploitation is customized without needing front end developer again to the task page of each node, saves the substantial amounts of time;The example of workflow engine is operationally separated with the definition of workflow, separate.

Description

It is a kind of to strengthen the workflow engine method and system of net O&M scenarios suitable for ground
Technical field
The present invention relates to a kind of workflow processing system, more particularly to a kind of work suitable for ground enhancing net O&M scenarios Make stream engine method and system.
Background technology
Ground enhancing net is that big-dipper satellite alignment system provides stable position service essential infrastructure, by the whole world The various ground base stations composition that various regions are dispersed with, is characterized in that distribution is wide, substantial amounts, maintenance cost is high, O&M is difficult Degree is big, when scale reaches to a certain degree, just as throwing the net one.
Workflow is the abstract of the business rule between each operating procedure to business in enterprise and is broadly described.Detailed Thin some workflow is then by the logical sum rule of the operating procedure in workflow, in a computer with appropriate model Express, and for a set of software systems or solution that associate uses.The workflow subject matter to be solved is:For Some business objective or business scenario are realized, certain is pressed between multiple participants (the relevant personnel i.e. with business) using computer Plant pre-defined rule and transmit document, information or task automatically, it is efficient to reach the standardization of business, and can reviewing.
And workflow engine is responsible for defining the node in workflow, and flow instance establishment, and realize task Executor is distributed to, and the task of next step is determined according to the returning result of tasks carrying, controls and coordinates various complex works The execution of flow, realizes the control to operation flow whole service life cycle.Workflow engine is that Workflow system is most crucial Module, it redirects the node for the laminar sublayer that works, and distributes the service logic of the logical AND the superiors such as task processing and realizes point From.
Workflow nodes are each operating procedure or link to each business scenario in workflow, such as in maintenance base station Operation maintenance personnel will first fill in the Trouble ticket of base station first in the workflow of flow, be then forwarded to whether leading body at a higher level's examination & approval can be tieed up Repair, if examination & approval pass through if if notify person skilled carry out maintenance work, maintenance people repair after notify operation maintenance personnel This base station can be used, and workflow nodes at this time have four:
Operation maintenance personnel fill in maintenance it is single->Leading body at a higher level's examination & approval->Notification technique person's progress maintenance work->Notify O&M people Member base station can use
As the distribution of the earth enhancing net base station is more and more wider, quantity is also increasing, and the complexity of O&M business will More and more higher, at this moment must just use Workflow system efficiently, the business demand produced in orderly processing O&M.But it is actual In but there is such a problem, it is different that O&M business has n kinds at different time points for different regions or scene Workflow (several work can be corresponded in three months by being responsible for the operation maintenance personnel in two regions (or province) than one if possible Stream, these three months crossed after be transferred to other region, the demand of different business is at this time had again), but lead in enterprise The speed for crossing existing most of Developing Workflow Engine workflow is but very slow, and result in many business scenarios can only use Excel, writes mail or artificial formal layout business.The workflow engine of current main flow, its shortcoming is as follows:
1st, main flow workflow engine learning cost is larger, and configuration item is more, and is limited by the limitation of certain platform, substantially Needing the progress secondary development on the platform of its limitation could use.
2nd, the front-end task page corresponding to each node of each flow, which remains unchanged, needs developer to start from scratch exploitation, Development time is very very long.
3rd, the substantial amounts of workflow demand that extensive base station operation maintenance personnel is proposed at any time can not be met.
4th, extensive operation maintenance personnel mobility is larger, and a flow made by existing procedure engine can not be timely Tasks carrying people corresponding to more new node.
The content of the invention
Regarding to the issue above, the present invention proposes a kind of workflow engine system suitable for ground enhancing net O&M scenarios, Including workflow template, workflow instance, interface layer, attribute widget library;Workflow template can to workflow, workflow nodes with And workflow nodes attribute is defined, information can be copied to workflow instance by workflow template;Workflow instance includes work Make stream instant node and workflow instance nodal community;Interface layer is used to obtain workflow instance Node field information and example section Point attribute field information;Attribute widget library is used for storage control, and control is used for dynamic rendering node task page.
Workflow nodes include more than one workflow nodes attribute, and workflow instance node includes more than one workflow Instant node attribute;Workflow template provides visualization interface editor by display device and input equipment;Workflow template can To be stored in workflow template database;Workflow instance can be stored in workflow instance database.
The field information of workflow nodes include a upper node, next node, whether present node, whether start node, Whether end node, processing people.The field information of workflow nodes attribute is included apart from browser left side distance, apart from browser Top distance, control height, control money list, control name;Control name and control in attribute widget library are uniquely corresponding.
It is a kind of to strengthen the workflow engine method of net O&M scenarios suitable for ground:Initiate a workflow instance;Work Stream Node field information copies to workflow instance node, and workflow nodes attribute field information copies to instant node attribute; Interface layer obtains workflow instance Node field information and instant node attribute field information;The node tasks page is obtained from interface layer Take workflow instance Node field information and instant node attribute field information;Transferred in node tasks page dependence widget library Corresponding control, control dynamically renders the node tasks page;
" agreement " operation of the node tasks page, if work at present stream instant node has next node, then Xia Yijie Point will be set to present node, while giving processing people's distribution according to the processing people field information of workflow instance node next node Next node is not present in one task, present node, and workflow instance terminates;
The node tasks page " refusal " operation is clicked on, if work at present stream instant node has a upper node and is not starting Node a, then node will be set to present node on workflow instance node, and to a node on workflow instance node Handle people and distribute a task, if a upper node for affiliated work at present stream instant node node is start node, flow quilt Reject to workflow instance section applicant's node.
Workflow engine has function of endorsing, and refers to increase a section between the next node of present node and present node The operation of point, and the operation of unlimited increase node can be realized.
The beneficial effect that technical solution of the present invention is realized:
This workflow engine can dynamically render the task form page of front end, without needing front end developer again Task page to each node is customized exploitation, saves the substantial amounts of time;Because the speed for formulating flow is very fast, The exploitation demand for the extensive work flow that extensive base station operation maintenance personnel is proposed at any time can be met, therefore is highly suitable on a large scale Used in base enhancing net O&M scenarios;Example is operationally separated with the definition of workflow, separate, even if workflow management person The operating of example is not interfered with during modification template yet.
Brief description of the drawings
Fig. 1 is a kind of schematic diagram for the workflow engine for strengthening net O&M scenarios suitable for ground of the present invention.
Fig. 2 is the graph of a relation of workflow template intermodule of the present invention.
Fig. 3 is the graph of a relation of workflow instance intermodule of the present invention.
Fig. 4 is that the present invention endorses functional schematic.
Embodiment
Below in conjunction with the accompanying drawings and specific embodiment, the present invention is expanded on further, the embodiment of the present invention is only to illustrate this hair The protection domain that bright technical scheme is not intended to limit the present invention.
As shown in Figure 1, Figure 2, Figure 3 shows, the present invention proposes a kind of workflow engine suitable for ground enhancing net O&M scenarios System, including workflow template, workflow instance, interface layer, attribute widget library;Workflow template can be to workflow, workflow Node and workflow nodes attribute are defined, and information can be copied to workflow instance by workflow template;Workflow instance Including workflow instance node and workflow instance nodal community;Interface layer be used for obtain workflow instance Node field information and Instant node attribute field information;Attribute widget library is used for storage control, and control is used for dynamic rendering node task page.
Workflow nodes include more than one workflow nodes attribute, and workflow instance node includes more than one workflow Instant node attribute;Workflow template provides visualization interface editor by display device and input equipment;Workflow template can To be stored in workflow template database;Workflow instance can be stored in workflow instance database.
The field information of workflow nodes include a upper node, next node, whether present node, whether start node, Whether end node, processing people.The field information of workflow nodes attribute is included apart from browser left side distance, apart from browser Top distance, control height, control money list, control name;Control name and control in attribute widget library are uniquely corresponding.
It is a kind of to strengthen the workflow engine method of net O&M scenarios suitable for ground:Initiate a workflow instance;Work Stream Node field information copies to workflow instance node, and workflow nodes attribute field information copies to instant node attribute; Interface layer obtains workflow instance Node field information and instant node attribute field information;The node tasks page is obtained from interface layer Take workflow instance Node field information and instant node attribute field information;Transferred in node tasks page dependence widget library Corresponding control, control dynamically renders the node tasks page;
" agreement " operation of the node tasks page, if work at present stream instant node has next node, then Xia Yijie Point will be set to present node, while giving processing people's distribution according to the processing people field information of workflow instance node next node Next node is not present in one task, present node, and workflow instance terminates;
The node tasks page " refusal " operation is clicked on, if work at present stream instant node has a upper node and is not starting Node a, then node will be set to present node on workflow instance node, and to a node on workflow instance node Handle people and distribute a task, if a upper node for affiliated work at present stream instant node node is start node, flow quilt Reject to workflow instance section applicant's node.
Workflow engine has function of endorsing, and refers to increase a section between the next node of present node and present node The operation of point, and the operation of unlimited increase node can be realized, as shown in Figure 4.Concrete operations are as follows:One is generated according to present node Individual new node, then the node attribute information of present node is also copied in newly-generated node.Then by present node The field of " the upper node " of next node points to new node, then " next node " of present node is pointed into new node.
When initiating example, according to selected workflow template, it will workflow template node and workflow nodes The data duplications such as attribute are among workflow instance.Among the design of this engine, the field in " workflow nodes definition " table There can be " a upper node ", " next node ", " whether present node ", " whether start node ", whether " end node " " is located Manage people " these fields, so, when visual edit workflow, the logic that redirects of flow is defined in workflow nodes In have been realized in.When handling people's click " agreement " operation, if there is next node in present node, then next node will be set to For present node, meanwhile, give processing people to distribute a task according to " processing people " field of next node, if present node is not There is next node, the flow instance terminates.Processing people click " refusal " operate when, if present node exist a upper node and It is not start node, then a upper node will be set to present node, and distribute a task to the processing people of a upper node.If A upper node for present node is start node, then flow is rejected to applicant's node.
The field of workflow nodes attribute has left (apart from browser left side distance), and top is (apart from browser top margin From), height (control is highly), width (control money list), widget (control name), these fields are that generation front end node is appointed It is engaged in the critical field of the page, principle is that to render region be absolute fix for the attribute of front end page, and front end page is according to task id The node attribute information of the present node of correspondence workflow instance is obtained from rear end, preceding end instruction dynamically renders these attributes The position of corresponding control in a browser, length and width, it is noted that widget control fields are merely representative of It is that input frame is exactly in the unique name of control in attribute widget library, such as attribute widget library in html language<input>Mark Label, then the value of the rear end field is exactly " input ", that is to say, that the control field of rear end record owns with attribute widget library Control be one-to-one, and not only deposited in attribute widget library is conventional bookmark name in html, can also It is the unique name for the independent control that other modular front end frames are developed, other fields are then described The x in screen of this control, y values (left fields and top fields i.e. in control) and length and width high level.Opened in front end page Only need to write the interface of a unified acquisition input value when hair according to these controls, you can by these when submitting Value acquisition comes into back-end data base and preserved.
Node definition and nodal community in workflow template is defined to the instant node copied in workflow instance With instance properties node, effect has two:
One, because for the operation maintenance personnel of the earth enhancing net, among the operation process of actual flow, it may occur that permitted Industry of the processor that many emergency situations, such as operation maintenance personnel are just gone on business in other regions or list to this block region Business, which is unfamiliar with, needs other people to solve, and at this moment flow engine should provide a kind of mechanism, allows the task of present node to handle people A node can be increased temporarily in the centre of next node, then this list is given to the processor of this newly-increased node, Herein, we are defined as this process " endorsing ".
Two, if flow instance reference is flow template node definition information, then after present node is endorsed, then stream The definition information of journey every template node will be changed, and spend a period of time, and next flow promoter initiates this list again When, the processing people of flow nodes has but no longer been the processing people that original flow nodes are specified.This is apparently not us Desired result, the result that we want is only that a node (endorsing) is further added by between present node and next node, Be only for this workflow instance, so when start flow example, by the every template node of flow template with And the most information of the field value in every template node attribute all copies in flow instance corresponding instant node and reality In example nodal community.

Claims (7)

1. a kind of strengthen the workflow engine system of net O&M scenarios suitable for ground, it is characterised in that:
Including workflow template, workflow instance, interface layer, attribute widget library;
The workflow template can be defined to workflow, workflow nodes and workflow nodes attribute, the workflow Information can be copied to the workflow instance by template;
The workflow instance includes workflow instance node and workflow instance nodal community;
The interface layer is used to obtain the workflow instance Node field information and the instant node attribute field information;
The attribute widget library is used for storage control, and the control is used for dynamic rendering node task page.
2. according to claim 1 strengthen the workflow engine of net O&M scenarios suitable for ground, it is characterised in that described Workflow nodes include more than one described workflow nodes attribute;The workflow instance node includes more than one described work Make stream instant node attribute.
3. according to claim 1 strengthen the workflow engine of net O&M scenarios suitable for ground, it is characterised in that described Workflow template provides visualization interface editor by display device and input equipment;The workflow template can be stored in work Make flow template database;The workflow instance can be stored in workflow instance database.
4. according to claim 1 strengthen the workflow engine of net O&M scenarios suitable for ground, it is characterised in that described The field information of workflow nodes include a upper node, next node, whether present node, whether start node, whether terminate Node, processing people.
5. according to claim 1 strengthen the workflow engine of net O&M scenarios suitable for ground, it is characterised in that described The field information of workflow nodes attribute is included apart from browser left side distance, apart from browser top distance, control height, control Part money list, control name;The control name and control in the attribute widget library are uniquely corresponding.
6. a kind of strengthen the workflow engine method of net O&M scenarios suitable for ground, it is characterised in that:
Initiate a workflow instance;
Workflow nodes field information copies to workflow instance node, and workflow nodes attribute field information copies to example section Point attribute;
Interface layer obtains the workflow instance Node field information and the instant node attribute field information;
The node tasks page obtains the workflow instance Node field information and the instant node attribute from the interface layer Field information;
Corresponding control is transferred in the node tasks page dependence widget library, the control dynamically renders the node Task page;
" agreement " operation of the node tasks page is clicked on, if work at present stream instant node has next node, then under One node will be set to present node, while according to the processing people field information of the workflow instance node next node to institute State processing people and distribute a task, if next node is not present in present node, the workflow instance terminates;
The node tasks page " refusal " operation is clicked on, if work at present stream instant node has a upper node and is not starting Node a, then node will be set to present node on the workflow instance node, and on the workflow instance node The processing people of one node distributes a task, if a upper node for affiliated work at present stream instant node node is start node, Then flow is rejected to workflow instance section applicant's node.
7. according to claim 6 strengthen the workflow engine method of net O&M scenarios suitable for ground, it is characterised in that The workflow engine has function of endorsing, and refers to one node of increase between the next node of present node and present node Operation, and the operation of unlimited increase node can be realized.
CN201710118911.8A 2017-03-01 2017-03-01 It is a kind of to strengthen the workflow engine method and system of net O&M scenarios suitable for ground Pending CN106952024A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710118911.8A CN106952024A (en) 2017-03-01 2017-03-01 It is a kind of to strengthen the workflow engine method and system of net O&M scenarios suitable for ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710118911.8A CN106952024A (en) 2017-03-01 2017-03-01 It is a kind of to strengthen the workflow engine method and system of net O&M scenarios suitable for ground

Publications (1)

Publication Number Publication Date
CN106952024A true CN106952024A (en) 2017-07-14

Family

ID=59466677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710118911.8A Pending CN106952024A (en) 2017-03-01 2017-03-01 It is a kind of to strengthen the workflow engine method and system of net O&M scenarios suitable for ground

Country Status (1)

Country Link
CN (1) CN106952024A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109101191A (en) * 2018-06-21 2018-12-28 东软集团股份有限公司 Date storage method, device and storage medium and electronic equipment
CN111144837A (en) * 2019-12-13 2020-05-12 东软集团股份有限公司 Flow arrangement method and device, storage medium and electronic equipment
CN111782248A (en) * 2020-07-10 2020-10-16 上海淇毓信息科技有限公司 Terminal application updating method and device and electronic equipment
CN113641405A (en) * 2021-08-31 2021-11-12 重庆允成互联网科技有限公司 Workflow rapid configuration method, device, equipment and storage medium
CN114546731A (en) * 2022-03-09 2022-05-27 北京有生博大软件股份有限公司 Workflow data recovery method and data recovery system

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103164774A (en) * 2013-03-11 2013-06-19 苏州市奥杰汽车技术有限公司 Automobile complete vehicle development system based on workflow
CN105808244A (en) * 2016-03-01 2016-07-27 杭州师范大学 Dynamic data visualized analysis tool based on workflows

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103164774A (en) * 2013-03-11 2013-06-19 苏州市奥杰汽车技术有限公司 Automobile complete vehicle development system based on workflow
CN105808244A (en) * 2016-03-01 2016-07-27 杭州师范大学 Dynamic data visualized analysis tool based on workflows

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
何嘉: "可视化业务流程定制、流转和管理的研究与应用", 《万方数据知识服务平台学位论文》 *
郭玉彬 等: "轻量级动态工作引擎的设计与实现", 《计算机工程与设计》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109101191A (en) * 2018-06-21 2018-12-28 东软集团股份有限公司 Date storage method, device and storage medium and electronic equipment
CN109101191B (en) * 2018-06-21 2021-07-16 东软集团股份有限公司 Data storage method, data storage device, storage medium and electronic equipment
CN111144837A (en) * 2019-12-13 2020-05-12 东软集团股份有限公司 Flow arrangement method and device, storage medium and electronic equipment
CN111782248A (en) * 2020-07-10 2020-10-16 上海淇毓信息科技有限公司 Terminal application updating method and device and electronic equipment
CN111782248B (en) * 2020-07-10 2023-09-19 上海淇毓信息科技有限公司 Updating method and device of terminal application and electronic equipment
CN113641405A (en) * 2021-08-31 2021-11-12 重庆允成互联网科技有限公司 Workflow rapid configuration method, device, equipment and storage medium
CN114546731A (en) * 2022-03-09 2022-05-27 北京有生博大软件股份有限公司 Workflow data recovery method and data recovery system
CN114546731B (en) * 2022-03-09 2024-04-05 北京有生博大软件股份有限公司 Workflow data recovery method and data recovery system

Similar Documents

Publication Publication Date Title
CN106952024A (en) It is a kind of to strengthen the workflow engine method and system of net O&M scenarios suitable for ground
Lian et al. Analysing the effects of Lean manufacturing using a value stream mapping-based simulation generator
US8302096B2 (en) Methods and systems to perform individual tasks as a composite task
Babulak et al. Discrete event simulation
US20110225484A1 (en) Cloud based modeling for enhancing spreadsheets
CN106897806A (en) Workflow creation method and system, operation system
JPH06214865A (en) Object base data processor
Wu et al. Integrated application of BIM and eXtended reality technology: a review, classification and outlook
CN106548429A (en) Education Administration Information System based on cloud platform
CN103793226A (en) Pervasive application code framework fast-generating method and prototype system
JPH043247A (en) Enterprise information flow defining method
Vasilecas et al. Analysis of using resources in business process modeling and simulation
Park et al. Towards reliable business process simulation: A framework to integrate erp systems
CN104346154B (en) Service-oriented model building method on basis of scenes
Dechamma et al. A review on robotic process automation
US11741496B2 (en) Solution graph for managing content in a multi-stage project
Vispi et al. Simulation on RFID interactive tabletop of working conditions in industry 4.0
Robertson et al. Feasibility for automatic data collection
Andrews GIS and BIM Integration Leads to Smart Communities
Al-Fedaghi et al. Business process mapping: a case study
CN114707429B (en) EAR-based executable modeling method, apparatus, computer device and medium
Whitman et al. A living enterprise model
Bider Towards process improvement for case management: an outline based on viable system model and an example of organizing scientific events
US8311862B2 (en) Organizational design approach to transition cost assessment for business transformation
Berlin et al. Change agent infrastructure (CHAI)—a stakeholder analysis tool for ergonomics-and work environment-related change projects

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170714

RJ01 Rejection of invention patent application after publication