CN106941417A - A kind of method that application resource controls framework - Google Patents

A kind of method that application resource controls framework Download PDF

Info

Publication number
CN106941417A
CN106941417A CN201710092668.7A CN201710092668A CN106941417A CN 106941417 A CN106941417 A CN 106941417A CN 201710092668 A CN201710092668 A CN 201710092668A CN 106941417 A CN106941417 A CN 106941417A
Authority
CN
China
Prior art keywords
resource
acceptor
group
fraction
interval grade
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710092668.7A
Other languages
Chinese (zh)
Other versions
CN106941417B (en
Inventor
沈玉将
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Codyy Education Technology Co Ltd
Original Assignee
Codyy Education Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Codyy Education Technology Co Ltd filed Critical Codyy Education Technology Co Ltd
Publication of CN106941417A publication Critical patent/CN106941417A/en
Application granted granted Critical
Publication of CN106941417B publication Critical patent/CN106941417B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/10Network architectures or network communication protocols for network security for controlling access to devices or network resources
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/08Network architectures or network communication protocols for network security for authentication of entities
    • H04L63/0807Network architectures or network communication protocols for network security for authentication of entities using tickets, e.g. Kerberos
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L65/00Network arrangements, protocols or services for supporting real-time applications in data packet communication
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L41/00Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
    • H04L41/16Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks using machine learning or artificial intelligence
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L65/00Network arrangements, protocols or services for supporting real-time applications in data packet communication
    • H04L65/10Architectures or entities
    • H04L65/102Gateways
    • H04L65/1043Gateway controllers, e.g. media gateway control protocol [MGCP] controllers

Abstract

The present invention provides a kind of method that application resource controls framework, including:Resource management center transmits the fraction assessment value of each resource acceptor of collection to Resource Control Center;Each resource acceptor is divided between multiple resource acceptor groups, the corresponding resource acceptor group of high score number interval grade resource acceptor group corresponding with the interval grade of low fraction and matched by Resource Control Center according to the interval grade of default different fractions, obtains mutual assistance group;The resource acceptor disengaging rate in the corresponding resource acceptor group of the interval grade of low fraction in Resource Control Center statistics preset period of time in mutual assistance group;If the resource acceptor disengaging rate in mutual assistance group is more than preset value, resource acceptor of the triggering resource management center into the corresponding resource acceptor group of high score number interval grade pushes corresponding information.The method that the application resource that the present invention is provided controls framework, realizes the fine-grained management of resource.

Description

A kind of method that application resource controls framework
Technical field
The invention belongs to resources control field, more particularly to a kind of method that application resource controls framework.
Background technology
Applicant Huawei Tech Co., Ltd applied for one on 06 02nd, 2007:Application number: 200710111735.1, patent name is business and resource control method and equipment under bearing separation structure, in such scheme, Bearing control equipment first obtains the resource management rule that load bearing equipment is supported, is operated further according to the regular down distributing resource of resource management Order.The attribute of description resource management rule can be increased in auditability command request, in auditability command response The resource management rule that load bearing equipment is supported is represented with the value of correspondence attribute.The resource pipe that load bearing equipment can also be supported Reason rule is pre-configured to be in the bearing control equipment, and the bearing control equipment obtains resource management rule from this device interior.Such as The resource management rule that fruit load bearing equipment is supported has a variety of, then can therefrom select one kind by bearing control equipment, indicates that this holds Equipment is carried subsequently using resource management rule.
Applicant ZTE Co., Ltd applied for one on 06 24th, 2009:Application number is 200910146754.7, the method that patent name controls for the policy control architecture and implementation strategy of UNE, including application Functional entity AF, fixed network policy decision entity and mobile network's policy decision entity, wherein:The AF, for described Fixed network policy decision entity provides the business information needed for decision-making, the business information include fixed user service information or Mobile subscriber business information;
The fixed network policy decision entity, believes for receiving the business information that the AF is sent, and to the business Breath is judged, if fixed user service information, then formulates fixed network resource control according to the fixed user service information System strategy;If mobile subscriber business information, then mobile network's policy decision entity is transmitted to;
Mobile network's policy decision entity, mobile subscriber's industry for receiving the forwarding of fixed network policy decision entity Business information, and mobile network resource control strategy is formulated according to the mobile subscriber business information.
Such scheme does not disclose the pass between resource provider, resource recipient, Resource Manager, resources control person System, is not carried out resource fine-grained management.
The content of the invention
A kind of method that the present invention provides resource control architecture and the application framework, to solve the above problems.
The present invention provides a kind of resource control architecture.Above-mentioned framework is included in resource donor, resource acceptor, resource management The heart, Resource Control Center;Wherein, it is two two interconnected between resource donor, resource acceptor, resource management center;Resources control Center is connected with resource donor, resource acceptor, resource management center respectively.
The present invention also provides a kind of method that application resource controls framework, and resource control architecture includes resource donor, resource Acceptor, resource management center, Resource Control Center;Wherein, two two-phases between resource donor, resource acceptor, resource management center Connect;Resource Control Center is connected with resource donor, resource acceptor, resource management center respectively, and method comprises the following steps: Resource Control Center obtains resource control scheme;Resource Control Center according to the resource control scheme of acquisition, control resource donor, The interaction of resource between resource acceptor, resource management center;The resource management center divides each resource acceptor of collection Number assessed value is transmitted to the Resource Control Center;The Resource Control Center is according to the interval grades of default different fractions by institute State each resource acceptor and be divided into multiple resource acceptor groups, the corresponding resource acceptor group of high score number interval grade and low fraction are interval Matched between the corresponding resource acceptor group of grade, obtained mutual assistance group;Institute in the Resource Control Center statistics preset period of time State the resource acceptor disengaging rate in the corresponding resource acceptor group of the interval grade of low fraction in mutual assistance group;If in the mutual assistance group Resource acceptor disengaging rate is more than preset value, then triggers the resource management center to the corresponding resource acceptor of high score number interval grade Resource acceptor in group pushes corresponding information.
Compared to prior art, the method for the resource control architecture provided according to the present invention and the application framework is realized The fine-grained management of resource.
In addition, can mutually be converted between resource donor, resource acceptor in scheme so that the scope of application of scheme is more Extensively, the experience of user is enhanced.
In addition, controlling the granting and resources centralized management of authorized certificate or by resource control by resource management center in scheme The granting of control authorized certificate in center processed and resources control, rather than authorized certificate is managed by single third party entity, significantly The interaction between system signaling is reduced, system resource has been saved, the communication efficiency of system is improved, greatly strengthen user's Experience.
In addition, the resource acceptor by paying certain expense to the resource management center, obtain it is described authorize with The mode of card, has increased the income of system operator.
In addition, by the setting of resource acceptor manager, realizing and having carried out certain monitoring to the behavior of resource acceptor, keep away The loss that the behavior of resource acceptor is brought to resource acceptor manager is exempted from.
In addition, passing through certain strategy so that non-targeted resource acceptor obtains new resources, greatly strengthen the body of user Test.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, this hair Bright schematic description and description is used to explain the present invention, does not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 show the resource control architecture schematic diagram of the offer of the embodiment of the present invention 1;
Fig. 2 show method and the flow signal of the resource control architecture shown in the application drawing 1 of the offer of the embodiment of the present invention 2 Figure;
Fig. 3 show the resource interaction diagrams of the offer of the embodiment of the present invention 3;
Fig. 4 show the resource interaction diagrams of the offer of the embodiment of the present invention 4;
Fig. 5 show the resource interaction diagrams of the offer of the embodiment of the present invention 5;
Fig. 6 show the resource interaction diagrams of the offer of the embodiment of the present invention 6;
Fig. 7 show the resource interaction diagrams of the offer of the embodiment of the present invention 7;
Fig. 8 show the resource interaction diagrams of the offer of the embodiment of the present invention 8;
Fig. 9 show the resource interaction diagrams of the offer of the embodiment of the present invention 9;
Figure 10 show the resource interaction diagrams of the offer of the embodiment of the present invention 10;
Figure 11 show the resource interaction diagrams of the offer of the embodiment of the present invention 11;
Figure 12 show the resource interaction diagrams of the offer of the embodiment of the present invention 12;
Figure 13 show the resource interaction diagrams of the offer of the embodiment of the present invention 13;
Figure 14 show the resource interaction diagrams of the offer of the embodiment of the present invention 14;
Figure 15 show the resource interaction diagrams of the offer of the embodiment of the present invention 15;
Figure 16 show the resource interaction diagrams of the offer of the embodiment of the present invention 16;
Figure 17 show the resource interaction diagrams of the offer of the embodiment of the present invention 17;
Figure 18 show the resource interaction diagrams of the offer of the embodiment of the present invention 18;
Figure 19 show the resource interaction diagrams of the offer of the embodiment of the present invention 19;
Figure 20 show the resource interaction diagrams of the offer of the embodiment of the present invention 20;
Figure 21 show the resource interaction diagrams of the offer of the embodiment of the present invention 21;
Figure 22 show the resource interaction diagrams of the offer of the embodiment of the present invention 22.
Embodiment
Describe the present invention in detail below with reference to accompanying drawing and in conjunction with the embodiments.It should be noted that not conflicting In the case of, the feature in embodiment and embodiment in the application can be mutually combined.
Fig. 1 show the resource control architecture schematic diagram of the offer of the embodiment of the present invention 1, including:Resource donor, resource by Body, resource management center, Resource Control Center;Wherein, it is mutual two-by-two between resource donor, resource acceptor, resource management center Connection;Resource Control Center is connected with resource donor, resource acceptor, resource management center respectively.
Wherein, resource donor is one or more;Resource acceptor is one or more.
Wherein, resource donor refers to:Resource provider;Resource acceptor is resource recipient;Resource management center is management The entity of resource;The entity that Resource Control Center interacts for control resource.
Wherein, resource donor under certain condition, can turn into resource acceptor;Resource acceptor under certain condition, can be with As resource donor.
Fig. 2 show method and the flow signal of the resource control architecture shown in the application drawing 1 of the offer of the embodiment of the present invention 2 Figure, comprises the following steps:
Step 201:Resource Control Center obtains resource control scheme;
Wherein, the mode of Resource Control Center acquisition resource control scheme is:Resource Control Center itself configures resource control System strategy or Resource Control Center from third party entity (for example:Strategy controller) middle acquisition resource control scheme.
Step 202:Resource Control Center is according to the resource control scheme of acquisition, control resource donor, resource acceptor, resource The interaction of resource between administrative center.
With reference to Fig. 3, Resource Control Center is according to the resource control scheme of acquisition, control resource donor, resource acceptor, resource The process of the interaction of resource is between administrative center:
Resource donor updates the resource for having been provided to resource acceptor and the resource of renewal is put into after resource management center, touches Send out Resource Control Center and send resource credential's request to resource acceptor;
The resource acceptor is received after resource credential's request, is obtained authorized certificate from resource management center and is notified institute State Resource Control Center;
The Resource Control Center is received after the notice, indicates that the resource management center is provided to the resource acceptor The updated resource of resource donor.
Wherein, the resource acceptor is from the approach of resource management center acquisition authorized certificate:By into resource management The heart pays certain expense, obtains the authorized certificate.
Wherein, resource donor updates the resource for having been provided to resource acceptor and the resource of renewal is put into resource management center Afterwards, triggering Resource Control Center is to the process of resource acceptor transmission resource credential request:
Resource donor updates the resource for having been provided to resource acceptor and the resource of renewal is put into after resource management center, to The Resource Control Center sends resource credential's request;
The Resource Control Center sends the resource credential to the resource acceptor and asked.
Wherein, resource donor updates the resource for having been provided to resource acceptor and the resource of renewal is put into resource management center Afterwards, triggering Resource Control Center is to the process of resource acceptor transmission resource credential request:
Resource donor updates the resource for having been provided to resource acceptor and the resource of renewal is put into after resource management center, institute State resource management center and send resource credential's request to the Resource Control Center;
The Resource Control Center sends the resource credential to the resource acceptor and asked.
Wherein, with reference to Fig. 4, Resource Control Center according to the resource control scheme of acquisition, control resource donor, resource by The process of the interaction of resource is between body, resource management center:
Resource donor updates the resource for having been provided to resource acceptor and the resource of renewal is put into after resource management center, touches Send out Resource Control Center and send resource credential's request to resource acceptor;
The resource acceptor is received after resource credential's request, and sending the resource credential to resource acceptor manager please Ask;
The resource acceptor manager is received after resource credential's request, and authorized certificate is obtained simultaneously from resource management center Notify the Resource Control Center;
The Resource Control Center is received after the notice, indicates that the resource management center is provided to the resource acceptor The updated resource of resource donor.
Wherein, resource donor updates the resource for having been provided to resource acceptor and the resource of renewal is put into resource management center Afterwards, triggering Resource Control Center is to the process of resource acceptor transmission resource credential request:
Resource donor updates the resource for having been provided to resource acceptor and the resource of renewal is put into after resource management center, institute State resource management center and send resource credential's request to the Resource Control Center;
The Resource Control Center sends the resource credential to the resource acceptor and asked.
With reference to Fig. 5, Resource Control Center is according to the resource control scheme of acquisition, control resource donor, resource acceptor, resource The process of the interaction of resource is between administrative center:
Resource donor, which updates, to be had been provided to after the resource of resource acceptor, is directly triggered Resource Control Center and is sent out to resource acceptor Resource credential is sent to ask;
The resource acceptor is received after resource credential's request, is obtained authorized certificate from resource management center and is notified institute State Resource Control Center;
The Resource Control Center is received after the notice, indicates that the resource donor provides described to the resource acceptor The updated resource of resource donor.
Resource donor, which updates, to be had been provided to after the resource of resource acceptor, is sent to Resource Control Center and is updated completion notice, Trigger Resource Control Center and send resource credential's request to resource acceptor.
Wherein, the resource donor is provided after the updated resource of resource donor to the resource acceptor, by more New resource is supplied to the resource management center to store.
With reference to Fig. 6, Resource Control Center is according to the resource control scheme of acquisition, control resource donor, resource acceptor, resource The process of the interaction of resource is between administrative center:
Resource donor, which updates, to be had been provided to after the resource of resource acceptor, is directly triggered Resource Control Center and is sent out to resource acceptor Resource credential is sent to ask;
The resource acceptor is received after resource credential's request, and sending the resource credential to resource acceptor manager please Ask;
The resource acceptor manager is received after resource credential's request, and authorized certificate is obtained simultaneously from resource management center Notify the Resource Control Center;
The Resource Control Center is received after the notice, indicates that the resource donor provides described to the resource acceptor The updated resource of resource donor.
Resource donor, which updates, to be had been provided to after the resource of resource acceptor, is sent to Resource Control Center and is updated completion notice, Trigger Resource Control Center and send resource credential's request to resource acceptor.
Wherein, the resource donor is provided after the updated resource of resource donor to the resource acceptor, by more New resource is supplied to the resource management center to store.
With reference to Fig. 7, Resource Control Center is according to the resource control scheme of acquisition, control resource donor, resource acceptor, resource The process of the interaction of resource is between administrative center:
The resource donor is provided after new resources to the resource management center, triggers the resource management center according to obtaining The resource donor taken and the resource acceptor table of comparisons, determine target resource acceptor and send the new money to the target resource acceptor Source;
If not target resource acceptor sends new resources to the Resource Control Center and asked;Then the Resource Control Center refers to Show that the non-targeted resource acceptor sends resource credential's request to the resource management center;
The resource management center is received after resource credential's request, to the non-targeted resource acceptor feedback resources with Demonstrate,prove response message;Wherein, authorized certificate information is carried in the message.
The non-targeted resource acceptor is obtained after authorized certificate, notifies the Resource Control Center;
The Resource Control Center indicates that the resource management center provides the new money to the non-targeted resource acceptor Source.
Wherein, the mode of resource donor and the resource acceptor table of comparisons that the resource management center is obtained is:The resource Administrative center itself configuration resource donor is obtained with the resource acceptor table of comparisons or by third party entity (mapping relations server) Take resource donor and the resource acceptor table of comparisons.
Wherein, in the backward resources control of resource donor and the resource acceptor table of comparisons that the resource management center is obtained The heart is sent, and carries out real-time or Timing Synchronization.
With reference to Fig. 8, Resource Control Center is according to the resource control scheme of acquisition, control resource donor, resource acceptor, resource The process of the interaction of resource is between administrative center:
The resource donor obtains new resources and resource donor with after the resource acceptor table of comparisons, determining target resource acceptor simultaneously The new resources are sent to the target resource acceptor;
If not target resource acceptor sends new resources to the Resource Control Center and asked;Then the Resource Control Center refers to Show that the non-targeted resource acceptor sends resource credential's request to the resource management center;
The resource management center is received after resource credential's request, to the non-targeted resource acceptor feedback resources with Demonstrate,prove response message;Wherein, authorized certificate information is carried in the message.
The non-targeted resource acceptor is obtained after authorized certificate, notifies the Resource Control Center;
The Resource Control Center indicates that the resource donor provides the new resources to the non-targeted resource acceptor.
Wherein, the resource donor is provided after the new resources to the non-targeted resource acceptor, and the new resources are sent out Deliver to the resource management center and stored by the resource management center.
Wherein, the mode of the acquisition of resource donor the resource donor and the resource acceptor table of comparisons is:The resource donor from The resource management center obtains the resource donor and the resource acceptor table of comparisons or the resource donor itself storage are described Resource donor and the resource acceptor table of comparisons.
Wherein, resource donor and the resource acceptor table of comparisons, as shown in table 1:
Resource donor Target resource acceptor
Resource donor 1 Resource acceptor A
Resource donor 2 Resource acceptor B
Resource donor 3 Resource acceptor C
Resource donor n Resource acceptor Z
With reference to Fig. 9, Resource Control Center is according to the resource control scheme of acquisition, control resource donor, resource acceptor, resource The process of the interaction of resource is between administrative center:
The resource donor is provided after new resources to the resource management center, triggers the resource management center according to obtaining The resource donor taken and the resource acceptor table of comparisons, determine target resource acceptor and send the new money to the target resource acceptor Source;
If not target resource acceptor obtains the new resources, then new resources request is sent to resource acceptor manager;Institute State resource acceptor manager to receive after the new resources request, sending the new resources to the Resource Control Center asks;
The Resource Control Center indicates that the resource acceptor manager sends resource credential to the resource management center Request;
The resource management center is received after resource credential's request, to the resource acceptor manager feedback resources with Demonstrate,prove response message;Wherein, authorized certificate information is carried in the message;
The resource acceptor manager is obtained after authorized certificate, notifies the Resource Control Center;
The Resource Control Center indicates that the resource management center provides the new money to the non-targeted resource acceptor Source.
With reference to Figure 10, Resource Control Center is according to the resource control scheme of acquisition, control resource donor, resource acceptor, money The process of the interaction of resource is between source control center:
The resource donor obtains new resources and resource donor with after the resource acceptor table of comparisons, determining target resource acceptor simultaneously The new resources are sent to the target resource acceptor;
If not target resource acceptor obtains the new resources, then new resources request is sent to resource acceptor manager;Institute State resource acceptor manager to receive after the new resources request, sending the new resources to the Resource Control Center asks;
The Resource Control Center indicates that the resource acceptor manager sends resource credential to the resource management center Request;
The resource management center is received after resource credential's request, to the resource acceptor manager feedback resources with Demonstrate,prove response message;Wherein, authorized certificate information is carried in the message;
The resource acceptor manager is obtained after authorized certificate, notifies the Resource Control Center;
The Resource Control Center indicates that the resource donor provides the new resources to the non-targeted resource acceptor.
Wherein, the resource donor is provided after the new resources to the non-targeted resource acceptor, and the new resources are sent out Deliver to the resource management center storage.
With reference to Figure 11, Resource Control Center is according to the resource control scheme of acquisition, control resource donor, resource acceptor, money The process of the interaction of resource is between source control center:
Resource donor updates the resource for having been provided to resource acceptor and the resource of renewal is put into after resource management center, touches Send out resource acceptor and send resource credential's request to Resource Control Center;
The Resource Control Center feedback resources voucher response message is to the resource acceptor and indicates the resource simultaneously Administrative center provides updated resource to the resource acceptor.
Wherein, the Resource Control Center feedback resources voucher response message is given before the resource acceptor, also includes:Institute State resource acceptor and certain expense is paid to the Resource Control Center.
Wherein, authorized certificate information is carried in resource credential's response message.
Wherein, resource donor updates the resource for having been provided to resource acceptor and the resource of renewal is put into resource management center Afterwards, triggering resource acceptor is to the process of Resource Control Center transmission resource credential request:
Resource donor updates the resource for having been provided to resource acceptor and the resource of renewal is put into after resource management center, provides Source control center sends resource credential's request to the resource acceptor;
The resource acceptor sends the resource credential to the Resource Control Center and asked.
With reference to Figure 12, Resource Control Center is according to the resource control scheme of acquisition, control resource donor, resource acceptor, money The process of the interaction of resource is between source control center:
Resource donor updates the resource for having been provided to resource acceptor and the resource of renewal is put into after resource management center, touches Send out resource acceptor and send resource credential's request to resource acceptor manager;
The resource acceptor manager sends resource credential's request to Resource Control Center;
The Resource Control Center feedback resources voucher response message is to the resource acceptor manager and indicates the money Source control center provides updated resource to the resource acceptor;Wherein, carry and authorize in resource credential's response message Credential information.
Wherein, resource donor updates the resource for having been provided to resource acceptor and the resource of renewal is put into resource management center Afterwards, triggering resource acceptor is to the process of resource acceptor manager transmission resource credential request:
Resource donor updates the resource for having been provided to resource acceptor and the resource of renewal is put into after resource management center, provides Source control center is sent to resource acceptor updates completion notice, and triggering resource acceptor sends resource credential to resource acceptor manager Request.
With reference to Figure 13, Resource Control Center is according to the resource control scheme of acquisition, control resource donor, resource acceptor, money The process of the interaction of resource is between source control center:
Resource donor, which updates, to be had been provided to after the resource of resource acceptor, and triggering resource acceptor sends to Resource Control Center and provided Source request for credentials;
The Resource Control Center feedback resources voucher response message is to the resource acceptor and indicates the resource simultaneously Donor provides updated resource to the resource acceptor.
Wherein, the resource donor is provided after the updated resource of resource donor to the resource acceptor, by more New resource is supplied to the resource management center to store.
Resource donor, which updates, to be had been provided to after the resource of resource acceptor, is sent to resource acceptor and is updated completion notice, triggering Resource acceptor sends resource credential's request to Resource Control Center.
With reference to Figure 14, Resource Control Center is according to the resource control scheme of acquisition, control resource donor, resource acceptor, money The process of the interaction of resource is between source control center:
Resource donor, which updates, to be had been provided to after the resource of resource acceptor, and triggering resource acceptor is sent to resource acceptor manager Resource credential asks;
The resource acceptor manager sends resource credential's request to Resource Control Center;
The Resource Control Center feedback resources voucher response message is to the resource acceptor manager and indicates the money Source donor provides updated resource to the resource acceptor;Wherein, authorized certificate is carried in resource credential's response message Information.
Wherein, the resource donor is provided after the updated resource of resource donor to the resource acceptor, by more New resource is supplied to the resource management center to store.
Resource donor, which updates, to be had been provided to after the resource of resource acceptor, is sent to resource acceptor and is updated completion notice, triggering Resource acceptor sends resource credential's request to Resource Control Center.
With reference to Figure 15, Resource Control Center is according to the resource control scheme of acquisition, control resource donor, resource acceptor, money The process of the interaction of resource is between source control center:
The resource donor is provided after new resources to the resource management center, triggers the resource management center according to obtaining The resource donor taken and the resource acceptor table of comparisons, determine target resource acceptor and send the new money to the target resource acceptor Source;
If not target resource acceptor is obtained before the new resources, resource credential's request is sent to Resource Control Center;
The Resource Control Center feedback resources voucher response message is to the non-targeted resource acceptor and indicates the money Source control center provides the new resources to the non-targeted resource acceptor.
Wherein, authorized certificate information is carried in resource credential's response message.
With reference to Figure 16, Resource Control Center is according to the resource control scheme of acquisition, control resource donor, resource acceptor, money The process of the interaction of resource is between source control center:
The resource donor obtains new resources and resource donor with after the resource acceptor table of comparisons, determining target resource acceptor simultaneously The new resources are sent to the target resource acceptor;
If not target resource acceptor is obtained before the new resources, resource credential's request is sent to Resource Control Center;
The Resource Control Center feedback resources voucher response message is to the non-targeted resource acceptor and indicates the money Source donor provides the new resources to the non-targeted resource acceptor.
Wherein, authorized certificate information is carried in resource credential's response message.
Wherein, the resource donor is provided after the new resources to the non-targeted resource acceptor, and the new resources are sent out Deliver to the resource management center storage.
With reference to Figure 17, Resource Control Center is according to the resource control scheme of acquisition, control resource donor, resource acceptor, money The process of the interaction of resource is between source control center:
The resource donor is provided after new resources to the resource management center, triggers the resource management center according to obtaining The resource donor taken and the resource acceptor table of comparisons, determine target resource acceptor and send the new money to the target resource acceptor Source;
If not target resource acceptor is obtained before the new resources, resource credential's request is sent to resource acceptor manager;
The resource acceptor manager sends resource credential's request to Resource Control Center;
The Resource Control Center feedback resources voucher response message is to the resource acceptor manager and indicates the money Source control center provides the new resources to the non-targeted resource acceptor;Wherein, carried in resource credential's response message Authorized certificate information.
With reference to Figure 18, Resource Control Center is according to the resource control scheme of acquisition, control resource donor, resource acceptor, money The process of the interaction of resource is between source control center:
The resource donor obtains new resources and resource donor with after the resource acceptor table of comparisons, determining target resource acceptor simultaneously The new resources are sent to the target resource acceptor;
If not target resource acceptor is obtained before the new resources, resource credential's request is sent to resource acceptor manager;
The resource acceptor manager sends resource credential's request to Resource Control Center;
The Resource Control Center feedback resources voucher response message is to the resource acceptor manager and indicates the money Source donor provides the new resources to the non-targeted resource acceptor;Wherein, carry and authorize in resource credential's response message Credential information.
Citing is carried out below to be described in detail:
For example:Resource donor is that teacher, resource acceptor are that student, resource management center are learning resource manager platform, money Source control centre is educational resource controller.Certainly, resource donor can also be main subject hall, and resource acceptor can also be subsidiary course Hall, is not limited here, can be according to actual situation depending on.
Teacher is updated by teacher side to be had been provided to the increment test question answer of student and puts it into learning resource manager Platform, triggering educational resource controller sends resource credential's request to student;Student is paid after certain expense, from educational resource Management platform obtains authorized certificate and notifies educational resource controller;After educational resource controller is notified, education money is indicated Source capsule platform provides the increment test question answer to student.The program can also teacher by teacher side update have been provided to After the increment test question answer of student, directly trigger educational resource controller and send resource credential's request to student;Student pays After certain expense, obtain authorized certificate from learning resource manager platform and notify educational resource controller;Educational resource is controlled After device is notified, indicate that teacher provides the increment test question answer to student.
Have been provided to the increment test question answer of student in addition, teacher is updated by teacher side and put it into educational resource Management platform, triggering educational resource controller sends resource credential to parent's client (resource acceptor manager) of student please Ask, obtaining in the case that parent agrees to, parent by resource acceptor manager, obtained from learning resource manager platform authorize with Demonstrate,prove and notify educational resource controller;Educational resource controller is received after the notice, indicates learning resource manager platform to It is raw that the increment test question answer is provided.The program can also teacher by teacher side update have been provided to student increment test Inscribe after answer, triggering educational resource controller sends resource credential to parent's client (resource acceptor manager) of student please Ask, obtaining in the case that parent agrees to, parent by resource acceptor manager, obtained from learning resource manager platform authorize with Demonstrate,prove and notify educational resource controller;Educational resource controller is received after the notice, indicates that teacher provides described increase to student It is worth test question answer.
In addition, if teacher is provided after a set of brand-new quiz and answer to learning resource manager platform, educational resource Management platform is according to the teacher and student table of comparisons of acquisition, it is determined that belonging to this class of student, then it is brand-new to send the set to this class of student Quiz and answer.If not this class of student sends the brand-new quiz of the set to educational resource controller and answer is asked, then Educational resource controller indicates that Fei Benban student sends resource credential's request to learning resource manager platform;Fei Benban student pays After certain expense, obtain authorized certificate from learning resource manager platform and notify educational resource controller;Educational resource is controlled Device indicates that learning resource manager platform provides the brand-new quiz of the set and answer to Fei Benban student.The program can also teacher After a set of brand-new quiz and answer, directly according to the teacher and student table of comparisons, it is determined that belong to this class of student, then to This class of student sends the brand-new quiz of the set and answer.It is brand-new that if not this class of student sends the set to educational resource controller Quiz and answer are asked, then educational resource controller indicates that Fei Benban student sends resource credential to learning resource manager platform Request;Fei Benban student is paid after certain expense, is obtained authorized certificate from learning resource manager platform and is notified educational resource Controller;Educational resource controller indicates that teacher provides the brand-new quiz of the set and answer to Fei Benban student.
In addition, if teacher is provided after a set of brand-new quiz and answer to learning resource manager platform, educational resource Management platform is according to the teacher and student table of comparisons of acquisition, it is determined that belonging to this class of student, then it is brand-new to send the set to this class of student Quiz and answer.If not this class of student obtains the brand-new quiz of the set and answer, pass through the first parent of parent's client New resources request is sent, if parent agrees to and pays certain expense from learning resource manager platform acquisition authorized certificate Afterwards, educational resource controller is notified;Educational resource controller indicates that learning resource manager platform provides the set to Fei Benban student Brand-new quiz and answer.The program can also teacher provide after a set of brand-new quiz and answer, directly according to religion Teacher and student's table of comparisons, it is determined that belonging to this class of student, then send the brand-new quiz of the set and answer to this class of student.If not this When class student obtains the brand-new quiz of the set and answer, new resources are sent by the first parent of parent's client and asked, if parent Agree to and pay certain expense after learning resource manager platform acquisition authorized certificate, notify educational resource controller; Educational resource controller indicates that teacher provides the brand-new quiz of the set and answer to Fei Benban student.
If in addition, teacher has updated the increment test question answer for being supplied to student and has been uploaded to learning resource manager platform Afterwards, triggering student sends resource credential's request, student's expense certain by paying, from educational resource to educational resource controller Obtained in controller after authorized certificate, educational resource controller indicates that learning resource manager platform provides more added value to student Test question answer.The increment test question answer for being supplied to student is updated if the program can also be teacher and has been uploaded to education money After source capsule platform, triggering student by parent's client to parent send resource credential ask, obtain parent agree to and On the premise of parent pays certain expense, authorized certificate is obtained from educational resource controller;Educational resource controller indicates religion Educate resource management platform and provide more added value test question answer to student.
If being supplied in addition, teacher has updated after the increment test question answer of student, student is triggered to educational resource control Device sends resource credential's request, and student's expense certain by paying is obtained after authorized certificate from educational resource controller, religion Educate resouce controller and indicate that teacher provides more added value test question answer to student.Updated if the program can also be teacher It is supplied to after the increment test question answer of student, triggering student sends resource credential to parent by parent's client and asked, Obtain parent to agree to and on the premise of parent pays certain expense, authorized certificate is obtained from educational resource controller;Education Resouce controller indicates that teacher provides more added value test question answer to student.
In addition, if teacher is provided after a set of brand-new quiz and answer to learning resource manager platform, educational resource Management platform is according to the teacher and student table of comparisons of acquisition, it is determined that belonging to this class of student, then it is brand-new to send the set to this class of student Quiz and answer.If not this class of student obtains the brand-new quiz of the set and answer, sent to educational resource controller Resource credential asks;The Fei Benban student obtains authorized certificate after certain expense is paid from educational resource controller;Religion Educate resouce controller and indicate that learning resource manager platform provides the brand-new quiz of the set and answer to student.The program can be with For:If teacher provides a set of brand-new quiz and answer and obtains the teacher and student table of comparisons, it is determined that belong to this class of student, Then the brand-new quiz of the set and answer are sent to this class of student.If not this class of student obtains the brand-new quiz of the set and answer When, send resource credential's request to educational resource controller;The Fei Benban student is after certain expense is paid, from education money Source controller obtains authorized certificate;Educational resource controller indicates that teacher provides the brand-new quiz of the set and answer to student.
In addition, if teacher is provided after a set of brand-new quiz and answer to learning resource manager platform, educational resource Management platform is according to the teacher and student table of comparisons of acquisition, it is determined that belonging to this class of student, then it is brand-new to send the set to this class of student Quiz and answer.If not this class of student obtains the brand-new quiz of the set and answer, then by parent's client to family It is long to send resource credential's request, agree to and on the premise of parent pays certain expense obtaining parent, from educational resource control Device processed obtains authorized certificate;Educational resource controller indicates that learning resource manager platform provides the set brand-new quiz to student And answer.If in addition, teacher provides a set of brand-new quiz and answer and obtains the teacher and student table of comparisons, it is determined that belonging to This class of student, then send the brand-new quiz of the set and answer to this class of student.If not this class of student obtains the survey of the set completely newly Test topic and during answer, then sending resource credential to parent by parent's client asks, parent agrees to and family draws money on credit obtaining On the premise of having paid certain expense, authorized certificate is obtained from educational resource controller;Educational resource controller indicates teacher Xiang Xue It is raw that the brand-new quiz of the set and answer are provided.
In another embodiment, with reference to Figure 19, it can be counted respectively in preset period of time according to the resource management center of the present invention (for example monthly once being counted) each resource acceptor upload resource citation times and by modification number of times;The resource Control centre obtains each money according to the citation times that the resource is obtained from the resource management center and by modification number of times Source acceptor distinguishes the corresponding superior factor of resource;Resource Control Center is according to residing for the superior factor of the resource of each resource acceptor The superior factor of resource is interval, and each resource acceptor is divided and division result is notified into resource management center;Resource management Center is in the different information of the interval resource acceptor push of the superior factor of different resource or sets different resources to use Authority.
It is secondary that being cited for the resource that each resource acceptor is uploaded in preset period of time is counted respectively in the resource management center Number and by before modification number of times, further comprising the steps of (referring to Figure 19):
If the resource acceptor changes the updated resource of resource donor or changes what the resource donor was provided New resources, then send resource upload request to the Resource Control Center;
The Resource Control Center forwards the resource upload request to the resource donor;
The resource donor is received after the resource upload request, if agreeing to upload, feedback resources upload response message To the Resource Control Center;
The Resource Control Center forwards the resource to upload response message to the resource acceptor;
The resource acceptor receives the resource and uploaded after response message, uploads the resource of modification into the resource management The heart.
In addition, after the resource donor receives the resource upload request, if refusal is uploaded, feedback refusal respond disappears Cease to the Resource Control Center.
In a concrete scene, the courseware after student A modification teacher B renewals, and send resource to Resource Control Center Upload request, the resource upload request is forwarded to the teacher B by Resource Control Center, and (teacher B is logged in can after Online class account The resource upload request is obtained, or by client proactive notification teacher B), if teacher B agrees to upload, it will have agreed to message feedback To Resource Control Center.The acceptance message is fed back to student A by Resource Control Center, student A receive the acceptance message it Afterwards, by the courseware upload of modification to resource management center, the upload to changing courseware is completed.If teacher B refusals are uploaded, instead The refusal respond message to Resource Control Center, Resource Control Center and then is sent to student A by feedback refusal respond message.
The citation times of resource can be understood as resource and be downloaded or be reprinted or be incorporated by reference data Number of times, resource can be modified mistake or be added the number of times of content by modification number of times, in the case of necessary, Resource needs to obtain author or third-party accreditation when being changed, and resource management center can just receive modification content.Resource by The superior factor of resource of body embody resource acceptor participation enthusiasm and its quality of resource is provided.According to resource by Each resource acceptor of the superior factor pair of resource of body is divided, and to be pushed away in the interval resource acceptor of the superior factor of different resource Different information or the different resources use rights limit of setting are sent, as shown in table 1 and shown in table 2.
Table 1
Wherein, the content of information pushing can flexibly be set in table 1, protection scope of the present invention not limited herein, for example: During for X >=a, the resource updated to resource acceptor M, resource acceptor N real time propelling movements;During for b≤X < a, to resource acceptor P Push the resource once updated within one week;During for X < b, the resource once updated is pushed within mono- month to resource acceptor W.
Table 2
Wherein, the content that resources use right is limited in table 2 can flexibly be set, and protection scope of the present invention is not limited herein, For example:During for X >=a, resource acceptor M, resource acceptor N access right are addressable charge interval in the money more than 100 yuan Source;During for b≤X < a, resource acceptor P access right is interval more than 10 yuan and less than or equal to 100 to may have access to charge The resource of member, during for X < b, resource acceptor W access rights are interval in the resource less than or equal to 10 yuan to may have access to charge.
Wherein, the superior factor of above-mentioned resource is obtained according to the citation times of resource and by the calculating of modification number of times, for example, provided The superior factor in source is citation times of resource and by the ratio between modification number of times.Specifically, the resource of resource acceptor is obtained The mode of the superior factor can be:
Wherein, miIt is the citation times of resource, niIt is resource by modification number of times, piBe resource it is superior because Son.
Assuming that the superior factor of resource interval boundary value a=3, b=1, the money that resource acceptor P is provided in upper Tables 1 and 2 Source W citation times are 100, are 50 by modification number of times, and the superior factor that calculating obtains the resource is 100/50=2, with reference to Table 1 understands that 2 are in b≤X < a intervals, and resource acceptor P can be obtained and be pushed senior teacher, the resource that common teachers are uploaded Qualification.Understood with reference to table 2, resource acceptor P resources use right limit is can only to access the resource before 2 months.
In another embodiment, it is secondary according to being cited for each resource according to the Resource Control Center of the present invention with reference to Figure 20 Number and the stock assessment factor that each resource is obtained by modification number of times;Resource according to residing for the stock assessment factor of each resource Evaluation factor is interval, and each resource is divided;The resource management center is interval in different resource evaluation factor Resource different service ratings are set, the different different grades of resource acceptors of service ratings correspondence, as shown in table 3:
Table 3
The division of resource acceptor in table 3 can be configured according to actual conditions, not limit the protection of the present invention herein Scope, for example:During X >=c, for resource O, resource P, the resource acceptor for obtaining the national contest first prize can be set to have Power is used;During d≤X < c, for resource Z, can set obtain the resource acceptor of the provincial contest first prize with access to;X During < d, for resource K, can set obtain the city-level contest first prize resource acceptor with access to.
In addition, Resource Control Center can obtain the stock assessment factor of each resource according to below equation:
Wherein,xiIt is the citation times of any resource, yi It is any resource by modification number of times, piIt is the stock assessment factor of any resource, n is total resources number.
Assuming that one has three resources, respectively A, B and C, it changes number of times, citation times and stock assessment factor feelings Condition is as shown in table 4 below.
Resource Citation times (x) By modification number of times (y) The stock assessment factor (m)
A 120 10 1.2
B 100 8 1.25
C 60 10 0.6
Table 4
The calculating process of the resource A stock assessment factor:
Similarly, the calculating process of the resource B stock assessment factor:
The calculating process of the resource C stock assessment factor:
Assuming that border c=1, the d=0.5 in the stock assessment factor interval in table 3, then the corresponding moneys of resource A and resource B Source service rating is one-level, and only resource acceptor of the year examination average mark more than 90 points could use resource A and resource B.And The corresponding resource service ratings of resource C are two grades, and only year examination average mark is more than 80 points and the resource less than or equal to 90 points Acceptor could use resource C.
In addition, with reference to Figure 21, resource management center transmits the fraction assessment value of each resource acceptor of collection to resource Control centre;Resource Control Center according to the interval grades of default different fractions by each resource acceptor be divided into multiple resources by Progress between body group, the corresponding resource acceptor group of high score number interval grade resource acceptor group corresponding with the interval grade of low fraction Match somebody with somebody, obtain mutual assistance group, and mutual assistance group's information is notified into each resource acceptor;In Resource Control Center statistics preset period of time in mutual assistance group The corresponding resource acceptor group of the interval grade of low fraction in resource acceptor disengaging rate;If the resource acceptor disengaging rate in mutual assistance group More than preset value, then trigger resource acceptor of the resource management center into the corresponding resource acceptor group of high score number interval grade and push Corresponding information.
Wherein, high score number interval grade corresponding resource acceptor group resource acceptor group corresponding with low fraction interval grade Between matched, obtain mutual assistance group process be:
If being the interval grade of the first fraction, the interval grade of the second fraction, the 3rd fraction interval by the interval grade classification of fraction The interval grade of grade, the 4th fraction;Wherein, interval fraction intervals of grade > the 3rd of the first fraction interval the second fractions of grade > etc. The interval grade of level > the 4th fractions;
The corresponding resource acceptor group of first fraction interval grade resource acceptor group corresponding with the interval grade of the 4th fraction ties Close, form mutual assistance group, the second fraction interval grade corresponding resource acceptor group resource corresponding with the 3rd fraction interval grade by Body group combine, and forms mutual assistance group;Or the second corresponding resource acceptor group of the interval grade of fraction and the interval grade pair of the 4th fraction The resource acceptor group answered combines, and forms mutual assistance group, and the corresponding resource acceptor group of the first fraction interval grade and the 3rd fraction are interval Grade corresponding resource acceptor group combine, and forms mutual assistance group;Or first the corresponding resource acceptor group of the interval grade of fraction with the Two fractions interval grade corresponding resource acceptor group combine, and forms mutual assistance group, the corresponding resource acceptor of the 3rd fraction interval grade Group resource acceptor group corresponding with the interval grade of the 4th fraction combines, and forms mutual assistance group.
Assuming that the corresponding resource acceptor group of the first fraction interval grade resource acceptor corresponding with the interval grade of the 4th fraction Group combines, and forms mutual assistance group, the corresponding resource acceptor group of the second fraction interval grade money corresponding with the interval grade of the 3rd fraction Source acceptor group combines, and forms mutual assistance group, as shown in table 5 below:
Table 5
As shown in table 5:Resource acceptor into mutual assistance group in high score number interval pushes corresponding information and can also be it Its information, does not limit protection scope of the present invention, for example herein:During X > a, the resource that teacher of a special classification uploads is pushed;0≤X < During a, the resource that senior teacher uploads is pushed.
Assuming that in a preferred embodiment, the fraction assessment value of resource acceptor is, for example, the exam score of student, according to pre- If exam score interval grade student is divided into multiple students groups, such as shown in table 6:
Fraction interval (Z) Fraction interval grade Student group
90 < Z≤100 Grade one Student group A
80 < Z≤90 Grade two Student group B
60 < Z≤80 Grade three Student group C
Z≤60 Grade four Student group D
Table 6
By student group A and student group D be combined into mutual assistance group W1, by student group B and student group C be combined into mutual assistance group W2 ( Student group A and student group B can be combined into mutual assistance group W3, student group C and be combined into mutual assistance group W4 with student group D).So, learn Raw group A and student's group's D-shaped are into mutual side pair, student group B and student group C-shaped into mutual side pair.
After having new exam score input, counted again, the student in student group D was likely to enter originally Student in raw group B or C, student group C is likely to enter student group A.For example for mutual assistance group:Student group A and student group D.Learn There are 8 students in raw group D, wherein there are 2 students to be included in next sub-distribution in student group C, thus can calculate mutual assistance Resource acceptor disengaging rate in group W1 middle school student group D is 2/8=0.25.
If the a=0.2 in table 5, then student group A and the student group D mutual assistance groups disengaging rate 0.25 are more than a, according to Table 5 understands that student of the resource management center into student group A pushes the stock assessment factor, and (R value can be according to reality more than R Situation set) resource.Or, the resource acceptor in the corresponding resource acceptor group of high score number interval grade can also be made to obtain most High resources use right limit, or when having new resources or updating optimal resource, new resources or the optimal resource supplying of renewal are given The corresponding resource acceptor group of the high score number interval grade.
In another embodiment, with reference to Figure 22, resource management center is by the fraction assessment value of each resource acceptor of collection Transmit to Resource Control Center;Each resource acceptor is divided into by Resource Control Center according to the interval grade of default different fractions Multiple resource acceptor groups, the corresponding resource acceptor group of high score number interval grade resource acceptor group corresponding with the interval grade of low fraction Between matched, obtain mutual assistance group;Low fraction interval in Resource Control Center statistics preset period of time in the mutual assistance group etc. Resource acceptor disengaging rate in the corresponding resource acceptor group of level;If the resource acceptor disengaging rate in mutual assistance group is more than preset value, Resource Control Center is that the resource acceptor in the corresponding resource acceptor group of high score number interval grade sets highest resource access right Limit and priority assignation result is pushed to resource management center;Resource management center controls balloon score according to priority assignation result Resource acceptor in the corresponding resource acceptor group of interval grade conducts interviews to the resource in resource management center.
Understood with reference to reference table 6:If student group A and student group D are combined into mutual assistance group W1, by student group B and student group C It is combined into mutual assistance group W2.
Table 7
Assuming that a=1 in table 7, for mutual assistance group:Student group A and student group D, calculate with the mutual assistance group middle school student group D pairs The disengaging rate answered is 2/8 (has 8 students, wherein there is 2 students to be included in student group C in next sub-distribution in student group D In, the resource acceptor disengaging rate that thus can be calculated in mutual assistance group W1 middle school student group D is 2/8=0.25), the disengaging rate is less than 1, Table 7 is then combined to understand, the resource in high score number interval grade corresponding resource acceptor group (i.e. student crowd A) in mutual assistance group by The resource access rights of body are to look at and reprinted.That is the student in student group A is enjoyed to the checking of resource, the power of reprinting Limit.
Compared to prior art, the method for the resource control architecture provided according to the present invention and the application framework is realized The fine-grained management of resource.
In addition, can mutually be converted between resource donor, resource acceptor in scheme so that the scope of application of scheme is more Extensively, the experience of user is enhanced.
In addition, controlling the granting and resources centralized management of authorized certificate or by resource control by resource management center in scheme The granting of control authorized certificate in center processed and resources control, rather than authorized certificate is managed by single third party entity, significantly The interaction between system signaling is reduced, system resource has been saved, the communication efficiency of system is improved, greatly strengthen user's Experience.
In addition, the resource acceptor by paying certain expense to the resource management center, obtain it is described authorize with The mode of card, has increased the income of system operator.
In addition, by the setting of resource acceptor manager, realizing and having carried out certain monitoring to the behavior of resource acceptor, keep away The loss that the behavior of resource acceptor is brought to resource acceptor manager is exempted from.
In addition, passing through certain strategy so that non-targeted resource acceptor obtains new resources, greatly strengthen the body of user Test.
In addition, high-quality resource and high-quality resource donor (or resource acceptor) are obtained according to the service condition of resource, so that High-quality resource donor can be made to use high-quality resource, the utilization rate of resource is improved.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent, improvement etc., should be included within the scope of the present invention.

Claims (4)

1. a kind of method that application resource controls framework, it is characterised in that resource control architecture include resource donor, resource by Body, resource management center, Resource Control Center;Wherein, it is mutual two-by-two between resource donor, resource acceptor, resource management center Connection;Resource Control Center is connected with resource donor, resource acceptor, resource management center respectively, and method comprises the following steps:
Resource Control Center obtains resource control scheme;
Resource Control Center is controlled between resource donor, resource acceptor, resource management center according to the resource control scheme of acquisition The interaction of resource;
The resource management center transmits the fraction assessment value of each resource acceptor of collection to the Resource Control Center;
Each described resource acceptor is divided into multiple moneys by the Resource Control Center according to the interval grade of default different fractions Enter between source acceptor group, the corresponding resource acceptor group of high score number interval grade resource acceptor group corresponding with the interval grade of low fraction Row matching, obtains mutual assistance group;
The corresponding resource acceptor of the interval grade of low fraction in the Resource Control Center statistics preset period of time in the mutual assistance group Resource acceptor disengaging rate in group;
If the resource acceptor disengaging rate in the mutual assistance group is more than preset value, the resource management center is triggered to balloon score area Between resource acceptor in grade corresponding resource acceptor group push corresponding information.
2. according to the method described in claim 1, it is characterised in that:High score number interval grade corresponding resource acceptor group with low point Matched between the corresponding resource acceptor group of number interval grade, the process for obtaining mutual assistance group is:
If by the interval grade classification of fraction be the interval grade of the first fraction, the interval grade of the second fraction, the interval grade of the 3rd fraction, 4th fraction interval grade;Wherein, the interval grade > of the interval fractions of grade > the 3rd of the first fraction interval the second fractions of grade > 4th fraction interval grade;
The corresponding resource acceptor group of first fraction interval grade resource acceptor group corresponding with the interval grade of the 4th fraction combines, shape Into mutual assistance group, the corresponding resource acceptor group of the second fraction interval grade resource acceptor group corresponding with the interval grade of the 3rd fraction ties Close, form mutual assistance group;
Or
The corresponding resource acceptor group of second fraction interval grade resource acceptor group corresponding with the interval grade of the 4th fraction combines, shape Into mutual assistance group, the corresponding resource acceptor group of the first fraction interval grade resource acceptor group corresponding with the interval grade of the 3rd fraction ties Close, form mutual assistance group;
Or
The corresponding resource acceptor group of first fraction interval grade resource acceptor group corresponding with the interval grade of the second fraction combines, shape Into mutual assistance group, the corresponding resource acceptor group of the 3rd fraction interval grade resource acceptor group corresponding with the interval grade of the 4th fraction ties Close, form mutual assistance group.
3. according to the method described in claim 1, it is characterised in that:The resource acceptor disengaging rate refers to the interval grade of low fraction Resource acceptor in corresponding resource acceptor group departs from the quantity resource acceptor group corresponding with the interval grade of low fraction of mutual assistance group In whole acceptor quantities ratio.
4. according to the method described in claim 1, it is characterised in that:If the resource acceptor disengaging rate in the mutual assistance group is more than pre- If value, then the Resource Control Center sends information pushing request to the resource management center;Wherein, described information, which is pushed, asks Seek the resource acceptor information carried in the corresponding resource acceptor group of high score number interval grade;
The resource management center receives described information and pushed after request, into the corresponding resource acceptor group of high score number interval grade Resource acceptor push corresponding information.
CN201710092668.7A 2014-08-01 2014-10-08 Application method of resource control architecture Expired - Fee Related CN106941417B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201410377750 2014-08-01
CN2014103777500 2014-08-01
CN201410524320.7A CN104320380B (en) 2014-08-01 2014-10-08 Resource control architecture and application method of architecture

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201410524320.7A Division CN104320380B (en) 2014-08-01 2014-10-08 Resource control architecture and application method of architecture

Publications (2)

Publication Number Publication Date
CN106941417A true CN106941417A (en) 2017-07-11
CN106941417B CN106941417B (en) 2020-07-17

Family

ID=52375551

Family Applications (4)

Application Number Title Priority Date Filing Date
CN201710092669.1A Expired - Fee Related CN106789364B (en) 2014-08-01 2014-10-08 Method for applying resource control architecture
CN201410524320.7A Expired - Fee Related CN104320380B (en) 2014-08-01 2014-10-08 Resource control architecture and application method of architecture
CN201710092857.4A Pending CN106789365A (en) 2014-08-01 2014-10-08 A kind of method that application resource controls framework
CN201710092668.7A Expired - Fee Related CN106941417B (en) 2014-08-01 2014-10-08 Application method of resource control architecture

Family Applications Before (3)

Application Number Title Priority Date Filing Date
CN201710092669.1A Expired - Fee Related CN106789364B (en) 2014-08-01 2014-10-08 Method for applying resource control architecture
CN201410524320.7A Expired - Fee Related CN104320380B (en) 2014-08-01 2014-10-08 Resource control architecture and application method of architecture
CN201710092857.4A Pending CN106789365A (en) 2014-08-01 2014-10-08 A kind of method that application resource controls framework

Country Status (2)

Country Link
CN (4) CN106789364B (en)
WO (2) WO2016015363A1 (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016015366A1 (en) * 2014-08-01 2016-02-04 苏州阔地网络科技有限公司 Resource control architecture based on identity service identifier, and method using said architecture
WO2016015363A1 (en) * 2014-08-01 2016-02-04 苏州阔地网络科技有限公司 Resource control architecture, and method using said architecture
CN108717314A (en) * 2018-05-08 2018-10-30 南京思达捷信息科技有限公司 A kind of control framework under cosmetics and its method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1371510A (en) * 1999-06-30 2002-09-25 布莱克勃德股份有限公司 Internet-based education support system and methods
CN101174326A (en) * 2007-11-16 2008-05-07 广东工业大学 Project training management system
CN101854387A (en) * 2010-05-14 2010-10-06 中国科学院计算技术研究所 P2P flow optimization method and system based on distributed index server architecture
CN101931534A (en) * 2010-08-30 2010-12-29 中兴通讯股份有限公司 Management method and device of operator resource usage license
CN102130949A (en) * 2011-03-10 2011-07-20 肖智刚 User contribution-based method and system for sharing personalized digital resources
CN103078859A (en) * 2012-12-31 2013-05-01 普天新能源有限责任公司 Service system authority management method, equipment and system

Family Cites Families (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6957261B2 (en) * 2001-07-17 2005-10-18 Intel Corporation Resource policy management using a centralized policy data structure
US7188364B2 (en) * 2001-12-20 2007-03-06 Cranite Systems, Inc. Personal virtual bridged local area networks
US8091088B2 (en) * 2005-02-22 2012-01-03 Microsoft Corporation Method and system for hierarchical resource management involving hard and soft resource limits
EP2127300B1 (en) * 2007-01-26 2018-04-18 InterDigital Technology Corporation Method and apparatus for securing location information and access control using the location information
CN101276269B (en) * 2007-03-30 2010-05-19 上海众恒信息产业股份有限公司 Expandable resource management platform
CN101282281B (en) * 2007-04-03 2011-03-30 华为技术有限公司 Medium distributing system and apparatus as well as flow medium play method
CN100574236C (en) * 2007-06-22 2009-12-23 华中科技大学 Heterogeneous medical information integrated system based on the HL7 acting server
CN101478398B (en) * 2009-01-07 2010-12-22 中国人民解放军信息工程大学 Authorization management system oriented to resource management and establishing method
CN101699819B (en) * 2009-11-13 2012-07-25 中国电信股份有限公司 Method and system for managing digital rights
CN101951375B (en) * 2010-09-21 2014-02-19 北京信息科技大学 Trust assessment-based adaptive trust negotiation system and method
CN102104501A (en) * 2011-03-30 2011-06-22 天津大学 Campus network service system
CN102708464A (en) * 2012-05-18 2012-10-03 苏州慧飞信息科技有限公司 Teaching resource management system
CN102789494B (en) * 2012-07-11 2015-08-05 深圳市宜搜科技发展有限公司 A kind of disposal route of Internet resources duplicate removal and system
WO2016015363A1 (en) * 2014-08-01 2016-02-04 苏州阔地网络科技有限公司 Resource control architecture, and method using said architecture

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1371510A (en) * 1999-06-30 2002-09-25 布莱克勃德股份有限公司 Internet-based education support system and methods
CN101174326A (en) * 2007-11-16 2008-05-07 广东工业大学 Project training management system
CN101854387A (en) * 2010-05-14 2010-10-06 中国科学院计算技术研究所 P2P flow optimization method and system based on distributed index server architecture
CN101931534A (en) * 2010-08-30 2010-12-29 中兴通讯股份有限公司 Management method and device of operator resource usage license
CN102130949A (en) * 2011-03-10 2011-07-20 肖智刚 User contribution-based method and system for sharing personalized digital resources
CN103078859A (en) * 2012-12-31 2013-05-01 普天新能源有限责任公司 Service system authority management method, equipment and system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨荣星 等: "《对开放教育学习小组的组建、效果及其作用的思考》", 《山西广播电视大学学报》 *

Also Published As

Publication number Publication date
CN106789365A (en) 2017-05-31
CN106941417B (en) 2020-07-17
WO2016015498A1 (en) 2016-02-04
WO2016015363A1 (en) 2016-02-04
CN104320380A (en) 2015-01-28
CN106789364A (en) 2017-05-31
CN104320380B (en) 2017-05-17
CN106789364B (en) 2020-05-08

Similar Documents

Publication Publication Date Title
CN104766255A (en) Course matching and supporting interactive management system and method for supporting terminals
CN109858908A (en) Alliance's chain building method, method of commerce and distributed supply chain system
CN109785200A (en) It answers questions method, equipment and storage medium
CN107657522B (en) A kind of construction site labour and capital management method
CN104243219B (en) A kind of resources control framework of identity-based service identification and apply this framework method
CN104320380B (en) Resource control architecture and application method of architecture
CN108876323A (en) A kind of Intelligent campus management system and method
Bissell The digital divide dilemma: Preserving Native American culture while increasing access to information technology on reservations
Aji et al. Bridging communication between public and government: a case study on kim surabaya
Bashir Connecting Africa’s Universities to Affordable High-Speed Broadband Internet: What Will it Take?
Chandra et al. Closing the Digital Divide in US Education—for Good
CN108154293A (en) A kind of Urban Data maturity appraisal procedure and system
CN106204370B (en) Interaction management method, interaction management platform and interaction management system
Daly The Diffusion of New Technologies: Community Online Access Centre in Indigenous Communities in Australia
CN105719207A (en) Finely intelligent homework score data generating method and system in SPOC platform
KR101766718B1 (en) Method for Providing Language Exchange Service and Language Teaching Service using Application
Chute Strategies for implementing teletraining systems
CN105050127B (en) The standby starting control method of calamity and system
CN109948894A (en) A kind of Web Course Selection-Arrangement system
Wei et al. The Open University of China and Chinese approach to a sustainable and learning society
Kamel ICT4D
Das et al. Mixed-methods study to validate and refine the'Strategic Healthcare Implementation Framework for Task Shifting, Sharing and Resource Enhancement'(SHIFT-SHARE)
Megdal The benefits of state regulation
Winslade et al. A Shared Responsibility: Working Together to Develop Professional Learning Opportunities for Professional-Experience Supervising Teachers
Emerson Integration and Needed Capacities for Hybrid Governance Arrangements

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200717

Termination date: 20201008