CN106951590A - A kind of emulation test system towards multidisciplinary isomery model - Google Patents

A kind of emulation test system towards multidisciplinary isomery model Download PDF

Info

Publication number
CN106951590A
CN106951590A CN201710083663.8A CN201710083663A CN106951590A CN 106951590 A CN106951590 A CN 106951590A CN 201710083663 A CN201710083663 A CN 201710083663A CN 106951590 A CN106951590 A CN 106951590A
Authority
CN
China
Prior art keywords
model
subsystem
simulation test
isomery
simulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710083663.8A
Other languages
Chinese (zh)
Other versions
CN106951590B (en
Inventor
杨亮
完颜振海
罗军
皮赞
徐嘉
梁磊
胡叶楠
沈志军
孙树森
马苏宏
肖进
孟超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Launch Vehicle Technology CALT
Beijing Institute of Astronautical Systems Engineering
Original Assignee
China Academy of Launch Vehicle Technology CALT
Beijing Institute of Astronautical Systems Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Launch Vehicle Technology CALT, Beijing Institute of Astronautical Systems Engineering filed Critical China Academy of Launch Vehicle Technology CALT
Priority to CN201710083663.8A priority Critical patent/CN106951590B/en
Publication of CN106951590A publication Critical patent/CN106951590A/en
Application granted granted Critical
Publication of CN106951590B publication Critical patent/CN106951590B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/15Vehicle, aircraft or watercraft design

Abstract

A kind of emulation test system towards multidisciplinary isomery model, including isomery model modeling subsystem, isomery model encapsulation subsystem, l-G simulation test flow scheme design subsystem, l-G simulation test resource distribution subsystem and l-G simulation test control subsystem.Isomery model modeling subsystem and isomery model interactive subsystem set up the interface of each isomery model and l-G simulation test control subsystem, realize the unification of each isomery model interface, l-G simulation test flow scheme design subsystem can set simulation flow and parameter matching relationship according to emulation purpose, l-G simulation test resource distribution subsystem is that each model configures calculate node, and the integrated emulation of each isomery model is then realized by l-G simulation test control subsystem.The present invention has unified the interface of each isomery model, can set simulation flow according to emulation purpose, and can be managed collectively and configure l-G simulation test resource, realizes multi-specialized coupling interaction emulation, and improve l-G simulation test operational efficiency.

Description

A kind of emulation test system towards multidisciplinary isomery model
Technical field
The present invention relates to a kind of emulation test system towards multidisciplinary isomery model, belong to space product system emulation skill Art field.
Background technology
Carrier rocket flight process will generally undergo some complex physical processes, such as hood is separated, boosting is separated, Coupled longitudinal vibration of the separation processes such as stage separation, satellite and the rocket separation and liquid rocket etc..These processes are often associated with holding The features such as continuous time is shorter, multidisciplinary coupling is stronger, is that link is paid close attention in current versions development, is influence carrier rocket can By the key factor of property, it is therefore desirable to which the simulation reappearance for carrying out correlated process using the means of multi-specialized comprehensive analysis is ground with mechanism Study carefully work, fully the reliability of lifting Project R&D.
The country has carried out a large amount of simulation works in space product development, forms many achievements in research, and construct Some Simulation Application systems.These Positive simulation results or system do not take into full account the different fields such as fluid, structure, dynamics, control The isomery feature of model, causes to be clearly present not in terms of model integrated ability, flow allocative abilities, associative simulation ability Foot, it is impossible to directly apply to the coupling Simulation application of association area.At present, by using FLUENT, ABAQUS, ADAMS, The secondary development of the business software such as MATLAB, LS-DYNA and the approach such as grind certainly, have developed some isomery models (by different business Industry software part difference modeling language is built), such as fluid, control, dynamics and load disciplines software model, for delivering fire Arrow ground or the Analysis on Mechanism of flight test.But, these isomery models are to carry out for particular professional from a certain angle Simulation analysis work, and modeling tool has larger difference with mode, and form disunity, running configuration interface is various, is unfavorable for Multi-specialized Integrated Analysis of Multi-Factors Involved.Simultaneously in the running of l-G simulation test, it is related to High-Performance Computing Cluster computer, graphical Work The access and scheduling for the various types of hardware resource such as stand.At present, for different l-G simulation tests, it will usually select specific hardware adaptations Environment, develops different interfaces and instrument, can so cause the waste of the resources such as manpower, funds.
In addition, each model is developed for particular problem, model running flow also solidifies therewith.It is new when facing During emulation demand, the operational process of solidification can cause l-G simulation test model utilization rate low, can so bring repeated construction, exist multiple The problems such as with property difference, the l-G simulation test for being unfavorable for all kinds of isomery models is integrated with configuring, it is impossible to realize that multi-specialized coupling interaction is imitated Very.
The content of the invention
The technology of the present invention solves problem:Overcome the deficiencies in the prior art there is provided one kind towards multidisciplinary isomery model Emulation test system, unified the interface of each isomery model, can according to emulation purpose set simulation flow, and can uniformly Management and configuration l-G simulation test resource, realize multi-specialized coupling interaction emulation, and improve l-G simulation test operational efficiency.
The present invention technical solution be:A kind of emulation test system towards multidisciplinary isomery model, including isomery Model modeling subsystem, isomery model encapsulation subsystem, l-G simulation test flow scheme design subsystem, l-G simulation test resource distribution subsystem System and l-G simulation test control subsystem;
Isomery model modeling subsystem:The model of every field is received, according to multi-specialized coupling Simulation purpose, each is defined The operational process of model, each model emulation calculate front and rear interface and interaction parameter with l-G simulation test control subsystem;Institute Stating interface includes control interface and parameter interface;
Isomery model encapsulation subsystem:Configure the essential information and the required resource information of operation of each model;According to The interaction parameter of isomery model modeling subsystem definition generates the model parameter file of each model;By the basic letter of each model Breath and model parameter file, which are exported, gives l-G simulation test flow scheme design subsystem;By the resource information output needed for each model running Give l-G simulation test resource distribution subsystem;
L-G simulation test flow scheme design subsystem:According to multi-specialized associative simulation purpose, l-G simulation test flow is configured, will be configured Good l-G simulation test flow is exported to l-G simulation test resource distribution subsystem and l-G simulation test control subsystem;According to each model Essential information and model parameter file, the parameter matching relationship of each interaction models in l-G simulation test flow is set, and exported Give l-G simulation test control subsystem;
L-G simulation test resource distribution subsystem:Resource information and l-G simulation test system according to required for each model running The currently available resource information of system, is each model configuration calculate node and operation catalogue in l-G simulation test flow;The money Source information refers to calculate node information;
L-G simulation test control subsystem:It is every kind of emulation examination according to the interaction parameter of isomery model modeling subsystem definition Flow definition different tests operating mode is tested, under every kind of operating mode, using the interface of isomery model modeling subsystem definition, according to emulation The parameter matching relationship of experiment process, the model parameter file of each model and each interaction models, sends out to corresponding model Control instruction, input parameter are sent, and receives response signal and output parameter, each connection is obtained according to the output parameter of each model Close the sample data that l-G simulation test is obtained.
Also include isomery model interactive subsystem, the isomery model interactive subsystem is used for the operation for configuring each model Mode is single step run, and is defined under each calculation procedure of each model with the interface of l-G simulation test control subsystem and interacting ginseng Number;
The interaction parameter that isomery model encapsulation subsystem is defined according to isomery model interactive subsystem generates each model Procedure parameter file;
When multi-specialized associative simulation is coupling Simulation, l-G simulation test control subsystem is according to l-G simulation test flow, each The procedure parameter file of model, by with each model single step run of Interface Controller under each calculation procedure of each model, it is real The Collaborative Control of each existing isomery model running process, and according to the model parameter file and each interaction models of each model Parameter matching relationship, complete associative simulation, obtain sample data.
The model parameter file and procedure parameter file include parametric variable name, data type, attribute, default value, Parameter units, meaning of parameters, parameter type, dimension type, the attribute refer to input or exported that parameter type refers to emulation meter Before calculation, during simulation calculation, after simulation calculation.
The l-G simulation test resource distribution subsystem is that the method for each model configuration calculate node is:
(4.1) the currently available calculate node information of emulation test system is obtained, by currently available calculate node and section Point combination is sorted from small to large according to check figure sum, obtains calculate node sequence;
(4.2) according to the calculating check figure x that currently model to be run needs, check figure sum is extracted from calculate node sequence Partial sequence not less than x alternately sequence;
(4.3) the minimum calculate node of check figure sum and combination of nodes are extracted from alternative sequence, it is total if there is check figure The minimum calculate node of number, then directly distribute to the minimum calculate node of check figure sum by the model;Otherwise, calculate node is selected The minimum combination of nodes of number, the minimum combination of nodes of the calculate node number is distributed to by the model.
Compared with prior art, the present invention has the advantages that:
(1) present invention by isomery model modeling subsystem and isomery model interactive subsystem set up each isomery model with The interface of l-G simulation test control subsystem, realizes the unification of each isomery model interface, can set imitative according to emulation purpose True flow, realizes multi-specialized coupling interaction emulation.Simulation flow is set according to emulation purpose simultaneously, each isomery can be realized The l-G simulation test of model is integrated with configuring, it is to avoid repeated construction, improves Model Reuse.
(2) it is single step run that the present invention configures each model by isomery model interactive subsystem, it is ensured that coupling Simulation When model between stringent synchronization, realize the synthetic operation of all kinds of isomery models.
(3) l-G simulation test control subsystem according to meaning of parameters in model parameter file and procedure parameter file, attribute and The information such as parameter type, realize the parameter matching of different variable names between interaction models, to realize that associative simulation provides primary condition.
(4) resource information of the l-G simulation test resource distribution subsystem of the present invention according to required for each model running, emulation The currently available resource information of pilot system, is that each model configures calculate node according to l-G simulation test flow, realizes calculating The unified management of resource and flexible configuration, lift l-G simulation test operational efficiency.
Brief description of the drawings
Fig. 1 is composition frame chart of the present invention;
Fig. 2 is isomery model single step run flow chart of the present invention;
Fig. 3 is to consider event driven l-G simulation test operational flow diagram.
Embodiment
The present invention provides a kind of emulation test system towards multidisciplinary isomery model, as shown in figure 1, including isomery model Model subsystem, isomery model interactive subsystem, isomery model encapsulation subsystem, l-G simulation test flow scheme design subsystem, emulation Test resource distribution subsystem and l-G simulation test control subsystem.Multi-disciplinary model includes fluid calculation model, Structure Calculation Model, control computation model, LOAD FOR model etc..
(1), isomery model modeling subsystem
Receive the model of every subjects, according to multi-specialized coupling Simulation purpose, define each model operational process, each Model emulation calculate before and after with the interface (including control interface and parameter interface) of l-G simulation test control subsystem and interacting ginseng Number.
(2), isomery model interactive subsystem
The method of operation that isomery model interactive subsystem is used to configure each model is single step run, and defines each model With the interface and interaction parameter of l-G simulation test control subsystem under each calculation procedure.Isomery model encapsulation subsystem is according to isomery The interaction parameter that model interactive subsystem is defined generates the procedure parameter file of each model.
When multi-specialized associative simulation is coupling Simulation, l-G simulation test control subsystem is according to l-G simulation test flow, each The procedure parameter file of model, by with each model single step run of Interface Controller under each calculation procedure of each model, it is real The Collaborative Control of each existing isomery model running process, and according to the model parameter file and each interaction models of each model Parameter matching relationship, complete associative simulation, obtain sample data.
Isomery model interactive subsystem is broadly divided into model initialization, Acceptance Model input parameter, model single step calculating, hair Send the steps such as model output parameters, model pause.
Wherein, the specific operation process of model initialization is as follows:Receive initiation parameter, the initialization for carrying out model is calculated With configuration, initial computation model is generated, transmission pattern initialization completes order.
The specific operation process that model single step is calculated is as follows:Receive the model running life in l-G simulation test control subsystem Order, Acceptance Model input parameter, model is actuated for next step and calculates solution and configuration, transmission pattern output parameter, Zhi Houfa Send model single step to calculate and terminate order.
(3), isomery model encapsulation subsystem
Configure the essential information and the required resource information of operation of each model;It is fixed according to isomery model modeling subsystem The interaction parameter of justice generates the model parameter file of each model, and the interaction parameter defined according to isomery model interactive subsystem is given birth to Into the procedure parameter file of each model;By the essential information of each model and model parameter file, the output of procedure parameter file Give l-G simulation test flow scheme design subsystem;Resource information needed for each model running is exported and gives l-G simulation test resource distribution System.
Model parameter file and procedure parameter file include parametric variable name, data type, attribute, default value, parameter Unit, meaning of parameters, parameter type, dimension type, the attribute refer to input or exported that parameter type refers to simulation calculation Before, during simulation calculation, after simulation calculation.
Such as:Parametric variable name:flow_time;Data type:DOUBLE;Attribute:output;Default value:0;Parameter list Position:m/s;Meaning of parameters:Speed;Parameter type:Before simulation calculation;Dimension type:It is three-dimensional.
(4), l-G simulation test flow scheme design subsystem
According to multi-specialized associative simulation purpose, it is l-G simulation test control subsystem configuration l-G simulation test flow, will configures L-G simulation test flow export to l-G simulation test resource distribution subsystem and l-G simulation test control subsystem;According to each model Essential information and model parameter file, set l-G simulation test flow in each interaction models parameter matching relationship, and export to L-G simulation test control subsystem.
L-G simulation test flow scheme design subsystem configuration l-G simulation test flow specifically includes progress simulation flow editor and isomery Model interaction, simulation run are set, wherein:
The specific operation process of simulation flow editor and isomery model interaction is as follows:It is clearly each according to the emulation content of setting Isomery model, and the operation order and parameter transitive relation of each isomery model are determined, and according to the operation order of isomery model Relation is associated.
The specific operation process that simulation run is set is as follows:The sequential relationship run according to l-G simulation test, refinement sets every Individual isomery model, specifies beginning and ending time, simulation step length, data syn-chronization point etc..According to multi-specialized associative simulation purpose, l-G simulation test Flow includes serial flow, parallel flow and synchronous operation configuration.
(5), l-G simulation test resource distribution subsystem
Resource information and l-G simulation test system of the l-G simulation test resource distribution subsystem according to required for each model running The currently available resource information of system, is each model configuration calculate node and operation catalogue in l-G simulation test flow.
L-G simulation test resource distribution subsystem is that the method for each model configuration calculate node is:
(4.1) the currently available calculate node information of emulation test system is obtained, by currently available calculate node and section Point combination is sorted from small to large according to check figure sum, obtains calculate node sequence;
(4.2) according to the calculating check figure x that currently model to be run needs, check figure sum is extracted from calculate node sequence Partial sequence not less than x alternately sequence;
(4.3) the minimum calculate node of check figure sum and combination of nodes are extracted from alternative sequence, it is total if there is check figure The minimum calculate node of number, then directly distribute to the minimum calculate node of check figure sum by the model;Otherwise, calculate node is selected The minimum combination of nodes of number, the minimum combination of nodes of the calculate node number is distributed to by the model.
The above method is illustrated below:
The experiment of this coupling Simulation has two models, respectively model A and Model B;Required for model A and Model B Resource information is 32 cores.
As l-G simulation test control subsystem Boot Model A, the inspection of l-G simulation test resource distribution subsystem confirms that system is worked as Preceding available calculate node resource, it is assumed that emulation test system currently has three class calculate node resources and can use, respectively one The node of the node of 64 cores, a 32 core nodes and two 16 cores, then calculate node sequence be:The node of one 64 core, one 32 core nodes and two 16 core nodes that 32 core nodes, the node of two 16 cores are constituted.That extracts according to the method described above is alternative Sequence is:The 32 core nodes that the node of one 64 core, 32 core node, a node for two 16 cores are constituted.Model A is distributed to One 32 core node.
As l-G simulation test control subsystem Boot Model B, if model A end of run, l-G simulation test resource distribution Subsystem reexamines the currently available calculate node resource of confirmation system, it is assumed that emulation test system currently has the calculating of three classes Node resource can use, the node of the node of respectively one 64 cores, two 16 core nodes and four 8 cores, then calculate node sequence For:The section of 32 core nodes that the node of one 64 core, the node of two 16 cores are enough constituted, the node of 16 core and two 8 cores Put the 32 core nodes constituted, the 32 core nodes that the node of four 8 cores is constituted, two 16 core nodes, four 8 core nodes.According to upper State method extraction alternative sequence be:32 core nodes that the node of one 64 core, the node of two 16 cores are constituted, four 8 cores The 32 core nodes that node is constituted.Model B is distributed on the 32 core combination of nodes that two 16 core nodes are constituted.
(6), l-G simulation test control subsystem
L-G simulation test control subsystem plays the model parameter file consolidation of each isomery model according to l-G simulation test purpose Come, generate l-G simulation test parameter, carry out l-G simulation test variable setting, specific operation process is as follows:According to l-G simulation test purpose, from In l-G simulation test parameter, optional test duty parameter variable, the valued space of arrange parameter variable chooses generation variate-value ordered series of numbers Method, generate the input sample of l-G simulation test parameter, complete the configuration of l-G simulation test variable.
It is the different experiment of every kind of l-G simulation test flow definition according to the interaction parameter of isomery model modeling subsystem definition Operating mode, the specific operation process that multi-state is set is as follows:According to l-G simulation test working condition, configured l-G simulation test is utilized to become Amount, the method for selecting one of the methods such as total divisor method, Orthogonal Method or uniform design generates the various operating mode groups of l-G simulation test Close, the multi-state for completing experiment is set.
Under every kind of operating mode, defined using the interface and isomery model interactive subsystem of isomery model modeling subsystem definition Interface, according to l-G simulation test flow, the procedure parameter file of each model, the model parameter file of each model and each The parameter matching relationship of interaction models, sends control instruction, input parameter to corresponding model, realizes each isomery model running The Collaborative Control of process, and response signal and output parameter are received, it is imitative to obtain joint every time according to the output parameter of each model The sample data that true experiment is obtained.
As shown in Fig. 2 being isomery model single step run flow chart of the present invention, by taking model M as an example, first have at the beginning of being emulated Beginningization, completes interface and interaction parameter is set, and then the model carries out single step iteration under the control of l-G simulation test control subsystem Calculate, if calculating the end of the step, carry out emulation post processing, otherwise judge whether to call other models, if it is, by the mould Type output parameter, which is sent to, wants calling model N, is called model N calculating, calling model N output parameter is exported to model M, continues to repeat the above steps.Until model M end of run.
In fact, l-G simulation test control subsystem can be also realized based on event driven emulation, in pre-defined triggering When event arrives, that is, current operation is interrupted, starts corresponding model.Fig. 3 is using computation model as starting point, it is contemplated that event-driven L-G simulation test operational flow diagram.It is that computation model A is calculated first, obtains result of calculation, then perform below step:
If this time step does not have downstream computation model, judge whether current event emulation terminates, if it is not, entering Enter the simulation calculation of next time step, if terminated, determine whether next simulated events, do not have, then emulation terminates, If next simulated events, then next simulated events are excited, perform new simulation time step;
If this time step has downstream computation model, downstream computation model starts to calculate, and obtains result of calculation.It is constantly heavy Previous step is performed again, until completing whole associative simulation.
The content not being described in detail in description of the invention belongs to the known technology of professional and technical personnel in the field.

Claims (4)

1. a kind of emulation test system towards multidisciplinary isomery model, it is characterised in that:Including isomery model modeling subsystem, Isomery model encapsulation subsystem, l-G simulation test flow scheme design subsystem, l-G simulation test resource distribution subsystem and l-G simulation test Control subsystem;
Isomery model modeling subsystem:The model of every field is received, according to multi-specialized coupling Simulation purpose, each model is defined Operational process, each model emulation calculate before and after with the interface of l-G simulation test control subsystem and interaction parameter;It is described to connect Mouth includes control interface and parameter interface;
Isomery model encapsulation subsystem:Configure the essential information and the required resource information of operation of each model;According to isomery The interaction parameter of model modeling subsystem definition generates the model parameter file of each model;By the essential information of each model and Model parameter file, which is exported, gives l-G simulation test flow scheme design subsystem;Resource information needed for each model running is exported to imitative True experiment resource distribution subsystem;
L-G simulation test flow scheme design subsystem:According to multi-specialized associative simulation purpose, l-G simulation test flow is configured, by what is configured L-G simulation test flow is exported to l-G simulation test resource distribution subsystem and l-G simulation test control subsystem;According to the base of each model This information and model parameter file, set the parameter matching relationship of each interaction models in l-G simulation test flow, and export to imitative True controlling test subsystem;
L-G simulation test resource distribution subsystem:Resource information and emulation test system according to required for each model running are worked as Preceding available resource information, is each model configuration calculate node and operation catalogue in l-G simulation test flow;The resource letter Breath refers to calculate node information;
L-G simulation test control subsystem:It is every kind of l-G simulation test stream according to the interaction parameter of isomery model modeling subsystem definition Cheng Dingyi different tests operating modes, under every kind of operating mode, using the interface of isomery model modeling subsystem definition, according to l-G simulation test The parameter matching relationship of flow, the model parameter file of each model and each interaction models, sends to corresponding model and controls System instruction, input parameter, and response signal and output parameter are received, it is imitative to obtain joint every time according to the output parameter of each model The sample data that true experiment is obtained.
2. a kind of emulation test system towards multidisciplinary isomery model according to claim 1, it is characterised in that:Also wrap Isomery model interactive subsystem is included, it is single step fortune that the isomery model interactive subsystem, which is used to configure the method for operation of each model, OK, and interface and interaction parameter under each calculation procedure of each model with l-G simulation test control subsystem are defined;
The interaction parameter that isomery model encapsulation subsystem is defined according to isomery model interactive subsystem generates the process of each model Parameter File;
When multi-specialized associative simulation is coupling Simulation, l-G simulation test control subsystem is according to l-G simulation test flow, each model Procedure parameter file, by with each model single step run of Interface Controller under each calculation procedure of each model, realize each The Collaborative Control of individual isomery model running process, and according to the model parameter file and the ginseng of each interaction models of each model Number matching relationship, completes associative simulation, obtains sample data.
3. a kind of emulation test system towards multidisciplinary isomery model according to claim 2, it is characterised in that:It is described Model parameter file and procedure parameter file include parametric variable name, data type, attribute, default value, Parameter units, parameter Implication, parameter type, dimension type, the attribute refer to input or exported that parameter type refers to before simulation calculation, simulation calculation During, after simulation calculation.
4. a kind of emulation test system towards multidisciplinary isomery model according to claim 1, it is characterised in that:It is described L-G simulation test resource distribution subsystem is that the method for each model configuration calculate node is:
(4.1) the currently available calculate node information of emulation test system is obtained, by currently available calculate node and node group Close and sorted from small to large according to check figure sum, obtain calculate node sequence;
(4.2) according to the calculating check figure x that currently model to be run needs, check figure sum is extracted from calculate node sequence not small In x partial sequence alternately sequence;
(4.3) the minimum calculate node of check figure sum and combination of nodes are extracted from alternative sequence, if there is check figure sum most Small calculate node, then directly distribute to the minimum calculate node of check figure sum by the model;Otherwise, calculate node number is selected most Few combination of nodes, the minimum combination of nodes of the calculate node number is distributed to by the model.
CN201710083663.8A 2017-02-16 2017-02-16 Simulation test system for multidisciplinary heterogeneous model Active CN106951590B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710083663.8A CN106951590B (en) 2017-02-16 2017-02-16 Simulation test system for multidisciplinary heterogeneous model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710083663.8A CN106951590B (en) 2017-02-16 2017-02-16 Simulation test system for multidisciplinary heterogeneous model

Publications (2)

Publication Number Publication Date
CN106951590A true CN106951590A (en) 2017-07-14
CN106951590B CN106951590B (en) 2020-08-14

Family

ID=59467090

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710083663.8A Active CN106951590B (en) 2017-02-16 2017-02-16 Simulation test system for multidisciplinary heterogeneous model

Country Status (1)

Country Link
CN (1) CN106951590B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108647395A (en) * 2018-04-11 2018-10-12 北京仿真中心 A kind of construction method of the design ontology of Complex Product design process
CN111985055A (en) * 2020-08-28 2020-11-24 北京世冠金洋科技发展有限公司 Model packaging method and device and electronic equipment
CN112100817A (en) * 2020-08-20 2020-12-18 上海机电工程研究所 Intelligent heterogeneous IO data conversion method and system based on distributed simulation system
CN112364538A (en) * 2020-11-09 2021-02-12 中国电子科技集团公司第二十九研究所 Multi-professional heterogeneous model unified packaging method based on data model
CN112364506A (en) * 2020-11-11 2021-02-12 中国电子科技集团公司第二十九研究所 Simulation calculation method of system topology link based on model data drive
CN112434415A (en) * 2020-11-19 2021-03-02 中国电子科技集团公司第二十九研究所 Method for implementing heterogeneous radio frequency front end model for microwave photonic array system
CN112511358A (en) * 2021-02-02 2021-03-16 湖南高至科技有限公司 Heterogeneous interconnection simulation system, method, computer device and storage medium
CN113254238A (en) * 2021-06-21 2021-08-13 中国人民解放军国防科技大学 Event-driven-based fluid-solid coupling module integration method and device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102289593A (en) * 2011-08-22 2011-12-21 上海交通大学 Multidisciplinary virtual experiment interactive simulation solution system
CN103412972A (en) * 2013-07-01 2013-11-27 北京理工大学 Method for packaging and integrating simulation models of distributed simulation platform of aircraft
US20140172401A1 (en) * 2012-12-17 2014-06-19 Agency For Defense Development Method of simulating discrete event
CN105183987A (en) * 2015-09-07 2015-12-23 北京航空航天大学 Complex engineering multidisciplinary synthetical design optimization software platform system
CN105301983A (en) * 2015-11-09 2016-02-03 苏州同元软控信息技术有限公司 Distributed combined simulation system based on FMI and construction method
CN105426628A (en) * 2015-12-10 2016-03-23 中南大学 Complex product heterogeneous model fusing method
CN106250204A (en) * 2016-07-21 2016-12-21 北京理工大学 A kind of optimizer developing plug method of multidisciplinary optimization simulation software

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102289593A (en) * 2011-08-22 2011-12-21 上海交通大学 Multidisciplinary virtual experiment interactive simulation solution system
US20140172401A1 (en) * 2012-12-17 2014-06-19 Agency For Defense Development Method of simulating discrete event
CN103412972A (en) * 2013-07-01 2013-11-27 北京理工大学 Method for packaging and integrating simulation models of distributed simulation platform of aircraft
CN105183987A (en) * 2015-09-07 2015-12-23 北京航空航天大学 Complex engineering multidisciplinary synthetical design optimization software platform system
CN105301983A (en) * 2015-11-09 2016-02-03 苏州同元软控信息技术有限公司 Distributed combined simulation system based on FMI and construction method
CN105426628A (en) * 2015-12-10 2016-03-23 中南大学 Complex product heterogeneous model fusing method
CN106250204A (en) * 2016-07-21 2016-12-21 北京理工大学 A kind of optimizer developing plug method of multidisciplinary optimization simulation software

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
于雪松等: ""面向装备体系的仿真技术发展趋势分析_于雪松"", 《航天与装备仿真》 *
吕明亮: ""基于多体动力学的火箭飞行仿真研究"", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 *
孙晓辰: ""多目标多学科设计优化算法及其在卫星星座总体设计中的应用初探"", 《中国优秀博硕士学位论文全文数据库(硕士) 工程科技II辑》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108647395A (en) * 2018-04-11 2018-10-12 北京仿真中心 A kind of construction method of the design ontology of Complex Product design process
CN112100817A (en) * 2020-08-20 2020-12-18 上海机电工程研究所 Intelligent heterogeneous IO data conversion method and system based on distributed simulation system
CN111985055A (en) * 2020-08-28 2020-11-24 北京世冠金洋科技发展有限公司 Model packaging method and device and electronic equipment
CN111985055B (en) * 2020-08-28 2023-08-08 北京世冠金洋科技发展有限公司 Model packaging method and device and electronic equipment
CN112364538A (en) * 2020-11-09 2021-02-12 中国电子科技集团公司第二十九研究所 Multi-professional heterogeneous model unified packaging method based on data model
CN112364506B (en) * 2020-11-11 2022-08-02 中国电子科技集团公司第二十九研究所 Simulation calculation method of system topology link based on model data drive
CN112364506A (en) * 2020-11-11 2021-02-12 中国电子科技集团公司第二十九研究所 Simulation calculation method of system topology link based on model data drive
CN112434415A (en) * 2020-11-19 2021-03-02 中国电子科技集团公司第二十九研究所 Method for implementing heterogeneous radio frequency front end model for microwave photonic array system
CN112434415B (en) * 2020-11-19 2023-03-14 中国电子科技集团公司第二十九研究所 Method for implementing heterogeneous radio frequency front end model for microwave photonic array system
CN112511358A (en) * 2021-02-02 2021-03-16 湖南高至科技有限公司 Heterogeneous interconnection simulation system, method, computer device and storage medium
CN112511358B (en) * 2021-02-02 2021-04-30 湖南高至科技有限公司 Heterogeneous interconnection simulation system, method, computer device and storage medium
CN113254238B (en) * 2021-06-21 2021-09-07 中国人民解放军国防科技大学 Event-driven-based fluid-solid coupling module integration method and device
CN113254238A (en) * 2021-06-21 2021-08-13 中国人民解放军国防科技大学 Event-driven-based fluid-solid coupling module integration method and device

Also Published As

Publication number Publication date
CN106951590B (en) 2020-08-14

Similar Documents

Publication Publication Date Title
CN106951590A (en) A kind of emulation test system towards multidisciplinary isomery model
CN110516325A (en) A kind of CAE automation simulation analysis method and system
CN107784152A (en) Include the simulation of multiple simulators
CN104679488B (en) A kind of flow custom development platform and flow custom development approach
US8150673B1 (en) Partitioning a model in modeling environments
CN103955373B (en) A kind of method for designing of SDN application integration development environment
CN106372370A (en) Flight control distributed type real-time simulation system
CN107612962A (en) A kind of distributed emulation evaluation test management system
CN106502898A (en) Method of testing and test driver and test platform
CN109657379A (en) A kind of model aircraft simulation and verification platform
CN107300860A (en) A kind of Simulation of Aeroengine Control System platform courses object online change method
CN106982140A (en) A kind of information flow emulation mode and system
CN102184136B (en) Method for checking operation state and demand consistency of AADL (Architecture Analysis and Design Language) model
CN105843745B (en) It is a kind of for testing the method and system of redundancy management software
KR101158637B1 (en) Experimental frame for efficient simulation data collection, and simulation method and system using it
CN105787141B (en) A kind of synergy emulation method and system of Complex Weapon System Campaign Process
CN110516277A (en) Quickly modeling, emulation mode and system, computer equipment, storage equipment
Jackson et al. Orion GN&C Model Based Development: Experience and Lessons Learned
CN110569615A (en) multi-source heterogeneous embedded software collaborative simulation test method
CN109101424A (en) A kind of method and device for realizing data stimuli
CN106134474B (en) A kind of virtual test progress control method
US8694293B2 (en) Simulation support method, computer-readable storage medium storing simulation support program, and simulation support apparatus
Mei et al. ATS software framework design pattern and application
CN111736490B (en) Combined simulation method, device and system and electronic equipment
Song et al. The Development of Complex and Large System Based on Simulation Prototype

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Yang Liang

Inventor after: Xiao Jin

Inventor after: Wanyan Zhenhai

Inventor after: Ma Suhong

Inventor after: Meng Chao

Inventor after: Luo Jun

Inventor after: Wu Yansheng

Inventor after: Pi Zan

Inventor after: Xu Jia

Inventor after: Liang Lei

Inventor after: Hu Yenan

Inventor after: Shen Zhijun

Inventor after: Sun Shusen

Inventor before: Yang Liang

Inventor before: Ma Suhong

Inventor before: Xiao Jin

Inventor before: Meng Chao

Inventor before: Wanyan Zhenhai

Inventor before: Luo Jun

Inventor before: Pi Zan

Inventor before: Xu Jia

Inventor before: Liang Lei

Inventor before: Hu Yenan

Inventor before: Shen Zhijun

Inventor before: Sun Shusen

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant