CN106930471A - A kind of quick assembled type pipe constrains prestressed component - Google Patents

A kind of quick assembled type pipe constrains prestressed component Download PDF

Info

Publication number
CN106930471A
CN106930471A CN201710291115.4A CN201710291115A CN106930471A CN 106930471 A CN106930471 A CN 106930471A CN 201710291115 A CN201710291115 A CN 201710291115A CN 106930471 A CN106930471 A CN 106930471A
Authority
CN
China
Prior art keywords
end plate
component
outer tube
steel
assembled type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710291115.4A
Other languages
Chinese (zh)
Inventor
郭兰慧
黄海家
高山
刘用
王云鹤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xijing University
Original Assignee
Xijing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xijing University filed Critical Xijing University
Priority to CN201710291115.4A priority Critical patent/CN106930471A/en
Publication of CN106930471A publication Critical patent/CN106930471A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/08Members specially adapted to be used in prestressed constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

A kind of quick assembled type pipe constrains prestressed component, including presstressed reinforcing steel, outer tube, outer tube upper and lower side is respectively equipped with end plate, upper and lower end plate is provided with not equal diameter bolt hole, in the screwed presstressed reinforcing steel plug-in-sleeve in end, two ends connect the installation nut in upper and lower end plate upper bolt hole, outer tube inside and inside are provided with outside the sleeve pipe of presstressed reinforcing steel and set internal packing material, apply prestressing force by internal packing material, using outer tube to the effect of contraction of internal packing material, make component that there is bearing capacity higher, good antidetonation and fire resistance, it is simultaneously easy to disassemble, realize the repeatable utilization of exterior tube and internal material.Suitable for the post component or permanent post component of temporary building, it has the advantages of speed of application is fast, and stress performance is superior to the present invention, and all parts can be reused in component, with preferable economic benefit.

Description

A kind of quick assembled type pipe constrains prestressed component
Technical field
The invention belongs to building structure technology field, and in particular to a kind of quick assembled type pipe constrains prestressed component.
Background technology
Now, accidental pollution event is increasingly subject to pay attention to, and building temporary building turns into the important content of rebuilding in disaster-hit areas. Temporary building can make place conversion according to different use demands, move in whole or in part, and simultaneously can simple group Dress.After the mission that temporary building completes it, construction material is just changed into permanent key element, and this is just to building temporary building Material propose ecological requirements higher, in temporary building construction material should from feedstock capture, the manufacture of product, applied Four aspects such as journey and the recycling after are accounted for.Post component is the main bearing member in temporary structure, if Crucial post component is destroyed, or even can cause the continuous collapse of structure, and the life and property to the people bring potential safety hazard.Pass The post component of system is frequently with reinforced column, steel-concrete coupled column or steel column, cost in reinforced column building course It is minimum, but due to needing the operations such as formwork, form removal, therefore speed of application is slow and should not remove, and is not suitable for temporary building.Steel- Concrete combination column has the advantages that high capacity, anti-seismic performance be good, speed of application is fast, for that can play it in temporary building Mechanical property advantage, but the temporary building for needing to remove, due to causing component to be difficult to remove after concrete hardening, therefore Also it is less suitable for use in provisional component.For steel structure member, because steel member fire resistance is poor, the low shortcoming of rigidity, use Certain defect is there is also in temporary building.
The content of the invention
The purpose of the present invention is to solve conventional steel bar concrete post, steel-concrete coupled column and steel column for provisional The defect of building, proposes a kind of quick assembled type pipe constraint prestressed component, including outer tube, internal packing material, prestressing force Muscle, sleeve pipe, end plate and nut.
To achieve these goals, the technical solution adopted by the present invention is:
A kind of quick assembled type pipe constrains prestressed component, including presstressed reinforcing steel, outer tube, and outer tube upper and lower side is respectively equipped with end Plate, upper and lower end plate is provided with not equal diameter bolt hole, and in the screwed presstressed reinforcing steel plug-in-sleeve in end, two ends connection is upper and lower Installation nut in end plate upper bolt hole, outer tube inside and inside are provided with outside the sleeve pipe of presstressed reinforcing steel and set internal filling material Material;
Described nut of tightening applies pretightning force to presstressed reinforcing steel, and the internal packing material of compression makes component form entirety and receives jointly Power.
Described end plate can contact with outer tube or leave gap.
Described outer tube uses circular, rectangle or polygonal cross-section, using stainless steel tube, common steel tube, stainless steel double Close pipe or FRP pipes.
Described inside packing material uses sand, soil or other powdery fillers.
Described sleeve pipe uses plastic bushing, steel sleeve or FRP sleeve pipes.
Described end plate can use general steel plate or stainless-steel sheet, and described end plate cross section is convex.
The beneficial effects of the invention are as follows:
The present invention in advance should using outer tube and the compound action of internal packing material by applying longitudinal direction to internal packing material Power, makes internal packing material produce transversely deforming, and outer tube is in hoop tension state, and energy operative constraint internal material makes at it In three dimension stress state, bearing capacity, ductility and the energy dissipation capacity of component are significantly improved.Such component is relative to traditional reinforced concrete Native component, has the advantages that speed of application is fast, high capacity, anti-seismic performance are good;Relative to steel-concrete combined member, have The characteristics of convenient disassembly, after component is removed, unloading is applied to the prestressing force on internal packing material, and internal material can conveniently take Go out, so as to realize the recycling of outside tubular construction and internal material;Relative to traditional steel components, with rigidity is big, bearing capacity It is high, the advantages of fire resistance is good, therefore quick assembled type pipe constrain prestressed component have in temporary building it is wide should With prospect, simultaneously because its superior mechanical property, can also use as permanent component.
Brief description of the drawings
Fig. 1 is quick assembled type pipe constraint prestressed component vertical cross section figure of the invention.
Fig. 2 is quick assembled type pipe constraint prestressed component cross-sectional view of the invention.
Fig. 3 end plate profiles.
Specific embodiment
The present invention is further discussed below with reference to accompanying drawing.
As shown in Figure 1, 2, 3, a kind of quick assembled type pipe constraint prestressed component, including presstressed reinforcing steel 1, outer tube 3, its It is characterised by, the upper and lower side of outer tube 3 is respectively equipped with end plate 5, upper and lower end plate 5 is provided with not equal diameter bolt hole 7, and end carries spiral shell In the plug-in-sleeve 2 of presstressed reinforcing steel 1 of line, two ends connect the installation nut 6 in the upper and lower upper bolt hole 7 of end plate 5, inside outer tube 3 And inside is provided with the internal packing material 4 of outer setting of sleeve pipe 2 of presstressed reinforcing steel 1;
Described nut 6 of tightening applies pretightning force to presstressed reinforcing steel 1, and the internal packing material 4 of compression forms component overall common Stress.
Described end plate 5 can contact with outer tube 3 or leave gap.
Described outer tube 3 uses circular, rectangle or polygonal cross-section, using stainless steel tube, common steel tube, stainless steel double Close pipe or FRP pipes.
Described inside packing material 4 is using sand, soil or other powdery fillers.
Described sleeve pipe 2 is using plastic bushing, steel sleeve or FRP sleeve pipes.
Described end plate 5 can use general steel plate or stainless-steel sheet, and the described cross section of end plate 5 is convex.
Operation principle of the invention is:
First by the screwed plug-in-sleeve 2 of presstressed reinforcing steel 1 in end;Then the presstressed reinforcing steel 1 with sleeve pipe 2 is put into outer In layer pipe 3, the bottom plate 5 with predetermined bolt hole is fixed on the bottom of outer tube 3, prestressing force is fixed using nut 6 is installed Muscle 1, end plate 5 can make variable cross-section form shown in Fig. 3, in the less insertion of a side end panel 5 outer tube 3 in section, be opened up on end plate 5 Not equal diameter bolt hole 7;Then internal packing material 4 is filled into outer tube 3, by the upper head plate 5 with predetermined bolt hole The top of outer tube 3 is arranged on, nut 6 then is installed on the top of presstressed reinforcing steel 3, nut 6 is placed in bolt hole 7, tightens nut 6 Pretightning force is applied to presstressed reinforcing steel 1, so as to compress internal packing material 4, being applied to after predetermined pretightning force can completion component Install, component is formed overall common stress.
The method is the packing material in pipe, applies prestressing force by internal packing material, using outer tube to inside The effect of contraction of packing material, makes component have bearing capacity and good fire resistance higher, easy to disassemble, while realizing outer Manage the recycling with internal material in portion.Specific implementation method:After packing material in pipe, by the presstressed reinforcing steel set in pipe Prestressing force is applied to core filler material, according to the demand using function, exterior tube can undertake part vertical load or not undertake Vertical load, after prestress application is finished and end plate is fixed, that is, forms overall primary structure member.The present invention is applied to temporary building Post component can also be used for permanent post component, component has the advantages that high capacity, anti-seismic performance are superior, and in component own Part can be reused, with preferable economic benefit.

Claims (6)

1. a kind of quick assembled type pipe constraint prestressed component, including presstressed reinforcing steel(1), outer tube(3), it is characterised in that outward Layer pipe(3)Upper and lower side is respectively equipped with end plate(5), upper and lower end plate(5)It is provided with not equal diameter bolt hole(7), end is screwed Presstressed reinforcing steel(1)Plug-in-sleeve(2)In, two ends connect upper and lower end plate(5)Upper bolt hole(7)Interior installation nut(6), outer tube (3)Internal and inside is provided with presstressed reinforcing steel(1)Sleeve pipe(2)Outer setting inside packing material(4);
Described tightens nut(6)Apply pretightning force, the internal packing material of compression to presstressed reinforcing steel (1)(4), form component whole The common stress of body.
2. a kind of quick assembled type pipe according to claim 1 constrains prestressed component, it is characterised in that described end plate (5)Can be with outer tube(3)Contact or leave gap.
3. a kind of quick assembled type pipe according to claim 1 constrains prestressed component, it is characterised in that described outer layer Pipe(3)Using circular, rectangle or polygonal cross-section, managed using stainless steel tube, common steel tube, stainless steel composite pipe or FRP.
4. a kind of quick assembled type pipe according to claim 1 constrains prestressed component, it is characterised in that described inside Packing material(4)Using sand, soil or other powdery fillers.
5. a kind of quick assembled type pipe according to claim 1 constrains prestressed component, it is characterised in that described sleeve pipe (2)Using plastic bushing, steel sleeve or FRP sleeve pipes.
6. a kind of quick assembled type pipe according to claim 1 constrains prestressed component, it is characterised in that described end plate (5)General steel plate or stainless-steel sheet, described end plate can be used(5)Cross section is convex.
CN201710291115.4A 2017-04-28 2017-04-28 A kind of quick assembled type pipe constrains prestressed component Pending CN106930471A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710291115.4A CN106930471A (en) 2017-04-28 2017-04-28 A kind of quick assembled type pipe constrains prestressed component

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710291115.4A CN106930471A (en) 2017-04-28 2017-04-28 A kind of quick assembled type pipe constrains prestressed component

Publications (1)

Publication Number Publication Date
CN106930471A true CN106930471A (en) 2017-07-07

Family

ID=59437465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710291115.4A Pending CN106930471A (en) 2017-04-28 2017-04-28 A kind of quick assembled type pipe constrains prestressed component

Country Status (1)

Country Link
CN (1) CN106930471A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108118830A (en) * 2017-12-27 2018-06-05 易春梅 A kind of steel structure concrete column based on BIM
CN115288292A (en) * 2022-08-26 2022-11-04 安徽省高迪循环经济产业园股份有限公司 Assembled steel structure frame and integrated house

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201943070U (en) * 2011-01-28 2011-08-24 宿迁市固丰管桩有限公司 Toughened type prestress centrifugal concrete pile
CN202323939U (en) * 2011-11-22 2012-07-11 上海中技桩业股份有限公司 Round end plate of prestressed concrete pipe pile
CN203583777U (en) * 2013-09-23 2014-05-07 江苏建筑职业技术学院 Prestressed round-pile core-filled concrete column
US20150113913A1 (en) * 2012-05-29 2015-04-30 Ajou University Industry-Academic Cooperation Foundation Hollow structure, and preparation method thereof
JP2016008441A (en) * 2014-06-25 2016-01-18 株式会社日本ピーエス Structure and manufacturing method for prestressed concrete member

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201943070U (en) * 2011-01-28 2011-08-24 宿迁市固丰管桩有限公司 Toughened type prestress centrifugal concrete pile
CN202323939U (en) * 2011-11-22 2012-07-11 上海中技桩业股份有限公司 Round end plate of prestressed concrete pipe pile
US20150113913A1 (en) * 2012-05-29 2015-04-30 Ajou University Industry-Academic Cooperation Foundation Hollow structure, and preparation method thereof
CN203583777U (en) * 2013-09-23 2014-05-07 江苏建筑职业技术学院 Prestressed round-pile core-filled concrete column
JP2016008441A (en) * 2014-06-25 2016-01-18 株式会社日本ピーエス Structure and manufacturing method for prestressed concrete member

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108118830A (en) * 2017-12-27 2018-06-05 易春梅 A kind of steel structure concrete column based on BIM
CN115288292A (en) * 2022-08-26 2022-11-04 安徽省高迪循环经济产业园股份有限公司 Assembled steel structure frame and integrated house

Similar Documents

Publication Publication Date Title
CN104032839B (en) Syndeton and the construction method thereof of friction damper assembling frame node
CN107254884A (en) A kind of detachable prefabricated assembled concrete-filled steel square tubular column pin node
CN206457929U (en) The bean column node of Self-resetting after a kind of energy-dissipating type shake
WO2021004417A1 (en) Anchoring assembly for transversely bonded prestressed steel rod for bridge tower and construction method
CN103541511A (en) Method for manufacturing concrete-filled steel tube special-shaped column with built-in polyvinyl chloride-fiber reinforce plastic (PVC-FRP) pipe and high-strength concrete core column
CN104060535A (en) Prestress high-strength twisted steel anchoring system and construction method
CN203924363U (en) The syndeton of friction damper assembling frame node
CN110468727B (en) Temporary prestress tensioning pedestal and lifting point integrated structure of segmental beam and construction method
CN106930471A (en) A kind of quick assembled type pipe constrains prestressed component
CN108060718B (en) Detachable assembly type column and foundation ductility node connection mode
CN105970803A (en) Shearing resisting energy consumption device and construction method of prefabricated pier
CN106703290A (en) Detachable-assembly type concrete-filled steel tube column and construction method thereof
CN203238979U (en) FRP reinforcement circular arc concrete shock-resistant column
JP2015078495A (en) Construction method of reinforcement structure
CN210439124U (en) Corrugated steel pipe-rubber concrete anti-collision anti-seismic pier
CN208136920U (en) A kind of triangle prestressing force foundation pit supporting pile and its connection structure
CN103306491A (en) FRP reinforcement arc concrete impact resistant column
CN203487666U (en) Partition with composite structure employing corrugated steel boards in double layers
CN201865206U (en) Connection node structure of edge beam and reinforced concrete prefabricated column bracket
CN201610516U (en) Composite material arch structural beam
CN201092730Y (en) Supporting structure for construction of composite wall
CN209620405U (en) Steel plate-ultra high strength concrete composite column structure
CN112302034A (en) Prefabricated hollow concrete supporting member, inner supporting system and construction method
CN105421587A (en) Sand filling steel pipe composite component and manufacturing method thereof
CN206090943U (en) Composite wallboard

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170707

RJ01 Rejection of invention patent application after publication