CN106925000A CN201511025424.4A CN201511025424A CN106925000A CN 106925000 A CN106925000 A CN 106925000A CN 201511025424 A CN201511025424 A CN 201511025424A CN 106925000 A CN106925000 A CN 106925000A
Authority
CN
China
Prior art keywords
partition wall
building site
water inlet
inlet pipe
pool wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201511025424.4A
Other languages
Chinese (zh)
Inventor
杜奇能
席旭军
叶标
武申申
吴文誉
陈红梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pvg Municipal Architecture Design And Research Institute Co Ltd
Original Assignee
Pvg Municipal Architecture Design And Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pvg Municipal Architecture Design And Research Institute Co Ltd filed Critical Pvg Municipal Architecture Design And Research Institute Co Ltd
Priority to CN201511025424.4A priority Critical patent/CN106925000A/en
Publication of CN106925000A publication Critical patent/CN106925000A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/02Settling tanks with single outlets for the separated liquid
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D21/00Separation of suspended solid particles from liquids by sedimentation
    • B01D21/003Sedimentation tanks provided with a plurality of compartments separated by a partition wall
    • B01D21/0033Vertical, perforated partition walls

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Sewage (AREA)

Abstract

The present invention relates to a kind of three lattice sedimentation basins for building site, the three lattice sedimentation basin locates below ground level, including pool wall (1), the water inlet pipe (3) being located on pool wall, outlet pipe (9) and the twice partition wall (5) being located in pool wall, the square hole (8) for fluid circulation is equipped with per pass partition wall (5).Compared with prior art, deposition efficiency of the present invention it is high, safe, without short stream turbulent flow phenomenon, can very well be applied to building site sewage treatment area.

Description

A kind of three lattice sedimentation basins for building site
Technical field
The present invention relates to stain disease pretreatment unit, and in particular to a kind of three lattice sedimentation basins for building site.
Background technology
Building site due to rain drop erosion, cleaning road surface and rinse construction waste water that earthwork car produces, mud has to pass through treatment can just enter municipal pipeline.City planting ductwork such as is directly discharged into without treatment, wherein a large amount of solid particles, mud and the chemical substance that contain will if things go on like this deposit, block, corroding city planting ductwork, normal rainwater discharge is influenceed, potential safety hazard is brought.
Although and the sedimentation basin that building site now uses can carry out certain treatment to building site waste water, because the effect of inertia intake, or water are heated up by wind-force and illumination and influenceed, easily forming short stream.This causes that the residence time of sedimentation basin internal zone dividing domain water is too short, cannot fully precipitate, and reduces deposition efficiency;Another part water retention time is long, occurs stagnating motionless slough, reduces the dischargeable capacity of sedimentation basin.Therefore the sedimentation basin structures in existing many building sites cannot efficiently reach the purpose of precipitation building site waste water for a long time, and treatment effect is not satisfactory.
The content of the invention
The purpose of the present invention is exactly that the three lattice sedimentation basins for building site that a kind of deposition efficiency is high, short stream turbulent flow phenomenon is few are provided for the defect for overcoming above-mentioned prior art to exist.
The purpose of the present invention can be achieved through the following technical solutions:A kind of three lattice sedimentation basins for building site, three described lattice sedimentation basins are located below ground level, including pool wall, the water inlet pipe being located on pool wall, outlet pipe and the twice partition wall that is located in pool wall, and the square hole for fluid circulation is equipped with per pass partition wall.
One end of the water inlet pipe is connected with building site place waste water, and the other end is located at described pool wall middle part, and sets rigid waterproofing wing eyelet thimble in the junction of water inlet pipe and pool wall;The depth of the water inlet pipe is set to 1.5~3m.
One end of the outlet pipe is connected with municipal rain pipe, and the other end is located on the pool wall relative with water inlet pipe, and sets rigid waterproofing wing eyelet thimble in the junction of outlet pipe and pool wall;The depth of described outlet pipe differs 0.15m with water inlet pipe, positioned at water inlet pipe horizontal plane lower section.
Described pool wall top sets rectangle reinforced concrete cover plate, lower section pours base plate, described pool wall depth is 3~5m, reinforced concrete cover plate can effectively close sedimentation basin and be contacted with extraneous, so that the wind-force of outside and shining upon and not interfering with waste water fluidised form in pond, avoid producing short stream, turbulent flow, avoid having a negative impact precipitation result with this.
Described pool wall, reinforced concrete cover plate, base plate are reinforced concrete cast-in-situ and form, it is ensured that the seal of sedimentation basin, it can be ensured that sewage does not penetrate into underground, polluted underground water.Meanwhile, cast-in-situ steel reinforced concrete can improve pool wall smooth degree, be conducive to fluidised form of the waste water in pond, effectively improve deposition efficiency.
Sedimentation basin is divided into three precipitation zones by the total twice of described partition wall, respectively partition wall a and partition wall b, and water inlet pipe, partition wall a, partition wall b and outlet pipe are arranged successively by current direction.
The square hole depth ratio low 0.05m of water inlet pipe depth on described partition wall a, the low 0.05m of square hole depth on square hole depth ratio partition wall a on partition wall b, the low 0.05m of square hole depth on the depth ratio partition wall b of outlet pipe.
Described water inlet pipe, two square holes, outlet pipes are staggered in the plane, in " it " shape.
Building site waste water flows into sedimentation basin after collecting from water inlet pipe, through square hole, so that in a zigzag by whole precipitation zone, solid particle is assembled in the presence of self gravitation and is deposited to bottom of pond in flow process reclaimed water.And the method for designing of lattice increased waste water flow, reduce hydraulic radius, improve flow condition, most flow into city planting ductwork through outlet pipe afterwards.
Compared with prior art, beneficial effects of the present invention are embodied in following several respects:
(1) present invention makes current in flowing in a zigzag by the square hole on partition wall, increases flow, saves the area, and is conducive to building site field course layout, improves wastewater sedimentation efficiency.
(2) three lattice sedimentation basin Stability Analysis of Structures reliability of the invention, safe.
(3) in the present invention, sediment fraction top is provided with reinforced concrete cover plate, and compared to existing technology, reinforced concrete cover plate can effectively prevent the short flow phenomenon that temperature difference that wind-force and Exposure to Sunlight cause etc. causes, so as to improve deposition efficiency.
(4) pool wall of the present invention is formed by reinforced concrete cast-in-situ, so can ensure that water does not penetrate into underground, polluted underground water.
(5) present invention in actual pilot when using, obtaining preferable achievement.
Brief description of the drawings
Fig. 1 is structural representation of the invention;
Fig. 2 is present invention looks up structural representation of the invention;
Fig. 3 is overlooking the structure diagram of the invention.
Wherein, 1 is pool wall, and 2 is rigid waterproofing wing eyelet thimble, and 3 is water inlet pipe, and 4 is precipitation zone, and 5 is partition wall, and 51 is partition wall a, and 52 is partition wall b, and 6 is reinforced concrete cover plate, and 7 is base plate, and 8 is square hole, and 9 is outlet pipe.
Specific embodiment
Embodiments of the invention are elaborated below, the present embodiment is implemented under premised on technical solution of the present invention, give detailed implementation method and specific operating process, but protection scope of the present invention is not limited to following embodiments.
Embodiment 1
As shown in Figure 1, it is a kind of three lattice sedimentation basins for building site, the three lattice sedimentation basin is arranged at the wastewater outlet of building site place, including pool wall 1, the water inlet pipe 3 being located in the middle part of pool wall 1 and outlet pipe 9 and the partition wall 5 being located in pool wall 1, partition wall 5 includes partition wall a51 and partition wall b52, and water inlet pipe 3, partition wall a51, partition wall b52 and outlet pipe 9 set gradually.Partition wall 5 is provided with the guiding function that square hole 8 is realized to current.Outlet pipe 9 is connected with municipal rain pipe.Water inlet pipe 3, outlet pipe 9 are equipped with rigid waterproofing wing eyelet thimble 2 with the junction of pool wall 1.
Three lattice sedimentation basin water inlet pipe depth determine that mobility scale is 1.5~3.0m according to building site wastewater drainage pipe road.The elevation difference of inlet and outlet pipe lines is 0.15m, and partition wall a51 and partition wall b52 square hole 8 still are respectively 0.05m and 0.1m, are used to compensate the loss of flood peak with the elevation difference of water inlet pipe 3.Bottom of pond absolute altitude determines that mobility scale is 3.0~5.0m according to building site wastewater flow rate.
Pool wall 1, partition wall 5 and base plate 7 are to be formed by reinforced concrete cast-in-situ, it is ensured that the seal of sedimentation basin, it can be ensured that sewage does not penetrate into underground, polluted underground water.Meanwhile, cast-in-situ steel reinforced concrete can improve pool wall smooth degree, be conducive to fluidised form of the waste water in pond, effectively improve deposition efficiency.
As shown in Fig. 2 building site waste water flows into sedimentation basin from water inlet pipe 3, through square hole 8, by whole precipitation zone 4, most to flow into city planting ductwork through outlet pipe 9 afterwards in a zigzag.
As shown in figure 3, corresponding to the top of precipitation zone 4 on pool wall 1 is provided with rectangle reinforced concrete cover plate 6.In the present embodiment, each corresponding region of rectangle reinforced concrete cover plate 6 sets 7 pieces, totally 21 pieces.Reinforced concrete cover plate can effectively close contacting for sedimentation basin and the external world so that outside wind-force and shine upon and do not interfere with waste water fluidised form in pond, it is to avoid produce short stream, turbulent flow, avoid having a negative impact precipitation result with this.

Claims (8)

1. a kind of three lattice sedimentation basins for building site, it is characterised in that three described lattice sedimentation basins be located at ground with Under, including pool wall (1), the water inlet pipe (3), the outlet pipe (9) and be located in pool wall two that are located on pool wall Road partition wall (5), is equipped with the square hole (8) for fluid circulation on per pass partition wall (5).
2. a kind of three lattice sedimentation basins for building site according to claim 1, it is characterised in that described One end of water inlet pipe (3) is connected with building site place waste water, and the other end is located in the middle part of described pool wall (1), and Water inlet pipe (3) sets rigid waterproofing wing eyelet thimble (2) with the junction of pool wall (1);Described water inlet pipe (3) Depth be set to 1.5~3m.
3. a kind of three lattice sedimentation basins for building site according to claim 1, it is characterised in that described One end of outlet pipe (9) is connected with municipal rain pipe, and the other end is located at the pool wall (1) relative with water inlet pipe (3) On, and rigid waterproofing wing eyelet thimble (2) is set in the junction of outlet pipe (3) and pool wall (1);Described goes out The depth of water pipe (9) differs 0.15m with water inlet pipe (3), positioned at water inlet pipe (3) horizontal plane lower section.
4. a kind of three lattice sedimentation basins for building site according to claim 1, it is characterised in that described Pool wall (1) top sets rectangle reinforced concrete cover plate (6), and lower section pours base plate (7), described pool wall depth It is 3~5m to spend.
5. a kind of three lattice sedimentation basins for building site according to claim 4, it is characterised in that described Pool wall (1), reinforced concrete cover plate (6), base plate (7) are reinforced concrete cast-in-situ and form.
6. a kind of three lattice sedimentation basins for building site according to claim 1, it is characterised in that described Partition wall (5) has twice, respectively partition wall a (51) and partition wall b (52), and sedimentation basin is divided into three precipitations Region (4), water inlet pipe (3), partition wall a (51), partition wall b (52) and outlet pipe (9) by current direction according to Secondary arrangement.
7. a kind of three lattice sedimentation basins for building site according to claim 6, it is characterised in that described The square hole depth in square hole depth ratio water inlet pipe (3) depth low 0.05m, partition wall b (52) on partition wall a (51) Spend than the low 0.05m of square hole depth on partition wall a (51), on depth ratio partition wall b (52) of outlet pipe (9) The low 0.05m of square hole depth.
8. a kind of three lattice sedimentation basins for building site according to claim 7, it is characterised in that described Water inlet pipe (3), two square holes (8), outlet pipes (9) alternate in the horizontal direction, in " it " shape.
CN201511025424.4A 2015-12-30 2015-12-30 A kind of three lattice sedimentation basins for building site Pending CN106925000A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201511025424.4A CN106925000A (en) 2015-12-30 2015-12-30 A kind of three lattice sedimentation basins for building site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201511025424.4A CN106925000A (en) 2015-12-30 2015-12-30 A kind of three lattice sedimentation basins for building site

Publications (1)

Publication Number Publication Date
CN106925000A true CN106925000A (en) 2017-07-07

Family

ID=59441672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201511025424.4A Pending CN106925000A (en) 2015-12-30 2015-12-30 A kind of three lattice sedimentation basins for building site

Country Status (1)

Country Link
CN (1) CN106925000A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547367A (en) * 2018-05-11 2018-09-18 深圳市中邦(集团)建设总承包有限公司 A kind of sedimentation basin and its construction method closing on seashore

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202185189U (en) * 2011-07-14 2012-04-11 云南大红山管道有限公司 Sedimentation tank for sewage disposal of iron ore concentrate pulp body
CN202700156U (en) * 2012-08-15 2013-01-30 中国水利水电第十四工程局有限公司 Sewage sedimentation pond of concrete mixing station
CN204411885U (en) * 2014-12-30 2015-06-24 上海浦东建筑设计研究院有限公司 A kind of residential quarter sewage grid setting pot
CN205435076U (en) * 2015-12-30 2016-08-10 上海浦东建筑设计研究院有限公司 A three check sedimentation tanks for building site

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202185189U (en) * 2011-07-14 2012-04-11 云南大红山管道有限公司 Sedimentation tank for sewage disposal of iron ore concentrate pulp body
CN202700156U (en) * 2012-08-15 2013-01-30 中国水利水电第十四工程局有限公司 Sewage sedimentation pond of concrete mixing station
CN204411885U (en) * 2014-12-30 2015-06-24 上海浦东建筑设计研究院有限公司 A kind of residential quarter sewage grid setting pot
CN205435076U (en) * 2015-12-30 2016-08-10 上海浦东建筑设计研究院有限公司 A three check sedimentation tanks for building site

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108547367A (en) * 2018-05-11 2018-09-18 深圳市中邦(集团)建设总承包有限公司 A kind of sedimentation basin and its construction method closing on seashore

Similar Documents

Publication Publication Date Title
CN101967841B (en) Method and device for implementing primary rainwater closure in municipal network system
CN104174191A (en) Integral grit chamber for treating rainwater and treating method
KR20090033663A (en) Purification treatment device of rainwater
CN105672466A (en) Integrated rainwater sand basin device
CN205776662U (en) A kind of rain water drainage system
CN207760989U (en) A kind of pump discharges into water system
CN207944527U (en) Rain water collecting system
CN201850643U (en) Closure deep well self-siphon hydraulic dredging device
CN205435076U (en) A three check sedimentation tanks for building site
CN106925000A (en) A kind of three lattice sedimentation basins for building site
CN108625461A (en) A kind of shutoff type shunting well on combined sewerage system
CN103967107B (en) Be suitable for the preliminary-stage rainwater flow-discarding well building rainwater utilization
CN203989972U (en) A kind of integrated setting pot of processing rainwater
CN207959470U (en) A kind of system including storage pond and online processing pond
CN207769375U (en) A kind of sewage catchment promotion integrated apparatus
CN205586623U (en) Rainwater silt basin device
CN206428911U (en) Mechanical float ball flow abandoning apparatus, rain water collecting system and roofing cooling structure
CN206090797U (en) Integration vatch basin
CN205935164U (en) A hydrocone type drainage filter equipment for urban road
KR101588201B1 (en) Rainwater utilization system
CN101892705B (en) Intercepting deep well self-siphoning hydraulic desilting device
CN209686557U (en) A kind of Vatch basin with debris retaining function
CN209241038U (en) A kind of construction site Simple vehicle-cleaning pond
CN209144648U (en) A kind of bridge drainage collection system
CN207712022U (en) Vehicle rinsing stage apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination