CN106939658A - A kind of frame concealed curtain wall modernization system - Google Patents

A kind of frame concealed curtain wall modernization system Download PDF

Info

Publication number
CN106939658A
CN106939658A CN201710218903.0A CN201710218903A CN106939658A CN 106939658 A CN106939658 A CN 106939658A CN 201710218903 A CN201710218903 A CN 201710218903A CN 106939658 A CN106939658 A CN 106939658A
Authority
CN
China
Prior art keywords
frame
curtain wall
glass
auxiliary frame
concealed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710218903.0A
Other languages
Chinese (zh)
Other versions
CN106939658B (en
Inventor
徐喜平
冯华晟
朱小琴
陈曙凌
卞锦卫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Upper Marine Jian Dongfu Investment And Development Co Ltd
Original Assignee
Upper Marine Jian Dongfu Investment And Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Upper Marine Jian Dongfu Investment And Development Co Ltd filed Critical Upper Marine Jian Dongfu Investment And Development Co Ltd
Priority to CN201710218903.0A priority Critical patent/CN106939658B/en
Publication of CN106939658A publication Critical patent/CN106939658A/en
Application granted granted Critical
Publication of CN106939658B publication Critical patent/CN106939658B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/885Curtain walls comprising a supporting structure for flush mounted glazing panels

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention discloses a kind of frame concealed curtain wall modernization system, it includes the doubling glass that the outside of former frame concealed curtain wall is installed on by auxiliary frame structure, and the auxiliary frame structure is connected to by the first tension member in the frame structure of former frame concealed curtain wall.The force structure of the present invention is to utilize original frame concealed curtain wall structural system for main force structure system, by the additional auxiliary frame structure of former frame concealed curtain wall, being transformed into safe and reliable concealed frame glass curtain wall.It is effectively to prevent potential safety hazard in transformation process, complete hidden frame glass can be transformed into perpendicular bright half concealed frame glass curtain wall of hidden horizontal stroke, half concealed frame glass curtain wall of one of bright hidden half concealed frame glass curtain wall, two kinds of patterns of horizontal stroke is erected by setting pressing plate.

Description

A kind of frame concealed curtain wall modernization system
Technical field
The present invention relates to frame concealed curtain wall field, more particularly to a kind of full frame concealed curtain wall modernization system.
Background technology
Shanghai had for more than 30 years so far from the First glass-wall building Joint Venture Building eighties in last century, and to glass curtain The power conservation requirement of wall was performed in 2003《Glass Curtain Wall Projects technical specification》Middle just proposition.Namely in this regulation enforcement The used glass curtain wall of building is built in preceding more than two decades and is non-energy-conserving product, building energy conservation can not be met already so far It is required that.It is larger to building energy consumption and indoor comfortable qualitative effects and glass curtain wall area is big, pursuing efficient, comfortable, energy-conservation Instantly, progress is needed in the reducing energy consumption of existing glass curtain wall badly for operation.
On the other hand the full concealed frame glass curtain wall that many early stages build is through the existing uncertain peace of the use of twenties years Full hidden danger, including structure glue bonding are all needed to check again for detection by force intensity, degree of aging etc., confirm that function ability to bear can It is safe to use.In recent years due to structure glue used failure cause glass to fall, device for fixing glass curtain wall failure etc. reason, led Cause occur a lot of high-altitude rapid drawdown " glass rain " events, cause to damage thing, loss of hurting sb.'s feelings, serious harm public safety.Particularly in early days Simple facade aesthetic of pursuing has built a large amount of full concealed frame glass curtain walls, due to the structure construction features of its complete hidden frame, glass It is particularly easy to come off.Shanghai City issue in 2012《Shanghai City building curtain wall engineering legislation》Complete hidden frame glass is completely forbidden The use of glass curtain wall, it is therefore desirable to pay close attention to original concealed frame glass curtain wall construction connected mode, it is ensured that meet existing specification regulation, change Making ensures its security.
Curtain wall transformation simultaneously takes into account owner's interests, it is ensured that normal use for not influenceing to build major function in transformation is also to need The importance to be explored to modification measures and method.
Reducing energy consumption concern at present to glass curtain wall is less, and the glass curtain wall in reconstruction of existing building is generally to remove weight Build, cause the waste of resource, while also the normal of influence existing building is used.Research to glass curtain wall focuses mostly in newly-built curtain On wall construction Construction treatment, the exploitation of special curtain wall construction system, curtain-wall energy-saving construction is improved, does not influence building normally to use The modification measures of function and take into account structure safety energy-conserving reconstruction method research still be blank.
The content of the invention
For above-mentioned situation, the problem of present invention is intended to solve is to provide a kind of frame concealed curtain wall modernization system, curtain of the invention Wall modernization system fills out the blank of white prior art, real to realize the renewal and reform for not tearing original decorative curtain wall open, meets it existing Specification is provided, existing use standard is reached in safety, energy-conservation.
To achieve the above object, the present invention uses following organization plan:A kind of frame concealed curtain wall modernization system, it includes:It is logical The doubling glass that auxiliary frame structure is installed on the outside of former frame concealed curtain wall is crossed, the auxiliary frame structure is connected to original by the first tension member In the frame structure of frame concealed curtain wall.
In certain embodiments, isolated between the auxiliary frame structure and former frame concealed curtain wall using the first rubber strip.
In certain embodiments, the side towards former frame concealed curtain wall of the auxiliary frame structure is provided with caulking groove, described first First side of rubber strip is embedded in the caulking groove, and the second side of first rubber strip fits in the surface of former frame concealed curtain wall.
In certain embodiments, the doubling glass is bonded in the auxiliary frame structure using structure glue.
In certain embodiments, the auxiliary frame structure includes the first auxiliary frame and the second auxiliary frame, first auxiliary frame and described Second auxiliary frame is detachably connected.
In certain embodiments, first auxiliary frame and second auxiliary frame are respectively connected on a doubling glass, and connection Glass piece is formed between the doubling glass in first auxiliary frame and the doubling glass being connected in second auxiliary frame.
In certain embodiments, the glass piece is filled using weather proofing sealant.
In certain embodiments, the frame concealed curtain wall modernization system also includes pressing plate, and the pressing plate is covered in the glass The outside of piece, and the pressing plate is connected in the auxiliary frame structure by the second tension member.
In certain embodiments, the outside of the pressing plate is provided with deckboard, and the deckboard is covered in described second The end of tension member.
In certain embodiments, isolated between the pressing plate and the doubling glass using the second rubber strip.
Using above-mentioned technical proposal, force structure is to utilize original frame concealed curtain wall structural system for main force structure system, is led to Cross in the additional auxiliary frame structure of former frame concealed curtain wall, be transformed into safe and reliable concealed frame glass curtain wall.It is effective Du in transformation process Exhausted potential safety hazard, can be transformed into perpendicular bright half concealed frame glass curtain wall of hidden horizontal stroke by complete hidden frame glass, erects bright horizontal stroke hidden half by setting pressing plate Half concealed frame glass curtain wall of one of two kinds of patterns of concealed frame glass curtain wall.
Brief description of the drawings
Technical scheme in order to illustrate more clearly the embodiments of the present invention, below will be to that will make needed for embodiment description Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for For those of ordinary skill in the art, on the premise of not paying creative work, other can also be obtained according to these accompanying drawings Accompanying drawing.
Fig. 1 is the cross-sectional configuration node overview of full concealed frame glass curtain wall at present.
Fig. 2 is the vertical profile structure node view of full concealed frame glass curtain wall at present.
Fig. 3 be embodiments of the invention in frame concealed curtain wall modernization system perpendicular frame concealed curtain wall cross-sectional configuration node overview.
Fig. 4 be Fig. 3 in auxiliary frame structure schematic diagram.
Fig. 5 illustrates for the front of the doubling glass of the single plate of the frame concealed curtain wall modernization system in embodiments of the invention Figure.
Fig. 6 be Fig. 5 in doubling glass top schematic diagram.
Fig. 7 be Fig. 5 in doubling glass side schematic view.
Fig. 8 be embodiments of the invention in frame concealed curtain wall modernization system perpendicular Curtain wall with open frame cross-sectional configuration node overview.
Fig. 9 be embodiments of the invention in frame concealed curtain wall modernization system horizontal frame concealed curtain wall cross-sectional configuration node overview.
Figure 10 be embodiments of the invention in frame concealed curtain wall modernization system horizontal Curtain wall with open frame cross-sectional configuration node overview.
In figure, 1- pair frames, 2- glass, 3- fluid sealants, 4- weather proofing sealants, the bolts of 5- first, 6- spacing pressing plates, 7- second Bolt, 8- stiles, 9- crossbeams, 10- corner braces, 11- supporting plates, 12- isolation rubber strips, the bolts of 13- the 3rd, 14- holdfasts, 15- doublings Glass, 16- auxiliary frame structures, the auxiliary frames of 161- first, the auxiliary frames of 162- second, the rubber strips of 163- the 3rd, the tension members of 17- first, 18- One rubber strip, 181- caulking grooves, 19- structure glues, 20- weather proofing sealants, 21- pressing plates, the tension members of 22- second, 23- deckboards, The rubber strips of 24- second.
Embodiment
Illustrate embodiments of the present invention below by way of specific instantiation, those skilled in the art can be by this specification Disclosed content understands other advantages and effect of the present invention easily.The present invention can also pass through specific realities different in addition The mode of applying is embodied or practiced, the various details in this specification can also based on different viewpoints with application, without departing from Various modifications or alterations are carried out under the spirit of the present invention.
Below in conjunction with the accompanying drawings and specific embodiment does to the present invention and further described in detail.
First, refering to shown in Fig. 1 and Fig. 2, it is shown that a kind of construction of concealed frame glass curtain wall complete at present, it is mainly:Curtain Frame of the positive facade of wall without curtain wall construction system, frame are exposed.Conventional complete hidden circle frame tectonic type is that stile 8 passes through the second bolt 7 By aluminium alloy corner brace 10 beaer framework is mutually fixedly connected into crossbeam 9.Pass through the 3rd bolt 13 between crossbeam 9 and corner brace 10 It is connected, is fixed into transverse beam assembly unit.The secondary frame 1 of glass lower end is externally provided with by holding that rivet 14 is connected at cruciform bracing 9 Heavy glass supporting plate 11.To ensure that the secondary frame 1 of glass avoids the occurrence of the situation of noise under stressing conditions, in the inner side of secondary frame 1 and horizontal stroke Isolation rubber strip 12 is set, and glass 2 is bonded using silicone structure sealant 3 with aluminum alloy auxiliary frame 1, in dustless, guarantor between beam 9 The warm workshop of wet, weighing apparatus is solidified into glass plate unit, and spacing pressing plate 6, locking glass pair frame 1, so as to reach are fixed by the first bolt 5 Come off to preventing that glass from forming in the case of the external force such as blast, external force is effectively delivered to by glass on curtain wall main frame, Form whole stress transmittance process.The gravity laod of curtain wall is to be supported by horizontal frame front glass lower end with the secondary frame 1 of supporting plate 11, glass Gap control is filled in more than 15mm using weather proofing sealant 4 between glass 2 and glass 2, forms waterproof and antiseepage system;Gap Size can meet the displacement performance under thermal expansion again, it is ensured that occur without hard collision, and from ensuring the safety in utilization of glass Energy.
However, above-mentioned this outmoded full concealed frame glass curtain wall uses the upper LOW-E for not using and having power saving function in glass Glass, energy consumption is especially severe, and advocating environmental protection with existing country is not consistent;More than two layers complete hidden frame glass of other Old building Glass outer, majority selects monolithic glass, in the case of by aging and self-destruction, and easily draws into glass rain phenomenon.Old There is many unsafe factors in full concealed frame glass curtain wall, therefore the complete hidden frame glass of transformation is also just into the research direction of prediction.
Exist for above-mentioned full concealed frame glass curtain wall or the implicit weak point existed, provided in embodiments of the invention A kind of frame concealed curtain wall modernization system, with reference to shown in Fig. 3 and Fig. 4, the frame concealed curtain wall modernization system in the present embodiment mainly includes:It is attached Mount structure 16 and the two parts of doubling glass 15.Wherein, doubling glass 15 is installed on the glass of former frame concealed curtain wall by auxiliary frame structure 16 The outside of glass 2, auxiliary frame structure 16 is further connected in the frame structure of former frame concealed curtain wall by the first tension member 17.
Specifically, doubling glass 15 be by two panels or divided glass, between pressed from both sides in the middle of one or more layers organic polymer Film, after special high temperature precompressed (or vacuumizing) and high-temperature high-pressure craft processing, makes glass and the intermediate coat permanent adhesive be The compound glass product of one.The intermediate coat of conventional doubling glass has:PVB, SGP, EVA, PU etc..
The structures shape of doubling glass 15 its have the advantage that:Even if doubling glass fragmentation, fragment can also be bonded to thin On film, broken glass surface still keeps clean and tidy smooth, and this just effectively prevent the generation that fall event was stabbed and penetrated to fragment, It ensure that personal safety.Therefore, one layer of doubling glass 15 is set in the outside of glass 2 of former frame concealed curtain wall, as in former hidden frame curtain The outside of glass 2 of wall is provided with one layer of protective cover, on the one hand, can avoid glass 2 in the case of by aging and self-destruction, draw into Glass rain phenomenon and trigger and injure by a crashing object, pound damage accident, on the other hand, the self deterioration of doubling glass 15, it is impaired after, even if fragmentation is not yet Fragment can be triggered to stab and penetrate the generation of fall event, especially in high-rise or high-rise building, with quite significant peace All-round excellent gesture.
The selection of doubling glass 15 in the present embodiment:For energy-saving index requirement, glass membrane system is chosen offline can tempering LOW-E membrane systems, glass types choose toughened rubber-laminated vacuum glass.Doubling glass 15 can be bonded in auxiliary frame structure 16 using structure glue 19 On, and it is ensured that be firmly bonded between the two, will not come off easily, structure glue 19 can use silicone structure sealant.
Auxiliary frame structure 16 in the present embodiment selects aluminium alloy auxiliary frame.
The first tension member 17 in the present embodiment can use bolt, and its first end be fixedly connected on auxiliary frame structure 16, and it the Two ends pass through the gap of the glass 2 of former frame concealed curtain wall and are fixedly connected on the frame structure of former frame concealed curtain wall, and frame structure is as former The column 8 or crossbeam 9 of frame concealed curtain wall.Second end of the first tension member 17 also can be connected its secondary frame with being used in former frame concealed curtain wall 1 and the first bolt 5 of column 8 be connected, can be by the way of welding or nut connection come first tension member 17 that is connected With the first bolt 5.
The force structure of frame concealed curtain wall modernization system in embodiments of the invention is to utilize former full frame concealed curtain wall structure It is for main force structure system, by adding auxiliary frame structure and doubling glass outside former frame concealed curtain wall, to be transformed into safe and reliable Concealed frame glass curtain wall structure.Original force structure resource is made full use of, improvement cost cost is saved, not to existing building Stop production to stop work under use premise and carry out transformation renovation.
Auxiliary frame structure 16 in the embodiment of the present invention is further using the first auxiliary frame 161 and the second auxiliary frame being detachably connected 162 are constituted, wherein, the mode of being detachably connected can be socket connection, buckled connection or other easy-to-mount connected modes. First auxiliary frame 161 and the second auxiliary frame 162 are respectively connected on a doubling glass 15, and the doubling glass being connected in the first auxiliary frame 161 Glass piece is formed between glass 15 and the doubling glass 15 being connected in the second auxiliary frame 162.It is attached by the first auxiliary frame 161 and second Being detachably connected for frame 162, can facilitate the dismounting and replacing of doubling glass 15, after certain block or the damage of some doubling glass, All changed without face glass curtain wall, only need to change, repair impaired doubling glass, it is cost-effective also to improve repairing effect Rate.Further, it can be filled, reached anti-using weather proofing sealant 20 in the glass piece for the adjacent doubling glass that assembly is completed Water anti-leakage function.
With reference to shown in Fig. 3 and Fig. 4, in the present embodiment, the first auxiliary frame 161 of auxiliary frame structure is removable with the second auxiliary frame 162 Unload and be connected as mutual snapping, the middle part of the first auxiliary frame 161 is connected to the frame structure of former frame concealed curtain wall by the first tension member 17 (column 8 or crossbeam 9), the both sides of the first auxiliary frame 161 are respectively formed with a horizontal U-shaped body, and two U-shaped body openings are relative, such as Fig. 4 Shown, and opening of the opening slightly larger than the U-shaped body on the left of it of the U-shaped body on right side, the second auxiliary frame 162 is also horizontal U-shaped in one Body, relative with the opening of the U-shaped body in the left side of the first auxiliary frame 161 and mutual snapping that is open of the second auxiliary frame 162, and at both Snapping at quarantine measures are carried out using the 3rd rubber strip 163, the 3rd rubber strip 163 can be fixed in the second auxiliary frame 162, and with Second auxiliary frame 162 is buckled in the first auxiliary frame 161 and entered in the first auxiliary frame 161, to the first auxiliary frame 161 and the second auxiliary frame 162 Buffer action is played, under the stressing conditions of the first auxiliary frame 161 and the second auxiliary frame 162, noise-proofing purpose is can reach.First drawknot Part 17 uses bolt, and bolt is arranged in the middle part of the first auxiliary frame 161, for the first auxiliary frame 161 to be connected into former frame concealed curtain wall In frame structure, wherein, the first tension member 17 is detachably connected with the first auxiliary frame 161, can be by the middle part of the first auxiliary frame 161 Open up bolt hole the first tension member 17 is installed.Using structure glue 19 respectively the right side of the first auxiliary frame 161 U-shaped body outside And second the outside of auxiliary frame paste a doubling glass 15, using the snapping of the first auxiliary frame 161 and the second auxiliary frame 162, realize the The splicing of the doubling glass 15 in the auxiliary frame 162 of doubling glass 15 and second in one auxiliary frame 161, two pieces of stitching portions of doubling glass 15 Glass piece is formed, then, the glass piece is filled using weather proofing sealant 20, completes the installation of doubling glass.
Further, can be carried out between the glass 2 of auxiliary frame structure 16 and former frame concealed curtain wall using the first rubber strip 18 every From measure, the hard contact between the glass 2 of modernization system and former frame concealed curtain wall can be effectively prevented, protective glass 2, prevented also from There is noise under stressing conditions in auxiliary frame structure 16.Wherein, auxiliary frame structure 16 towards on the side of the glass 2 of former frame concealed curtain wall Provided with caulking groove 181, the shape of caulking groove 181 is in tongue-and-groove shape, and the first side of the first rubber strip 18 is formed with a tenon, and the tenon is embedded In the caulking groove 181 of tongue-and-groove shape, by the cooperation of tenon and caulking groove, the first rubber strip 18 is installed in auxiliary frame structure 16, the Second side of one rubber strip 18 fits in the surface of glass 2 of former frame concealed curtain wall.It is first attached that caulking groove 181 is arranged on auxiliary frame structure 16 Frame 161, and each first auxiliary frame 161, provided with two caulking grooves 181, two caulking grooves 181 are separately positioned on the two of the first auxiliary frame 161 On individual U-shaped body, and two caulking grooves 181 are relatively symmetrically set relative to the middle part of the first auxiliary frame 161, are all provided with two caulking grooves 181 There is the first rubber strip 18.
It is single shown in figure present invention also offers a kind of splicing structure of doubling glass in conjunction with shown in Fig. 5~7 The doubling glass of plate, the doubling glass 15 is rectangular, with two adjacent first sides and two adjacent second sides, The first auxiliary frame 161 of auxiliary frame structure is respectively arranged with one of which adjacent side, is then set respectively in another group of adjacent side The second auxiliary frame 162 of auxiliary frame structure is equipped with, and so that the setting of the first auxiliary frame 161 and the second auxiliary frame 162 is relative two-by-two, with Ensure that its first auxiliary frame 161 (or second auxiliary frame 162) can be with the second auxiliary frame 162 of the doubling glass of other plates (or One auxiliary frame 162) assembling, the assembly between doubling glass to realize different plates.
As the better embodiment of the present invention, frame concealed curtain wall modernization system of the invention also includes pressing plate 21, the pressing plate 21 are covered in the outside of the glass piece of doubling glass 15, and pressing plate 21 is connected in auxiliary frame structure 16 by the second tension member 22, The first end of second tension member 22 is fixedly connected on pressing plate 21, and the second end of the second tension member 22 passes through the glass of doubling glass 15 Piece is simultaneously fixedly connected in the first auxiliary frame 161 of auxiliary frame structure 16, can be also fixedly connected the second end of the second tension member 22 On the first tension member 17 of auxiliary frame structure 16, the He of the second tension member 22 can be fixedly connected by the way of welding or nut connection First tension member 17.Further, deckboard 23 is provided with the outside of pressing plate 21, the deckboard 23 is covered in the second drawknot The end of the first end of part 22, plays aesthetic, is isolated between pressing plate 21 and doubling glass 15 using the second rubber strip, reached To noise-proofing purpose.
Half concealed frame glass curtain wall is transformed into by setting pressing plate 21 by full concealed frame glass curtain wall, although added in appearance Frame, frame, still, can greatly promote the security of concealed frame glass curtain wall, effectively prevent potential safety hazard, in transformation, can will be complete hidden Frame glass curtain wall is transformed into perpendicular bright half concealed frame glass curtain wall of hidden horizontal stroke, erects the half of one of the bright hidden half concealed frame glass curtain wall both of which of horizontal stroke Concealed frame glass curtain wall.With reference to full concealed frame glass curtain wall and half concealed frame glass curtain wall of both patterns, with reference to accompanying drawing 3~10 It is described in further details.
Embodiment 1:Erect hidden horizontal Ming Dynasty style
As shown in figure 3, perpendicular cryptostructure transformation is to install safe LOW-E toughened rubber-laminated vacuum glass 15 additional in the former hidden outside of frame glass 2, Socket connection, left and right auxiliary frame are carried out by the left auxiliary frame of glass (the first auxiliary frame) and the right auxiliary frame (the second auxiliary frame) of other plate Between form association gap, the gap between two pieces of doubling glass 15 is filled using weather proofing sealant 20, reaches waterproof and antiseepage Function.The left auxiliary frame of glass (the first auxiliary frame) is isolated with the former hidden surface of frame glass 2 using the first rubber strip 18, effectively prevents that transformation from being System and the hard contact of bare glass 2.Quarantine measures are carried out using the 3rd rubber strip 163 at the left and right auxiliary frame snapping of aluminium alloy, reached anti- Noise purpose, the doubling glass plate with auxiliary frame is entered by the column 8 of the first tension member 17 (such as bolt) and former frame concealed curtain wall Row mechanism is fixedly connected, and forming external force can be effectively passed on main frame column.
As shown in Figure 10, horizontal bright tectonic reworking is to install safe LOW-E toughened rubber-laminated vacuum glass additional in the former hidden outside of frame glass 2 15, socket connection is carried out by auxiliary frame on glass (the first auxiliary frame) and the lower auxiliary frame (the second auxiliary frame) of other plate, it is upper and lower attached Isolated between frame from vulcanie bar, can prevent from being formed between plate bounce of the glass under geological process, upper and lower auxiliary frame and close The gap joined between gap, two pieces of doubling glass 15 is filled using weather proofing sealant, reaches waterproof and antiseepage function.Glass auxiliary frame Isolated with former hidden frame glass surface using the first rubber strip 18, effectively prevent modernization system and the hard contact of bare glass 2.Aluminium alloy Using 163 articles of progress quarantine measures of the 3rd rubber at upper and lower auxiliary frame snapping, noise-proofing purpose is reached, the glass plate with auxiliary frame Block be mechanically fixed being connected by the first tension member 17 with the crossbeam 9 of former frame concealed curtain wall, and the outside of doubling glass 15 uses pressing plate 21 carry out mechanical connection fixation by auxiliary frame on the second tension member 22 (optional bolt) and doubling glass, and glass can be prevented because of knot Structure glue 19 fails and safety is caused a hidden trouble, and the outside of pressing plate 21 covers the end of the second tension member 22 from aluminium alloy deckboard 23 Portion, forms the bright frame of decoration.Unitary construction is that external force can be effectively passed on main frame crossbeam.
Embodiment 2:It is perpendicular bright horizontal implicit
As shown in figure 8, it is to install safe LOW-E toughened rubber-laminated vacuum glass 15 additional in the former hidden outside of frame glass 2 to erect bright tectonic reworking, Shape between socket connection, auxiliary frame is carried out by the left auxiliary frame of glass (the first auxiliary frame) and the right auxiliary frame (the second auxiliary frame) of other plate Into association gap, the gap between two pieces of doubling glass 15 is filled using weather proofing sealant, reaches waterproof and antiseepage function.Glass Auxiliary frame is isolated with the former hidden surface of frame glass 2 using the first rubber strip 18, effectively prevents modernization system and the hard contact of bare glass 2. Quarantine measures are carried out using the 3rd rubber strip 163 at the left and right auxiliary frame snapping of aluminium alloy, noise-proofing purpose are reached, with auxiliary frame Glass plate is fixedly connected by the first tension member 18 with the carry out of column 8 mechanism of former frame concealed curtain wall, and the outside of doubling glass 15 is adopted Mechanical connection fixation is carried out by the second tension member 22 and auxiliary frame on glass with pressing plate 21, doubling glass can be prevented because of structure glue 19 Fail and safety is caused a hidden trouble, the outside of pressing plate 21 covers the end of the second tension member 22, shape from aluminium alloy deckboard 23 Into the bright frame of decoration.Unitary construction is that external force can be effectively passed on main frame column.
As shown in figure 9, horizontal cryptostructure transformation is to install safe LOW-E toughened rubber-laminated vacuum glass 15 additional in the former hidden outside of frame glass 2, Socket connection, upper and lower auxiliary frame are carried out by auxiliary frame on glass (the first auxiliary frame) and the lower auxiliary frame (the second auxiliary frame) of other plate Between from the isolation of vulcanie block, plate bounce of the glass under geological process can be prevented, association gap is formed between auxiliary frame, Gap between two pieces of doubling glass 15 is filled using weather proofing sealant, reaches waterproof and antiseepage function.Glass auxiliary frame and original are hidden The surface of frame glass 2 is isolated using the first rubber strip 18, effectively prevents modernization system and the hard contact of bare glass 2.Aluminium alloy is upper and lower Quarantine measures are carried out using the 3rd rubber strip 163 at auxiliary frame snapping, noise-proofing purpose are reached, the glass plate with auxiliary frame passes through First tension member is fixedly connected with the carry out of crossbeam 9 mechanism of former frame concealed curtain wall.Unitary construction be allow external force can be effectively passed to master On cruciform bracing.
Frame concealed curtain wall modernization system in the embodiment of the present invention is for energy-saving index requirement, and glass membrane system is chosen offline can steel Change LOW-E membrane systems, glass types choose toughened rubber-laminated vacuum glass.Original force structure resource is made full use of, improvement cost is saved and makes Valency, existing building is not stopped production to stop work just under use premise carries out transformation renovation.The stress knot of modernization system of the present invention Structure is to utilize original frame concealed curtain wall structural system for main force structure system, by the additional auxiliary frame structure of former frame concealed curtain wall, transformation Into safe and reliable concealed frame glass curtain wall.It is effectively to prevent potential safety hazard in transformation process, can be by setting pressing plate, will be complete Hidden frame glass is transformed into perpendicular bright half concealed frame glass curtain wall of hidden horizontal stroke, erects the half hidden of one of bright hidden half concealed frame glass curtain wall, two kinds of patterns of horizontal stroke Frame glass curtain wall.
It should be noted that structure, ratio, size depicted in this specification institute accompanying drawings etc., only to coordinate Content disclosed in bright book, so that those skilled in the art understands and reads, is not limited to the enforceable limit of the present invention Fixed condition, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, not Under influence effect of the invention that can be generated and the purpose that can reach, it all should still fall and be obtained in disclosed technology contents In the range of covering.Meanwhile, it is cited such as " on ", " under ", "left", "right", " centre " and " one " etc. in this specification Term, is merely convenient to understanding for narration, and is not used to limit enforceable scope of the invention, the change of its relativeness or tune It is whole, under without essence change technology contents, when being also considered as enforceable category of the invention.
The above is only presently preferred embodiments of the present invention, not does any formal limitation to the present invention, though So the present invention is disclosed above with preferred embodiment, but is not limited to the present invention, any to be familiar with this professional technology people Member, in the range of technical solution of the present invention is not departed from, when the technology contents using the disclosure above make a little change or repair The Equivalent embodiments for equivalent variations are adornd, as long as being the content without departing from technical solution of the present invention, the technology according to the present invention is real Any simple modification, equivalent variations and modification that confrontation above example is made, still fall within the scope of technical solution of the present invention It is interior.

Claims (10)

1. a kind of frame concealed curtain wall modernization system, it is characterised in that:The frame concealed curtain wall modernization system includes pacifying by auxiliary frame structure The doubling glass in the outside loaded on former frame concealed curtain wall, the auxiliary frame structure is connected to the frame of former frame concealed curtain wall by the first tension member In frame structure.
2. frame concealed curtain wall modernization system as claimed in claim 1, it is characterised in that:The auxiliary frame structure and former frame concealed curtain wall it Between using the first rubber strip isolation.
3. frame concealed curtain wall modernization system as claimed in claim 2, it is characterised in that:The auxiliary frame structure towards former hidden frame curtain The side of wall is provided with caulking groove, and the first side of first rubber strip is embedded in the caulking groove, and the of first rubber strip Two sides fit in the surface of former frame concealed curtain wall.
4. frame concealed curtain wall modernization system as claimed in claim 1, it is characterised in that:The doubling glass is bonded using structure glue In in the auxiliary frame structure.
5. such as frame concealed curtain wall modernization system according to any one of claims 1 to 4, it is characterised in that:The auxiliary frame structure bag The first auxiliary frame and the second auxiliary frame are included, first auxiliary frame and second auxiliary frame are detachably connected.
6. frame concealed curtain wall modernization system as claimed in claim 5, it is characterised in that:First auxiliary frame and second auxiliary frame A doubling glass is respectively connected on, and the doubling glass being connected in first auxiliary frame is with being connected in second auxiliary frame Glass piece is formed between doubling glass.
7. frame concealed curtain wall modernization system as claimed in claim 6, it is characterised in that:The glass piece uses weather proofing sealant Filling.
8. frame concealed curtain wall modernization system as claimed in claim 6, it is characterised in that:The frame concealed curtain wall modernization system also includes Pressing plate, the pressing plate is covered in the outside of the glass piece, and the pressing plate is connected to the auxiliary frame by the second tension member In structure.
9. frame concealed curtain wall modernization system as claimed in claim 8, it is characterised in that:The outside of the pressing plate is provided with trim Plate, the deckboard is covered in the end of second tension member.
10. frame concealed curtain wall modernization system as claimed in claim 8, it is characterised in that:The pressing plate and the doubling glass it Between using the second rubber strip isolation.
CN201710218903.0A 2017-04-05 2017-04-05 A kind of frame concealed curtain wall modernization system Active CN106939658B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710218903.0A CN106939658B (en) 2017-04-05 2017-04-05 A kind of frame concealed curtain wall modernization system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710218903.0A CN106939658B (en) 2017-04-05 2017-04-05 A kind of frame concealed curtain wall modernization system

Publications (2)

Publication Number Publication Date
CN106939658A true CN106939658A (en) 2017-07-11
CN106939658B CN106939658B (en) 2019-03-29

Family

ID=59463210

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710218903.0A Active CN106939658B (en) 2017-04-05 2017-04-05 A kind of frame concealed curtain wall modernization system

Country Status (1)

Country Link
CN (1) CN106939658B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824679A (en) * 2018-07-13 2018-11-16 苏州虎皇建设发展有限公司 A kind of biotechnology garden suspension type glass curtain wall

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH084318A (en) * 1994-06-08 1996-01-09 Ykk Architect Prod Kk Repairing method of curtain wall and bearing device used therefor
JP2006028818A (en) * 2004-07-14 2006-02-02 Inaxトステム・ビルリモデリング株式会社 Method for reforming curtain wall of building, and reformed curtain wall of building
CN201883576U (en) * 2010-11-10 2011-06-29 王闻雷 Reinforcing device for hidden frame supported glass curtain wall
CN102661058A (en) * 2012-05-31 2012-09-12 朱杨 Construction method for performing energy conservation transformation for glass of existing building
CN103243845A (en) * 2013-05-07 2013-08-14 成信绿集成股份有限公司 Construction technology for processing glass curtain wall into hollow glass curtain wall
CN203499061U (en) * 2013-09-02 2014-03-26 德才装饰股份有限公司 Reinforced structure for hidden-frame glass curtain wall
CN205935332U (en) * 2016-04-25 2017-02-08 常熟市华丽坚装饰工程有限公司 Existing latent frame or half horizontal hidden frame glass curtain wall reform transform and add with holding in palm strip
CN106760612A (en) * 2017-03-27 2017-05-31 上海佑华节能科技集团有限公司 A kind of low influence energy-conserving reconstruction method and structure of concealed frame glass curtain wall

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH084318A (en) * 1994-06-08 1996-01-09 Ykk Architect Prod Kk Repairing method of curtain wall and bearing device used therefor
JP2006028818A (en) * 2004-07-14 2006-02-02 Inaxトステム・ビルリモデリング株式会社 Method for reforming curtain wall of building, and reformed curtain wall of building
CN201883576U (en) * 2010-11-10 2011-06-29 王闻雷 Reinforcing device for hidden frame supported glass curtain wall
CN102661058A (en) * 2012-05-31 2012-09-12 朱杨 Construction method for performing energy conservation transformation for glass of existing building
CN103243845A (en) * 2013-05-07 2013-08-14 成信绿集成股份有限公司 Construction technology for processing glass curtain wall into hollow glass curtain wall
CN203499061U (en) * 2013-09-02 2014-03-26 德才装饰股份有限公司 Reinforced structure for hidden-frame glass curtain wall
CN205935332U (en) * 2016-04-25 2017-02-08 常熟市华丽坚装饰工程有限公司 Existing latent frame or half horizontal hidden frame glass curtain wall reform transform and add with holding in palm strip
CN106760612A (en) * 2017-03-27 2017-05-31 上海佑华节能科技集团有限公司 A kind of low influence energy-conserving reconstruction method and structure of concealed frame glass curtain wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824679A (en) * 2018-07-13 2018-11-16 苏州虎皇建设发展有限公司 A kind of biotechnology garden suspension type glass curtain wall
CN108824679B (en) * 2018-07-13 2024-04-19 江苏大千虎皇集团有限公司 Suspension type glass curtain wall for biotechnology garden

Also Published As

Publication number Publication date
CN106939658B (en) 2019-03-29

Similar Documents

Publication Publication Date Title
CN106836586B (en) The curtain wall splicing structure and pin-connected panel curtain wall construction of hidden curtain wall system
WO2006024214A1 (en) A link mechanism between the unit board and main body of the curtain wall
CN106092631A (en) A kind of detection device of the reliability after glass curtain wall installation
CN206693466U (en) The curtain wall splicing structure and pin-connected panel curtain wall construction of hidden curtain wall system
CN205259415U (en) Glass rib connection structure among full glass curtain wall of large -span
CN106939658A (en) A kind of frame concealed curtain wall modernization system
CN202324276U (en) Heat insulation and sound insulation aluminum plate
CN108661220A (en) A kind of glass curtain wall system and its installation method
CN210767394U (en) Corner-free vertical frame unit curtain wall system
CN202913541U (en) Semi-unit open aluminum panel curtain wall structure
CN208844765U (en) A kind of glass curtain wall system
CN102433974A (en) Curtain wall-imitating wall insulation technical method by anchoring and pasting inorganic heat-insulation decorative composite board
CN214994772U (en) Deformation joint device between glass curtain walls
CN209443633U (en) Wall exterior finish prefabricated unit integrates composite plates and its connecting structure
CN213329604U (en) High-strength energy-saving hidden frame curtain wall
CN209817210U (en) Building frame type curtain wall
CN103343585B (en) Built in hollow glass auxiliary frame installation system
CN109083316B (en) Double-layer curtain wall
CN207484871U (en) A kind of outer wall heat insulating and decorating plate for not penetrating artificial inorganic plate
CN209653185U (en) A kind of curtain wall guard rail
CN209620672U (en) A kind of assembled porcelain powder self-insulating external wall panel window installation reinforcement system
CN109356304A (en) Wall exterior finish prefabricated unit integrates composite plates and its connecting structure
CN207620167U (en) A kind of stuffy waterproof louver curtain-wall system
CN208137112U (en) A kind of aerial vestibule lighting top system of board-like annular of organ
CN205808744U (en) A kind of detection device of the reliability after glass curtain wall installation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant