CN106930412A - Timber structure post PC is incubated board wall guide type node connection construction method - Google Patents

Timber structure post PC is incubated board wall guide type node connection construction method Download PDF

Info

Publication number
CN106930412A
CN106930412A CN201710130447.4A CN201710130447A CN106930412A CN 106930412 A CN106930412 A CN 106930412A CN 201710130447 A CN201710130447 A CN 201710130447A CN 106930412 A CN106930412 A CN 106930412A
Authority
CN
China
Prior art keywords
guide groove
post
board wall
place
timber structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710130447.4A
Other languages
Chinese (zh)
Other versions
CN106930412B (en
Inventor
吕厚俊
沙峰峰
贾飞虎
朱余军
冒建军
高路恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG HUAXIN CONSTRUCTION ENGINEERING GROUP Co Ltd
Original Assignee
NANTONG HUAXIN CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG HUAXIN CONSTRUCTION ENGINEERING GROUP Co Ltd filed Critical NANTONG HUAXIN CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN201710130447.4A priority Critical patent/CN106930412B/en
Publication of CN106930412A publication Critical patent/CN106930412A/en
Application granted granted Critical
Publication of CN106930412B publication Critical patent/CN106930412B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/26Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/26Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
    • E04B1/2604Connections specially adapted therefor
    • E04B2001/2644Brackets, gussets or joining plates
    • E04B2001/2648Brackets, gussets or joining plates located in slots of the elongated wooden members

Abstract

The invention discloses a kind of timber structure post PC insulation board wall guide type node connection construction methods, construction process includes:(1)Processing strix;(2)Steel guide groove is embedded in, fixes;(3)Component conveying and site acceptance;(4)Post is lifted, fixed;(5)Post alignment error is adjusted;(6)Brushing slushing compound;(7)PC insulation board wall liftings;(8)Node encapsulation process;(9)The rear top surface treatment in place of PC insulation board walls;(10)Beam is lifted.The present invention is rational in infrastructure, and batch production customization, live fast hoisting saves the duration, substantial amounts of labour is saved, with good economic benefit.

Description

Timber structure post-PC is incubated board wall guide type node connection construction method
Technical field
The present invention relates to a kind of construction method of fabricated construction board wall, and in particular to a kind of timber structure post-PC warming plates Wall guide type node connection construction method.
Background technology
At home and abroad development speed is very fast for prefabricated construction, but China's prefabricated construction construction technology into Ripe degree is not also very high, especially on PC structural elements connecting node tectonic sievings, strengthens setting component connecting node construction Meter, construction are a major issues for being currently badly in need of capturing.
The content of the invention
Goal of the invention:The present invention is directed to deficiency of the prior art, proposes a kind of rational in infrastructure, batch production customization, scene Fast hoisting, saves the duration, saves substantial amounts of labour, and the timber structure post-PC insulation board walls with good economic benefit are led Slot type connection construction method.
Technical scheme:A kind of timber structure post-PC insulations board wall guide type node connection construction method of the present invention, applies Work flow comprises the following steps:
(1)Processing strix:, in factory's concentrated processing treatment, the size design of strix will for timber structure post and strix Disclosure satisfy that the insertion of later stage steel guide groove requires that its error amount will be controlled strictly with fixed;
(2)Steel guide groove is embedded in, fixes:Steel guide groove is made using channel-section steel, and guide groove inwall answers flat smooth, warpage change must not occurs The defects such as shape, while the rigidity of guide groove will meet certain requirement, are unlikely to excessive deformation occur in guide groove telescopiny, Guide groove is fixed using thread forming self-tapping screw with timber structure post along shaft;
(3)Component conveying and site acceptance:Manufactured timber structure post is transported to engineering site from factory and should strengthened The protection of component, especially carries out finished product protection to the steel guide groove having been inserted into groove, while inclined to what is caused due to transport Difference is forbidden to march into the arena more than the timber structure post finished product member of code requirement;
(4)Post is lifted, fixed:Post lifting will according to the plane of the strict control column of code requirement, perpendicularity and absolute altitude error, and The interim fixed work after prefabricated post is installed is carried out, error is incubated the meeting in place of board wall no more than code requirement, otherwise later stage It is relatively difficult;
(5)Post alignment error is adjusted:Before PC insulation board wall liftings are carried out, the error in place of every post need to be checked and adjusted It is whole, once error is larger, directly affect PC insulation board wall lifting efficiency;
(6)Brushing slushing compound:Brushing slushing compound contributes to the protection to joint structure on the inside of guide groove, while may be used also With reduce PC insulation board walls it is in place during frictional force between guide groove, it is convenient in place;
(7)PC insulation board wall liftings:PC insulation board walls are installed just from top to bottom along guide groove in guide groove between post and post Position, under the premise of board wall design size meets the requirements, if there is difficulty in place, should be appropriate using cable wind rope or oblique adjustable support The perpendicularity of adjustment column, in order in place;If it is excessive to occur inter-pillar dimensions when in place, after board wall is in place loosely, steel pad should be used Piece is suitably adjusted;
(8)Node encapsulation process:PC is incubated board wall rigging out, is carried out using fluid sealant in board wall with steel guide groove crack close Envelope treatment, when there is the situation of injecting glue difficulty, should use pressure injecting glue, and encapsulation process should ensure that and gas is occurred without at connecting node The phenomenon such as close property is bad;
(9)The rear top surface treatment in place of PC insulation board walls:After post wall is all fixed in place, board wall top surface absolute altitude should be checked, and do suitable When treatment, board wall top surface absolute altitude should be less than beam bottom designed elevation 10-20mm, in order to overall structure reasonable stress;
(10)Beam is lifted:Before beam lifting, one layer should be set at the 10-20mm gaps that PC insulation board wall top surfaces leave with soffit Rubber lath, then carry out the lifting work of beam body.
Further, the step(1)The groove compact dimensions 1- more bigger than the size of steel guide groove of middle timber structure post 2mm, the installation in order to steel guide groove is in place.
Further, the step(2)Middle steel guide groove wall thickness is advisable for 5-8mm, the depth in guide groove insertion timber structure post Spend for the 1/3 of timber structure post direction size is advisable, the outsourcing of steel guide groove design width for [B+2t+2 ×(2-3)], wherein B is PC warming plate wall thickness, t is the wall thickness of steel guide groove.
Further, the step(2)Middle thread forming self-tapping screw is set along shaft, and spacing is not more than 350mm, screw thread Shaping self-tapping screw realizes fixed operation by the preformed hole on steel guide groove, the spiral shell after thread forming self-tapping screw is finally fixed Silk top surface should stretch into 1-2mm in steel guide groove, in order to the quick in place of later stage insulation board wall.
Further, the step step(4)Or(5)In post lifting control errors:Plane error is no more than 2mm, mark Error high is no more than 3mm, and perpendicularity deviation is no more than 0.3%.
Further, the step(8)In board wall and steel guide groove crack in sealed using silicone sealant Treatment.
Further, step(10)The thickness of middle rubber lath is 10-30mm.
Beneficial effect:The present invention is rational in infrastructure, and batch production customization, live fast hoisting saves the duration, saves substantial amounts of labor Power, with good economic benefit.
Specific embodiment
With reference to specific embodiment, the invention will be further described:
Embodiment 1
A kind of timber structure post-PC is incubated board wall guide type node connection construction method, and construction process comprises the following steps:
(1)Processing strix:, in factory's concentrated processing treatment, the size design of strix will for timber structure post and strix Disclosure satisfy that the insertion of later stage steel guide groove requires that its error amount will be controlled strictly with fixed, the groove shaping chi of timber structure post The bigger 1mm of the very little size than steel guide groove, the installation in order to steel guide groove is in place;
(2)Steel guide groove is embedded in, fixes:Steel guide groove is made using channel-section steel, and steel guide groove wall thickness is advisable for 5mm, guide groove insertion wood Depth in structural column is advisable for the 1/3 of timber structure post direction size, steel guide groove outsourcing design width for [B+2t+2 × (2-3)],(Wherein B is PC warming plate wall thickness, and t is the wall thickness of steel guide groove), guide groove inwall answers flat smooth, must not occur The defects such as buckling deformation, while the rigidity of guide groove will meet certain requirement, are unlikely to appearance excessive in guide groove telescopiny Deformation, guide groove fixed using thread forming self-tapping screw with timber structure post along shaft, and thread forming self-tapping screw sets along shaft Put, spacing is not more than 350mm, thread forming self-tapping screw realizes fixed operation by the preformed hole on steel guide groove, screw thread into Screw top surface after type self-tapping screw is finally fixed should stretch into 1mm in steel guide groove, in order to later stage insulation board wall it is quick just Position;
(3)Component conveying and site acceptance:Manufactured timber structure post is transported to engineering site from factory and should strengthened The protection of component, especially carries out finished product protection to the steel guide groove having been inserted into groove, while inclined to what is caused due to transport Difference is forbidden to march into the arena more than the timber structure post finished product member of code requirement;
(4)Post is lifted, fixed:Post lifting will according to the plane of the strict control column of code requirement, perpendicularity and absolute altitude error, and The interim fixed work after prefabricated post is installed is carried out, error is incubated the meeting in place of board wall no more than code requirement, otherwise later stage It is relatively difficult, post lifting control errors:Plane error is no more than 2mm, and absolute altitude error is no more than 3mm, and perpendicularity deviation is no more than 0.3%;
(5)Post alignment error is adjusted:Before PC insulation board wall liftings are carried out, the error in place of every post need to be checked and adjusted It is whole, once error is larger, directly affect PC insulation board wall lifting efficiency;
(6)Brushing slushing compound:Brushing slushing compound contributes to the protection to joint structure on the inside of guide groove, while may be used also With reduce PC insulation board walls it is in place during frictional force between guide groove, it is convenient in place;
(7)PC insulation board wall liftings:PC insulation board walls are installed just from top to bottom along guide groove in guide groove between post and post Position, under the premise of board wall design size meets the requirements, if there is difficulty in place, should be appropriate using cable wind rope or oblique adjustable support The perpendicularity of adjustment column, in order in place;If it is excessive to occur inter-pillar dimensions when in place, after board wall is in place loosely, steel pad should be used Piece is suitably adjusted;
(8)Node encapsulation process:PC is incubated board wall rigging out, is carried out using fluid sealant in board wall with steel guide groove crack close Envelope treatment, is processed in board wall and steel guide groove crack using silicone sealant, when there is the situation of injecting glue difficulty, should Using pressure injecting glue, encapsulation process should ensure that and occurred without at connecting node the phenomenons such as air-tightness is bad;
(9)The rear top surface treatment in place of PC insulation board walls:After post wall is all fixed in place, board wall top surface absolute altitude should be checked, and do suitable When treatment, board wall top surface absolute altitude should be less than beam bottom designed elevation 10mm, in order to overall structure reasonable stress;
(10)Beam is lifted:Before beam lifting, one layer of rubber should be set at the 10mm gaps that PC insulation board wall top surfaces leave with soffit Offset plate bar, the thickness of rubber lath is 10mm, then the lifting work for carrying out beam body.
Embodiment 2
A kind of timber structure post-PC is incubated board wall guide type node connection construction method, and construction process comprises the following steps:
(1)Processing strix:, in factory's concentrated processing treatment, the size design of strix will for timber structure post and strix Disclosure satisfy that the insertion of later stage steel guide groove requires that its error amount will be controlled strictly with fixed, the groove shaping chi of timber structure post The bigger 1.5mm of the very little size than steel guide groove, the installation in order to steel guide groove is in place;
(2)Steel guide groove is embedded in, fixes:Steel guide groove is made using channel-section steel, and steel guide groove wall thickness is advisable for 6mm, guide groove insertion wood Depth in structural column is advisable for the 1/3 of timber structure post direction size, steel guide groove outsourcing design width for [B+2t+2 × (2-3)],(Wherein B is PC warming plate wall thickness, and t is the wall thickness of steel guide groove), guide groove inwall answers flat smooth, must not occur The defects such as buckling deformation, while the rigidity of guide groove will meet certain requirement, are unlikely to appearance excessive in guide groove telescopiny Deformation, guide groove fixed using thread forming self-tapping screw with timber structure post along shaft, and thread forming self-tapping screw sets along shaft Put, spacing is not more than 350mm, thread forming self-tapping screw realizes fixed operation by the preformed hole on steel guide groove, screw thread into Screw top surface after type self-tapping screw is finally fixed should stretch into 1.5mm in steel guide groove, in order to the quick of later stage insulation board wall In place;
(3)Component conveying and site acceptance:Manufactured timber structure post is transported to engineering site from factory and should strengthened The protection of component, especially carries out finished product protection to the steel guide groove having been inserted into groove, while inclined to what is caused due to transport Difference is forbidden to march into the arena more than the timber structure post finished product member of code requirement;
(4)Post is lifted, fixed:Post lifting will according to the plane of the strict control column of code requirement, perpendicularity and absolute altitude error, and The interim fixed work after prefabricated post is installed is carried out, error is incubated the meeting in place of board wall no more than code requirement, otherwise later stage It is relatively difficult, post lifting control errors:Plane error is no more than 2mm, and absolute altitude error is no more than 3mm, and perpendicularity deviation is no more than 0.3%;
(5)Post alignment error is adjusted:Before PC insulation board wall liftings are carried out, the error in place of every post need to be checked and adjusted It is whole, once error is larger, directly affect PC insulation board wall lifting efficiency;
(6)Brushing slushing compound:Brushing slushing compound contributes to the protection to joint structure on the inside of guide groove, while may be used also With reduce PC insulation board walls it is in place during frictional force between guide groove, it is convenient in place;
(7)PC insulation board wall liftings:PC insulation board walls are installed just from top to bottom along guide groove in guide groove between post and post Position, under the premise of board wall design size meets the requirements, if there is difficulty in place, should be appropriate using cable wind rope or oblique adjustable support The perpendicularity of adjustment column, in order in place;If it is excessive to occur inter-pillar dimensions when in place, after board wall is in place loosely, steel pad should be used Piece is suitably adjusted;
(8)Node encapsulation process:PC is incubated board wall rigging out, is carried out using fluid sealant in board wall with steel guide groove crack close Envelope treatment, is processed in board wall and steel guide groove crack using silicone sealant, when there is the situation of injecting glue difficulty, should Using pressure injecting glue, encapsulation process should ensure that and occurred without at connecting node the phenomenons such as air-tightness is bad;
(9)The rear top surface treatment in place of PC insulation board walls:After post wall is all fixed in place, board wall top surface absolute altitude should be checked, and do suitable When treatment, board wall top surface absolute altitude should be less than beam bottom designed elevation 15mm, in order to overall structure reasonable stress;
(10)Beam is lifted:Before beam lifting, one layer of rubber should be set at the 15mm gaps that PC insulation board wall top surfaces leave with soffit Offset plate bar, the thickness of rubber lath is 20mm, then the lifting work for carrying out beam body.
Embodiment 3
A kind of timber structure post-PC is incubated board wall guide type node connection construction method, and construction process comprises the following steps:
(1)Processing strix:, in factory's concentrated processing treatment, the size design of strix will for timber structure post and strix Disclosure satisfy that the insertion of later stage steel guide groove requires that its error amount will be controlled strictly with fixed, the groove shaping chi of timber structure post The bigger 2mm of the very little size than steel guide groove, the installation in order to steel guide groove is in place;
(2)Steel guide groove is embedded in, fixes:Steel guide groove is made using channel-section steel, and steel guide groove wall thickness is advisable for 8mm, guide groove insertion wood Depth in structural column is advisable for the 1/3 of timber structure post direction size, steel guide groove outsourcing design width for [B+2t+2 × (2-3)],(Wherein B is PC warming plate wall thickness, and t is the wall thickness of steel guide groove), guide groove inwall answers flat smooth, must not occur The defects such as buckling deformation, while the rigidity of guide groove will meet certain requirement, are unlikely to appearance excessive in guide groove telescopiny Deformation, guide groove fixed using thread forming self-tapping screw with timber structure post along shaft, and thread forming self-tapping screw sets along shaft Put, spacing is not more than 350mm, thread forming self-tapping screw realizes fixed operation by the preformed hole on steel guide groove, screw thread into Screw top surface after type self-tapping screw is finally fixed should stretch into 2mm in steel guide groove, in order to later stage insulation board wall it is quick just Position;
(3)Component conveying and site acceptance:Manufactured timber structure post is transported to engineering site from factory and should strengthened The protection of component, especially carries out finished product protection to the steel guide groove having been inserted into groove, while inclined to what is caused due to transport Difference is forbidden to march into the arena more than the timber structure post finished product member of code requirement;
(4)Post is lifted, fixed:Post lifting will according to the plane of the strict control column of code requirement, perpendicularity and absolute altitude error, and The interim fixed work after prefabricated post is installed is carried out, error is incubated the meeting in place of board wall no more than code requirement, otherwise later stage It is relatively difficult, post lifting control errors:Plane error is no more than 2mm, and absolute altitude error is no more than 3mm, and perpendicularity deviation is no more than 0.3%;
(5)Post alignment error is adjusted:Before PC insulation board wall liftings are carried out, the error in place of every post need to be checked and adjusted It is whole, once error is larger, directly affect PC insulation board wall lifting efficiency;
(6)Brushing slushing compound:Brushing slushing compound contributes to the protection to joint structure on the inside of guide groove, while may be used also With reduce PC insulation board walls it is in place during frictional force between guide groove, it is convenient in place;
(7)PC insulation board wall liftings:PC insulation board walls are installed just from top to bottom along guide groove in guide groove between post and post Position, under the premise of board wall design size meets the requirements, if there is difficulty in place, should be appropriate using cable wind rope or oblique adjustable support The perpendicularity of adjustment column, in order in place;If it is excessive to occur inter-pillar dimensions when in place, after board wall is in place loosely, steel pad should be used Piece is suitably adjusted;
(8)Node encapsulation process:PC is incubated board wall rigging out, is carried out using fluid sealant in board wall with steel guide groove crack close Envelope treatment, is processed in board wall and steel guide groove crack using silicone sealant, when there is the situation of injecting glue difficulty, should Using pressure injecting glue, encapsulation process should ensure that and occurred without at connecting node the phenomenons such as air-tightness is bad;
(9)The rear top surface treatment in place of PC insulation board walls:After post wall is all fixed in place, board wall top surface absolute altitude should be checked, and do suitable When treatment, board wall top surface absolute altitude should be less than beam bottom designed elevation 20mm, in order to overall structure reasonable stress;
(10)Beam is lifted:Before beam lifting, one layer of rubber should be set at the 20mm gaps that PC insulation board wall top surfaces leave with soffit Offset plate bar, the thickness of rubber lath is 30mm, then the lifting work for carrying out beam body.
The present invention is rational in infrastructure, and batch production customization, live fast hoisting saves the duration, saves substantial amounts of labour, has Good economic benefit.
The above, is only presently preferred embodiments of the present invention, and any formal limitation is not made to the present invention, though So the present invention is disclosed above with preferred embodiment, but is not limited to the present invention, any to be familiar with this professional technology people Member, without departing from the scope of the present invention, when making a little change or modification using the technology contents of the disclosure above It is the Equivalent embodiments of equivalent variations, as long as being the content without departing from technical solution of the present invention, according to technical spirit of the invention Any simple modification, equivalent variations and the modification made to above example, still fall within the range of technical solution of the present invention.

Claims (7)

1. a kind of timber structure post-PC is incubated board wall guide type node connection construction method, it is characterised in that:Construction process is included such as Lower step:
(1)Processing strix:, in factory's concentrated processing treatment, the size design of strix will for timber structure post and strix Disclosure satisfy that the insertion of later stage steel guide groove requires that its error amount will be controlled strictly with fixed;
(2)Steel guide groove is embedded in, fixes:Steel guide groove is made using channel-section steel, and guide groove inwall answers flat smooth, warpage change must not occurs The defects such as shape, while the rigidity of guide groove will meet certain requirement, are unlikely to excessive deformation occur in guide groove telescopiny, Guide groove is fixed using thread forming self-tapping screw with timber structure post along shaft;
(3)Component conveying and site acceptance:Manufactured timber structure post is transported to engineering site from factory and should strengthened The protection of component, especially carries out finished product protection to the steel guide groove having been inserted into groove, while inclined to what is caused due to transport Difference is forbidden to march into the arena more than the timber structure post finished product member of code requirement;
(4)Post is lifted, fixed:Post lifting will according to the plane of the strict control column of code requirement, perpendicularity and absolute altitude error, and The interim fixed work after prefabricated post is installed is carried out, error is incubated the meeting in place of board wall no more than code requirement, otherwise later stage It is relatively difficult;
(5)Post alignment error is adjusted:Before PC insulation board wall liftings are carried out, the error in place of every post need to be checked and adjusted It is whole, once error is larger, directly affect PC insulation board wall lifting efficiency;
(6)Brushing slushing compound:Brushing slushing compound contributes to the protection to joint structure on the inside of guide groove, while may be used also With reduce PC insulation board walls it is in place during frictional force between guide groove, it is convenient in place;
(7)PC insulation board wall liftings:PC insulation board walls are installed just from top to bottom along guide groove in guide groove between post and post Position, under the premise of board wall design size meets the requirements, if there is difficulty in place, should be appropriate using cable wind rope or oblique adjustable support The perpendicularity of adjustment column, in order in place;If it is excessive to occur inter-pillar dimensions when in place, after board wall is in place loosely, steel pad should be used Piece is suitably adjusted;
(8)Node encapsulation process:PC is incubated board wall rigging out, is carried out using fluid sealant in board wall with steel guide groove crack close Envelope treatment, when there is the situation of injecting glue difficulty, should use pressure injecting glue, and encapsulation process should ensure that and gas is occurred without at connecting node The phenomenon such as close property is bad;
(9)The rear top surface treatment in place of PC insulation board walls:After post wall is all fixed in place, board wall top surface absolute altitude should be checked, and do suitable When treatment, board wall top surface absolute altitude should be less than beam bottom designed elevation 10-20mm, in order to overall structure reasonable stress;
(10)Beam is lifted:Before beam lifting, one layer should be set at the 10-20mm gaps that PC insulation board wall top surfaces leave with soffit Rubber lath, then carry out the lifting work of beam body.
2. a kind of timber structure post-PC according to claim 1 is incubated board wall guide type node connection construction method, its feature It is:The step(1)The groove compact dimensions 1-2mm more bigger than the size of steel guide groove of middle timber structure post, in order to steel The installation of guide groove processed is in place.
3. a kind of timber structure post-PC according to claim 1 is incubated board wall guide type node connection construction method, its feature It is:The step(2)Middle steel guide groove wall thickness is advisable for 5-8mm, and the depth in guide groove insertion timber structure post is timber structure post The 1/3 of direction size is advisable, the outsourcing of steel guide groove design width for [B+2t+2 ×(2-3)], wherein B is PC warming plate wall thicknesses Degree, t is the wall thickness of steel guide groove.
4. a kind of timber structure post-PC according to claim 1 is incubated board wall guide type node connection construction method, its feature It is:The step(2)Middle thread forming self-tapping screw is set along shaft, and spacing is not more than 350mm, thread forming self-tapping screw Fixed operation is realized by the preformed hole on steel guide groove, the screw top surface after thread forming self-tapping screw is finally fixed should be stretched into 1-2mm in steel guide groove, in order to the quick in place of later stage insulation board wall.
5. a kind of timber structure post-PC according to claim 1 is incubated board wall guide type node connection construction method, its feature It is:The step(4)Or(5)In post lifting control errors:Plane error is no more than 2mm, and absolute altitude error is no more than 3mm, Perpendicularity deviation is no more than 0.3%.
6. a kind of timber structure post-PC according to claim 1 is incubated board wall guide type node connection construction method, its feature It is:The step(8)In board wall and steel guide groove crack in encapsulation process is carried out using silicone sealant.
7. a kind of timber structure post-PC according to claim 1 is incubated board wall guide type node connection construction method, its feature It is:The step(10)The thickness of middle rubber lath is 10-30mm.
CN201710130447.4A 2017-03-07 2017-03-07 Timber structure column-PC keeps the temperature board wall guide type node connection construction method Active CN106930412B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710130447.4A CN106930412B (en) 2017-03-07 2017-03-07 Timber structure column-PC keeps the temperature board wall guide type node connection construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710130447.4A CN106930412B (en) 2017-03-07 2017-03-07 Timber structure column-PC keeps the temperature board wall guide type node connection construction method

Publications (2)

Publication Number Publication Date
CN106930412A true CN106930412A (en) 2017-07-07
CN106930412B CN106930412B (en) 2019-04-30

Family

ID=59424395

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710130447.4A Active CN106930412B (en) 2017-03-07 2017-03-07 Timber structure column-PC keeps the temperature board wall guide type node connection construction method

Country Status (1)

Country Link
CN (1) CN106930412B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5325719U (en) * 1976-08-12 1978-03-04
JPS5510865U (en) * 1978-06-30 1980-01-24
JPS5835768Y2 (en) * 1978-12-25 1983-08-12 アイシン精機株式会社 Column and foundation joining device
CN1384900A (en) * 1999-10-29 2002-12-11 Cds新制铁国际株式会社 Structural member and method of manufacturing the structural member
CN104790555A (en) * 2015-04-22 2015-07-22 武汉思可达建筑技术有限公司 Light steel keel and lightweight concrete prefabricated combining wall and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5325719U (en) * 1976-08-12 1978-03-04
JPS5510865U (en) * 1978-06-30 1980-01-24
JPS5835768Y2 (en) * 1978-12-25 1983-08-12 アイシン精機株式会社 Column and foundation joining device
CN1384900A (en) * 1999-10-29 2002-12-11 Cds新制铁国际株式会社 Structural member and method of manufacturing the structural member
CN104790555A (en) * 2015-04-22 2015-07-22 武汉思可达建筑技术有限公司 Light steel keel and lightweight concrete prefabricated combining wall and construction method thereof

Also Published As

Publication number Publication date
CN106930412B (en) 2019-04-30

Similar Documents

Publication Publication Date Title
CN204019700U (en) Stair prefabricated components mould
CN105220998A (en) Connector, window frame structure and mounting method thereof
CN103612402B (en) There is the built-in fitting localization method of threaded hole
CN202882247U (en) Archaized mechanism
CN106930412A (en) Timber structure post PC is incubated board wall guide type node connection construction method
CN204456428U (en) A kind of entirety being installed on composite wallboard is waftd window
CN206708583U (en) A kind of fiber magnesium strengthens composite air duct
CN106894530A (en) A kind of waterproof construction and its installation method of the prefabricated vertical piece of sandwich heat preservation wallboard
CN103887060A (en) Manufacturing method for lower end seal of dry type transformer low-voltage coil
CN204850293U (en) Foamed ceramic board is connected in interlock
CN107796687A (en) A kind of glass fibre connector anti-pulling concrete sample and preparation method thereof
CN204386389U (en) A kind of shape of peripheral frame with health hole
CN204160591U (en) Panel straightening system
CN204571163U (en) Insulating wall body decoration plate
CN203808743U (en) Heat-preservation energy-saving type door and window sub-frame
CN207453346U (en) For the connection structure of bamboo and woods fiber plate splicing
CN207314588U (en) A kind of brick body builds off-load construction by laying bricks or stones
CN204804159U (en) Light energy - saving wall panels of staggered structure
CN206070944U (en) A kind of new insert-type wooden decorative wallboard
CN204983228U (en) " M " type location fossil fragments
CN203080826U (en) Frame type glass canopy with aluminum veneer wrapping steel joists
CN212956939U (en) Reinforced concrete anti-cracking plate
CN204645602U (en) A kind of advanced composite material (ACM) construction formwork
CN203783135U (en) Hollow die shell for concrete constructional column of wall
CN203156904U (en) Device for producing porous cement pantile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant