CN106929038B - A kind of pair of dry coke quenching auxiliary uses the red burnt method for carrying out baker - Google Patents

A kind of pair of dry coke quenching auxiliary uses the red burnt method for carrying out baker Download PDF

Info

Publication number
CN106929038B
CN106929038B CN201710084018.8A CN201710084018A CN106929038B CN 106929038 B CN106929038 B CN 106929038B CN 201710084018 A CN201710084018 A CN 201710084018A CN 106929038 B CN106929038 B CN 106929038B
Authority
CN
China
Prior art keywords
coke
temperature
dry
red
baker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710084018.8A
Other languages
Chinese (zh)
Other versions
CN106929038A (en
Inventor
李志斌
李巨兵
尹秀英
钱贵东
崔光
康玉龙
兰正宏
郭有林
尤文茹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuanhua Iron and Steel Group Co Ltd
Original Assignee
Xuanhua Iron and Steel Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuanhua Iron and Steel Group Co Ltd filed Critical Xuanhua Iron and Steel Group Co Ltd
Priority to CN201710084018.8A priority Critical patent/CN106929038B/en
Publication of CN106929038A publication Critical patent/CN106929038A/en
Application granted granted Critical
Publication of CN106929038B publication Critical patent/CN106929038B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B39/00Cooling or quenching coke
    • C10B39/02Dry cooling outside the oven

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Coke Industry (AREA)

Abstract

A kind of pair of dry coke quenching auxiliary belongs to coking dry coke quenching process technical field using the red burnt method for carrying out baker, for carrying out baker to dry coke quenching auxiliary.Its technical solution is: carrying out nitrogen pipeline purging operation to dry coke quenching auxiliary after warm wind drying stage, then red coke is packed into coke dry quenching furnace cooling chamber, circulating fan driving circulates in Dry quenching device by the inert gas of nitrogen of main component, inert gas and red burnt progress heat convection, when high-temperature gas flows through other positions of dry coke quenching auxiliary, gradually rise its temperature, and own temperature reduces, enable heat exchange and temperature-rise period in dry coke quenching auxiliary to continue to carry out, completes baker process.The present invention can overcome the shortcomings that coke-stove gas baker, the difficulty for reducing furnace operation improves the safety of baker process, reduces the consumption of the energy during baker, guarantee that the resistance to material of dry coke quenching auxiliary and metal component heat up under controlled conditions, is safely and smoothly transferred to normal production.

Description

A kind of pair of dry coke quenching auxiliary uses the red burnt method for carrying out baker
Technical field
The present invention relates to a kind of dry coke quenching auxiliaries for going into operation again after annual overhaul using the red burnt method for carrying out baker, belongs to In coking dry coke quenching process technical field.
Background technique
Coke-oven plant's dry coke quenching auxiliary must carry out baker operation before going into operation again after annual overhaul before being newly constructed and put into operation and every time, Purpose be remove coke dry quenching furnace, the moisture in disposable dust remover masonry, while by the equipment such as coke dry quenching furnace, disposable dust remover, boiler by Room temperature uniformly, is smoothly heated to continuous production then being phased out into again, to avoid cold conditions close to the temperature normally produced Dry quenching system, which is directly transferred to normal production, to be caused refractory material and Boiler Metallic member temperature sharply to increase and occurs irreversible Damage, influence dry coke quenching safety and stability production.
Dry coke quenching baker is divided into two stages, i.e., is main to remove coke dry quenching furnace and disposable dust remover refractory brick marshalling moisture The warm wind drying stage of purpose, and the coal gas baker stage to heat up as the main purpose.Wherein coal gas baker is entire baker The critical stage of process generallys use coke-stove gas as heat medium.The advantages of carrying out baker using coke-stove gas is coke oven Calorific value of gas height, flameholding can accurately adjust heating by the adjusting to gas volume, air capacity and air circulation Speed.The disadvantage is that coke-stove gas is explosive, operation difficulty is big, security risk is big;Need to be arranged in coke dry quenching furnace large-scale heating Equipment simultaneously carries out cold burnt moulding;Dismounting heating equipment will cause system temperature and sharply decline after baker;Coke-stove gas is aqueous And the water of constitution that burning generates is unfavorable to dust-extraction unit;And baker process consumes a large amount of coke-stove gas etc..In addition, dry coke quenching fills It sets and usually only part refractory brick marshalling is placed under repair and replaced during annual overhaul, contained humidity is well below creating into masonry Dry coke quenching, therefore drying stage time-consuming is shorter, and the emphasis of baker is the heating period.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of pair of dry coke quenching auxiliaries to use the red burnt method for carrying out baker, The shortcomings that this method is applied to the dry coke quenching auxiliary to go into operation again after overhaul, can overcome coke-stove gas baker reduces baker The difficulty of operation, the safety for improving baker process, the consumption for reducing the energy during baker, guarantee the resistance to material of dry coke quenching auxiliary and Metal component heats up under controlled conditions, is safely and smoothly transferred to normal production.
The technical solution for solving above-mentioned technical problem is:
Using the red burnt method for carrying out baker, it is carried out a kind of pair of dry coke quenching auxiliary using following steps:
(1) temperature air-dry it is dry before, cold coke is packed into coke dry quenching furnace, cold coke is filled to 1 meter of the bottom coke dry quenching furnace chute Xia Kou or less In the coke dry quenching furnace cooling chamber at place, it is not necessary to burnt progress moulding operation cold in coke dry quenching furnace;
(2) the heat-insulated chamotte mud of one layer of diatomite is brushed on the cooling chamber metope under cold burnt top to chute between mouth;
(3) warm wind drying operation is carried out to baker;
(4) after warm wind drying stage, to dry coke quenching auxiliary carry out nitrogen pipeline purging operation, by nitrogen coke dry quenching furnace, It is circulated in the circulation gas channel that disposable dust remover, boiler, secondary filter, secondary economizer and air duct form, with nitrogen Oxygen present in dry coke quenching auxiliary is replaced, the oxygen content in recyclegas is made to be down to 5% hereinafter, avoiding oxygen and red coke directly Reaction causes combustible gas component in recyclegas exceeded, can start after threatening the safety of dry coke quenching, nitrogen pipeline purging qualified red The burnt baker stage;
(5) be intermittently packed into coke dry quenching furnace cooling chamber it is red it is burnt carry out baker, in the red burnt baker stage, with nitrogen be mainly at The inert gas divided is under the action of circulating fan suction, in coke dry quenching furnace, disposable dust remover, boiler, secondary filter, secondary province's coal It is circulated in the circulation gas channel of device and air duct composition, the sensible heat for the red coke that interval is packed into is absorbed in coke dry quenching furnace cooling chamber Temperature increases afterwards, when high-temperature gas flows through other positions of dry coke quenching auxiliary, gradually rises its temperature, and own temperature drops It is low, enable heat exchange and temperature-rise period in dry coke quenching auxiliary to continue to carry out, completes baker process.
It is above-mentioned that the red burnt method for carrying out baker, the supervisor in the red burnt baker stage of the step 5 are used to dry coke quenching auxiliary Reason temperature is boiler inlet temperature T6, and heating rate is controlled at 10 DEG C/h;Secondary management temperature is to prestore room temperature T5, is heated up Rate control is at 10 DEG C/h;Added Management temperature is cooling chamber upper temp T4, when the burnt interval being packed into red to determination Between;300 DEG C, 650 DEG C and 800 DEG C three constant temperature zones are arranged in the red coke baker stage altogether.
It is above-mentioned that the red burnt method for carrying out baker, the red coke in the red burnt baker stage of the step 5 are used to dry coke quenching auxiliary It is packed into the time interval of coke dry quenching furnace are as follows:
(1) the primary red coke of 1 small fashionable dress in initially red burnt the commitment principle, first 10 times per canned 1/4 red cokes, can after 10 times Fill tank, red burnt point of 5 investments of every tank, filling the burnt time is no less than 10 minutes, cannot make after investment boiler inlet temperature sharply on It rises, in case boiler drum pressure, water level fluctuate;
(2) room temperature T5, cooling chamber temperature of lower T3, cooling chamber top can be prestored according to coke dry quenching furnace by filling burnt time interval Temperature T4 and boiler inlet temperature T6 make the appropriate adjustments;
(3) start a small amount of coke discharging after dress is 1 hour burnt, keep initial material position;
(4) boiler inlet temperature T6 temperature rise control controls temperature as auxiliary in 10 DEG C/h, cooling chamber upper temp T4, Decline is gone to close to boiler inlet temperature heating controlling value, cooling chamber upper temp T4 by rising to boiler inlet temperature T6 temperature It is again loaded into red coke when 25-30 DEG C of temperature when temperature stablizing burnt to higher than previous time dress, guarantees boiler inlet, coke dry quenching furnace cooling Section slowly heating.
It is above-mentioned that dry coke quenching auxiliary is done using the red burnt method for carrying out baker when prestoring room temperature T5 at 650 DEG C or less Putting out coke material position in furnace will be controlled always it by interval coke discharging at lower than 1 meter of mouth under chute, and red burnt and chute area is avoided It is directly contacted with the refractory brick in annular passage area, after prestoring room temperature T5 higher than 650 DEG C, material position is sustainable to be increased to normal raw Material position when production, is not limited to the above.
Beneficial effects of the present invention:
The present invention is the pioneering of dry coke quenching roast technic, breaches the tradition side that dry coke quenching baker carries out baker using coal gas Method.It replaces coal gas to carry out baker using red coke, is not only fully able to achieve the effect that coal gas baker, and have significant advanced Property, safety and economic benefit.
The present invention is compared with traditional coal gas baker, without to burnt progress moulding cold in coke dry quenching furnace, it is not necessary to install coal gas and add Hot burner dismounts burner after eliminating baker and closes the time of manhole, avoids the sharply decline of coke dry quenching furnace temperature;Behaviour Make simple, safety, is not in the danger of gas explosion, dust pelletizing system is not influenced;It can be kept away using drying method under cooling chamber Exempt from red coke the chute area and annular passage area refractory brick bad with relative flimsiness in coke dry quenching furnace directly to contact, protects the two keys The masonry at position extends the service life of dry coke quenching auxiliary to a certain extent;A large amount of cokes can also be saved using red burnt baker Producer gas reduces baker cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of red burnt roast technic of the invention;
Fig. 2 is the cold burnt Level control schematic diagram of coke dry quenching furnace of the invention.
It is marked in figure as follows: coke dry quenching furnace 1, disposable dust remover 2, boiler 3, secondary filter 4, circulating fan 5, heat pipe heat exchanging Device 6, rotary seal valve 7, belt 8, cold burnt material position line 9, air 10, it is red it is burnt be packed into 11, to dedusting earth station 12, prestore room 13, Mouth 16 under cooling chamber 14, chute area 15, chute is brushed 17 at heat-insulated chamotte, removes disposable dust remover 18.
Specific embodiment
The present invention replaces coal gas baker after warm wind drying stage with red burnt baker, and red Jiaozhuo is heating medium, with Main component is the inert gas of nitrogen as intermediate thermophore, is changed using inert gas and red burnt and dry coke quenching auxiliary convection current The heat radiation of hot and red coke equably heats up to dry coke quenching auxiliary, makes dry coke quenching auxiliary temperature under controlled conditions gradually Reach the requirement that dry coke quenching normally produces.
The method of red coke baker includes preparation, nitrogen pipeline purging and the red burnt baker three phases before baker:
(1) preparation before baker includes the loading of cold coke, the setting of coke material position and the painting of heat-insulated chamotte in coke dry quenching furnace 1 Brush.This stage must air-dry dry preceding completion in temperature.
(2) after warm wind drying stage, nitrogen pipeline purging operation is carried out to dry coke quenching auxiliary first, with nitrogen substitution line Oxygen present in system makes the oxygen content in recyclegas be down to 5% and causes to recycle hereinafter, oxygen is avoided directly to react with red coke Combustible gas component is exceeded in gas, threatens the safety of dry coke quenching.It can start the red burnt baker stage after nitrogen pipeline purging is qualified.
(3) in red burnt baker stage, with nitrogen inert gas as main component under the action of circulating fan suction, In It is recycled in the circulation gas channel that coke dry quenching furnace 1, disposable dust remover 2, boiler 3, secondary filter 4, secondary economizer and air duct form Flowing, temperature increases after the sensible heat for the red coke that interval is packed into is absorbed in coke dry quenching furnace cooling chamber 14, and high-temperature gas flows through dry coke quenching When other positions of device, gradually rise its temperature, and own temperature reduces, and makes the heat exchange and heating in dry coke quenching auxiliary Process can continue to carry out, and complete baker process.
The key of the method for the present invention is the selection of red burnt baker mode, is exactly cold coke material position in coke dry quenching furnace 1 specifically Determination and Controlling principle.Distribution situation and pneumatics principle of the requirement, red coke protected according to resistance to material in coke dry quenching furnace 1, It is carried out using the method for " drying formula under cooling chamber ".Cold coke i.e. in coke dry quenching furnace 1 is filled under 1 chute of coke dry quenching furnace 1 below 16 bottom of mouth In coke dry quenching furnace cooling chamber 4 at rice, since the red coke of loading is in that approximation is pyramidal on furnace inner plane after distributing device cloth, with The amount that furnace wall directly contacts is less, and the cooling along with inert gas to red coke will not damage furnace wall, it is not necessary to put out to dry Cold burnt progress moulding operation in furnace.In view of the safety of 14 refractory brick of cooling chamber, under cold burnt top to chute between mouth 16 The heat-insulated chamotte mud of one layer of diatomite is brushed on cooling chamber metope.Due to the indifferent gas after the effect of heat buoyancy, with red burnt heat exchange Body under the action of heat buoyancy, can part enter and prestore 13 upper space of room, and flow through the hot inert gas of annular passage under Supreme common heating prestores 13 masonry of room, and being heated for each portion of masonry is relatively uniform, is conducive to the control of temperature and the protection of resistance to material. When prestoring room temperature T5 at 650 DEG C or less, it will be controlled always by interval coke discharging and is being lower than by coke material position in coke dry quenching furnace 1 Under chute at 1 meter of mouth 16, the purpose is to when chute area 15 and when prestoring 13 temperature of room lower than 650 DEG C, avoid always it is red it is burnt with The refractory brick in chute area 15 and annular passage area directly contacts, rise heat effect mainly inertia recyclegas and it is red coke and it is dry The heat convection of coke quenching device to protect the two weak parts of masonry, while being convenient for each portion's temperature of control system;In addition The interval coke discharging in this stage can also avoid the generation of 1 hanging of coke dry quenching furnace to a certain extent.It is higher than when prestoring room temperature T5 After 650 DEG C, material position is sustainable to be increased to material position during normal production, is not limited to the above.
The warming temperature management in red coke baker stage:
(1) the main management temperature in red burnt baker stage is boiler inlet temperature T6, and heating rate is controlled at 10 DEG C/h; Prestoring room temperature T5 is time management temperature, and heating rate is controlled at 10 DEG C/h;Cooling chamber upper temp T4 is Added Management temperature Degree, to the determination red burnt interval time being packed into.
(2) 300 DEG C, 650 DEG C and 800 DEG C three constant temperature zones are arranged in the red burnt baker stage altogether.
Heat up planning chart
The red burnt time interval setting for being packed into coke dry quenching furnace:
(1) the primary red coke of 1 small fashionable dress in initially red burnt the commitment principle, first 10 times per canned 1/4 red cokes, can after 10 times Fill tank, red burnt point of 5 investments of every tank, filling the burnt time is no less than 10 minutes, not make after investment boiler inlet temperature sharply on It rises, in case boiler drum pressure, water level fluctuate.
(2) filling burnt time interval can prestoring under room temperature T5, cooling chamber upper temp T4, cooling chamber according to coke dry quenching furnace Portion temperature T3 and boiler inlet temperature T6 make the appropriate adjustments.
(3) start a small amount of coke discharging after dress is 1 hour burnt, keep initial material position.
(4) boiler inlet temperature T6 temperature rise control controls temperature as auxiliary in 10 DEG C/h, cooling chamber upper temp T4, Decline is gone to close to boiler inlet temperature heating controlling value, cooling chamber upper temp T4 by rising to boiler inlet temperature T6 temperature It is again loaded into red coke when 25-30 DEG C of temperature when temperature stablizing burnt to higher than previous time dress, guarantees boiler inlet, coke dry quenching furnace cooling Section slowly heating.
Specific implementation process of the invention is as follows:
(1) after the work of dry coke quenching annual overhaul is fully completed, cold coke is packed into coke dry quenching furnace 1.Dry coke quenching charcoal is preferred in cold coke.
Coke material position will control at 1 meter lower than mouth 16 under chute in coke dry quenching furnace 1.Coke dry quenching furnace level-sensing device indicating value is recorded, Foundation as baker coke dry quenching furnace early period Level control.It is applied on 14 metope of cooling chamber under cold burnt top to chute between mouth 16 Brush the heat-insulated chamotte mud of one layer of diatomite.When prestoring room temperature T5 lower than 650 DEG C, such as fill defocused material position and increase, should by Coke discharging of having a rest remains this material position.After prestoring room temperature T5 higher than 650 DEG C, material position is sustainable to be increased to expecting during normal production Position, is not limited to the above.
(2) warm wind completes following preparation after drying:
Coke dry quenching furnace: bleeding valve standard-sized sheet;Air imports valve and closes entirely.
Recyclegas system: coke dry quenching furnace inlet baffle center 50%, periphery 50%;Top water seal tank continuous drainage;Promptly put Dissipate valve water seal water inlet;Bleeding valve water seal water inlet.
Boiler system: one or two drain valves excessively are crack;Deaerator feed water pump is continuously run;Boiler feed pump is continuously run;It removes Oxygen device liquid level is normal;0~-100mm of liquid level of steam drum;Periodical blowdown closes entirely;Continuous blowdown is crack;Dosing pump is continuously run;Water supply Valve regulation is adjusted to " center is manually ";Main steam pressure force regulating valve was adjusted to " center is manually ";Attemperator adjust valve regulation to " in Centre is manual ";Steam stop valve is adjusted to complete and is closed.
(3) nitrogen pipeline purging operation, O in system after pipeline purging are carried out2Content must < 5%.
(4) red burnt baker heating standard:
Boiler inlet temperature T6, room temperature T5 is prestored by heating requirements of plan execution.
4 cooling chamber temperature of lower T3, cooling chamber upper temp T4 temperature uniformly rise, and cannot fluctuate excessive.Cooling chamber Not more than 350 DEG C of temperature of lower T3, not more than 450 DEG C of cooling chamber upper temp T4.
(5) the primary red coke of 1 small fashionable dress in initially red burnt the commitment principle, first 10 times per canned 1/4 red cokes, can after 10 times Fill tank, red burnt point of 5 investments of every tank, filling the burnt time is no less than 10 minutes, not make after investment boiler inlet temperature sharply on It rises, in case boiler drum pressure, water level fluctuate.
(6) filling burnt time interval can be according to prestoring room temperature T5, middle section cooling chamber temperature of lower T3, cold at the top of coke dry quenching furnace 1 But room upper temp T4 and boiler inlet temperature T6 make the appropriate adjustments.
(7) start a small amount of coke discharging after dress is 1 hour burnt, keep initial material position.
(8) boiler inlet temperature T6 temperature rise control controls temperature as auxiliary in 10 DEG C/h, cooling chamber upper temp T4, Decline is gone to close to boiler inlet temperature heating controlling value, cooling chamber upper temp T4 by rising to boiler inlet temperature T6 temperature It is again loaded into red coke when 25-30 DEG C of temperature when temperature stablizing burnt to higher than previous time dress, guarantees boiler inlet, coke dry quenching furnace cooling Section slowly heating.
(9) red burnt loading method: " manual " switch in elevator scene is slowly operated, burnt tank bottom gate is slowly opened, a bit A little a small amount of dress is burnt.Red defocused by the loading of prescribed requirement amount, burnt tank is lifted move to specified position as early as possible by " manual " operation.
(10) start, with the gradually increase of dressing coke amount, gradually to increase and follow with the air-supply of minimal circulation air quantity after red burnt loading Ring air quantity.
(11) with the loading of red coke, the generation of boiler inlet temperature rapidly changes.To prevent because of boiler inlet temperature sharply Pressure jump caused by variation and furnace gas volume expansion, dress will gradually increase air circulation when burnt, to main management temperature When degree is begun to decline, then air quantity is slowly reduced, to guarantee that temperature is normal.
(12) when heat coke is packed into, internal system H2, CO concentration adjustment, generally can be by being blown into N2Amount is to run.Boiler enters When mouth temperature T6 is greater than 650 DEG C, passes through and import air control combustible gas component.
(13) when filling red coke steam water-level occur it is obvious change, but after a period of time can spontaneous recovery, however Gao Shui Position will adjust confluent when being abnormal variation in time.
(14) gradually increasing with dressing coke amount, steam generating amount will also increase, and drum hydraulic pressure will also rise with it. Before steam circulation, main steam should be diffused motor-driven valve standard-sized sheet, pressure adjustment is carried out using main steam pressure force regulating valve.
(15) with the increase of dressing coke amount, gradually shorten the interval to boiler water supply, the company of being transferred to after burnt, coke discharging to be installed is stablized Continuous water supply.
(16) when boiler inlet temperature T6 temperature rises to 800 DEG C or more, coke discharge amount can be set according to actual conditions, follow Ring air quantity, and gradually it is transferred to the normal operation of dry coke quenching.

Claims (3)

1. a kind of pair of dry coke quenching auxiliary uses the red burnt method for carrying out baker, it is characterised in that: it is carried out using following steps:
A. temperature air-dry it is dry before, cold coke is packed into the coke dry quenching furnace (1), cold coke is filled under coke dry quenching furnace chute 1 below mouth (16) bottom In coke dry quenching furnace cooling chamber (14) at rice, it is not necessary to burnt progress moulding operation cold in coke dry quenching furnace (1);
B. the heat-insulated chamotte mud of one layer of diatomite is brushed on cooling chamber (14) metope under cold burnt top to chute between mouth (16) Slurry;
C. warm wind drying operation is carried out;
D. after warm wind drying stage, nitrogen pipeline purging operation is carried out to dry coke quenching auxiliary, makes nitrogen in coke dry quenching furnace (1), one It is circulated in the circulation gas channel that secondary deduster (2), boiler (3), secondary filter (4), secondary economizer and air duct form, With oxygen present in nitrogen displacement dry coke quenching auxiliary, make the oxygen content in recyclegas be down to 5% hereinafter, avoid oxygen with it is red Burnt directly reaction causes combustible gas component in recyclegas exceeded, after threatening the safety of dry coke quenching auxiliary, nitrogen pipeline purging qualified It can start the red burnt baker stage;
E. in the coke dry quenching furnace cooling chamber (14) interval be packed into it is red it is burnt carry out baker, in the red burnt baker stage, with nitrogen be mainly at Point inert gas under the action of circulating fan (5) suction, in coke dry quenching furnace (1), disposable dust remover (2), boiler (3), secondary It circulates in the circulation gas channel of deduster (4), secondary economizer and air duct composition, is absorbed in coke dry quenching furnace cooling chamber (14) Interval be packed into red coke sensible heat after temperature raising, when high-temperature gas flows through other positions of dry coke quenching auxiliary, make its temperature by Edge up height, and own temperature reduces, and enables heat exchange and temperature-rise period in dry coke quenching auxiliary to continue to carry out, completes baker mistake Journey;The main management temperature in red coke baker stage is boiler inlet temperature T6, and heating rate is controlled at 10 DEG C/h;Secondary management temperature To prestore room temperature T5, heating rate is controlled at 10 DEG C/h degree;Added Management temperature is cooling chamber upper temp T4, to Determine the red burnt interval time being packed into;300 DEG C, 650 DEG C and 800 DEG C three constant temperature zones are arranged in the red coke baker stage altogether.
2. according to claim 1 use the red burnt method for carrying out baker to dry coke quenching auxiliary, it is characterised in that: the step The red burnt time interval for being packed into coke dry quenching furnace in the red burnt baker stage of rapid e are as follows:
A. the primary red coke of 1 small fashionable dress in initially red burnt the commitment principle, per canned 1/4 red cokes, after 10 times, can fill for first 10 times Tank, red burnt point of 5 investments of every tank, dress burnt time are no less than 10 minutes, boiler inlet temperature cannot be made to steeply rise after investment, with Exempt from boiler drum pressure, water level fluctuates;
B. room temperature T5, cooling chamber temperature of lower T3, cooling chamber top temperature can be prestored according to coke dry quenching furnace (1) by filling burnt time interval Degree T4 and boiler inlet temperature T6 makes the appropriate adjustments;
C. start a small amount of coke discharging after dress is 1 hour burnt, keep initial material position;
D. boiler inlet temperature T6 temperature rise control is in 10 DEG C/h, and cooling chamber upper temp T4 is as auxiliary control temperature, to pot Furnace inlet temperature T6 temperature goes to decline close to boiler inlet temperature heating controlling value, cooling chamber upper temp T4 temperature by rising It is again loaded into red coke when 25-30 DEG C of temperature when stablizing burnt to higher than previous time dress, guarantees that boiler inlet, coke dry quenching furnace cooling section delay Slow heating.
3. according to claim 2 use the red burnt method for carrying out baker to dry coke quenching auxiliary, it is characterised in that: when prestoring At 650 DEG C or less, coke material position will be controlled always it by interval coke discharging lower than under chute room temperature T5 in coke dry quenching furnace At mouthfuls (16) 1 meters, red coke is avoided directly to contact with the refractory brick of chute area (15) and annular passage area, when prestoring room temperature T5 high After 650 DEG C, material position is sustainable to be increased to material position during normal production, is not limited to the above.
CN201710084018.8A 2017-02-16 2017-02-16 A kind of pair of dry coke quenching auxiliary uses the red burnt method for carrying out baker Active CN106929038B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710084018.8A CN106929038B (en) 2017-02-16 2017-02-16 A kind of pair of dry coke quenching auxiliary uses the red burnt method for carrying out baker

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710084018.8A CN106929038B (en) 2017-02-16 2017-02-16 A kind of pair of dry coke quenching auxiliary uses the red burnt method for carrying out baker

Publications (2)

Publication Number Publication Date
CN106929038A CN106929038A (en) 2017-07-07
CN106929038B true CN106929038B (en) 2019-11-08

Family

ID=59424250

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710084018.8A Active CN106929038B (en) 2017-02-16 2017-02-16 A kind of pair of dry coke quenching auxiliary uses the red burnt method for carrying out baker

Country Status (1)

Country Link
CN (1) CN106929038B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107603677B (en) * 2017-11-07 2020-11-20 山东京博众诚清洁能源有限公司 Coal gas production equipment and safe blow-in method thereof
CN107936990A (en) * 2017-11-27 2018-04-20 安徽临涣化工有限责任公司 A kind of dry coke quenching furnace drying method
CN108709413B (en) * 2018-05-24 2020-06-30 山东钢铁集团日照有限公司 Method for dry quenching coke warm air drying oven by adopting flue gas oven
CN109233872A (en) * 2018-11-09 2019-01-18 榆林学院 A kind of factory's coke dry quenching furnace and dry coke quenching system
CN112898995B (en) * 2021-01-15 2021-08-31 广东韶钢松山股份有限公司 Coke loading control method and device and electronic equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101747913A (en) * 2009-12-31 2010-06-23 山西太钢不锈钢股份有限公司 Method for baking dry quenching furnace
CN102304369A (en) * 2011-08-12 2012-01-04 重庆钢铁(集团)有限责任公司 Oven-drying working process for coke dry quenching system
CN102559214A (en) * 2011-12-21 2012-07-11 攀钢集团攀枝花钢钒有限公司 Method for raising temperature in coke dry quenching furnace

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58127778A (en) * 1982-01-25 1983-07-29 Ishikawajima Harima Heavy Ind Co Ltd Drying and heating of dry quenching equipment for coke

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101747913A (en) * 2009-12-31 2010-06-23 山西太钢不锈钢股份有限公司 Method for baking dry quenching furnace
CN102304369A (en) * 2011-08-12 2012-01-04 重庆钢铁(集团)有限责任公司 Oven-drying working process for coke dry quenching system
CN102559214A (en) * 2011-12-21 2012-07-11 攀钢集团攀枝花钢钒有限公司 Method for raising temperature in coke dry quenching furnace

Also Published As

Publication number Publication date
CN106929038A (en) 2017-07-07

Similar Documents

Publication Publication Date Title
CN106929038B (en) A kind of pair of dry coke quenching auxiliary uses the red burnt method for carrying out baker
CN206232660U (en) A kind of attemperating unit of coal oven dithio-gas Exposure degree
CN106967861B (en) Time-sharing preheating system for combustion air of hot blast stove
CN103740380B (en) A kind of heatingup of coke oven battery technique
CN107201237A (en) A kind of baker temperature-rising method for being used to reproduce after repairing in coke dry quenching furnace
CN208829589U (en) A kind of tedge waste-heat recovery device
CN204400922U (en) A kind of biomass gasification burning is for the device of annealing furnace
CN104215076A (en) Device and method utilizing smoke residual heat of coking pipe type furnace to dry ammonium sulphate
CN104479698B (en) Product method is protected for steam outside dry coke quenching
CN202705299U (en) Water cooling coke oven top structure
CN105039898B (en) Pit carburizing furnace bottomless Mafu Tank flows water cooling sealing structure
CN104001853B (en) Heating device for casting used sand hot method regeneration technology and heating mode of heating device
CN203875275U (en) Heating device of thermal reclamation process of used casting sand
CN112920817A (en) Automatic control system and control method for raw coke oven gas sensible heat recovery in ascending pipe of coke oven
CN108328915B (en) Transverse circulating toughened glass homogenizing furnace
CN207738686U (en) The one-way heating system of external-heat low order fine coal continuous shale oven
CN204898049U (en) Well formula cementation furnace does not have not jar mobile water -cooling seal structure of end horse
CN107936990A (en) A kind of dry coke quenching furnace drying method
CN204251633U (en) For preventing the change water speed cooling system of cooling stave scaling loss
CN110317909A (en) Blast oven method
CN206244713U (en) A kind of top collaboration bottom regulation coke oven structure to distribution of air flow long
CN110079353A (en) A kind of pulverized coal pyrolysis charing chamber device
CN115197723B (en) Coke oven brick coal gas flue channeling treatment method
CN104152167B (en) A kind of coking process method
CN204301548U (en) Flash distillation power drainage pump

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant