CN106950056A - A kind of anti-skidding air draft valve detection device and detection method - Google Patents

A kind of anti-skidding air draft valve detection device and detection method Download PDF

Info

Publication number
CN106950056A
CN106950056A CN201710382977.8A CN201710382977A CN106950056A CN 106950056 A CN106950056 A CN 106950056A CN 201710382977 A CN201710382977 A CN 201710382977A CN 106950056 A CN106950056 A CN 106950056A
Authority
CN
China
Prior art keywords
valve
skidding
air
pneumatic
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710382977.8A
Other languages
Chinese (zh)
Other versions
CN106950056B (en
Inventor
郭斌
闫富菊
陆艺
范伟军
罗哉
胡晓峰
赵静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Radium Intelligence Science And Technology Co Ltd Is Irrigated In Hangzhou
Original Assignee
Radium Intelligence Science And Technology Co Ltd Is Irrigated In Hangzhou
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Radium Intelligence Science And Technology Co Ltd Is Irrigated In Hangzhou filed Critical Radium Intelligence Science And Technology Co Ltd Is Irrigated In Hangzhou
Priority to CN201710382977.8A priority Critical patent/CN106950056B/en
Publication of CN106950056A publication Critical patent/CN106950056A/en
Application granted granted Critical
Publication of CN106950056B publication Critical patent/CN106950056B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M13/00Testing of machine parts
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M3/00Investigating fluid-tightness of structures
    • G01M3/02Investigating fluid-tightness of structures by using fluid or vacuum
    • G01M3/26Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors
    • G01M3/28Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors for pipes, cables or tubes; for pipe joints or seals; for valves ; for welds
    • G01M3/2876Investigating fluid-tightness of structures by using fluid or vacuum by measuring rate of loss or gain of fluid, e.g. by pressure-responsive devices, by flow detectors for pipes, cables or tubes; for pipe joints or seals; for valves ; for welds for valves
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/10Internal combustion engine [ICE] based vehicles
    • Y02T10/40Engine management systems

Abstract

The invention discloses a kind of anti-skidding air draft valve detection device, including for the fixed rack for fixing anti-skidding exhaust valve, air-channel system, control circuit, fixed rack includes top cover and base, provided with three support bars between top cover and base, anti-skidding exhaust valve is fixed between top cover and base, and anti-skidding exhaust valve is provided with air inlet, gas outlet, exhaust outlet, air-channel system, including source of the gas, Pneumatic valve, magnetic valve, pressure sensor etc., control system includes industrial computer, data collecting card etc..Detection means and method of the present invention, for the action response time test, inflation and exhaust performance test, performing leak test of anti-skidding exhaust valve, testing efficiency and measuring accuracy are higher, and fixation kit is simple and practical, and clamping precision is high.

Description

A kind of anti-skidding air draft valve detection device and detection method
Technical field
It is that a kind of express locomotive use is anti-the present invention relates to express locomotive anti-skid brake system system product detection means field Sliding air draft valve detection device and detection method.
Background technology
Anti-skidding exhaust valve as anti-skid braking device execution unit, when wheel because braking moment is excessive slide when Need by anti-skidding exhaust valve fill air draft effect implement non-skid braking, with realize quick response brake, reach shortening slide away from From the reduction abrasive purpose of wheel sliding.Therefore, the quality of anti-skidding air draft valve performance will directly influence the stabilization of non-skid braking Property, reliability, or even influence railroad track vehicle brakes security, influence train operation security.Domestic master Anti-skid brake system production firm is wanted, also in part production and technology exploration stage, to understand and grasp core development technique, For the anti-skidding exhaust valve of critical component in non-skid braking, a kind of detection efficiency and the higher detection means of accuracy of detection and inspection are designed Survey method is particularly important.
The content of the invention
The invention aims to provide a kind of automobile-used anti-skidding air draft valve detection device of express locomotive and detection method.
For achieving the above object, the technical scheme is that:A kind of anti-skidding air draft valve detection device, including for The fixed rack of fixed anti-skidding exhaust valve, air-channel system, control circuit, the fixed rack include top cover and base, top cover with Provided with three support bars between base, anti-skidding exhaust valve is fixed between top cover and base, and anti-skidding exhaust valve is provided with air inlet, gone out Gas port, exhaust outlet;
The air-channel system, including source of the gas, source of the gas are connected with the input of pneumatic bigeminy part, the output end of pneumatic bigeminy part and the The input connection of one air accumulator, the input phase of the output end of the first air accumulator respectively with the first pressure regulator valve and the second pressure regulator valve Even;
The output end of first pressure regulator valve is connected with the input of the first Pneumatic valve, and the output end of the first Pneumatic valve is divided into two-way, one Road is connected to the input of the second Pneumatic valve, and the output end of the second Pneumatic valve is connected with the air inlet of anti-skidding exhaust valve, Ling Yilu The input of the 3rd Pneumatic valve is connected to, the output end of the 3rd Pneumatic valve is connected to muffler, and muffler leads directly to air;
The output end of second pressure regulator valve is connected with the input of the first 2/2-way magnetic valve, the first 2/2-way magnetic valve it is defeated Go out end and be divided into two-way, the input of the second 2/2-way magnetic valve, the output end of the second 2/2-way magnetic valve are connected to all the way Be connected to muffler, the input of another 2/2-way valves of Lu Yu six is connected, the output end of the 6th 2/2-way magnetic valve with The air inlet of anti-skidding exhaust valve is connected;
The 3rd 2/2-way magnetic valve, the 3rd liang are connected between the first 2/2-way magnetic valve, the 6th 2/2-way valve Two three-way electromagnetic valves of position the 4th 2/2-way magnetic valve in parallel, the 3rd 2/2-way magnetic valve is connected by the 5th 2/2-way magnetic valve Logical reference cavity, the 4th 2/2-way magnetic valve output end directly connects output end, and the 3rd, gas of the 4th 2/2-way magnetic valve two The differential pressure pickup for being used for monitoring gas-path leakage amount is housed in the middle of road.
The gas outlet of anti-skidding exhaust valve is connected to the input of the 4th Pneumatic valve, and the input of the 4th Pneumatic valve is connected to The inlet end of two air accumulators;
The control circuit includes industrial computer, and industrial computer is connected with data collecting card, data collecting card connection signal conversion module, Drive module, user's operation module, the signal conversion module connect the first air pressure inductor, the second air pressure inductor, and will Current signal is converted into voltage signal, and the first air pressure inductor is connected with anti-skidding exhaust valve air inlet, the sensing of the second air pressure Device is connected with anti-skidding air draft valve air gate;The drive module includes air-channel system drive module and anti-skidding exhaust valve driving mould Block, gas circuit drive module is connected to each Pneumatic valve of air-channel system, magnetic valve, and anti-skidding exhaust valve drive module is connected to anti-skidding air draft Graduated release valve, brake valve inside valve.
The first gas storage tankage size is 40L, and the second gas storage tankage size is 6L.
The detection method of anti-skidding exhaust valve action response time, comprises the following steps:
Step one, anti-skidding exhaust valve is installed
Anti-skidding exhaust valve is arranged on fixed rack, and is connected in air-channel system;
Step 2, anti-skidding exhaust valve action response time test
Industrial computer controls the first Pneumatic valve, the second Pneumatic valve to open, and the 3rd Pneumatic valve is closed, and graduated release valve and brake valve are not charged, 500kPa pressure is passed through to anti-skidding exhaust valve air inlet, first pressure sensor registration is stabilized to after 500kPa, makes brake valve Powered with graduated release valve, anti-skidding exhaust valve carries out rapid air draft, and test phase alleviates the response time;Control the first Pneumatic valve, second Pneumatic valve is opened, and the 3rd Pneumatic valve is closed, and graduated release valve and brake valve are not charged, are passed through 500kPa's to anti-skidding exhaust valve air inlet After pressure, pressure stability, make brake valve and graduated release valve powered, anti-skidding exhaust valve carries out rapid air draft, first pressure sensor shows Number is stabilized to after 0kPa, makes brake valve and graduated release valve not charged, test phase fills the wind response time.
Anti-skidding exhaust valve fills the detection method of exhaust performance test, comprises the following steps:
Step one, anti-skidding exhaust valve is installed
Anti-skidding exhaust valve is arranged on fixed rack, and is connected in air-channel system;
Step 2, including quick fill wind and graduated release ability, direct release ability, stage fill wind energy power, quick air draft ability, row The test of empty ability, straight-through relief capabilities
A. wind and graduated release aptitude tests are quickly filled, industrial computer controls the first Pneumatic valve, the second Pneumatic valve to open, the 3rd gas Control valve to close, graduated release valve and brake valve are not charged, and 500kPa pressure is passed through to anti-skidding exhaust valve air inlet, lasts after 7s, makes The powered 0.1s of brake valve, graduated release valve, controls anti-skidding air draft valve exhaust, then makes that brake valve is powered, the not charged 0.9s of graduated release valve, control Make anti-skidding exhaust valve and work in packing state, according to this after logical action 5 times, make that brake valve is powered, graduated release valve is not charged, anti-skidding row Air-valve works in packing state 4s, by the reading to second pressure sensor, completes quick wind and the graduated release ability of filling Test;
B. direct release aptitude tests, make graduated release valve and brake valve powered after a test terminates, pass through the row of anti-skidding exhaust valve Gas port is vented 2s, then makes that brake valve is powered, graduated release valve is not charged, and anti-skidding exhaust valve works in packing state 5s, by the The reading of two pressure sensors, completes the test of direct release ability;
C. the stage fills wind aptitude tests, and industrial computer control closes the 3rd Pneumatic valve, the pressure of the second air accumulator is drained into 0kPa, The first Pneumatic valve, the second Pneumatic valve are opened, the 3rd Pneumatic valve, control brake valve and graduated release valve is closed, anti-skidding exhaust valve is worked In air-suction state 0.1s, packing state 0.9s, according to this after logic working 5 times, make anti-skidding exhaust valve pressurize 3s, by pressing second The reading of force snesor completes to fill the stage test of wind energy power;
D. the test of quick air draft ability, industrial computer controls the first Pneumatic valve, the second Pneumatic valve to open, and the 3rd Pneumatic valve is closed, Make graduated release valve and brake valve not charged, 500kPa pressure be passed through to anti-skidding exhaust valve air inlet, is lasted after 6s, make graduated release valve, Brake valve is powered, by the vent 1.2s of anti-skidding exhaust valve, then makes that brake valve is powered, graduated release valve is not charged, anti-skidding Exhaust valve works in packing state 3s, by the reading to second pressure sensor, completes the test to quick air draft ability;
E. the test of emptying ability, industrial computer controls the first Pneumatic valve, the second Pneumatic valve to open, and the 3rd Pneumatic valve is closed, and alleviates Valve and brake valve are not charged, and 500kPa pressure is passed through to anti-skidding exhaust valve air inlet, is lasted after 6s, makes graduated release valve, brake valve It is powered, by the vent 10s of anti-skidding exhaust valve, obtain the data of second pressure sensor;
Industrial computer controls the first Pneumatic valve, the second Pneumatic valve to open, and the 3rd Pneumatic valve is closed, and graduated release valve and brake valve are not charged, 500kPa pressure is passed through to anti-skidding exhaust valve air inlet D, then by the 3rd Pneumatic valve air draft 20s, second pressure is obtained and passes The data of sensor, complete the test to emptying ability.
The detection method of anti-skidding exhaust valve sealing, comprises the following steps:
Step one, anti-skidding exhaust valve is installed
Anti-skidding exhaust valve is arranged on fixed rack, and is connected in air-channel system;
Step 2, performing leak test, including pipeline performing leak test and anti-skidding exhaust valve performing leak test
I, pipeline performing leak tests, pipeline test is tested under conditions of without the second air accumulator, including the charging stage, The stage is exited in equilibrium stage, test phase, exhaust
Charging stage, the first 2/2-way magnetic valve is opened, close the second 2/2-way magnetic valve, the 5th 2/2-way electromagnetism Valve, opens the 6th 2/2-way magnetic valve, closes the 3rd Pneumatic valve, the 4th Pneumatic valve, air-channel system is in air-suction state, when Stable gas pressure is in 500kPa, into equilibrium stage, closes and enters test phase after the first 2/2-way magnetic valve 60s, test In the stage, the 5th 2/2-way magnetic valve is opened, test is carried out after 60s, it is close to complete pipeline by the reading of differential pressure pick-up numerical value The stage is exited in envelope property test, exhaust, and the gas on light pipe road is arranged by the second 2/2-way magnetic valve;
The anti-skidding exhaust valve overall tightness tests of II, the test of anti-skidding exhaust valve overall tightness needs to bear in the second air accumulator Carried out in the case of load, including charging stage, rapid exhaust phase, equilibrium stage, test phase, exhaust exit the stage
Charging stage, the first 2/2-way magnetic valve is opened, close the second 2/2-way magnetic valve, the 5th 2/2-way electromagnetism Valve, opens the 6th 2/2-way magnetic valve, closes the 3rd Pneumatic valve, opens the 4th Pneumatic valve, and the second air accumulator is inflated, works as pressure When power stabilization is to 500kpa, rapid exhaust turns off the first 2/2-way magnetic valve, makes brake valve and graduated release valve powered, anti-skidding row Air-valve works in air draft state, and gas is discharged by the exhaust outlet of anti-skidding exhaust valve, reached by the value for judging second pressure sensor During to 200kPa, make that brake valve is powered, graduated release valve is not charged, anti-skidding exhaust valve works in packing state, subsequently into air pressure Poised state, enters test phase when closing after the first 2/2-way magnetic valve, 60s, test phase turns off the 5th 2/2-way The reading of current differential pressure pick-up is obtained after magnetic valve, test 60s, anti-skidding exhaust valve overall tightness test is completed, exhaust is moved back Go out the stage, make brake valve, graduated release valve not charged, anti-skidding exhaust valve is operated in on-position, open the second 2/2-way magnetic valve Arrange the gas of the air accumulator of light second.
The beneficial effects of the invention are as follows:
Detection means and method of the present invention, for anti-skidding exhaust valve action response time test, inflation and exhaust performance test, Performing leak test, testing efficiency and measuring accuracy are higher, and fixation kit is simple and practical, and clamping precision is high.
Brief description of the drawings
Fig. 1 is fixed rack structural representation;
Fig. 2 is the structural representation of anti-skidding exhaust valve;
Fig. 3 is air-channel system schematic diagram of the present invention;
Fig. 4 is present invention control circuit logic diagram.
Embodiment
The technical scheme in the embodiment of the present invention is clearly and completely described below in conjunction with accompanying drawing.
As shown in Figure 1, 2, 3, a kind of anti-skidding air draft valve detection device, including for fixing the fixed station of anti-skidding exhaust valve Frame, air-channel system, control circuit, the fixed rack includes top cover 1 and base 2, provided with three branch between top cover 1 and base 2 Strut 3, anti-skidding exhaust valve 4 is fixed between top cover 1 and base 2, and anti-skidding exhaust valve 4 is provided with air inlet D, gas outlet C, exhaust outlet E.Air inlet D, gas outlet C are connected to air-channel system, and exhaust outlet E directly leads to air.
The air-channel system, including air source A IR, air source A IR enter after ball valve SOR1, the input with pneumatic bigeminy part REG0 End is connected, and pneumatic bigeminy part REG0 output end is connected with the first air accumulator TNK1 input, and the first air accumulator TNK1's is defeated Go out input of the end respectively with the first pressure regulator valve REG1 and the second pressure regulator valve REG2 to be connected.
First pressure regulator valve REG1 output end is connected with the first Pneumatic valve VAL1 input, and the first Pneumatic valve VAL1's is defeated Go out end and be divided into two-way, the second Pneumatic valve VAL2 input, the second Pneumatic valve VAL2 output end and anti-skidding row are connected to all the way The air inlet D of air-valve 4 is connected, and another road is connected to the 3rd Pneumatic valve VAL3 input, the 3rd Pneumatic valve VAL3 output end Muffler ZP is connected to, muffler ZP leads directly to air.
Second pressure regulator valve REG2 output end is connected with the first 2/2-way magnetic valve YV1 input, the first two two Three-way electromagnetic valve YV1 output end is divided into two-way, is connected to the second 2/2-way magnetic valve YV2 input all the way, the second two The input that two three-way electromagnetic valve YV2 output end is connected to muffler ZP, another 2/2-way valve YV6 of Lu Yu six is connected, the Six 2/2-way magnetic valve YV6 output end is connected with the air inlet D of anti-skidding exhaust valve 4.
The 3rd 2/2-way electromagnetism is connected between the first 2/2-way magnetic valve YV1, the 6th 2/2-way valve YV6 Valve YV3, the 3rd 2/2-way magnetic valve YV3 are parallel with the 4th 2/2-way magnetic valve YV4, the 3rd 2/2-way magnetic valve YV3 By the 5th 2/2-way magnetic valve YV5 connect reference cavity, the 4th 2/2-way magnetic valve YV4 output ends directly connect benchmark Chamber, and the three, the 4th 2/2-way solenoid valve blocks into gas circuit in the middle of be equipped with and be used to monitor the differential pressure pickup of gas-path leakage amount DP。
The gas outlet C of anti-skidding exhaust valve 4 is connected to the 4th Pneumatic valve VAL4 input, the 4th Pneumatic valve VAL4 input End is connected to the second air accumulator TNK2 inlet end.
As shown in Figure 3,4, control circuit includes industrial computer 5, and industrial computer 5 is connected with data collecting card 6, data collecting card 6 Signal conversion module 7, drive module 8, user's operation module 9 are connected, the signal conversion module 7 connects the first air pressure inductor P1, the second air pressure inductor P2, and current signal is converted into voltage signal, the first air pressure inductor P1 and anti-skidding air draft The air inlet D connections of valve 4, the second air pressure inductor P2 is connected with the anti-skidding gas outlet C of exhaust valve 4;The drive module 8 includes gas circuit System drive module 801 and anti-skidding exhaust valve drive module 802, gas circuit drive module 801 be connected to each Pneumatic valve of air-channel system, Magnetic valve, anti-skidding exhaust valve drive module 802 is connected to graduated release valve inside anti-skidding exhaust valve 4, brake valve.
The first air accumulator TNK1 capacity is 40L, and the second air accumulator TNK2 capacity is 6L.
The anti-skidding exhaust valve detection of the present invention specifically can be used for detecting the action response time of anti-skidding exhaust valve, fill exhaust Performance, sealing property.
Wherein, the detection method of anti-skidding exhaust valve action response time, comprises the following steps:
Step one, anti-skidding exhaust valve is installed
Anti-skidding exhaust valve 4 is arranged on fixed rack, and is connected in air-channel system;
Step 2, anti-skidding exhaust valve action response time test
Industrial computer 5 control the first Pneumatic valve VAL1, the second Pneumatic valve VAL2 open, the 3rd Pneumatic valve VAL3 close, graduated release valve and Brake valve is not charged, and 500kPa pressure is passed through to the anti-skidding air inlet D of exhaust valve 4, and first pressure sensor P1 registrations are stabilized to After 500kPa, make brake valve and graduated release valve powered, anti-skidding exhaust valve 4 carries out rapid air draft, test phase alleviates the response time;Control The first Pneumatic valve VAL1, the second Pneumatic valve VAL2 opening are made, the 3rd Pneumatic valve VAL3 is closed, and graduated release valve and brake valve are not charged, It is passed through to the anti-skidding air inlet D of exhaust valve 4 after 500kPa pressure, pressure stability, makes brake valve and graduated release valve powered, anti-skidding air draft Valve 4 carries out rapid air draft, and first pressure sensor P1 registrations are stabilized to after 0kPa, make brake valve and graduated release valve not charged, test Stage fills the wind response time.
Anti-skidding exhaust valve fills the detection method of exhaust performance test, comprises the following steps:
Step one, anti-skidding exhaust valve is installed
Anti-skidding exhaust valve 4 is arranged on fixed rack, and is connected in air-channel system;
Step 2, including quick fill wind and graduated release ability, direct release ability, stage fill wind energy power, quick air draft ability, row The test of empty ability, straight-through relief capabilities
A. wind and graduated release aptitude tests are quickly filled, industrial computer 5 controls the first Pneumatic valve VAL1, the second Pneumatic valve VAL2 to beat Open, the 3rd Pneumatic valve VAL3 is closed, graduated release valve and brake valve are not charged, and 500kPa pressure is passed through to the anti-skidding air inlet D of exhaust valve 4 Power, lasts after 7s, makes the powered 0.1s of brake valve, graduated release valve, controls anti-skidding exhaust valve 4 to be vented, and then makes that brake valve is powered, alleviate The not charged 0.9s of valve, controls anti-skidding exhaust valve 4 to work in packing state, according to this after logical action 5 times, makes brake valve powered, slow Solution valve is not charged, and anti-skidding exhaust valve 4 works in packing state 4s, by the reading to second pressure sensor P2, completes quick Fill the test of wind and graduated release ability;
B. direct release aptitude tests, make graduated release valve and brake valve powered after a test terminates, and pass through the row of anti-skidding exhaust valve 4 Gas port E is vented 2s, then makes that brake valve is powered, graduated release valve is not charged, and anti-skidding exhaust valve works in packing state 5s, by the Two pressure sensor P2 reading, completes the test of direct release ability;
C. the stage fills wind aptitude tests, and the control of industrial computer 5 closes the 3rd Pneumatic valve VAL3, makes the second air accumulator TNK2 pressure 0kPa is drained into, the first Pneumatic valve VAL1, the second Pneumatic valve VAL2 is opened, the 3rd Pneumatic valve VAL3 is closed, control brake valve eases up Valve is solved, anti-skidding exhaust valve 4 is worked in air-suction state 0.1s, packing state 0.9s, according to this after logic working 5 times, makes anti-skidding row The pressurize 3s of air-valve 4, completes to fill the stage test of wind energy power by the reading to second pressure sensor P2;
D. the test of quick air draft ability, industrial computer 5 controls the first Pneumatic valve VAL1, the second Pneumatic valve VAL2 to open, the 3rd gas Control valve VAL3 to close, make graduated release valve and brake valve not charged, 500kPa pressure is passed through to the anti-skidding air inlet D of exhaust valve 4, is lasted After 6s, make graduated release valve, brake valve powered, 1.2s is vented by the exhaust outlet E of anti-skidding exhaust valve 4, then makes brake valve powered, slow Solution valve is not charged, and anti-skidding exhaust valve 4 works in packing state 3s, by the reading to second pressure sensor P2, completes to fast The test of fast air draft ability;
E. the test of emptying ability, industrial computer 5 controls the first Pneumatic valve VAL1, the second Pneumatic valve VAL2 to open, the 3rd Pneumatic valve VAL3 is closed, and graduated release valve and brake valve are not charged, and 500kPa pressure is passed through to the anti-skidding air inlet D of exhaust valve 4, is lasted after 6s, Make graduated release valve, brake valve powered, 10s is vented by the exhaust outlet E of anti-skidding exhaust valve 4, second pressure sensor P2 number is obtained According to;
Industrial computer 5 control the first Pneumatic valve VAL1, the second Pneumatic valve VAL2 open, the 3rd Pneumatic valve VAL3 close, graduated release valve and Brake valve is not charged, and 500kPa pressure is passed through to the anti-skidding air inlet D of exhaust valve 4, then passes through the 3rd Pneumatic valve VAL3 air drafts 20s, obtains second pressure sensor P2 data, completes the test to emptying ability.
The detection method of anti-skidding exhaust valve sealing, comprises the following steps:
Step one, anti-skidding exhaust valve is installed
Anti-skidding exhaust valve 4 is arranged on fixed rack, and is connected in air-channel system;
Step 2, performing leak test, including pipeline performing leak test and anti-skidding exhaust valve performing leak test
I, pipeline performing leak tests, pipeline test is tested under conditions of without the second air accumulator TNK2, including air inlet rank The stage is exited in section, equilibrium stage, test phase, exhaust
Charging stage, the first 2/2-way magnetic valve YV1 is opened, close the second 2/2-way magnetic valve YV2, the 5th 2/2-way Magnetic valve YV5, opens the 6th 2/2-way magnetic valve YV6, closes the 3rd Pneumatic valve VAL3, the 4th Pneumatic valve VAL4, makes gas circuit System is in air-suction state, when stable gas pressure is in 500kPa, into equilibrium stage, closes the first 2/2-way magnetic valve YV1 Enter test phase after 60s, test phase opens the 5th 2/2-way magnetic valve YV5, and test is carried out after 60s, passed by differential pressure The reading of sensor DP numerical value completes pipeline performing leak test, and the stage is exited in exhaust, and light is arranged by the second 2/2-way magnetic valve YV2 The gas of pipeline;
The anti-skidding overall tightness of exhaust valve 4 tests of II, the test of the anti-skidding overall tightness of exhaust valve 4 is needed in the second air accumulator TNK2 is carried out in the case of loading, including charging stage, rapid exhaust phase, equilibrium stage, test phase, exhaust exit the stage
Charging stage, the first 2/2-way magnetic valve YV1 is opened, close the second 2/2-way magnetic valve YV2, the 5th 2/2-way Magnetic valve YV5, opens the 6th 2/2-way magnetic valve YV6, closes the 3rd Pneumatic valve VAL3, opens the 4th Pneumatic valve VAL4, right Second air accumulator TNK2 is inflated, when pressure stability is to 500kpa, rapid exhaust, is turned off the first 2/2-way magnetic valve YV1, is made Brake valve and graduated release valve are powered, and anti-skidding exhaust valve 4 works in air draft state, and gas is discharged by the exhaust outlet E of anti-skidding exhaust valve 4, During by judging that second pressure sensor P2 value reaches 200kPa, make that brake valve is powered, graduated release valve is not charged, anti-skidding exhaust valve 4 work in packing state, subsequently into the poised state of air pressure, enter when closing after the first 2/2-way magnetic valve YV1,60s Test phase, test phase turns off the reading that current differential pressure pick-up DP is obtained after the 5th 2/2-way magnetic valve YV5, test 60s Number, completes the anti-skidding overall tightness of exhaust valve 4 test, and exhaust exits the stage, makes brake valve, graduated release valve not charged, anti-skidding air draft Valve 4 is operated in on-position, opens the second 2/2-way magnetic valve YV2 row's the second air accumulators of light TNK2 gas.
Described embodiment is only a part of embodiment of the invention, rather than whole embodiments.Based on the present invention In embodiment, the every other implementation that those of ordinary skill in the art are obtained under the premise of creative work is not made Example, belongs to the scope of protection of the invention.

Claims (5)

1. a kind of anti-skidding air draft valve detection device, including for fixing the fixed rack, air-channel system, control electricity of anti-skidding exhaust valve Road, it is characterised in that the fixed rack includes top cover and base, provided with three support bars, anti-skidding row between top cover and base Air-valve is fixed between top cover and base, and anti-skidding exhaust valve is provided with air inlet, gas outlet, exhaust outlet;
The air-channel system, including source of the gas, source of the gas are connected with the input of pneumatic bigeminy part, the output end of pneumatic bigeminy part and the The input connection of one air accumulator, the input phase of the output end of the first air accumulator respectively with the first pressure regulator valve and the second pressure regulator valve Even;
The output end of first pressure regulator valve is connected with the input of the first Pneumatic valve, and the output end of the first Pneumatic valve is divided into two-way, one Road is connected to the input of the second Pneumatic valve, and the output end of the second Pneumatic valve is connected with the air inlet of anti-skidding exhaust valve, Ling Yilu The input of the 3rd Pneumatic valve is connected to, the output end of the 3rd Pneumatic valve is connected to muffler, and muffler leads directly to air;
The output end of second pressure regulator valve is connected with the input of the first 2/2-way magnetic valve, the first 2/2-way magnetic valve it is defeated Go out end and be divided into two-way, the input of the second 2/2-way magnetic valve, the output end of the second 2/2-way magnetic valve are connected to all the way Be connected to muffler, the input of another 2/2-way valves of Lu Yu six is connected, the output end of the 6th 2/2-way magnetic valve with The air inlet of anti-skidding exhaust valve is connected;
The 3rd 2/2-way magnetic valve, the 3rd liang are connected between the first 2/2-way magnetic valve, the 6th 2/2-way valve Two three-way electromagnetic valves of position are parallel with the 4th 2/2-way magnetic valve, and the 3rd 2/2-way magnetic valve passes through the 5th 2/2-way magnetic valve Reference cavity is connected, the output end of the 4th 2/2-way magnetic valve is connected directly to reference cavity, and the three, the 4th 2/2-way electromagnetism The differential pressure pickup for being used for monitoring gas-path leakage amount is housed in the middle of the gas circuit of valve;
The gas outlet of anti-skidding exhaust valve is connected to the input of the 4th Pneumatic valve, and the input of the 4th Pneumatic valve is connected to the second storage The inlet end of gas tank;
The control circuit includes industrial computer, and industrial computer is connected with data collecting card, data collecting card connection signal conversion module, Drive module, user's operation module, the signal conversion module connect the first air pressure inductor, the second air pressure inductor, and will Current signal is converted into voltage signal, and the first air pressure inductor is connected with anti-skidding exhaust valve air inlet, the sensing of the second air pressure Device is connected with anti-skidding air draft valve air gate;The drive module includes air-channel system drive module and anti-skidding exhaust valve driving mould Block, gas circuit drive module is connected to each Pneumatic valve of air-channel system, magnetic valve, and anti-skidding exhaust valve drive module is connected to anti-skidding air draft Graduated release valve, brake valve inside valve.
2. anti-skidding air draft valve detection device according to claim 1, it is characterised in that the first gas storage tankage size is 40L, the second gas storage tankage size is 6L.
3. according to the anti-skidding exhaust valve action response time of any described anti-skidding air draft valve detection device of claim 1 or 2 Detection method, it is characterised in that comprise the following steps:
Step one, anti-skidding exhaust valve is installed
Anti-skidding exhaust valve is arranged on fixed rack, and is connected in air-channel system;
Step 2, anti-skidding exhaust valve action response time test
Industrial computer controls the first Pneumatic valve, the second Pneumatic valve to open, and the 3rd Pneumatic valve is closed, and graduated release valve and brake valve are not charged, 500kPa pressure is passed through to anti-skidding exhaust valve air inlet, first pressure sensor registration is stabilized to after 500kPa, makes brake valve Powered with graduated release valve, anti-skidding exhaust valve carries out rapid air draft, and test phase alleviates the response time;Control the first Pneumatic valve, second Pneumatic valve is opened, and the 3rd Pneumatic valve is closed, and graduated release valve and brake valve are not charged, are passed through 500kPa's to anti-skidding exhaust valve air inlet After pressure, pressure stability, make brake valve and graduated release valve powered, anti-skidding exhaust valve carries out rapid air draft, first pressure sensor shows Number is stabilized to after 0kPa, makes brake valve and graduated release valve not charged, test phase fills the wind response time.
4. exhaust performance test is filled according to the anti-skidding exhaust valve of any described anti-skidding air draft valve detection device of claim 1 or 2 Detection method, it is characterised in that comprise the following steps:
Step one, anti-skidding exhaust valve is installed
Anti-skidding exhaust valve is arranged on fixed rack, and is connected in air-channel system;
Step 2, including quick fill wind and graduated release ability, direct release ability, stage fill wind energy power, quick air draft ability, row The test of empty ability, straight-through relief capabilities
A. wind and graduated release aptitude tests are quickly filled, industrial computer controls the first Pneumatic valve, the second Pneumatic valve to open, the 3rd gas Control valve to close, graduated release valve and brake valve are not charged, and 500kPa pressure is passed through to anti-skidding exhaust valve air inlet, lasts after 7s, makes The powered 0.1s of brake valve, graduated release valve, controls anti-skidding air draft valve exhaust, then makes that brake valve is powered, the not charged 0.9s of graduated release valve, control Make anti-skidding exhaust valve and work in packing state, according to this after logical action 5 times, make that brake valve is powered, graduated release valve is not charged, anti-skidding row Air-valve works in packing state 4s, by the reading to second pressure sensor, completes quick wind and the graduated release ability of filling Test;
B. direct release aptitude tests, make graduated release valve and brake valve powered after a test terminates, pass through the row of anti-skidding exhaust valve Gas port is vented 2s, then makes that brake valve is powered, graduated release valve is not charged, and anti-skidding exhaust valve works in packing state 5s, by the The reading of two pressure sensors, completes the test of direct release ability;
C. the stage fills wind aptitude tests, and industrial computer control closes the 3rd Pneumatic valve, the pressure of the second air accumulator is drained into 0kPa, The first Pneumatic valve, the second Pneumatic valve are opened, the 3rd Pneumatic valve, control brake valve and graduated release valve is closed, anti-skidding exhaust valve is worked In air-suction state 0.1s, packing state 0.9s, according to this after logic working 5 times, make anti-skidding exhaust valve pressurize 3s, by pressing second The reading of force snesor completes to fill the stage test of wind energy power;
D. the test of quick air draft ability, industrial computer controls the first Pneumatic valve, the second Pneumatic valve to open, and the 3rd Pneumatic valve is closed, Make graduated release valve and brake valve not charged, 500kPa pressure be passed through to anti-skidding exhaust valve air inlet, is lasted after 6s, make graduated release valve, Brake valve is powered, by the vent 1.2s of anti-skidding exhaust valve, then makes that brake valve is powered, graduated release valve is not charged, anti-skidding Exhaust valve works in packing state 3s, by the reading to second pressure sensor, completes the test to quick air draft ability;
E. the test of emptying ability, industrial computer controls the first Pneumatic valve, the second Pneumatic valve to open, and the 3rd Pneumatic valve is closed, and alleviates Valve and brake valve are not charged, and 500kPa pressure is passed through to anti-skidding exhaust valve air inlet, is lasted after 6s, makes graduated release valve, brake valve It is powered, by the vent 10s of anti-skidding exhaust valve, obtain the data of second pressure sensor;
Industrial computer controls the first Pneumatic valve, the second Pneumatic valve to open, and the 3rd Pneumatic valve is closed, and graduated release valve and brake valve are not charged, 500kPa pressure is passed through to anti-skidding exhaust valve air inlet D, then by the 3rd Pneumatic valve air draft 20s, second pressure is obtained and passes The data of sensor, complete the test to emptying ability.
5. according to the detection side of the anti-skidding exhaust valve sealing of any described anti-skidding air draft valve detection device of claim 1 or 2 Method, it is characterised in that comprise the following steps:
Step one, anti-skidding exhaust valve is installed
Anti-skidding exhaust valve is arranged on fixed rack, and is connected in air-channel system;
Step 2, performing leak test, including pipeline performing leak test and anti-skidding exhaust valve performing leak test
I, pipeline performing leak tests, pipeline test is tested under conditions of without the second air accumulator, including the charging stage, The stage is exited in equilibrium stage, test phase, exhaust
Charging stage, the first 2/2-way magnetic valve is opened, close the second 2/2-way magnetic valve, the 5th 2/2-way electromagnetism Valve, opens the 6th 2/2-way magnetic valve, closes the 3rd Pneumatic valve, the 4th Pneumatic valve, air-channel system is in air-suction state, when Stable gas pressure is in 500kPa, into equilibrium stage, closes and enters test phase after the first 2/2-way magnetic valve 60s, test In the stage, the 5th 2/2-way magnetic valve is opened, test is carried out after 60s, it is close to complete pipeline by the reading of differential pressure pick-up numerical value The stage is exited in envelope property test, exhaust, and the gas on light pipe road is arranged by the second 2/2-way magnetic valve;
The anti-skidding exhaust valve overall tightness tests of II, the test of anti-skidding exhaust valve overall tightness needs to bear in the second air accumulator Carried out in the case of load, including charging stage, rapid exhaust phase, equilibrium stage, test phase, exhaust exit the stage
Charging stage, the first 2/2-way magnetic valve is opened, close the second 2/2-way magnetic valve, the 5th 2/2-way electromagnetism Valve, opens the 6th 2/2-way magnetic valve, closes the 3rd Pneumatic valve, opens the 4th Pneumatic valve, and the second air accumulator is inflated, works as pressure When power stabilization is to 500kpa, rapid exhaust turns off the first 2/2-way magnetic valve, makes brake valve and graduated release valve powered, anti-skidding row Air-valve works in air draft state, and gas is discharged by the exhaust outlet of anti-skidding exhaust valve, reached by the value for judging second pressure sensor During to 200kPa, make that brake valve is powered, graduated release valve is not charged, anti-skidding exhaust valve works in packing state, subsequently into air pressure Poised state, enters test phase when closing after the first 2/2-way magnetic valve, 60s, test phase turns off the 5th 2/2-way The reading of current differential pressure pick-up is obtained after magnetic valve, test 60s, anti-skidding exhaust valve overall tightness test is completed, exhaust is moved back Go out the stage, make brake valve, graduated release valve not charged, anti-skidding exhaust valve is operated in on-position, open the second 2/2-way magnetic valve Arrange the gas of the air accumulator of light second.
CN201710382977.8A 2017-05-26 2017-05-26 Detection method of anti-skid exhaust valve detection device Active CN106950056B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710382977.8A CN106950056B (en) 2017-05-26 2017-05-26 Detection method of anti-skid exhaust valve detection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710382977.8A CN106950056B (en) 2017-05-26 2017-05-26 Detection method of anti-skid exhaust valve detection device

Publications (2)

Publication Number Publication Date
CN106950056A true CN106950056A (en) 2017-07-14
CN106950056B CN106950056B (en) 2023-06-09

Family

ID=59480034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710382977.8A Active CN106950056B (en) 2017-05-26 2017-05-26 Detection method of anti-skid exhaust valve detection device

Country Status (1)

Country Link
CN (1) CN106950056B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107727329A (en) * 2017-09-08 2018-02-23 南京沪江复合材料股份有限公司 A kind of packaging bag one-way exhaust valve method of testing and tester
CN107748062A (en) * 2017-11-10 2018-03-02 瑞立集团瑞安汽车零部件有限公司 A kind of anti-skidding exhaust valve experimental bench
CN111289193A (en) * 2020-04-08 2020-06-16 姜元成 Valve gas tightness quality inspection equipment

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52115986A (en) * 1976-03-24 1977-09-28 Bosch Gmbh Robert Testing apparatus for antilock regulating apparatus
KR20040096797A (en) * 2004-06-18 2004-11-17 박건홍 Tester for anti-skid valve for railway car
CN2886539Y (en) * 2004-11-24 2007-04-04 王淑娟 Emulational testing device for electronic anti-skid device of railway carriage
CN202648919U (en) * 2012-04-25 2013-01-02 南京浦镇海泰制动设备有限公司 Anti-skid valve test device
CN106706234A (en) * 2017-01-16 2017-05-24 中国计量大学 Vehicle proportion relay valve detection device and method
CN206710087U (en) * 2017-05-26 2017-12-05 杭州沃镭智能科技股份有限公司 A kind of anti-skidding air draft valve detection device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52115986A (en) * 1976-03-24 1977-09-28 Bosch Gmbh Robert Testing apparatus for antilock regulating apparatus
KR20040096797A (en) * 2004-06-18 2004-11-17 박건홍 Tester for anti-skid valve for railway car
CN2886539Y (en) * 2004-11-24 2007-04-04 王淑娟 Emulational testing device for electronic anti-skid device of railway carriage
CN202648919U (en) * 2012-04-25 2013-01-02 南京浦镇海泰制动设备有限公司 Anti-skid valve test device
CN106706234A (en) * 2017-01-16 2017-05-24 中国计量大学 Vehicle proportion relay valve detection device and method
CN206710087U (en) * 2017-05-26 2017-12-05 杭州沃镭智能科技股份有限公司 A kind of anti-skidding air draft valve detection device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
罗聿斌等: "气制动整车模拟试验系统设计" *
陈宁等: "SY—A型防滑器试验台及其微机测控系统的设计" *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107727329A (en) * 2017-09-08 2018-02-23 南京沪江复合材料股份有限公司 A kind of packaging bag one-way exhaust valve method of testing and tester
CN107727329B (en) * 2017-09-08 2024-01-26 南京沪江复合材料股份有限公司 Method and instrument for testing one-way exhaust valve for packaging bag
CN107748062A (en) * 2017-11-10 2018-03-02 瑞立集团瑞安汽车零部件有限公司 A kind of anti-skidding exhaust valve experimental bench
CN111289193A (en) * 2020-04-08 2020-06-16 姜元成 Valve gas tightness quality inspection equipment

Also Published As

Publication number Publication date
CN106950056B (en) 2023-06-09

Similar Documents

Publication Publication Date Title
CN106950056A (en) A kind of anti-skidding air draft valve detection device and detection method
CN203203767U (en) Leakage test system
CN108120606B (en) Commercial vehicle electric brake system hardware-in-the-loop test platform and test method based on PXI and cRIO controller
CN203203768U (en) Sealing device sealing performance test system
CN202502025U (en) Device for high pressure isothermal absorption experiment of coal
CN104458276B (en) Performance test method of hydraulic control unit of car brake system
CN103308254B (en) A kind of oil cooler dry test method for testing leak tightness and device thereof
CN206656857U (en) Automatically controlled foot valve function test device
CN201965006U (en) Lithium ion battery differential pressure formula leak hunting device
CN108107876B (en) Commercial vehicle electric brake system hardware-in-the-loop test platform and test method based on TTC580 controller
CN107036829B (en) High-accuracy multifunctional railcar brake system test platform and its application method
CN106840547A (en) A kind of batteries of electric automobile bag air-tightness detection device and detection method
CN201983913U (en) Micro-control air tight test station of railway brake valve parts
CN109357887A (en) A kind of the engine bench test device and its application method of the braking of simulated automotive plateau
CN106706234A (en) Vehicle proportion relay valve detection device and method
CN103162956B (en) Method and system for detecting comprehensive performance of pneumatic brake four circuit protection valve
CN103604571B (en) A kind of marking pen leak-testing apparatus
CN104943482A (en) Automobile tire pressure monitoring system testing device and testing method
CN206710087U (en) A kind of anti-skidding air draft valve detection device
CN111855070B (en) Device and method for testing pressure change rate of components of commercial vehicle electric control air pressure braking system
CN107907280A (en) ABS hydraulic pressure units sealing property testing equipment and its test method
CN206638397U (en) A kind of batteries of electric automobile bag air-tightness detection device
CN109084991A (en) A kind of commercial vehicle air-pressure brake performance hardware is in ring test system and test method
CN206601219U (en) A kind of air tightness detection apparatus controlled based on PLC
CN102235936B (en) Airtightness test method for automobile electronic control unit shells and airtightness tester

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Guo Bin

Inventor after: Yan Fuju

Inventor after: Zhao Jing

Inventor after: Yuan Sujuan

Inventor before: Guo Bin

Inventor before: Yan Fuju

Inventor before: Lu Yi

Inventor before: Fan Weijun

Inventor before: Luo Zai

Inventor before: Hu Xiaofeng

Inventor before: Zhao Jing

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant